CN107679818A - Software project management method, terminal and computer-readable recording medium - Google Patents
Software project management method, terminal and computer-readable recording medium Download PDFInfo
- Publication number
- CN107679818A CN107679818A CN201710327645.XA CN201710327645A CN107679818A CN 107679818 A CN107679818 A CN 107679818A CN 201710327645 A CN201710327645 A CN 201710327645A CN 107679818 A CN107679818 A CN 107679818A
- Authority
- CN
- China
- Prior art keywords
- project
- participant
- information
- software
- work
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
Abstract
The invention discloses a kind of software project management method to comprise the following steps:When detecting Data Enter request, display information typing frame is laid out according to development project, so that user sets project information, project participant's information, according to preset rules Project evaluation information, project participant's information, establish the incidence relation of project and project participant, detection obtains the project process in project information, and according to the work of project process analysis project participant.The present invention is also corresponding to disclose software project management terminal and computer-readable recording medium.The distribution for realizing project work by carrying project management platform on project system, the assessment management of project and its project personnel, improves project development quality.
Description
Technical field
The present invention relates to software project development field, more particularly to software project management method, terminal and computer-readable
Storage medium.
Background technology
Ripe with the fast development of computer network, increasing enterprise is directed to software system development, along with
The exploitation of software systems is, it is necessary to which enterprise puts into substantial amounts of human and material resources, financial resources etc., because these inputs all can not be quick
Income is obtained, thus the management and control of human and material resources, financial resources can not be carried out according to income in real time.
Existing enterprise software system exploitation, test program are formulated and rely primarily on project manager, by project manager to exploitation
Whole strategy is formulated in project analysis, plan and control, first project manager, is then realized according to whole strategy to project entirety
Management and relevant item task share out the work, in the allocation flow management of project task can not to each designer and
Tester does special job placement, but from project entirety, it can so cause human resource distribution uneven.Equally not
The problem of energy is directed in software development process system is analyzed, comprehensively evaluated.
The above is only used for auxiliary and understands technical scheme, does not represent and recognizes that the above is existing skill
Art.
The content of the invention
It is a primary object of the present invention to provide a kind of software project management method, it is intended to it is unilateral to solve software project management
The problem of.
To achieve the above object, the present invention provides a kind of software project management method, and software project management method is soft
Part, preset term management platform (or test shared platform) on systems development project, software project management method includes following
Step:
When detecting Data Enter request, display information typing frame is laid out according to development project, so that user sets
Put project information, project participant's information;
According to preset rules Project evaluation information, project participant's information, associating for project and project participant is established
System;
Detect and obtain the project process in project information, and according to the work of project process analysis project participant.
Alternatively, according to preset rules Project evaluation information, project participant's information, project and project participant's are established
The step of incidence relation, includes:
According to preset rules Project evaluation information, project participant's information, judge whether to establish project and project participant
Incidence relation;
If the project task and the temporal information of project participant in project information meet, establish project and participated in project
The incidence relation of people.
Alternatively, according to preset rules Project evaluation information, project participant's information, project and project participant's are established
Include after the step of incidence relation:
The related information of project and project participant are sent to management terminal, so that project leader is according to incidence relation
Allocated items task;
When detecting that project leader's allocated items task is completed, project task allocation information is sent to project participant
Counterpart terminal.
Alternatively, according to preset rules Project evaluation information, project participant's information, project and project participant's are established
Include after the step of incidence relation:
When detecting the renewal of the project process in project information, information alert project participant is distributed according to project task
Project document is uploaded, so that project participant shares project resource.
Alternatively, detect and obtain the project process in project information, and according to project process analysis project participant's
The step of work, includes:
Detection obtains the project process in project information, and by project process cuit schedule, so that project participates in
People checks;
According to the work of project process analysis project participant, and the project task of adjusted iterm participant.
Alternatively, project process is provided with multiple item nodes, described to detect and obtain the project process in project information, and
Include after according to the step of the work of project process analysis project participant:
When detecting that project process reaches item nodes, the work of statistical item participant simultaneously generates job analysis report
Accuse;
Reported according to the job analysis of project participant, the work of adjusted iterm index and evaluation item participant.
Alternatively, detect and obtain the project process in project information, and according to project process analysis project participant's
Include after the step of work:
When detecting that project process reaches item nodes, statistical item quality simultaneously generates project analysis report, to assess
Project quality.
Alternatively, detect and obtain the project process in project information, and according to project process analysis project participant's
Also include after the step of work:
When detecting project process update abnormal, analysis project progress abnormal factorses, to improve project quality.
To achieve the above object, the present invention provides a kind of software project management terminal, and software project management device includes:Deposit
Reservoir, processor and the software project management computer journey that is stored on the memory and can run on the processor
Sequence, the computer program by during the computing device realize institute method described above the step of.
In addition, to achieve the above object, the present invention also provides a kind of computer-readable recording medium, described computer-readable
Software project management program is stored with storage medium, is realized as described above when the software project management program is executed by processor
Software project management method the step of.
The present invention proposes a kind of software project management method, by the Project Management in software development process, in item
Project management platform (test shared platform) is built in mesh system, realizes to project task distribution and quality management, lifts item
The efficiency of mesh exploitation, with this simultaneously, project development test is subjected to systematically quantitative management, by software development test process
Problem, progress, resource-sharing is carried out, project manager is no longer completely dependent in project management and carries out project analysis, plan, control
System;But objectively management control is objectively more realized comprehensively using data analysis, improve the work of project participant
Efficiency, avoid meaningless waste of time;Project participant more preferable can must obtain the experience resource of other colleagues, reduce
The risk of project, project resource completely preserve, and with reference to concluding and study after being available for, have promoted the job schedule of team,
It must develop beneficial to team is more preferable, record entry defect situation, evade the rate occurred frequently of defect, Improving Project exploitation to a certain extent
Quality.
Brief description of the drawings
Fig. 1 is the terminal structure schematic diagram for the hardware running environment that scheme of the embodiment of the present invention is related to;
Fig. 2 is the concrete scene schematic diagram of invention software project management method;
Fig. 3 is the interface display schematic diagram of invention software project management terminal;
Fig. 4 is the schematic flow sheet of invention software project management method first embodiment;
Fig. 5 is the step S20 of Fig. 4 software project management methods refinement schematic flow sheet;
Fig. 6 is the schematic flow sheet of invention software project management method second embodiment;
Fig. 7 is the step S30 of Fig. 4 software project management methods refinement schematic flow sheet;
Fig. 8 is the schematic flow sheet of invention software project management method 3rd embodiment.
The realization, functional characteristics and advantage of the object of the invention will be described further referring to the drawings in conjunction with the embodiments.
Embodiment
It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not intended to limit the present invention.
The primary solutions of the embodiment of the present invention are:Project management platform is built on software development system (in this hair
Both project management platform and test shared platform in bright are replaceable), by project information and project participant's Data Enter item
Mesh management platform, the distribution of project work is carried out according to project information and project participant information, and according to project global analysis
Report review project participant works and the quality of project.
Project work is allocated because prior art relies primarily on project manager, the project of exploitation can not be done whole
The project evaluation work of body, or the assessment dependence of project and manual evaluation.
The present invention provides a kind of software project management method, and project process is followed up and the project indicator adjusted in real time
It is whole, and the project evaluation of various dimensions is carried out to item related information.
As shown in figure 1, Fig. 1 is the terminal structure schematic diagram for the hardware running environment that scheme of the embodiment of the present invention is related to.
Terminal of the embodiment of the present invention can be PC or smart mobile phone, tablet personal computer, pocket computer etc. with aobvious
Show the packaged type terminal device of function.
As shown in figure 1, the terminal can include:Processor 1001, such as CPU, network interface 1004, user interface
1003, memory 1005, communication bus 1002.Wherein, communication bus 1002 is used to realize the connection communication between these components.
User interface 1003 can include display screen (Display), input block such as keyboard (Keyboard), optional user interface
1003 can also include wireline interface, the wave point of standard, and user interface 1003 is provided with not for different project participants
(e.g., project administrator can be by user interface, cuit information, project participant's information, and confirms that project is closed for same authority
Project work distribution after connection, other participants of project can upload corresponding project data, and check corresponding performance evaluation
Report).Network interface 1004 can optionally include wireline interface, the wave point (such as WI-FI interfaces) of standard.Memory
1005 can be high-speed RAM memory or stable memory (non-volatile memory), such as disk is deposited
Reservoir.Memory 1005 optionally can also be the storage device independently of aforementioned processor 1001.
Alternatively, terminal can also include camera, RF (Radio Frequency, radio frequency) circuit, sensor, audio
Circuit, WiFi module etc..Wherein, sensor ratio such as optical sensor, motion sensor and other sensors.Specifically, light
Sensor may include ambient light sensor and proximity transducer, wherein, ambient light sensor can according to the light and shade of ambient light come
The brightness of display screen is adjusted, proximity transducer can close display screen and/or backlight when mobile terminal is moved in one's ear.As
One kind of motion sensor, gravity accelerometer can detect in all directions the size of (generally three axles) acceleration, quiet
Size and the direction of gravity are can detect that when only, the application available for identification mobile terminal posture is (such as horizontal/vertical screen switching, related
Game, magnetometer pose calibrating), Vibration identification correlation function (such as pedometer, tap) etc.;Certainly, mobile terminal can also match somebody with somebody
The other sensors such as gyroscope, barometer, hygrometer, thermometer, infrared ray sensor are put, will not be repeated here.
It will be understood by those skilled in the art that the restriction of the terminal structure shown in Fig. 1 not structure paired terminal, can be wrapped
Include than illustrating more or less parts, either combine some parts or different parts arrangement.
As shown in figure 1, it can lead to as in a kind of memory 1005 of computer-readable storage medium including operating system, network
Believe module, Subscriber Interface Module SIM and software project management application program.
As shown in Fig. 2 the method for invention software project management method can be applicable in multiple terminals, terminal and server
It is connected, server connect with database information, and terminal is available for showing interface as shown in Figure 3 (interface shown in Fig. 3 and be only
One determines, interface shown in Fig. 3 is only to understand that the present invention illustrates), it can be entered by corresponding button on interface related
Connection shows details.
In the terminal shown in Fig. 1, network interface 1004 is mainly used in connecting background server, is carried out with background server
Data communicate;User interface 1003 is mainly used in connecting client (user terminal), enters row data communication, user interface with client
1003 project participants set different operating rights of checking, and (e.g., project administrator can be by user interface, cuit letter
Breath, project participant's information etc.);And processor 1001 can be used for calling the software project management stored in memory 1005 should
With program, and perform following operate:
When detecting Data Enter request, display information typing frame is laid out according to development project, so that user sets
Put project information, project participant's information;
According to preset rules Project evaluation information, project participant's information, associating for project and project participant is established
System;
Detect and obtain the project process in project information, and according to the work of project process analysis project participant.
Further, processor 1001 can call the software project management application program stored in memory 1005, also
Perform following operate:
According to preset rules Project evaluation information, project participant's information, judge whether to establish project and project participant
Incidence relation;
If the project task and the temporal information of project participant in project information meet, establish project and participated in project
The incidence relation of people.
Further, processor 1001 can call the software project management application program stored in memory 1005, also
Perform following operate:
According to preset rules Project evaluation information, project participant's information, associating for project and project participant is established
Include after the step of being:
The related information of project and project participant are sent to management terminal, so that project leader is according to incidence relation
Allocated items task;
When detecting that project leader's allocated items task is completed, project task allocation information is sent to project participant
Counterpart terminal.
Further, processor 1001 can call the software project management application program stored in memory 1005, also
Perform following operate:
According to preset rules Project evaluation information, project participant's information, associating for project and project participant is established
Also include after the step of being:
When detecting the renewal of the project process in project information, information alert project participant is distributed according to project task
Project document is uploaded, so that project participant shares project resource.
Further, processor 1001 can call the software project management application program stored in memory 1005, also
Perform following operate:
Detect and obtain the project process in project information, and the step of the work according to project process analysis project participant
Suddenly include:
Detection obtains the project process in project information, and by project process cuit schedule, so that project participates in
People checks;
According to the work of project process analysis project participant, and the project task of adjusted iterm participant.
Further, processor 1001 can call the software project management application program stored in memory 1005, also
Perform following operate:
Detect and obtain the project process in project information, and the step of the work according to project process analysis project participant
Include after rapid:
When detecting that project process reaches item nodes, the work of statistical item participant simultaneously generates job analysis report
Accuse;
Reported according to the job analysis of project participant, the work of adjusted iterm index and evaluation item participant.
Further, processor 1001 can call the software project management application program stored in memory 1005, also
Perform following operate:
Detect and obtain the project process in project information, and the step of the work according to project process analysis project participant
Include after rapid:
When detecting that project process reaches item nodes, statistical item quality simultaneously generates project analysis report, to assess
Project quality.
Further, processor 1001 can call the software project management application program stored in memory 1005, also
Perform following operate:
Detect and obtain the project process in project information, and the step of the work according to project process analysis project participant
Also include after rapid:
When detecting project process update abnormal, analysis project progress abnormal factorses, to improve project quality.
Reference picture 4, invention software project management method first embodiment provide software project management method, the software
Project management method includes:
Step S10, when detecting Data Enter request, display information typing frame is laid out according to development project, with
For user, project information, project participant's information are set.
Test shared platform (project management platform) is carried on project system, tests in shared platform and detects a catalogue
During the request entered, server controls terminal display information typing project is laid out display information typing frame according to development project,
The administrative staff of shared platform are tested by project information (project information:PROJECT TIME, preset term progress, item nodes, other
Relevant item is detailed) and project participant (project manager, project development personnel, project testing personnel etc.) Data Enter arrive
Project management platform.
Step S20, according to preset rules Project evaluation information, project participant's information, establish project and project participant
Incidence relation.
Project management platform is preset with project analysis rule (project analysis rule:Refer to after the progress of identifying project, for
Project process is identified project the time, PROJECT TIME and project participant's time and project participant job specification is analyzed, if item
Project task in mesh information matches with project participant, then establishes the incidence relation of project and project participant;Such as, it is determined that item
Mesh is in the project testing stage, it is necessary to which project testing personnel's test event, then estimate according to the corresponding item of searching of project analysis rule
Examination personnel, if the information matches such as project testing personnel time and project testing time, project testing task will be given to be estimated with item
Examination personnel establish incidence relation), when the information of project information and project participant meets preset rules and evaluates regular, establish
Project and the pipe of project participant connect relation.
Step S30, detect and obtain the project process in project information, and according to project process analysis project participant's
Work.
The project management platform project process in detection project information in real time, specifically, project management platform is according to same
The project process of type entry, average project process is pre-set, project management platform is according to the change of project process, analysis item
Work (the work of analysis project participant of mesh participant:Around project quality, PROJECT TIME and other works that can quantify
Make index).
A project management platform is built in the present embodiment on software system development, in real time monitoring project progress, and
Worked according to project process adjusted iterm, it is real by the typing management of information so as to realize management of the project to project participant
The visual comprehensive analysis of reliance server, terminal-pair project, and the management of project quality, the effect of Improving Project exploitation are showed
Rate, with this simultaneously, quantitative management, can be by during software system development the problem of, scheduling resource are shared by project system,
Project manager is no longer completely dependent on during project management and carries out project analysis, plan, control, is advantageous to the overall assessment of project.
Reference picture 5, step S20 includes in invention software project management method, the present embodiment:
Step S21, according to preset rules Project evaluation information, project participant's information, judge whether to establish project and item
The incidence relation of mesh participant.
Specifically, server controls terminal is in project management platform, according to preset rules (preset rules:Project information,
Project participant's information analysis matching standard) Project evaluation information, and according to evaluation judge whether establish project and project
The incidence relation of participant.
Step S22, if the project task and the temporal information of project participant in project information meet, establish project with
The incidence relation of project participant.
According to project task and the information of project participant in project management platform, the distribution of project task is carried out, is had
Body, identified project task according to project information, project task matched with project participant's information, project can be directed to
Different phase sets project task and project participant, i.e. project development period by project development personnel and project development
Work is corresponding, and the project testing stage is corresponding with project testing work by item range estimation personnel;As, it is necessary to the partial test in project
Work is arranged, then by between at the beginning of test job, it is contemplated that end time typing in systems, is detected in the corresponding period
Idle tester A, B, C, D, the B for having job placement is excluded first, neck is further good at according to tester A, C, D
Domain, tester C is excluded, the task of test job and tester A, D are associated.
In the present embodiment, it is the project task in project each stage is corresponding with project participant, appoint identifying project
During business, project management platform establishes incidence relation according to what project task carried out project work and project participant, makes project
The arrangement of the distribution of task not only relies only on artificial arrangement, participates in project and project project management system more comprehensive system
Personnel combine.
Reference picture 6, include in the second embodiment of invention software project management method after step S20:
Step S40, the related information of project and project participant are sent to management terminal so that project leader according to
Incidence relation allocated items task.
Specifically, after project management platform establishes incidence relation of the project with project participant, incidence relation is sent
To project management terminal (form that wechat, QQ, short message, mail etc. can be used), in project management corresponding to project management terminal
Personnel receive the incidence relation of project task and project participant, and project manager can identify project task according to incidence relation
Distribution, specifically, project manager receive project management platform transmission project testing it is corresponding with tester pass
System, project manager can combine other factors, be confirmed whether to distribute project task to counterpart personnel, i.e. if project pipe
Platform, a test assignment and two testers are established into incidence relation, project manager can integration project task
The other factors such as property or project participant individual's reason, it is determined that project task and other project participant are managed
Reason, to be finally completed the distribution arrangement of project work.
Step S50, when detecting that project leader's allocated items task is completed, project task allocation information is sent to item
Mesh participant's counterpart terminal.
Specifically, project management platform receives project manager and is based on item association relation, the project task made point
Timing, project management platform by project task distribution notice be sent to project participant corresponding to terminal, prevent that project is corresponding
Participant does not receive the job placement of system and is delayed the office hours, i.e. when project manager in project management platform really
When recognizing the distribution of project work, project management platform sends respective items purpose distribution information to project participant's counterpart terminal
(allocation of items information may include:Project task, PROJECT TIME, Item Detail and other relevant item information).
In the present embodiment, project management platform will have built up project and the project participant of incidence relation, send
To terminal corresponding to project manager, by the distribution of project manager's manual confirmation project task, ensureing that project management platform is comprehensive
While scientifically considering project work, when project manager to should be appreciated that the arrangement of project work, realize project work
Comprehensive management implement, with this simultaneously, for be allocated project work project participant can receive allocation of items information,
Prevent the omission of project task.
Reference picture 6, include in invention software project management method after step S50:
Step S60, when detecting the renewal of the project process in project information, information alert item is distributed according to project task
Mesh participant uploads project document, so that project participant shares project resource.
Specifically, when the project process that project information is detected in project management platform updates, project management platform root
According to project work arrangement, i.e. when test job is completed, project management platform confirms to be the tester of the project testing, sends
Prompt message is to project testing personnel, to prompt project testing personnel to upload project testing document;Project management platform is by project
The project document that tester uploads is arranged and (that is, carries out classification processing to project document), so that other participants of project
Member can correspond to and search project data.
In the present embodiment when project process updates, corresponding project leader is inquired about, prompts project leader to upload item
Mesh document, the shared of project resource is realized, reduces tedious work of the present people for management project document, the project of improving is born
Task efficiency is blamed, avoids meaningless waste of time, project participant more preferable can must obtain the warp of other colleagues
Certification of registered capital source, the risk of test is reduced, meanwhile, improve the ability to work of itself by being exchanged with other colleagues;Project resource is believed
Breath is completely preserved, with reference to conclusion and study after being available for.
Reference picture 7, step S30 includes in invention software project management method:
Step S31, detection obtain the project process in project information, and by project process cuit schedule, for
Project participant checks.
Specifically, the real-time project process that must be obtained in project information of project management platform, and by project process input pair
Project schedule (the project schedule answered:Include item object time message corresponding with project process etc.) in, project participant
Project schedule can be intuitively checked, grasps the project work of oneself, to adjust work state in time.
Step S32, according to the work of project process analysis project participant, and the project task of adjusted iterm participant.
For project management platform according to project process, the work of analysis project participant (specifically, can be from project participant
Work saturation degree, to project contribution etc. different angle analysis), according to the work of project process adjusted iterm participant pacify
Row, e.g., during system testing, term system system test assignment, if system testers for a period of time, are not tested
The feedback of work, i.e. project process are not updated in real time, then link up and test for test assignment and project testing personnel
Problem, it is determined whether need to increase system testers.
Detection project process in real time in the present embodiment, and by project process cuit schedule, for project
Participant checks job schedule, while using project process as foundation, divides around work of the project process to project participant
Analysis, detection project progress is favorably improved the operating efficiency of project participant in real time.
Reference picture 8, applied the 3rd of the present invention in example also includes after step S30:
Step S70, when detecting that project process reaches item nodes, the work of statistical item participant simultaneously generates work
Analysis report.
Specifically, when the project management platform in terminal detects that project reaches item nodes, item related information is searched for
(item related information:Test defect during the project status of the item nodes being integrated with development process, project testing,
The basic datas such as the rank and reparation speed of defect), project information and project participant's information are integrated, generation is directed to
The project report of disparity items participant, analysis report are probably instrument board, and different forms or network analysis figure etc. are no
Same type.
Step S80, reported according to the job analysis of project participant, the work of adjusted iterm index and evaluation item participant
Make.
Work of the project management platform to project participant is assessed, and e.g., is occurred during project testing different
Project defect do not have systematic management, do and evade, it is necessary to which what is illustrated is eye-catching management platform not only for item after being unfavorable for
Mesh participant individual is assessed, and more for project team etc., carries out the assessment of system multidimensional, further according to the project evaluation
Ground is adjusted to project work progress with new index formulation, and the assessment for the project team is advantageous to the construction of the project team.
Step S90, when detecting that project process reaches item nodes, statistical item quality simultaneously generates project analysis report
Accuse, with evaluation item quality.
When detecting item nodes in project management platform, statistical item quality is similarly asked for what is occurred in project
Topic does statistic record, and generates project analysis report, is reported, project is integrally analyzed, i.e. according to item according to project analysis
Mesh analysis report to it is specific the problem of the link that optimizes of needs is improved, with Improving Project quality and accelerate project development stream
Journey.
Step S100, when detecting project process update abnormal, analysis project progress abnormal factorses, to improve project matter
Amount.
Specifically, in abnormal (the project progress exception of project process:It can be regarded as project development excessive velocities, or project
Development rate is slow), analysis project progress abnormal factorses, as not finding effectively occurs defect and repeatedly carry out test maintaining in project
Solution, or project occur, by quoting particular algorithm, accelerating project development or project testing entering in a link
Degree.
When the present embodiment project process reaches item nodes, the work generation job analysis report of statistical item participant
Accuse, reported according to the job analysis of project participant, adjust corresponding index and the work to project participant is assessed, it is existing
Demand analysis teacher in team, without the rule of a set of scoring, it is unfavorable for the progress of whole team, passes through of project participant
People, the performance evaluation of group, contribute to the construction of project team.When project reaches item nodes, it is also necessary to statistical item quality,
And project analysis report is generated, project quality assessment is carried out, contributes to the development of end item, passes through project management platform
Systematically project analysis, be advantageous to evade later development risk.When detecting project process update abnormal, analysis project progress
Abnormal factorses are identified project progress issue, to improve project quality;By recording defect situation, defect is evaded to a certain extent
Rate occurred frequently, lift development quality, by record entry marked improvement factor, work and provide for the project development of later stage same type
With reference to project development efficiency can be accelerated.
To achieve the above object, the embodiment of the present invention provides a kind of software project management terminal, software project management device
Including:Memory, processor and it is stored in the software project management meter that can be run on the memory and on the processor
Calculation machine program, the computer program by during the computing device realize institute method described above the step of.
In addition, to achieve the above object, the embodiment of the present invention also provides a kind of computer-readable recording medium, the calculating
Software project management program is stored with machine readable storage medium storing program for executing, the software project management program is realized when being executed by processor
The step of software project management method described above.
It should be noted that herein, term " comprising ", "comprising" or its any other variant are intended to non-row
His property includes, so that process, method, article or system including a series of elements not only include those key elements, and
And also include the other element being not expressly set out, or also include for this process, method, article or system institute inherently
Key element.In the absence of more restrictions, the key element limited by sentence "including a ...", it is not excluded that including this
Other identical element also be present in the process of key element, method, article or system.
The embodiments of the present invention are for illustration only, do not represent the quality of embodiment.
Through the above description of the embodiments, those skilled in the art can be understood that above-described embodiment side
Method can add the mode of required general hardware platform to realize by software, naturally it is also possible to by hardware, but in many cases
The former is more preferably embodiment.Based on such understanding, technical scheme is substantially done to prior art in other words
Going out the part of contribution can be embodied in the form of software product, and the computer software product is stored in one as described above
In storage medium (such as ROM/RAM, magnetic disc, CD), including some instructions to cause a station terminal equipment (can be mobile phone,
Computer, server, air conditioner, or network equipment etc.) perform method described in each embodiment of the present invention.
The preferred embodiments of the present invention are these are only, are not intended to limit the scope of the invention, it is every to utilize this hair
The equivalent structure or equivalent flow conversion that bright specification and accompanying drawing content are made, or directly or indirectly it is used in other related skills
Art field, is included within the scope of the present invention.
Claims (10)
- A kind of 1. software project management method, it is characterised in that the software project management method comprises the following steps:When detecting Data Enter request, display information typing frame is laid out according to development project, for user's setting option Mesh information, project participant's information;According to preset rules Project evaluation information, project participant's information, the incidence relation of project and project participant is established;Detect and obtain the project process in project information, and according to the work of project process analysis project participant.
- 2. software project management method as claimed in claim 1, it is characterised in that described to be believed according to preset rules Project evaluation The step of ceasing, project participant's information, establishing project and the incidence relation of project participant includes:According to preset rules Project evaluation information, project participant's information, judge whether to establish the pass of project and project participant Connection relation;If the project task and the temporal information of project participant in project information meet, project and project participant's are established Incidence relation.
- 3. software project management method as claimed in claim 1, it is characterised in that described to be believed according to preset rules Project evaluation The step of ceasing, project participant's information, establishing project and the incidence relation of project participant includes afterwards:The related information of project and project participant are sent to management terminal, so that project leader distributes according to incidence relation Project task;When detecting that project leader's allocated items task is completed, it is corresponding to project participant to send project task allocation information Terminal.
- 4. software project management method as claimed in claim 3, it is characterised in that described to be believed according to preset rules Project evaluation The step of ceasing, project participant's information, establishing project and the incidence relation of project participant also includes afterwards:When detecting the renewal of the project process in project information, distribute information alert project participant according to project task and upload Project document, so that project participant shares project resource.
- 5. the software project management method as described in Claims 1-4 any one, it is characterised in that the detection simultaneously obtains Project process in project information, and included according to the step of work of project process analysis project participant:Detection obtains the project process in project information, and by project process cuit schedule, for project, participant looks into See;According to the work of project process analysis project participant, and the project task of adjusted iterm participant.
- 6. software project management method as claimed in claim 5, it is characterised in that the project process is provided with multiple project sections Point, it is described to detect and obtain the project process in project information, and the step of the work according to project process analysis project participant Include after rapid:When detecting that project process reaches item nodes, the work of statistical item participant simultaneously generates job analysis report;Reported according to the job analysis of project participant, the work of adjusted iterm index and evaluation item participant.
- 7. software project management method as claimed in claim 6, it is characterised in that described to detect and obtain in project information Project process, and according to including after the step of work of project process analysis project participant:When detecting that project process reaches item nodes, statistical item quality simultaneously generates project analysis report, with evaluation item Quality.
- 8. software project management method as claimed in claim 7, it is characterised in that described to detect and obtain in project information Project process, and according to also including after the step of work of project process analysis project participant:When detecting project process update abnormal, analysis project progress abnormal factorses, to improve project quality.
- 9. a kind of software project management terminal, it is characterised in that the software project management device includes:Memory, processor And it is stored in the software project management computer program that can be run on the memory and on the processor, the computer Program is realized the method as any one of claim 1 to 8 during computing device the step of.
- 10. a kind of computer-readable recording medium, it is characterised in that be stored with software item on the computer-readable recording medium Mesh management program, realized when the software project management program is executed by processor as any one of claim 1 to 8 The step of software project management method.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710327645.XA CN107679818A (en) | 2017-05-10 | 2017-05-10 | Software project management method, terminal and computer-readable recording medium |
PCT/CN2017/111639 WO2018205544A1 (en) | 2017-05-10 | 2017-11-17 | Software project management method, apparatus, terminal, and computer storage medium |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710327645.XA CN107679818A (en) | 2017-05-10 | 2017-05-10 | Software project management method, terminal and computer-readable recording medium |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107679818A true CN107679818A (en) | 2018-02-09 |
Family
ID=61134112
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710327645.XA Pending CN107679818A (en) | 2017-05-10 | 2017-05-10 | Software project management method, terminal and computer-readable recording medium |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN107679818A (en) |
WO (1) | WO2018205544A1 (en) |
Cited By (26)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108596471A (en) * | 2018-04-19 | 2018-09-28 | 平安科技(深圳)有限公司 | Project evaluation information processing method, device, computer equipment and storage medium |
CN108846564A (en) * | 2018-05-31 | 2018-11-20 | 康键信息技术(深圳)有限公司 | Server, the method for waiting and storage medium |
CN109118060A (en) * | 2018-07-24 | 2019-01-01 | 武汉空心科技有限公司 | Quick development method, platform and system based on timeliness control |
CN109165931A (en) * | 2018-09-25 | 2019-01-08 | 阿里巴巴集团控股有限公司 | Project workflow management method and device |
CN109190888A (en) * | 2018-07-27 | 2019-01-11 | 平安科技(深圳)有限公司 | project evaluation distribution method, device, terminal device and storage medium |
CN109324976A (en) * | 2018-10-22 | 2019-02-12 | 中国平安财产保险股份有限公司 | Manage method, apparatus, computer equipment and the storage medium of testing progress |
CN109388376A (en) * | 2018-09-29 | 2019-02-26 | 平安科技(深圳)有限公司 | Risk of software development appraisal procedure, device, equipment and readable storage medium storing program for executing |
CN109683859A (en) * | 2018-12-04 | 2019-04-26 | 郑州云海信息技术有限公司 | A kind of computer software development management platform, equipment and readable storage medium storing program for executing |
CN109683860A (en) * | 2018-12-04 | 2019-04-26 | 郑州云海信息技术有限公司 | A kind of computer software project management platform, equipment and readable storage medium storing program for executing |
CN109726975A (en) * | 2018-06-01 | 2019-05-07 | 平安普惠企业管理有限公司 | Project development method, apparatus, equipment and readable storage medium storing program for executing based on workflow |
CN110210759A (en) * | 2019-05-31 | 2019-09-06 | 北京银企融合技术开发有限公司 | A kind of object evaluation method, apparatus and electronic equipment |
CN110264042A (en) * | 2019-05-25 | 2019-09-20 | 深圳市元征科技股份有限公司 | A kind of method and relevant apparatus of project management |
CN110275708A (en) * | 2019-06-06 | 2019-09-24 | 江西理工大学 | A kind of visual software modeling method of computer software view |
CN110335004A (en) * | 2019-05-08 | 2019-10-15 | 重庆天蓬网络有限公司 | A kind of product and engineering relationships solution based on responsibility system |
CN110610350A (en) * | 2019-08-30 | 2019-12-24 | 深圳市元征科技股份有限公司 | Project management method, device and equipment |
CN110750299A (en) * | 2019-09-25 | 2020-02-04 | 恒大智慧科技有限公司 | Intelligent software quality tracking system, method and storage medium |
CN111104331A (en) * | 2019-12-20 | 2020-05-05 | 广州唯品会信息科技有限公司 | Software management method, terminal device and computer-readable storage medium |
CN111222520A (en) * | 2018-11-23 | 2020-06-02 | 中移(杭州)信息技术有限公司 | Classification model training method, classification method and classification system |
CN112085471A (en) * | 2020-09-10 | 2020-12-15 | 北京百度网讯科技有限公司 | Task distribution method and device, electronic equipment and storage medium |
CN112286984A (en) * | 2020-09-29 | 2021-01-29 | 卓尔智联(武汉)研究院有限公司 | Block data processing method and device, computer equipment and storage medium |
CN112950138A (en) * | 2020-09-11 | 2021-06-11 | 深圳市明源云科技有限公司 | Collaborative development state management method and device and server |
CN113361909A (en) * | 2021-06-03 | 2021-09-07 | 杭州推啊网络科技有限公司 | Internet project management method and system |
CN113392420A (en) * | 2021-07-06 | 2021-09-14 | 山东电力工程咨询院有限公司 | Intelligent project data management method and system |
CN113592439A (en) * | 2021-07-14 | 2021-11-02 | 青岛海尔科技有限公司 | Software project flow management system and method |
CN116523263A (en) * | 2023-06-06 | 2023-08-01 | 深圳明辉智能技术有限公司 | Intelligent data processing method, system and storage medium |
CN116993286A (en) * | 2023-07-24 | 2023-11-03 | 北京泰策科技有限公司 | Test management system and method based on test progress reverse project progress |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2003073234A2 (en) * | 2002-02-27 | 2003-09-04 | Levy Scott | System and method for managing organization's resources |
CN1719462A (en) * | 2004-07-09 | 2006-01-11 | 千乡万才科技(中国)有限公司 | Resource management system and method |
CN102592195A (en) * | 2011-12-28 | 2012-07-18 | Tcl集团股份有限公司 | Project control system and method based on development of products |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1372091A3 (en) * | 2002-06-12 | 2004-07-14 | Siemens Gebäudesicherheit GmbH & Co. OHG | Computer system for projects control |
CN105139103A (en) * | 2015-07-24 | 2015-12-09 | 广州支点网络科技有限公司 | Method and apparatus for controlling process circulation of project management and terminal device |
CN106447161A (en) * | 2016-08-29 | 2017-02-22 | 上海青睐商务咨询有限公司 | Project management system |
-
2017
- 2017-05-10 CN CN201710327645.XA patent/CN107679818A/en active Pending
- 2017-11-17 WO PCT/CN2017/111639 patent/WO2018205544A1/en active Application Filing
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2003073234A2 (en) * | 2002-02-27 | 2003-09-04 | Levy Scott | System and method for managing organization's resources |
CN1719462A (en) * | 2004-07-09 | 2006-01-11 | 千乡万才科技(中国)有限公司 | Resource management system and method |
CN102592195A (en) * | 2011-12-28 | 2012-07-18 | Tcl集团股份有限公司 | Project control system and method based on development of products |
Cited By (32)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108596471A (en) * | 2018-04-19 | 2018-09-28 | 平安科技(深圳)有限公司 | Project evaluation information processing method, device, computer equipment and storage medium |
CN108846564A (en) * | 2018-05-31 | 2018-11-20 | 康键信息技术(深圳)有限公司 | Server, the method for waiting and storage medium |
CN109726975A (en) * | 2018-06-01 | 2019-05-07 | 平安普惠企业管理有限公司 | Project development method, apparatus, equipment and readable storage medium storing program for executing based on workflow |
CN109118060A (en) * | 2018-07-24 | 2019-01-01 | 武汉空心科技有限公司 | Quick development method, platform and system based on timeliness control |
CN109190888A (en) * | 2018-07-27 | 2019-01-11 | 平安科技(深圳)有限公司 | project evaluation distribution method, device, terminal device and storage medium |
CN109165931A (en) * | 2018-09-25 | 2019-01-08 | 阿里巴巴集团控股有限公司 | Project workflow management method and device |
CN109388376A (en) * | 2018-09-29 | 2019-02-26 | 平安科技(深圳)有限公司 | Risk of software development appraisal procedure, device, equipment and readable storage medium storing program for executing |
CN109388376B (en) * | 2018-09-29 | 2023-08-11 | 平安科技(深圳)有限公司 | Software development risk assessment method, device, equipment and readable storage medium |
CN109324976A (en) * | 2018-10-22 | 2019-02-12 | 中国平安财产保险股份有限公司 | Manage method, apparatus, computer equipment and the storage medium of testing progress |
CN111222520A (en) * | 2018-11-23 | 2020-06-02 | 中移(杭州)信息技术有限公司 | Classification model training method, classification method and classification system |
CN109683859B (en) * | 2018-12-04 | 2022-02-18 | 郑州云海信息技术有限公司 | Computer software development management platform, equipment and readable storage medium |
CN109683860B (en) * | 2018-12-04 | 2022-02-18 | 郑州云海信息技术有限公司 | Computer software project management platform, equipment and readable storage medium |
CN109683860A (en) * | 2018-12-04 | 2019-04-26 | 郑州云海信息技术有限公司 | A kind of computer software project management platform, equipment and readable storage medium storing program for executing |
CN109683859A (en) * | 2018-12-04 | 2019-04-26 | 郑州云海信息技术有限公司 | A kind of computer software development management platform, equipment and readable storage medium storing program for executing |
CN110335004A (en) * | 2019-05-08 | 2019-10-15 | 重庆天蓬网络有限公司 | A kind of product and engineering relationships solution based on responsibility system |
CN110264042A (en) * | 2019-05-25 | 2019-09-20 | 深圳市元征科技股份有限公司 | A kind of method and relevant apparatus of project management |
CN110210759A (en) * | 2019-05-31 | 2019-09-06 | 北京银企融合技术开发有限公司 | A kind of object evaluation method, apparatus and electronic equipment |
CN110275708A (en) * | 2019-06-06 | 2019-09-24 | 江西理工大学 | A kind of visual software modeling method of computer software view |
CN110610350A (en) * | 2019-08-30 | 2019-12-24 | 深圳市元征科技股份有限公司 | Project management method, device and equipment |
CN110750299A (en) * | 2019-09-25 | 2020-02-04 | 恒大智慧科技有限公司 | Intelligent software quality tracking system, method and storage medium |
CN111104331A (en) * | 2019-12-20 | 2020-05-05 | 广州唯品会信息科技有限公司 | Software management method, terminal device and computer-readable storage medium |
CN112085471A (en) * | 2020-09-10 | 2020-12-15 | 北京百度网讯科技有限公司 | Task distribution method and device, electronic equipment and storage medium |
CN112950138A (en) * | 2020-09-11 | 2021-06-11 | 深圳市明源云科技有限公司 | Collaborative development state management method and device and server |
CN112950138B (en) * | 2020-09-11 | 2024-03-12 | 深圳市明源云科技有限公司 | Collaborative development state management method, device and server |
CN112286984A (en) * | 2020-09-29 | 2021-01-29 | 卓尔智联(武汉)研究院有限公司 | Block data processing method and device, computer equipment and storage medium |
CN113361909A (en) * | 2021-06-03 | 2021-09-07 | 杭州推啊网络科技有限公司 | Internet project management method and system |
CN113392420A (en) * | 2021-07-06 | 2021-09-14 | 山东电力工程咨询院有限公司 | Intelligent project data management method and system |
CN113592439A (en) * | 2021-07-14 | 2021-11-02 | 青岛海尔科技有限公司 | Software project flow management system and method |
CN113592439B (en) * | 2021-07-14 | 2024-03-26 | 青岛海尔科技有限公司 | Software project flow management system and method |
CN116523263A (en) * | 2023-06-06 | 2023-08-01 | 深圳明辉智能技术有限公司 | Intelligent data processing method, system and storage medium |
CN116993286A (en) * | 2023-07-24 | 2023-11-03 | 北京泰策科技有限公司 | Test management system and method based on test progress reverse project progress |
CN116993286B (en) * | 2023-07-24 | 2024-04-12 | 北京泰策科技有限公司 | Test management system and method based on test progress reverse project progress |
Also Published As
Publication number | Publication date |
---|---|
WO2018205544A1 (en) | 2018-11-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107679818A (en) | Software project management method, terminal and computer-readable recording medium | |
CN109684047A (en) | Event-handling method, device, equipment and computer storage medium | |
US9753839B2 (en) | Test script evaluation system and method | |
IL246744A (en) | Systems and methods for social graph data analytics to determine connectivity within a community | |
US20150178134A1 (en) | Hybrid Crowdsourcing Platform | |
US20160224453A1 (en) | Monitoring the quality of software systems | |
US11676503B2 (en) | Systems and methods for predictive modelling of digital assessment performance | |
US20120128147A1 (en) | User-defined system-enforced session termination in a unified telephony environment | |
CN109146271A (en) | Performance management method, apparatus, terminal and computer readable storage medium | |
CN113268336A (en) | Service acquisition method, device, equipment and readable medium | |
CN106384399A (en) | IOT (Internet of Things)-office-oriented network attendance method | |
US20130198127A1 (en) | Systems and methods for managing wide area networks | |
CN112926941A (en) | Management method and device for financial auditing rules, storage medium and server | |
CN110335687A (en) | Remote medical consultation with specialists method, system and computer readable storage medium | |
US20220270055A1 (en) | Verifying meeting attendance via a meeting expense and verification controller | |
CN109726975A (en) | Project development method, apparatus, equipment and readable storage medium storing program for executing based on workflow | |
KR20190024857A (en) | A System for Matching a Mentoring Relationship and Managing a Mentoring Process | |
US8504412B1 (en) | Audit automation with survey and test plan | |
CN116523263A (en) | Intelligent data processing method, system and storage medium | |
US10104159B2 (en) | Task processing method, program, and system | |
KR102507442B1 (en) | Environmental safety and health management methods and systems | |
Tang et al. | CloudRec: A mobile cloud service recommender system based on adaptive QoS management | |
CN106686403B (en) | A kind of video preview drawing generating method, device, server and system | |
CN112785418B (en) | Credit risk modeling method, apparatus, device and computer readable storage medium | |
CN109102248A (en) | Amending method, device and the computer readable storage medium of nodal information |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180209 |
|
RJ01 | Rejection of invention patent application after publication |