CN108288146A - Trend of work supervisory methods and storage medium - Google Patents
Trend of work supervisory methods and storage medium Download PDFInfo
- Publication number
- CN108288146A CN108288146A CN201711453919.6A CN201711453919A CN108288146A CN 108288146 A CN108288146 A CN 108288146A CN 201711453919 A CN201711453919 A CN 201711453919A CN 108288146 A CN108288146 A CN 108288146A
- Authority
- CN
- China
- Prior art keywords
- rectification
- notice
- scrutineer
- trend
- work
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Engineering & Computer Science (AREA)
- Entrepreneurship & Innovation (AREA)
- Operations Research (AREA)
- Economics (AREA)
- Marketing (AREA)
- Data Mining & Analysis (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses trend of work supervisory methods and storage medium, the method includes:S10, scrutineer pinpoint the problems, and create rectification notice.S20, group responsible person examine after being connected to.After S30, rectification responsible party are connected to " rectification notice ", " rectification is replied " is carried out, submits rectification result.S40, scrutineer carry out rectification result to implement rectification situation inspection, i.e. " rectification check ", and group responsible person is submitted to after check is qualified.S50, group responsible person finally check all processes, and confirmation, which reaches after rectification requires, carries out " problem pin item ".In the present invention, as long as any related side is opened all trend of works of permission real time inspection and can be linked up efficiently intuitive with feedback opinion.Whole flow work all realize that the ends PC can also correspond to respective unique account and log in use by the present invention on a platform.All real-time high in the clouds storages of data, can trace, can check, irreversible.Related data can also download printing when needing.
Description
Technical field
The present invention relates to Building technology and related management field more particularly to a kind of trend of work supervisory methods and deposit
Storage media.
Background technology
The work of modern society, all trades and professions is interweaved together, especially the cybertimes of advanced IT application.
Any any member of tissue, which works, to be required for by the inspection of other members, criticism, suggestion, feedback etc., is then carried out whole
, rectification implement work, finally by check, check and accept etc. links, this item work just calculate completion.In turn, any tissue
An instruction can be directly initiated, the work such as then checked, supervised.
In actual working state, for scrutineer in particular exam work, pinpointing the problems cannot be anti-in time at the first time
Feed checked people, and problem cannot be rectified and improved in time, perhaps can lead to ill effect, generates harmful effect.As a same reason, whole
Changing result cannot submit in time, and rectification effect is caused to be had a greatly reduced quality.If there is serious consequence, it is unclear to will also result in responsibility, calls to account
It is inconvenient.Feedback result is mostly that cannot be showed with modernizing multimedia mode in the form of paper document, be not easy to preserve simultaneously.It relates to
And it is not easy to transmit to paper document when signature.Even if using electronic document, can not effectively be carried out on file or drawing bright
Really mark causes instruction statement not clear enough.In addition, all participants or related side cannot interact on a platform,
Problem and rectification situation cannot be understood in time.
Invention content
It is an object of the present invention to provide a kind of trend of work supervisory methods, solve at least above-mentioned technical problem it
One.
It is realized by program in view of the present invention, therefore, the present invention also provides a kind of storage mediums, especially computer
Readable storage medium storing program for executing.
The present invention solves technical problem and adopts the following technical scheme that:A kind of trend of work supervisory methods comprising:
When S10, scrutineer pinpoint the problems or carry out work communication, rectification notice is created, is arranged in rectification notice
It is bright to pinpoint the problems and rectify and improve requirement, it chooses rectification responsible party and the side of making a copy for, the group responsible person of being then forwarded to is needed to examine
It looks into;
S20, when group responsible person think rectification notice content it is imperfect when, by the rectification notice be back to scrutineer weight
New edited, and after the completion of scrutineer changes, resubmit to group responsible person and examine, and execute step S20;When described small
Group responsible person think the rectification notice content it is necessary to rectify and improve when, then by the rectification notice be sent to rectification responsible party and
The side of making a copy for is needed, and executes step S30;When group responsible person thinks that the content of rectification notice need not be rectified and improved, knot
The beam trend of work supervisory methods;
After S30, rectification responsible party receive rectification notice, rectified and improved one by one for rectifying and improving the problem of enumerated in notice, and create
Build rectification reply sheet;After the completion of rectifying and improving reply sheet, scrutineer is submitted to;
After S40, scrutineer receive the rectification reply sheet transmitted by rectification responsible party, what is enumerated in being notified according to rectification asks
Topic is checked one by one;It, should if rectification responsible party rectifies and improves qualification to the upper cited problem of rectification notice after check
Rectification reply sheet is committed to group responsible person, and executes step S50;When rectification responsible party is to the upper cited problem of rectification notice
When rectifying and improving unqualified, which is returned into rectification responsible party, and after rectification responsible party rectifies and improves again, retransmit inspection
People checks, and executes step S40;
S50, group responsible person finally check all processes, after confirmation reaches rectification requirement, power cut-off dynamic
Supervisory methods, and rectification reply sheet is preserved on the server;
S60, all notification sheets are according to attribute status programming count list, for consulting at any time.
Optionally, in the step S10, in rectification notice, pdf document can be called, mark is asked on it
Photo is directly added in topic, position, written instructions;In the step S30, rectification responsible party can directly put out pdf document, check
Problem, position, written instructions and photo details, and rectified and improved or replied;In the rectification reply sheet, including photo or from PC
Hold the file uploaded.
Optionally, in the step S50, after group responsible person judges not meeting all rectification requirements and flow, lead to
It crosses and shares with scrutineer or linked up with rectification responsible party, or the rectification reply sheet is sent to and rectifies and improves responsible party, and
After rectification responsible party rectifies and improves and changes rectification reply sheet again, which is sent to scrutineer, and hold
Row step S40.
Optionally, when needing scrutineer, group responsible person or rectification responsible party's signature, this is directly realized by by mobile phone
People signs.
Optionally, it in above steps, can be linked up by sharing button realization and other accredited personnel.
The present invention solves technical problem and also adopts the following technical scheme that:A kind of storage medium, has program stored therein, the journey
Sequence is for executing above-mentioned method.
The present invention has the advantages that:The trend of work supervisory methods of the present invention, each side can use and move
Moved end participates in cooperation, as reviewing party, using this method can upload there are the problem of, for attached drawing situation, can also carry out
Clearly drawings marked, and the situation of check rectification in time handle this problem into marketing item;For being examined side, it can also this
Method understands the problem and hidden danger in the work of oneself at the first time, and does rectification in time, submits check in time.
Description of the drawings
Fig. 1 is the flow chart of the trend of work supervisory methods of the present invention;
The device structure schematic diagram of the methods of Fig. 2 to realize the present invention;
Specific implementation mode
Technical scheme of the present invention is further elaborated with reference to embodiment and attached drawing.
Embodiment 1
Present embodiments provide a kind of trend of work supervisory methods comprising following steps:
When S10, scrutineer pinpoint the problems or carry out work and link up, rectification notice is created, lists and pinpoints the problems and whole
Change requirement, select the clear labeling position of PDF construction drawings and brief problem explanation, chooses rectification responsible party and need to make a copy for
Side, is then forwarded to group responsible person.
In the present embodiment, the trend of work supervisory methods is executed based on software, in the software, may include
Submodules such as " task executions ", " rectification notice ", " rectification is replied ", " rectification check " and " problem pin item ".
In the trend of work supervisory methods for carrying out the present embodiment, held by task in scrutineer (group member)
Row module executes task, and when pinpointing the problems or carry out work and linking up, and into " rectification notice " module, creates rectification and leads to
Know, and is listed in rectification notifies and pinpoint the problems and rectify and improve requirement.For example, by taking construction site as an example, as electrical supervising engineer
(scrutineer) has found that unit in charge of construction's conduit installation is undesirable, based on the tight of the problem in the work of daily walkaround inspection
Weight degree, it is believed that be general considerations;Then " work contact list " (rectification notifies) is created by mobile phone mobile terminal, and scene is taken pictures
As attachment, construction drawing can also be mounted, directly carries out problem mark and brief description, is then uploaded at the ends PC and carries out correlation
Installation specification requirement.
After creating rectification notice, chooses rectification responsible party and need the side of making a copy for, be then forwarded to group responsible person, and
It is audited by group responsible person, in the present embodiment, such as selection unit in charge of construction (Shenyang Singapore dollar construction group Co., Ltd) makees
To rectify and improve unit, while this contact can be singly made a copy for and give Construction Party's (Guo Ce groups Beijing Company national geographic information project
Portion) or other unit (Zhong Tie equipment installation company), it carries out submitting to chief supervision engineer (group responsible person) examination after the completion.
S20, group responsible person examine after being connected to, and rectification notice is sent out if passing, otherwise retracts inspection
People is looked into modify.
For example, chief supervision engineer audits after receiving " work contact list " that electrical supervising engineer sends, when whole
The content for changing notice is imperfect, can return to electrical supervising engineer and update, and when electrical supervising engineer has changed
Bi Hou is sent to chief supervision engineer and audits again;Or the content of rectification notice terminates when need not be rectified and improved
The trend of work supervisory methods;When the chief supervision engineer think the rectification notice content it is necessary to rectify and improve
When, then should " work contact list " be then sent to unit in charge of construction.
After S30, rectification responsible party are connected to " rectification notice ", " rectification is replied " is carried out, submits rectification result.
For example, after unit in charge of construction's (rectification responsible party) receives " work contact list ", point, which is opened construction drawing and can be checked, to be waited for
Rectification problem is rectified and improved for rectifying and improving the problem of enumerated in notice, and creates rectification reply sheet one by one, can also be in drawings marked
Attachment is rectified and improved, and in the rectification reply sheet, can enclose photo, or from transmitting file on the ends PC as reply attachment;
After the completion of rectifying and improving reply sheet, electrical supervising engineer is submitted to.
S40, scrutineer carry out rectification result to implement rectification situation inspection, i.e. " rectification check ", are submitted after check is qualified
Give group responsible person.
After electrical supervising engineer receives the rectification reply sheet transmitted by unit in charge of construction, enumerated problem is checked one by one,
After check, if unit in charge of construction rectifies and improves qualification to the upper cited problem of rectification notice, which is carried
It hands over to chief supervision engineer, depending on problem severity matter, scrutineer (electrical supervising engineer) can also be according to permission, oneself is carried out
Problem pin item;When unit in charge of construction (rectification responsible party) cited problem rectification upper to rectification notice is unqualified, by the rectification
Reply sheet returns to unit in charge of construction, and after unit in charge of construction rectifies and improves again, retransmits scrutineer's inspection.
S50, group responsible person finally check all processes, and confirmation, which reaches after rectification requires, carries out " problem pin
".
After chief supervision engineer receives electrical supervising engineer's review result, judgement meets all rectification requirement and flow
Afterwards, " pin item " is clicked into marketing item processing;After judging not meeting all rectification requirements and flow, which is sent
To unit in charge of construction, sharing function can also be used, supervises further carry out problem rectification, and rectify and improve and repair again in unit in charge of construction
After changing rectification reply sheet, which is sent to scrutineer, and execute step S40.
S60, all notification sheets are according to attribute status programming count list, for consulting at any time.
Having had part Internet company gradually to start research and development currently on the market, simultaneously local pilot uses similar management software,
But majority still rests on traditional OA office theories, and the quick transmission for not adapting to information is shared.And due to insufficiency, no
Energy realization is multidisciplinary to be interacted at many levels.In addition, process data majority is all stored in local server, it is easily lost.
That is, the prior art is primarily present problems with:(1) multidisciplinary and multi-level personnel are can not achieve mutually to hand over
Mutually.(2) it cannot integrate and effectively use multimedia form transmission data, problem cannot effectively be marked.(3) it can not achieve and disappear
Cease real time push.(4) ends PC are can not achieve to use simultaneously with mobile terminal unified account number.(5) the problem of finding and rectification situation are not
Energy real-time tracking, problem pin item is not in time.(6) data preservation is easily lost.
In the present invention, as long as any related side opens all trend of works of permission real time inspection and can feed back
Opinion is linked up efficiently intuitive.Whole flow work all realize that the ends PC can also correspond to uniquely by the present invention on a platform
Account, which logs in, to be used.All real-time high in the clouds storages of data, can trace, can check, irreversible.When needing related data can also under
Carry printing.
So that in the present invention, above-mentioned steps are all completed in mobile phone mobile terminal and the ends PC, when need not upload attachment
Shi Shouji is done directly.Any accredited personnel in the realization of " sharing " button and system can be clicked in each process to link up.
The formal table sample that " preview " button checks generation can be clicked, my signature work(can be directly realized by by mobile phone in table sample
Energy.Whole flow datas are stored in high in the clouds in real time, can download printing at any time.
Embodiment 2
Fig. 2 is the device structure schematic diagram for showing to realize the method for the embodiment of the present application 1, and the application specific embodiment is not
The specific implementation of equipment 400 is limited.As shown in Fig. 2, the equipment 400 may include:
Processor (processor) 410, communication interface (Communications Interface) 420, storage medium
(memory) 430 and communication bus 440.Wherein:
Processor 410, communication interface 420 and storage medium 430 complete mutual communication by communication bus 440.
Communication interface 420, for being communicated with the network element of such as client etc..
Processor 410 can specifically execute the correlation step in above method embodiment for executing program 432.
Specifically, program 432 may include program code, and said program code includes computer-managed instruction.
Processor 410 may be a central processor CPU or specific integrated circuit ASIC (Application
Specific Integrated Circuit), or be arranged to implement the integrated electricity of one or more of the embodiment of the present application
Road.
Storage medium 430, especially computer-readable storage medium, for storing program 432.Storage medium 430
May include high-speed RAM storage medium, it is also possible to further include non-volatile memory medium (non-volatile memory), example
Such as at least one magnetic disk storage medium.Program 432 specifically can be used for so that the equipment 400 executes following operation:
When S10, scrutineer pinpoint the problems or carry out work communication, rectification notice is created, is arranged in rectification notice
It is bright to pinpoint the problems and rectify and improve requirement (or carrying out drawings marked and explanation), it chooses rectification responsible party and needs the side of making a copy for, then
The group responsible person of submitting to examines;S20, when group responsible person think rectification notice content it is imperfect when, by the rectification
Notice is back to scrutineer and updates, and after the completion of scrutineer changes, and resubmits to group responsible person and examines, and holds
Row step S20;When the group responsible person thinks the content of rectification notice it is necessary to rectify and improve, then the rectification is notified
It is sent to rectification responsible party and needs the side of making a copy for, and execute step S30;When group responsible person thinks the content of rectification notice not
When being rectified and improved, terminate the trend of work supervisory methods;After S30, rectification responsible party receive rectification notice, for whole
Change the problem of enumerated in notice rectifies and improves one by one, or puts and open and directly rectified and improved at drawings marked problem, and creates rectification reply sheet;When
After the completion of rectifying and improving reply sheet, scrutineer is submitted to;After S40, scrutineer receive the rectification reply sheet transmitted by rectification responsible party, root
The problem of enumerated in being notified according to rectification, checks one by one;After check, if rectification responsible party is upper to rectification notice cited
The problem of rectify and improve qualification, then the rectification reply sheet is committed to group responsible person, can also regard problem severity oneself sell item.
And execute step S50;When rectification responsible party rectifies and improves unqualified to the upper cited problem of rectification notice, by the rectification reply sheet
Rectification responsible party is returned to, or button is shared in use, is linked up with related side, carry out problem is further rectified and improved.And in rectification responsibility
After Fang Zaici rectifications, scrutineer's inspection is retransmited, and execute step S40;S50, group responsible person carry out all processes final
Review, after confirmation reaches rectification requirement, power cut-off dynamic supervisory management method, and rectification reply sheet is stored in server
On.
The specific implementation of each step may refer to corresponding description in the corresponding steps in above-described embodiment 1 in program 432,
This will not be repeated here.
The sequencing of above example is only for ease of description, can not represent the quality of embodiment.
Finally it should be noted that:The above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although
Present invention has been described in detail with reference to the aforementioned embodiments, it will be understood by those of ordinary skill in the art that:It still may be used
With technical scheme described in the above embodiments is modified or equivalent replacement of some of the technical features;
And these modifications or replacements, various embodiments of the present invention technical solution that it does not separate the essence of the corresponding technical solution spirit and
Range.
Claims (6)
1. a kind of trend of work supervisory methods, which is characterized in that including:
When S10, scrutineer pinpoint the problems or carry out work communication, rectification notice is created, hair is listed in rectification notice
Existing problem and rectification require, and choose rectification responsible party and the side of making a copy for, the group responsible person of being then forwarded to is needed to examine;
S20, when group responsible person thinks that the content of rectification notice is imperfect, rectification notice is back to scrutineer and compiles again
Volume, and after the completion of scrutineer changes, resubmit to group responsible person and examine, and execute step S20;When the group is negative
When duty people thinks the content of rectification notice it is necessary to rectify and improve, then rectification notice is sent to rectification responsible party and needs
The side of making a copy for, and execute step S30;When group responsible person thinks that the content of rectification notice need not be rectified and improved, terminate this
Trend of work supervisory methods;
After S30, rectification responsible party receive rectification notice, rectified and improved one by one for rectifying and improving the problem of enumerated in notice, and create whole
Change reply sheet;After the completion of rectifying and improving reply sheet, scrutineer is submitted to;
S40, scrutineer receive rectification responsible party transmitted by rectification reply sheet after, according to rectification notify in it is enumerated the problem of by
One check;After check, if rectification responsible party rectifies and improves qualification to the upper cited problem of rectification notice, by the rectification
Reply sheet is committed to group responsible person, and executes step S50;When rectification responsible party rectifies and improves the upper cited problem of rectification notice
When unqualified, which is returned into rectification responsible party, and after rectification responsible party rectifies and improves again, retransmit scrutineer's inspection
It looks into, and executes step S40;
S50, group responsible person finally check all processes, after confirmation reaches rectification requirement, power cut-off dynamic supervisory
Management method, and rectification reply sheet is preserved on the server;
S60, all notification sheets are according to attribute status programming count list, for consulting at any time.
2. trend of work supervisory methods according to claim 1, which is characterized in that in the step S10, in institute
It states in rectification notice, pdf document can be called, mark problem, position, written instructions on it or directly add photo;In step S30
In, rectification responsible party can directly put out pdf document, check problem, position, written instructions and photo details, and rectified and improved or returned
It is multiple;In the rectification reply sheet, including photo or the file from the upload of the ends PC.
3. trend of work supervisory methods according to claim 2, which is characterized in that in the step S50, when small
After group responsible person judges not meeting all rectification requirements and flow, by sharing with scrutineer or carrying out ditch with rectification responsible party
It is logical, or the rectification reply sheet is sent to rectification responsible party, and rectified and improved again in rectification responsible party and change rectification reply sheet
Afterwards, which is sent to scrutineer, and executes step S40.
4. trend of work supervisory methods according to claim 3, which is characterized in that born when needing scrutineer, group
When blaming people or rectification responsible party's signature, I is directly realized by by mobile phone and is signed.
5. trend of work supervisory methods according to claim 4, which is characterized in that, can in above steps
It is linked up by sharing button realization and other accredited personnel, real-time oversight work progress and work quality.
6. a kind of storage medium, has program stored therein, described program requires the method described in 1-5 for perform claim.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711453919.6A CN108288146A (en) | 2017-12-28 | 2017-12-28 | Trend of work supervisory methods and storage medium |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711453919.6A CN108288146A (en) | 2017-12-28 | 2017-12-28 | Trend of work supervisory methods and storage medium |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108288146A true CN108288146A (en) | 2018-07-17 |
Family
ID=62832304
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711453919.6A Pending CN108288146A (en) | 2017-12-28 | 2017-12-28 | Trend of work supervisory methods and storage medium |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108288146A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109583771A (en) * | 2018-12-04 | 2019-04-05 | 北京诺士诚国际工程项目管理有限公司 | A kind of engineering supervisor method and device |
CN110334954A (en) * | 2019-07-08 | 2019-10-15 | 江苏易用科技有限公司 | Building engineering construction site safety Quality Information System |
CN111222775A (en) * | 2019-12-31 | 2020-06-02 | 嘉兴太美医疗科技有限公司 | Problem management method, system and computer readable medium |
CN112116174A (en) * | 2019-06-19 | 2020-12-22 | 中国石油化工股份有限公司 | Enterprise safety responsibility management method |
CN112508345A (en) * | 2020-11-12 | 2021-03-16 | 聚通智用(重庆)信息科技有限公司 | Rectification work management system and method |
CN113780816A (en) * | 2021-09-13 | 2021-12-10 | 青岛海尔工业智能研究院有限公司 | Intelligent control method and device for quality detection, terminal equipment and storage medium |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20140005446A (en) * | 2012-07-04 | 2014-01-15 | 현대중공업 주식회사 | System for managing a dangerousness work permission of the drillship using a mobile device |
CN104599045A (en) * | 2014-12-30 | 2015-05-06 | 东莞市亚欧装饰设计工程有限公司 | Project real scene acceptance inspection method |
CN104700179A (en) * | 2013-12-06 | 2015-06-10 | 大连灵动科技发展有限公司 | Method for managing hazards and risks on basis of geographic information of enterprises |
CN105069566A (en) * | 2015-08-04 | 2015-11-18 | 国网上海市电力公司 | Power transmission and transformation project safety and quality inspection and management equipment |
CN106169131A (en) * | 2016-05-16 | 2016-11-30 | 北京诺士诚国际工程项目管理有限公司 | Project management cloud platform system based on the Internet |
CN106779380A (en) * | 2016-12-06 | 2017-05-31 | 山西省交通科学研究院 | A kind of intelligent construction safety checks evaluation system and method |
-
2017
- 2017-12-28 CN CN201711453919.6A patent/CN108288146A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20140005446A (en) * | 2012-07-04 | 2014-01-15 | 현대중공업 주식회사 | System for managing a dangerousness work permission of the drillship using a mobile device |
CN104700179A (en) * | 2013-12-06 | 2015-06-10 | 大连灵动科技发展有限公司 | Method for managing hazards and risks on basis of geographic information of enterprises |
CN104599045A (en) * | 2014-12-30 | 2015-05-06 | 东莞市亚欧装饰设计工程有限公司 | Project real scene acceptance inspection method |
CN105069566A (en) * | 2015-08-04 | 2015-11-18 | 国网上海市电力公司 | Power transmission and transformation project safety and quality inspection and management equipment |
CN106169131A (en) * | 2016-05-16 | 2016-11-30 | 北京诺士诚国际工程项目管理有限公司 | Project management cloud platform system based on the Internet |
CN106779380A (en) * | 2016-12-06 | 2017-05-31 | 山西省交通科学研究院 | A kind of intelligent construction safety checks evaluation system and method |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109583771A (en) * | 2018-12-04 | 2019-04-05 | 北京诺士诚国际工程项目管理有限公司 | A kind of engineering supervisor method and device |
CN112116174A (en) * | 2019-06-19 | 2020-12-22 | 中国石油化工股份有限公司 | Enterprise safety responsibility management method |
CN110334954A (en) * | 2019-07-08 | 2019-10-15 | 江苏易用科技有限公司 | Building engineering construction site safety Quality Information System |
CN111222775A (en) * | 2019-12-31 | 2020-06-02 | 嘉兴太美医疗科技有限公司 | Problem management method, system and computer readable medium |
CN112508345A (en) * | 2020-11-12 | 2021-03-16 | 聚通智用(重庆)信息科技有限公司 | Rectification work management system and method |
CN112508345B (en) * | 2020-11-12 | 2022-04-22 | 聚通智用(重庆)信息科技有限公司 | Management system and method for work checking and correcting |
CN113780816A (en) * | 2021-09-13 | 2021-12-10 | 青岛海尔工业智能研究院有限公司 | Intelligent control method and device for quality detection, terminal equipment and storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108288146A (en) | Trend of work supervisory methods and storage medium | |
US10193845B2 (en) | Predictive electronic message management systems and controllers | |
CN110210708A (en) | The management method that barcode scanning based on mobile terminal is reported for repairment | |
CN110414908A (en) | Project examination method, air control approval system and medium based on air control approval system | |
CN103942654A (en) | Electric power engineering quality supervision and management platform | |
CN102496088A (en) | Method for improving executive force of power communication overhaul core flow | |
CN106096872A (en) | A kind of factory's substandard product report processing system and method | |
Kusumah et al. | Model design of information security governance assessment with collaborative integration of COBIT 5 and ITIL (case study: INTRAC) | |
Nita Ali et al. | Improving the business process of reactive maintenance projects | |
Hicks | The language of collaborative engineering projects | |
CN111242643B (en) | Real-time updating system for manufacturing service information of miniature annular part | |
Gong et al. | UML presentation of a conceptual green design control system to react to environmental requirements | |
CN109886528A (en) | A method of management control is executed for manufacturing | |
CN109683860A (en) | A kind of computer software project management platform, equipment and readable storage medium storing program for executing | |
US20150127402A1 (en) | Method and system for structuring information background of the invention | |
CN106980950B (en) | Material supply management method and system based on mobile social contact | |
Chang et al. | A blockchain based industrial internet of things enterprise supervision method | |
CN105450773A (en) | Navigation visual display system | |
Lei et al. | Smart management system of employment in universities based on big data collection and intelligent analysis | |
Peng et al. | Automatic service composition verification based on pi-calculus | |
CN109102178A (en) | A kind of electric power enterprise Valuation Method, device and equipment | |
Wang et al. | Fourth party logistics service quality management with logistics audit. | |
Zhu et al. | Group Decision Model of Intelligent Traffic Integrated Information Platform Based on Multi-Agent Technique | |
Li et al. | Application of Equipment Quality Management in Fulfillment Tasks Based on Alliance Blockchain Intelligent Contract Technology | |
Gao | Design And Implementation of Construction Project Management System Based on Web Technology |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180717 |
|
RJ01 | Rejection of invention patent application after publication |