CN112116174A - Enterprise safety responsibility management method - Google Patents
Enterprise safety responsibility management method Download PDFInfo
- Publication number
- CN112116174A CN112116174A CN201910529037.6A CN201910529037A CN112116174A CN 112116174 A CN112116174 A CN 112116174A CN 201910529037 A CN201910529037 A CN 201910529037A CN 112116174 A CN112116174 A CN 112116174A
- Authority
- CN
- China
- Prior art keywords
- responsibility
- list
- primary
- management method
- items
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0635—Risk analysis of enterprise or organisation activities
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Economics (AREA)
- Tourism & Hospitality (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Game Theory and Decision Science (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Data Mining & Analysis (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses an enterprise safety responsibility management method, and relates to the field of petrochemical enterprise safety production management. The invention mainly aims at the problems that the petrochemical enterprise is difficult to implement and supervise the safety production responsibility and the safety measures are not practical. The invention provides an enterprise safety responsibility management method, which decomposes safety production responsibility into executable and recordable data flows so as to register execution and evaluation results into an information system and promote implementation of safety production responsibility.
Description
Technical Field
The invention relates to the field of petrochemical enterprise safety production management, in particular to an enterprise safety responsibility management method.
Background
In recent years, serious accidents in the field of domestic safety production frequently occur, and analysis shows that the failure of safety production responsibility is the main reason of accidents. Law laws and regulations such as the safety production law of the people's republic of China in the new edition clearly require production enterprises to make a whole-person safety production responsibility system. Although most enterprises set a post safety production responsibility system, the problems of not-in-place implementation, not-strict supervision and the like exist. At present, the responsibility system of the post safety production is defined in a mode of the post safety responsibility, and a responsibility book is signed, so that the responsibility system is difficult to be executed by a computer. Therefore, the execution of the current safety responsibility is difficult to track and quantify, and the supervision is fuzzy, so that the enterprise accidents are frequent.
Disclosure of Invention
The invention aims to provide an enterprise safety responsibility management method, which realizes safety production responsibility and improves the enterprise safety level.
In order to achieve the purpose, the invention adopts the technical scheme that:
an enterprise safety responsibility management method is used for digitalized and informationized management of an enterprise by establishing responsibility lists of all posts of the enterprise, setting a unique ID for a responsibility item in each responsibility list and registering the ID of the post and a working procedure in a block chain.
Preferably, the management method is used for block chain management of enterprise security responsibility, and the block chain management mode aiming at the enterprise security responsibility is established to realize the block management of the enterprise security responsibility.
Preferably, the block chain management mode includes a primary responsibility node type management method, a secondary responsibility information type management method, and a block information type management method.
Preferably, the primary responsibility node type management method includes the following steps:
step 41, establishing a primary responsibility list for each post;
step 42, recording the main body responsibility items of the posts and the corresponding IDs in the primary responsibility list;
and 43, establishing evaluation rules respectively aiming at the primary responsibility list of each node, and connecting the evaluation rules with an information system, wherein the information system is used for sending out a prompt.
Preferably, the secondary responsibility information type management method comprises the following steps:
step 51, establishing a primary responsibility list and a secondary responsibility list for each post;
step 52, for the primary responsibility list, recording the main responsibility items of the posts and the corresponding IDs in the primary responsibility list;
step 53, recording responsibility items related to the responsibility items in the primary responsibility list and corresponding IDs in the secondary responsibility list;
and step 54, establishing evaluation rules respectively aiming at the primary responsibility list and the secondary responsibility list of each node, wherein the evaluation rules in the primary responsibility list and the secondary responsibility list are connected with an information system, and the information system is used for reminding corresponding information in the primary responsibility list and the secondary responsibility list.
Preferably, the block information type management method includes the steps of:
step 61, establishing a primary responsibility list and a secondary responsibility list for each post, namely each node, and associating the primary responsibility list and the secondary responsibility list;
step 62, recording the main body responsibility items of the posts and the corresponding IDs in the primary responsibility list;
step 63, recording responsibility items related to the responsibility items in the primary responsibility list and corresponding IDs in the secondary responsibility list;
step 64, establishing an evaluation rule respectively aiming at the primary responsibility list of each node, wherein the evaluation rule of the primary responsibility list is connected with an information system, and the information system can be used for reminding;
and step 65, synchronously sending out the latest block of each node in real time aiming at each node, and if the latest block contains the ID of the post responsibility item, sending out a prompt by the ID of the post responsibility item through an information system.
Preferably, the subject responsibility items include a subject responsibility item for supervising a previous post of the present post and a subject responsibility item for a next post.
Preferably, the work schedule of the subject responsibility project includes a time requirement to complete the project and a project record requirement.
Preferably, the responsibility item content related to the responsibility items in the primary responsibility list in the secondary responsibility list includes a primary responsibility item start time reminder, a primary item work progress time reminder, and a primary item expiration time reminder.
Preferably, when the task blocks of the primary responsibility list and the secondary responsibility list are established, a primary responsibility score table corresponding to the primary responsibility list and a secondary responsibility score table corresponding to the secondary responsibility list are established.
Preferably, the information to be recorded in the primary responsibility score table includes a primary responsibility block node, a primary responsibility time, a primary responsibility item and a primary responsibility score.
Preferably, the information to be recorded in the secondary responsibility score table includes secondary responsibility block-out nodes, secondary responsibility time, responsibility items of the secondary responsibility and scores of the secondary responsibility.
Preferably, in each block for establishing the primary responsibility list and the secondary responsibility list, the relevant information of the block needs to be recorded into a responsibility score table, and after the recording of the responsibility scores is completed, the scores of a plurality of responsibility items are read through the responsibility score table, and the scores of the responsibility items are summarized.
Preferably, the post worker in the latest block in step 65 processes the task according to the work rules of the responsibility item to generate a task processing data packet, and the node evaluates the produced task processing data packet according to the evaluation rule of the primary responsibility list, evaluates the completion degree of the item, and broadcasts the evaluation result.
The invention has the beneficial effects that:
the invention aims to provide an enterprise safety responsibility management method, which decomposes safety production responsibility into executable and recordable data flows so as to register execution and evaluation results into an information system and promote implementation of the safety production responsibility. The method mainly aims at the problems that the petrochemical enterprise safety production responsibility is difficult to implement and monitor and the safety measures cannot be implemented effectively, and has important significance for implementing the safety production responsibility and improving the safety level of the enterprise.
Drawings
In order to clearly illustrate the embodiments or technical solutions of the present invention in the prior art, the drawings used in the description of the embodiments or prior art will be briefly introduced below, and it is obvious that the drawings in the following description are some embodiments of the present invention, and it is obvious for those skilled in the art that other drawings can be obtained based on these drawings without creative efforts.
FIG. 1 is a block diagram of a process for petrochemical enterprise security responsibility management.
FIG. 2 is a block diagram of a process for managing enterprise emergency security responsibilities.
Fig. 3 is a block diagram of a safe production emergency plan drilling process.
Fig. 4 is a block diagram of an emergency rescue protocol drilling process.
Fig. 5 is a block diagram of an enterprise emergency drilling responsibility safety process.
Detailed Description
The invention is described in detail below with reference to the accompanying drawings:
an enterprise safety responsibility management method is used for digitalized and informationized management of an enterprise by establishing responsibility lists of all posts of the enterprise, setting a unique ID for a responsibility item in each responsibility list and registering the ID of the post and a working procedure in a block chain.
The management method is used for block chain management of enterprise safety responsibility, and block management of the enterprise safety responsibility is realized by establishing a block chain management mode aiming at the enterprise safety responsibility.
The block chain management mode comprises a primary responsibility node type management method, a secondary responsibility information type management method and a block information type management method.
The primary responsibility node type management method comprises the following steps:
step 41, establishing a primary responsibility list for each post;
step 42, recording the main body responsibility items of the posts and the corresponding IDs in the primary responsibility list;
and 43, establishing evaluation rules respectively aiming at the primary responsibility list of each node, and connecting the evaluation rules with an information system, wherein the information system is used for sending out a prompt.
The secondary responsibility information type management method comprises the following steps:
step 51, establishing a primary responsibility list and a secondary responsibility list for each post;
step 52, for the primary responsibility list, recording the main responsibility items of the posts and the corresponding IDs in the primary responsibility list;
step 53, recording responsibility items related to the responsibility items in the primary responsibility list and corresponding IDs in the secondary responsibility list;
and step 54, establishing evaluation rules respectively aiming at the primary responsibility list and the secondary responsibility list of each node, wherein the evaluation rules in the primary responsibility list and the secondary responsibility list are connected with an information system, and the information system is used for reminding corresponding information in the primary responsibility list and the secondary responsibility list.
The block information type management method comprises the following steps:
step 61, establishing a primary responsibility list and a secondary responsibility list for each post, namely each node, and associating the primary responsibility list and the secondary responsibility list;
step 62, recording the main body responsibility items of the posts and the corresponding IDs in the primary responsibility list;
step 63, recording responsibility items related to the responsibility items in the primary responsibility list and corresponding IDs in the secondary responsibility list;
step 64, establishing an evaluation rule respectively aiming at the primary responsibility list of each node, wherein the evaluation rule of the primary responsibility list is connected with an information system, and the information system can be used for reminding;
and step 65, synchronously sending out the latest block of each node in real time aiming at each node, and if the latest block contains the ID of the post responsibility item, sending out a prompt by the ID of the post responsibility item through an information system.
The main body responsibility items comprise main body responsibility items for supervising the upper-level position of the position and main body responsibility items for the lower-level position.
The work schedule for the subject responsibility project includes the time requirements to complete the project and the project record requirements.
The responsibility item content related to the responsibility items in the primary responsibility list in the secondary responsibility list comprises a primary responsibility item starting time prompt, a primary item work progress time prompt and a primary item expiration time prompt.
When the task blocks of the primary responsibility list and the secondary responsibility list are established, a primary responsibility score table corresponding to the primary responsibility list and a secondary responsibility score table corresponding to the secondary responsibility list are established.
The information needing to be recorded in the primary responsibility score table comprises primary responsibility block-out nodes, primary responsibility time, responsibility items of the primary responsibility and scores of the primary responsibility.
The information to be recorded in the secondary responsibility score table comprises secondary responsibility block-out nodes, secondary responsibility time, responsibility items of the secondary responsibility and scores of the secondary responsibility.
In each block for establishing the primary responsibility list and the secondary responsibility list, the related information of the block needs to be input into a responsibility score table, and after the responsibility score is recorded, the scores of a plurality of responsibility items are read through the responsibility score table, and the scores of the responsibility items are summarized.
And (6) processing the task by the post worker of the latest block in the step 65 according to the work rule of the responsibility item to generate a task processing data packet, and meanwhile, evaluating the produced task processing data packet by the node according to the evaluation rule of the primary responsibility list to evaluate the completion degree of the item and broadcasting.
Example 1
With reference to fig. 1, a petrochemical enterprise security responsibility management method specifically includes the following steps:
step a, establishing a petrochemical enterprise responsibility list 100, and establishing a petrochemical enterprise level responsibility list and a petrochemical enterprise level responsibility list aiming at each post, namely each node. The contents of the petrochemical enterprise primary responsibility list comprise petrochemical enterprise project monitoring.
Step b, establishing a main body responsibility item and an ID200 in a primary responsibility list of the petrochemical enterprise, namely recording the main body responsibility item of the post and the corresponding ID in the primary responsibility list for the primary responsibility list;
step c, establishing related responsibility items and IDs 300 in a petrochemical enterprise secondary list, namely recording the responsibility items related to the responsibility items in the primary responsibility list and the corresponding IDs in the secondary responsibility list;
step d, establishing petrochemical enterprise responsibility list evaluation rules 400, namely establishing evaluation rules respectively aiming at the primary responsibility list of each node, and connecting the evaluation rules with an information system, wherein the information system can be used for reminding;
step e, synchronizing the information 500 of each node of the petrochemical enterprise responsibility list in real time, namely synchronizing the latest block of each node in real time aiming at each node, and if the latest block contains the ID of the post responsibility item, sending a prompt through an information system;
the main body responsibility items comprise main body responsibility items for supervising the upper-level position of the position and main body responsibility items for the lower-level position.
The work schedule for the responsible project includes the time requirements to complete the project and project record requirements.
When the task blocks of the primary responsibility list and the secondary responsibility list are established, a corresponding responsibility score table is established, and block nodes, time, responsibility items and scores are recorded.
In each block of the primary responsibility list and the secondary responsibility list, relevant information of the block is input into a responsibility score table, scores of a plurality of responsibility items are read through the responsibility score table, and scores of the responsibility items are summarized.
And the post workers in the latest block process the task according to the working procedures of the responsibility items to generate a task processing data packet, and meanwhile, the node evaluates the produced task processing data packet according to the evaluation rule of the primary responsibility list to evaluate the completion degree of the items and broadcasts the item.
Example 2
With reference to fig. 2, the management method of the emergency safety responsibility of the enterprise is as follows:
the enterprise should implement the step-by-step emergency safety responsibility and the post safety responsibility system, clarify the post safety responsibility and establish the responsibility list containing all responsibility items. According to the law or the post responsibility list, an informationized applicable responsibility item list is refined, a unique ID is set for each responsibility item in the list, and meanwhile, an executable work schedule with specific informationization is given.
Each node, namely each post, establishes a primary responsibility list and a secondary responsibility list, wherein the primary responsibility list records the main responsibility items of the post, namely the responsibility item list mentioned above, and the corresponding ID; the secondary responsibility list corresponds to one responsibility item recorded in the primary responsibility list, records the responsibility item associated with the responsibility item, and the corresponding ID.
The list of position responsibilities is as follows:
1. the general manager performs the following emergency responsibilities:
1.1, the organization is responsible for making and commanding the implementation of the emergency plan for safety production of the unit, and regularly organizing or participating in emergency drilling of the unit;
1.2 undertake the obligation stipulated by the emergency plan of the safety production accident;
1.3, the emergency rescue of the accident is organized, the situation development is controlled, and the production safety accident is reported timely and faithfully;
1.4, organizing or matching the production safety accident investigation of the unit according to the principle of 'no-go-over in four';
2. the sub-master manager for managing the safety production side performs the following emergency responsibilities:
2.1 organizing or participating in emergency treatment and investigation treatment of accidents in a business range;
2.2 undertake the obligation stipulated by the emergency plan of the safety production accident, and regularly organize or participate in emergency drilling;
2.3 organizing accident emergency rescue according to the obligation specified by the emergency plan, controlling the situation development, and reporting the production safety accident timely and faithfully;
2.4, the principle of 'four-time leaving' is adhered to, and the unit is organized or matched with the production safety accident investigation.
3. The other secondary head managers fulfill the following emergency duties:
3.1 organizing or participating in emergency treatment and investigation treatment of accidents in a business range;
3.2 undertake the obligation stipulated by the emergency plan of the safety production accident, and regularly organize or participate in emergency drilling;
3.3 organizing accident emergency rescue according to the obligation specified by the emergency plan, controlling the situation development and reporting the production safety accident in time and faithfully;
3.4, the principle of 'four-time leaving' is adhered to, and the safety accident investigation of the unit production is organized or matched.
4. The security ring takes over duties:
4.1 organizing and compiling the comprehensive emergency plan of the enterprise emergency, timely recording the plan system, and implementing emergency responsibility;
4.2, recording the case to the government emergency and safety supervision department in time;
4.3 undertake the related responsibilities stipulated in the emergency plan of the enterprise production safety accident;
4.4 organizing and developing at regular intervals and participating in emergency rescue plan drilling;
4.5 taking part in emergency treatment according to the requirements specified by the emergency plan;
4.6 making statistics and summary of accidents (events) and reporting the accidents faithfully in time;
4.7 organizing or participating in the production safety accident investigation and treatment work according to the 'no-go-over-four' principle to form an accident investigation report;
4.8 organization develops the management of the failure events.
5. The secondary unit is responsible for human duties:
5.1, organizing and formulating the emergency plan for the safety production of the unit;
5.2, the emergency plan exercise of the unit safety production is carried out;
5.3 undertake the obligation stipulated by the emergency plan of the production safety accident;
5.4, immediately organizing rescue according to the regulations when the accident happens, controlling the situation development, and reporting the production safety accident timely and faithfully;
5.5 insisting on the principle of 'no-discharge in four' and organizing or matching the safety accident management of the production of the unit,
Example 3
Referring to fig. 3, the post responsibility list of each secondary unit corresponds to a corresponding responsibility item, taking 5.2 as an example, "responsible for implementing the emergency plan exercise of the safety production of the unit. "the following are listed:
5.2.1 determining the priority of the drill according to the different levels of the potential emergency;
5.2.2, a comprehensive drilling plan is made, including emergency categories and personnel;
5.2.3, completing the drilling according to the plan, and evaluating and summarizing the drilling plan and the drilling effect;
5.2.4 identifies problems found in the drill and makes revisions to the emergency protocol.
5.2 can be evaluated by summarizing the four items of 5.2.1-5.2.4.
Example 4
With reference to fig. 4, the station responsibility items corresponding to the security ring are: "4.4 regularly organize and develop and participate in emergency rescue plan exercise", its responsibility after refining is:
4.4.1 supervising and checking the development condition of the emergency drilling organization of the second-level unit;
4.4.2 regularly organizing and participating in enterprise-level emergency drilling;
4.4.3 evaluating and summarizing the drilling situation;
4.4.4 amend the emergency protocol in time to find problems.
Wherein, the secondary responsibility list corresponding to 4.4.1 is 5.2.1-5.2.4. And the safety ring part formulates an automatic scoring rule according to the four specific implementation conditions, such as a deduction rule of the classification of the lack of emergency drilling, a deduction rule of whether emergency summary is complete or not, and the like.
When building a block chain of security responsibility, registering each responsibility item into the block chain, such as 5.2 and 5.2.1, 5.2.2, 5.2.3, 5.2.4, 4.4 and 4.4.1, 4.4.2, 4.4.3, which can be submitted in a block mode, or directly registering in a basic information table of the block chain, and simultaneously including basic information of registration related posts, personnel, scoring rules, and the like.
Example 5
With reference to fig. 5, the responsibility score table 1 and the statistical summary table 1, for example, in a month of a year, the handheld terminal (or the mobile phone) automatically reminds the secondary unit that emergency drilling should be performed in the month, meanwhile, the terminal app automatically lists the requirements of the emergency drilling, and the security ring ensures that the working space is in place through RFID association (or other association methods).
And when the drilling is finished, the blocks are automatically submitted to form blocks, and the app automatically scores according to the scoring rule, submits the scores to an security ring and automatically broadcasts the scores. Blocks are also generated when the responsibility of the security ring is submitted, and meanwhile, the scoring items can be corrected and summarized.
The secondary responsibility list comprises the steps of scoring the associated items according to the work completion effect, for example, the scores of automatic scoring of a first plant, a second plant, a third plant and a fourth plant of a secondary unit are 83, 85, 75 and 91 respectively, 4.4.1 is automatically scored into 84 when the safety ring is summarized, the scores of the secondary unit are respectively added and subtracted according to the supervision and inspection condition, the scores are 83, 84, 80 and 92 respectively, and the total score is 85.
Meanwhile, the score of 4.4.2 is 86, the score of 4.4.3 is 90, and the score of 4.4.4 is 83, the same condition is submitted to a sub-master manager for managing safety production to form the score and summary of the score, and the sub-master manager for managing safety production revises the score again according to the condition.
Responsibility score table 1
Date | Name of factory | Responsibility item ID | Responsibility item score | Remarks for note |
2018-8-10 | Refinery-chemical plant | 5.2.1 | 81 | |
2018-8-10 | Refinery-chemical plant | 5.2.2 | 82 | |
2018-8-10 | Refinery-chemical plant | 5.2.3 | 85 | |
2018-8-10 | Refinery-chemical plant | 5.2.4 | 86 | |
2018-8-10 | Refinery and chemical plant | 5.2.1 | 82 | |
2018-8-10 | Refinery and chemical plant | 5.2.2 | 83 | |
2018-8-10 | Refinery and chemical plant | 5.2.3 | 87 | |
2018-8-10 | Refinery and chemical plant | 5.2.4 | 88 |
Statistics summary Table 1
According to the scores, the assessment promotion of safety responsibility work can be carried out, and the safety responsibility implementation is promoted, such as:
2.2.1 evaluating the development condition of emergency drilling of each secondary unit;
2.2.2 according to the circumstances:
(1) the emergency drilling is not required to be performed on time, and the drilling is performed on time;
(2) requiring no drill assessment, the drill assessment must be performed and the emergency protocol modified based on the problem.
2.2.3 require the ring installation position to strengthen direct supervision and inspection again;
once the major problems in emergency are found, the major problems are directly reported to a general manager, and corresponding measures are taken.
When work is temporarily scheduled, or the conditions of leaving the post, resigning the post or merging or withdrawing the post occur, the responsibility list containing all responsibility items can be modified through the register, and correspondingly, each node synchronizes the modified responsibility items according to the ID.
Through the steps, the information processing flow is reconstructed through the responsibility list, the effective implementation of the safety production responsibility layer by layer is realized through the effective management of the block chain, the mutual confidence and the efficient authentication of the information are realized through the block chain, the score evaluation is carried out simultaneously, the implementation effect of the safety production responsibility of multiple levels and multiple units is effectively evaluated, and the accurate management of the whole process is realized through an informatization mode.
It is to be understood that the above description is not intended to limit the present invention, and the present invention is not limited to the above examples, and those skilled in the art may make modifications, alterations, additions or substitutions within the spirit and scope of the present invention.
Claims (14)
1. The enterprise safety responsibility management method is characterized in that responsibility lists of all positions of an enterprise are established, a unique ID is set for a responsibility item in each responsibility list, and the ID of the position and a work procedure are registered in a block chain for digital and information management of the enterprise.
2. The method as claimed in claim 1, wherein the management method is used for blockchain management of enterprise security responsibilities, and the blockchain management of enterprise security responsibilities is realized by establishing a blockchain management mode for the enterprise security responsibilities.
3. The enterprise security responsibility management method according to claim 2, wherein the blockchain management mode comprises a primary responsibility node type management method, a secondary responsibility information type management method and a blockchain information type management method.
4. The enterprise security responsibility management method according to claim 3, wherein the primary responsibility node type management method comprises the following steps:
step 41, establishing a primary responsibility list for each post;
step 42, recording the main body responsibility items of the posts and the corresponding IDs in the primary responsibility list;
and 43, establishing evaluation rules respectively aiming at the primary responsibility list of each node, and connecting the evaluation rules with an information system, wherein the information system is used for sending out a prompt.
5. The enterprise security responsibility management method according to claim 3, wherein the secondary responsibility information type management method comprises the following steps:
step 51, establishing a primary responsibility list and a secondary responsibility list for each post;
step 52, for the primary responsibility list, recording the main responsibility items of the posts and the corresponding IDs in the primary responsibility list;
step 53, recording responsibility items related to the responsibility items in the primary responsibility list and corresponding IDs in the secondary responsibility list;
and step 54, establishing evaluation rules respectively aiming at the primary responsibility list and the secondary responsibility list of each node, wherein the evaluation rules in the primary responsibility list and the secondary responsibility list are connected with an information system, and the information system is used for reminding corresponding information in the primary responsibility list and the secondary responsibility list.
6. The enterprise security responsibility management method according to claim 3, wherein the block information type management method comprises the following steps:
step 61, establishing a primary responsibility list and a secondary responsibility list for each post, namely each node, and associating the primary responsibility list and the secondary responsibility list;
step 62, recording the main body responsibility items of the posts and the corresponding IDs in the primary responsibility list;
step 63, recording responsibility items related to the responsibility items in the primary responsibility list and corresponding IDs in the secondary responsibility list;
step 64, establishing an evaluation rule respectively aiming at the primary responsibility list of each node, wherein the evaluation rule of the primary responsibility list is connected with an information system, and the information system can be used for reminding;
and step 65, synchronously sending out the latest block of each node in real time aiming at each node, and if the latest block contains the ID of the post responsibility item, sending out a prompt by the ID of the post responsibility item through an information system.
7. The method as claimed in claim 6, wherein the subject responsibility items include subject responsibility items for supervising a post higher than the current post and subject responsibility items for a post lower than the current post.
8. The enterprise security responsibility management method of claim 6, wherein the work procedure of the subject responsibility project comprises a time requirement for completing the project and a project record requirement.
9. The enterprise security responsibility management method according to claim 6, wherein the responsibility item content in the secondary responsibility list related to the responsibility items in the primary responsibility list comprises a primary responsibility item start time reminder, a primary item work progress time reminder, and a primary item expiration time reminder.
10. The enterprise safety responsibility management method according to claim 6, wherein a primary responsibility score table corresponding to the primary responsibility list and a secondary responsibility score table corresponding to the secondary responsibility list are established when task blocks of the primary responsibility list and the secondary responsibility list are established.
11. The enterprise safety responsibility management method according to claim 10, wherein the information to be recorded in the primary responsibility score table comprises primary responsibility block-out nodes, primary responsibility time, responsibility items of the primary responsibility and scores of the primary responsibility.
12. The enterprise safety responsibility management method according to claim 10, wherein the information to be recorded in the secondary responsibility score table comprises secondary responsibility block nodes, secondary responsibility time, responsibility items of the secondary responsibility and scores of the secondary responsibility.
13. The enterprise safety responsibility management method according to claim 6, wherein in each block establishing the primary responsibility list and the secondary responsibility list, relevant information of the block needs to be input into a responsibility score table, and after the responsibility score is completely input, scores of a plurality of responsibility items are read through the responsibility score table, and the scores of the responsibility items are summarized.
14. The enterprise security responsibility management method according to claim 6, wherein the station staff of the latest block in the step 65 processes the task according to the work rules of the responsibility item to generate a task processing data packet, and the node evaluates the produced task processing data packet according to the evaluation rules of the primary responsibility list, evaluates the completion degree of the item, and broadcasts the evaluation result.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910529037.6A CN112116174A (en) | 2019-06-19 | 2019-06-19 | Enterprise safety responsibility management method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910529037.6A CN112116174A (en) | 2019-06-19 | 2019-06-19 | Enterprise safety responsibility management method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN112116174A true CN112116174A (en) | 2020-12-22 |
Family
ID=73795983
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910529037.6A Pending CN112116174A (en) | 2019-06-19 | 2019-06-19 | Enterprise safety responsibility management method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112116174A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113610485A (en) * | 2021-07-02 | 2021-11-05 | 深圳供电局有限公司 | Work supervision method, system, electronic device and storage medium |
CN113869740A (en) * | 2021-09-29 | 2021-12-31 | 赛飞特工程技术集团有限公司 | Enterprise hidden danger responsibility assessment method and system based on block chain |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107480945A (en) * | 2017-08-10 | 2017-12-15 | 杭州全视软件有限公司 | A kind of block chain management method of responsibility |
CN108288146A (en) * | 2017-12-28 | 2018-07-17 | 北京地厚云图科技有限公司 | Trend of work supervisory methods and storage medium |
WO2019028758A1 (en) * | 2017-08-10 | 2019-02-14 | 杭州全视软件有限公司 | Blockchain management method applied to responsibilities |
CN109740771A (en) * | 2019-01-08 | 2019-05-10 | 杭州全视软件有限公司 | A kind of intelligent control management system and method for responsibility assessment |
-
2019
- 2019-06-19 CN CN201910529037.6A patent/CN112116174A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107480945A (en) * | 2017-08-10 | 2017-12-15 | 杭州全视软件有限公司 | A kind of block chain management method of responsibility |
WO2019028758A1 (en) * | 2017-08-10 | 2019-02-14 | 杭州全视软件有限公司 | Blockchain management method applied to responsibilities |
CN108288146A (en) * | 2017-12-28 | 2018-07-17 | 北京地厚云图科技有限公司 | Trend of work supervisory methods and storage medium |
CN109740771A (en) * | 2019-01-08 | 2019-05-10 | 杭州全视软件有限公司 | A kind of intelligent control management system and method for responsibility assessment |
Non-Patent Citations (1)
Title |
---|
曹坤茂;余子华;王理金;季晨阳;张洋;王爱花;吴家梁;: "基于安全责任清单与区块链技术的安全责任落实强化应用", 安全与环境工程, no. 01 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113610485A (en) * | 2021-07-02 | 2021-11-05 | 深圳供电局有限公司 | Work supervision method, system, electronic device and storage medium |
CN113869740A (en) * | 2021-09-29 | 2021-12-31 | 赛飞特工程技术集团有限公司 | Enterprise hidden danger responsibility assessment method and system based on block chain |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Zhang et al. | Root causes of coal mine accidents: Characteristics of safety culture deficiencies based on accident statistics | |
CN111695836B (en) | Clinical trial online operation management and control integrated system | |
CN112116174A (en) | Enterprise safety responsibility management method | |
CN108595491B (en) | Back tone method and system based on resume splitting and computer storage medium thereof | |
Fine et al. | Partners or adversaries? The relation between juvenile diversion supervision and parenting practices. | |
CN112347074A (en) | Method and device for establishing nuclear power plant maintenance expert library | |
CN111353724A (en) | Enterprise research and development management system | |
Zhang et al. | An experimental study of the Los Angeles county repeat offender prevention program: Its implementation and evaluation | |
TWM638011U (en) | Trust Personnel Management Device | |
CN115600877A (en) | Hidden danger troubleshooting system and method based on dual prevention mechanism | |
Huded et al. | Psychological impact of COVID-19 on medical interns–Findings from a nationwide survey | |
Yam et al. | Shaping the culture of safety through effective leadership in Malaysia | |
CN112598267A (en) | Integral system enterprise security management method and system | |
Bosetti | Sustainability in the workplace: a global concern | |
Hare et al. | Suicides among Construction Occupations in the UK | |
Koh et al. | Pandemic Software Development: The Student Experiences from Developing a COVID-19 Information Dashboard | |
Ahmad et al. | Relationship of Knowledge and Attitude with The Implementation of Occupational Safety and Health Management Systems | |
Liu et al. | Improving the Quality of Homeless Dataset | |
Izadabadi et al. | Implementation and evaluation of extracurricular theme for undergraduate basic sciences medical courses at Shiraz Medical School | |
Andriukaitiene | Increasing the level of management culture in business organizations in the context of applying social responsibility practice | |
CN117557219A (en) | Informationized management system for accompanying staff | |
Kopp et al. | Estimating environmental compliance costs for industry: engineering and economic approaches | |
CN114548684A (en) | Informatization system for troubleshooting and governing hidden danger of highway engineering construction and use method | |
CN118071298A (en) | Enterprise collaborative management information system based on workflow engine | |
PETA et al. | Integrating Comprehensive Safety And Financial Security Measures In The Textile Industry: An In-Depth Study At Marikatex |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |