CN107423223A - Test and management system - Google Patents

Test and management system Download PDF

Info

Publication number
CN107423223A
CN107423223A CN201710681345.1A CN201710681345A CN107423223A CN 107423223 A CN107423223 A CN 107423223A CN 201710681345 A CN201710681345 A CN 201710681345A CN 107423223 A CN107423223 A CN 107423223A
Authority
CN
China
Prior art keywords
management
test
interfaces
interface
back office
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710681345.1A
Other languages
Chinese (zh)
Inventor
杨京翰
肖启川
蔡欣
任还
张峻铭
蒋德富
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Travelsky Technology Co Ltd
China Travelsky Holding Co
Original Assignee
China Travelsky Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Travelsky Technology Co Ltd filed Critical China Travelsky Technology Co Ltd
Priority to CN201710681345.1A priority Critical patent/CN107423223A/en
Publication of CN107423223A publication Critical patent/CN107423223A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/36Preventing errors by testing or debugging software
    • G06F11/3668Software testing
    • G06F11/3672Test management
    • G06F11/3688Test management for test execution, e.g. scheduling of test suites
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/36Preventing errors by testing or debugging software
    • G06F11/3668Software testing
    • G06F11/3672Test management
    • G06F11/3692Test management for test results analysis
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L63/00Network architectures or network communication protocols for network security
    • H04L63/10Network architectures or network communication protocols for network security for controlling access to devices or network resources
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/02Protocols based on web technology, e.g. hypertext transfer protocol [HTTP]
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/133Protocols for remote procedure calls [RPC]
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L9/00Cryptographic mechanisms or cryptographic arrangements for secret or secure communications; Network security protocols
    • H04L9/32Cryptographic mechanisms or cryptographic arrangements for secret or secure communications; Network security protocols including means for verifying the identity or authority of a user of the system or for message authentication, e.g. authorization, entity authentication, data integrity or data verification, non-repudiation, key authentication or verification of credentials
    • H04L9/321Cryptographic mechanisms or cryptographic arrangements for secret or secure communications; Network security protocols including means for verifying the identity or authority of a user of the system or for message authentication, e.g. authorization, entity authentication, data integrity or data verification, non-repudiation, key authentication or verification of credentials involving a third party or a trusted authority
    • H04L9/3213Cryptographic mechanisms or cryptographic arrangements for secret or secure communications; Network security protocols including means for verifying the identity or authority of a user of the system or for message authentication, e.g. authorization, entity authentication, data integrity or data verification, non-repudiation, key authentication or verification of credentials involving a third party or a trusted authority using tickets or tokens, e.g. Kerberos

Abstract

The invention provides a kind of test and management system, including:The multi-platform service system in front end, for performing test assignment;Back office interface, it is connected with the multi-platform service system in the front end, for generating test data, and passes through the statistical analysis of the unified interface completion test data;Database, it is connected with the back office interface, for preserving the test data by unified data requirement.By the present invention, solves the too low technical problem of testing efficiency in the prior art.

Description

Test and management system
Technical field
The present invention relates to computer realm, in particular to a kind of test and management system.
Background technology
Test process belongs to indispensable part with delivering in research and development of software management, the most of test of industry at present Management tool or platform are all based on itself independent data and business structure is operated in a manner of web system, on the one hand this A little systems substantially each cover only process and deliver in part flow so that during daily test and management, it is necessary to The handover operation in different system;On the other hand because the Systematic selection of different team is different, and there is no unification between each system Data requirement and operate interface so that problem be present in test data sharing, statistics, analysis, to test Team Management and survey Examination efficiency causes certain influence;Furthermore testing team can not be according to the improvement or change of itself processes of research & development and research and development pattern Personalized customization is carried out on these systems, and what time the above have impact on test process and the efficiency and matter delivered to a certain extent Amount, and some flow or specification can not be solidified, the establishment and shaping of test team can not be referred from.
For above mentioned problem of the prior art, at present it is not yet found that the solution of effect.
The content of the invention
It is too low at least to solve testing efficiency in the prior art the embodiments of the invention provide a kind of test and management system Technical problem.
According to one embodiment of present invention, there is provided a kind of test and management system, including:The multi-platform service system in front end System, for performing test assignment;Back office interface, it is connected with the multi-platform service system in the front end, for generating test data, and The statistical analysis of the test data is completed by unified interface;Database, it is connected with the back office interface, for passing through system One data requirement preserves the test data.
Alternatively, the multi-platform service system in the front end includes at least one of:Test process management system, automation Continuous integrating management system, safety test management system, test data statistical analysis system.
Alternatively, the back office interface also includes at least one of:Docment interfaces for operational requirements management, Task interfaces for task management, the case interfaces for case management, the execute interfaces for test execution management, Bug interfaces for defect management, the summary interfaces for reporting and summarizing management, for automatic management Autotest interfaces, the safetest interfaces for safety management, for jenkins management jenkins interfaces, for counting With the report interfaces of analysis.
Alternatively, the system also includes:Authority management module, it is connected to the multi-platform service system in the front end and described Between back office interface, for carrying out claim management to the back office interface.
Alternatively, the authority management module is additionally operable to:When calling the back office interface, pass through what is sent in request Token tokens obtain user role and carry out authority judgement.
Alternatively, the authority management module carries out claim management using jwt and shiro to the back office interface.
Alternatively, the back office interface applies the framework in one below:jersey、spring、mybatis、jwt、 shiro、logback。
Alternatively, the back office interface is restful interfaces.
Alternatively, the multi-platform service system in the front end is additionally operable to start the test assignment by access mode.
Alternatively, the system also includes:Java client, it is connected with the back office interface, for passing through access mode Start the test assignment.
By the present invention, the form that test data can be transferred through uniform data specification is stored in database, each system and Project team can share test data, solve the too low technical problem of testing efficiency in the prior art, and test data is with before Operation system separation is held, further ensure that the security of data.
Brief description of the drawings
Accompanying drawing described herein is used for providing a further understanding of the present invention, forms the part of the application, this hair Bright schematic description and description is used to explain the present invention, does not form inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 is the structured flowchart of test and management system according to embodiments of the present invention;
Fig. 2 is the test process management system application drawing of the embodiment of the present invention;
Fig. 3 is the automation continuous integrating management system application figure of the embodiment of the present invention;
Fig. 4 is the test report of the embodiment of the present invention with summarizing application drawing;
Fig. 5 is the system architecture diagram of the embodiment of the present invention;
Fig. 6 is the workflow diagram of the embodiment of the present invention.
Embodiment
Describe the present invention in detail below with reference to accompanying drawing and in conjunction with the embodiments.It should be noted that do not conflicting In the case of, the feature in embodiment and embodiment in the application can be mutually combined.
It should be noted that term " first " in description and claims of this specification and above-mentioned accompanying drawing, " Two " etc. be for distinguishing similar object, without for describing specific order or precedence.
Embodiment 1
Used below, term " module " can realize the combination of the software and/or hardware of predetermined function.It is although following Device described by embodiment is preferably realized with software, but hardware, or the realization of the combination of software and hardware is also May and it be contemplated.
Fig. 1 is the structured flowchart of test and management system according to embodiments of the present invention, as shown in figure 1, the device includes:
The multi-platform service system 10 in front end, for performing test assignment;
Back office interface 12, it is connected with the multi-platform service system in front end, for generating test data, and passes through unified interface Complete the statistical analysis of test data;
Database 14, is connected with back office interface, for preserving test data by unified data requirement.
By the present embodiment, the form that test data can be transferred through uniform data specification is stored in database, each system Can share test data with project team, solve the too low technical problem of testing efficiency in the prior art, and test data with Front end service system separates, and further ensure that the security of data.
In the present embodiment, the multi-platform service system in front end includes at least one of:It is test process management system, automatic Change continuous integrating management system, safety test management system, test data statistical analysis system.
In the present embodiment, back office interface also includes at least one of:Docment for operational requirements management connects Mouth, the task interfaces for task management, the case interfaces for case management, the execute for test execution management connect Mouth, the bug interfaces for defect management, the summary interfaces for reporting and summarizing management, for automatic management Autotest interfaces, the safetest interfaces for safety management, for jenkins management jenkins interfaces, for counting With the report interfaces of analysis.
Optionally, system also includes:Authority management module, be connected to the multi-platform service system in front end and back office interface it Between, for carrying out claim management to back office interface.
In the present embodiment, authority management module is additionally operable to:When calling back office interface, pass through what is sent in request Token tokens obtain user role and carry out authority judgement.Authority management module is carried out using jwt and shiro to back office interface Claim management.
In the present embodiment, back office interface applies the framework in one below:jersey、spring、mybatis、jwt、 shiro、logback。
Optionally, back office interface is restful interfaces.
Optionally, the multi-platform service system in front end is additionally operable to start test assignment by access mode.Or system is also wrapped Include:Java client, it is connected with back office interface, for starting test assignment by access mode.
It should be noted that above-mentioned modules can be realized by software or hardware, for the latter, Ke Yitong Cross in the following manner realization, but not limited to this:Above-mentioned module is respectively positioned in same processor;Or above-mentioned modules are with any The form of combination is located in different processors respectively.
Embodiment 2
The application is described in detail the present embodiment combination specific embodiment:
The present embodiment is developed using javaweb lightweight frames, is divided into backstage rest style datas service interface and preceding The multi-platform service management system at end.Back office interface mainly provides various test data fundamental operations and statistical analysis service, bag Include demand data, task (user's story) data, use-case data, execution data, defective data, progress chasing data, automation The interface service of the whole testing process of covering such as test data, jenkins structure data;The multi-platform service management system in front end is then Based on data operating interface, binding test process and delivery process, the multimode management developed using ease for use, feature as principle System, including demand management, task management, case management, defect management, automatic management, Reports Administration, summary management etc..
Back-end data service interface be this programme architecture, can use jersey, spring, mybatis, jwt, The Open Frameworks such as shiro, logback, it is responsible for the tissue and operation, authority, the management of access control and system of test data The management of daily record.Data-interface combination industry data standard and test process specification, the data rule of each interface are uniformly formulated Lattice, avoid between disparity items group or different system to the inconsistent of data specification requirement.User can pass through direct access interface The mode of address obtains the statistics of various test datas, and also can carry out additions and deletions to data by java client calling interfaces changes Look into or secondary analysis.Database service interface additionally provides complete authority and access control management, can complete during calling interface Checking to user.Caused various test datas in daily test process are uniformly operated by database service interface, can be with The data of convenient fusion separate sources so that test data has higher uniformity, uniformity, commonality and security.
The multi-platform service management system in front end mainly provides test process industry corresponding with the key link in delivery process Business management operation, test process management system, automation continuous integrating management system, safety test management system are broadly divided into, Test data statistical analysis system, major function include crucial demand task tracking distribution, the writing and perform of test case, The submission of defect and tracking, the integrated of automatic test, the implementation status of normalization safety test, test report and summary, survey Try data statistics and analysis etc..Pass through front end services management system coverage test process and the critical workflow delivered, rapid curing The testing process specification of R&D team, suitable for various common research and development patterns, it can help to test Team, distributed research and development Middle test and management and rapid shaping.Fig. 2 is the test process management system application drawing of the embodiment of the present invention, and Fig. 3 is real for the present invention The automation continuous integrating management system application figure of example is applied, Fig. 4 is the test report of the embodiment of the present invention with summarizing application drawing.
Fig. 5 is the system architecture diagram of the embodiment of the present invention, from the background using jersey, spring, mybatis as framework, there is provided Comprehensive interface service, including the docment interfaces of operational requirements management, the task interfaces of task management, case management The summary of case interfaces, the execute interfaces of test execution management, the bug interfaces of defect management, report with summarizing management Interface, the autotest interfaces of automatic management, the safetest interfaces of safety management, the jenkins of jenkins management connect Report interfaces of mouth, statistics and analysis etc., front-end service system, third party system, automated test frame, safety test work Tool generates corresponding test data, then complete test by unified interface by calling above interface to complete the operation of data The statistical analysis of data.
Optionally, scheme can also use the management of jwt, shiro progress user right and access control, and user is calling While interface, user role is obtained by the token tokens sent in request and carries out authority judgement.
This programme is by the workflow of java client interface access modes as shown in fig. 6, Fig. 6 is implementation of the present invention The workflow diagram of example, is described as follows:
Step 1, login interfaces are called, token is returned after authentication;
Step 2, the token returned is added in step 1 in request header information, and sends the request of other interface interchanges;
Step 3, backstage jersey frameworks filter interception requests, first pass through in jwt authenticating steps 2 in request header Token, if certification success, role-security judgement is carried out into shiro;
Step 4, shiro judges the request according to the user role of certification in the interface and step 3 called in step 2 Whether it is allowed to call, step 5 is entered if allowing, otherwise returns to error code;
Step 5, into called interface, database is stored in by interface operation test data or returned with json strings related Test data;
Step 6, dependence test statistics and analysis situation can be checked by report interfaces.
This programme is by the workflow of the multi-platform service management system access mode in front end as shown in fig. 6, being described as follows:
Step 1, by browser access logging request, login interfaces is called, token is returned after authentication success, and Preserved in a browser with cookie;
Step 2, the business function in test process management platform, can be connect by demand management module accesses document Mouthful, by task management module access task interfaces, by use-case management module access case interfaces, by performing management module Execute interfaces are accessed, by defect management module accesses bug interfaces, are connect by report with summarizing module accesses summary Mouthful, after the page submits request, the Background scheduling interface related to business module;
Step 3, backstage jersey frameworks filter interception requests, first pass through in jwt authenticating steps 2 in request header Token, if certification success, role-security judgement is carried out into shiro;
Step 4, shiro judges the request according to the user role of certification in the interface and step 3 called in step 2 Whether it is allowed to call, step 5 is entered if allowing, otherwise returns to error code;
Step 5, into called interface, database is stored in by interface operation test data or returned with json strings related Test data, backstage can also carry out other business logical operations, and back page to returned data;
Step 6, the json strings that front end parsing returns, and user is showed with data mode;
Step 7, user can enter test data statistics and analysis system checks relevant information.
Pass through both the above mode, it is ensured that test process is with delivery process, testing number caused by all key links It is stored according to the form that can be transferred through uniform data specification in database, each system and project team can share test data, and Data separate with front end service system, further ensure that the security of data, and test data statistics can also carry with analysis system For the data sheet of various dimensions, reference is provided with scheme for test Capability Maturity Model.Multi-platform service management system, there is provided cover Lid function test, automatic test, the management function of safety test, it can complete to test work easily and fast according to the flow of solidification Make, can also integrate jenkins rest interfaces in addition, realize the operation persistently delivered and key link is tested in pipeline.
Using the scheme of the present embodiment, developed using javaweb lightweight frames, possess higher customization and extension Property, it can be realized by accessing the rest style interfaces of the uniform data specification provided between each system to the behaviour of various test datas Make, reach the centrality, uniformity, security of test data, it is convenient to carry out later data statistics and analysis;Can be also by front end The multi-platform management system provided, it is easily accomplished test each link such as demand, plan, task, use-case, defect, automation, report Etc. the tracing management of key link;Can also be according to team, the demand of user and quick the being customized module of feedback and function Exploitation.
Obviously, those skilled in the art should be understood that above-mentioned each module of the invention or each step can be with general Computing device realize that they can be concentrated on single computing device, or be distributed in multiple computing devices and formed Network on, alternatively, they can be realized with the program code that computing device can perform, it is thus possible to they are stored Performed in the storage device by computing device, and in some cases, can be with different from shown in order execution herein The step of going out or describing, they are either fabricated to each integrated circuit modules respectively or by multiple modules in them or Step is fabricated to single integrated circuit module to realize.So, the present invention is not restricted to any specific hardware and software combination.
The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the invention, for the skill of this area For art personnel, the present invention can have various modifications and variations.Within the spirit and principles of the invention, that is made any repaiies Change, equivalent substitution, improvement etc., should be included in the scope of the protection.

Claims (10)

  1. A kind of 1. test and management system, it is characterised in that including:
    The multi-platform service system in front end, for performing test assignment;
    Back office interface, it is connected with the multi-platform service system in the front end, for generating test data, and it is complete by unified interface Into the statistical analysis of the test data;
    Database, it is connected with the back office interface, for preserving the test data by unified data requirement.
  2. 2. according to the method for claim 1, it is characterised in that the multi-platform service system in front end include it is following at least it One:
    Test process management system, automation continuous integrating management system, safety test management system, test data statistical analysis System.
  3. 3. system according to claim 1, it is characterised in that the back office interface also includes at least one of:
    Docment interfaces for operational requirements management, the task interfaces for task management, the case for case management connect Mouth, the execute interfaces for test execution management, the bug interfaces for defect management, for reporting and summarizing management Summary interfaces, the autotest interfaces for automatic management, the safetest interfaces for safety management, it is used for Jenkins interfaces, the report interface for counting and analyzing of jenkins management.
  4. 4. system according to claim 1, it is characterised in that the system also includes:
    Authority management module, it is connected between the multi-platform service system in the front end and the back office interface, for after described Platform interface carries out claim management.
  5. 5. system according to claim 4, it is characterised in that the authority management module is additionally operable to:After calling is described During platform interface, user role is obtained by the token tokens sent in request and carries out authority judgement.
  6. 6. system according to claim 4, it is characterised in that the authority management module is using jwt and shiro to described Back office interface carries out claim management.
  7. 7. system according to claim 1, it is characterised in that the back office interface applies the framework in one below: jersey、spring、mybatis、jwt、shiro、logback。
  8. 8. system according to claim 1, it is characterised in that the back office interface is restful interfaces.
  9. 9. system according to claim 1, it is characterised in that the multi-platform service system in front end is additionally operable to pass through access Mode starts the test assignment.
  10. 10. system according to claim 1, it is characterised in that the system also includes:
    Java client, it is connected with the back office interface, for starting the test assignment by access mode.
CN201710681345.1A 2017-08-10 2017-08-10 Test and management system Pending CN107423223A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710681345.1A CN107423223A (en) 2017-08-10 2017-08-10 Test and management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710681345.1A CN107423223A (en) 2017-08-10 2017-08-10 Test and management system

Publications (1)

Publication Number Publication Date
CN107423223A true CN107423223A (en) 2017-12-01

Family

ID=60437873

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710681345.1A Pending CN107423223A (en) 2017-08-10 2017-08-10 Test and management system

Country Status (1)

Country Link
CN (1) CN107423223A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109240919A (en) * 2018-08-20 2019-01-18 郑州云海信息技术有限公司 A kind of test data volume statistic system and method
CN109254916A (en) * 2018-08-30 2019-01-22 郑州云海信息技术有限公司 A kind of method and server of the visualization RestFul interface testing relying on injection based on Spring
CN110688643A (en) * 2019-11-05 2020-01-14 北京集奥聚合科技有限公司 Processing method for platform identity identification and authority authentication
CN111756738A (en) * 2020-06-24 2020-10-09 昆明东电科技有限公司 System framework for quickly constructing Web application, data processing method and system
CN112988555A (en) * 2019-12-13 2021-06-18 中移信息技术有限公司 Interface test method, device, equipment and storage medium

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5157782A (en) * 1990-01-31 1992-10-20 Hewlett-Packard Company System and method for testing computer hardware and software
CN101834747A (en) * 2009-03-12 2010-09-15 上海科泰信息技术有限公司 Data acquisition device and method thereof suitable for various alarm information formats
CN103377406A (en) * 2012-04-25 2013-10-30 富泰华工业(深圳)有限公司 System and method for managing test files

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5157782A (en) * 1990-01-31 1992-10-20 Hewlett-Packard Company System and method for testing computer hardware and software
CN101834747A (en) * 2009-03-12 2010-09-15 上海科泰信息技术有限公司 Data acquisition device and method thereof suitable for various alarm information formats
CN103377406A (en) * 2012-04-25 2013-10-30 富泰华工业(深圳)有限公司 System and method for managing test files

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109240919A (en) * 2018-08-20 2019-01-18 郑州云海信息技术有限公司 A kind of test data volume statistic system and method
CN109240919B (en) * 2018-08-20 2022-03-22 郑州云海信息技术有限公司 Test data volume statistical system and method
CN109254916A (en) * 2018-08-30 2019-01-22 郑州云海信息技术有限公司 A kind of method and server of the visualization RestFul interface testing relying on injection based on Spring
CN110688643A (en) * 2019-11-05 2020-01-14 北京集奥聚合科技有限公司 Processing method for platform identity identification and authority authentication
CN112988555A (en) * 2019-12-13 2021-06-18 中移信息技术有限公司 Interface test method, device, equipment and storage medium
CN111756738A (en) * 2020-06-24 2020-10-09 昆明东电科技有限公司 System framework for quickly constructing Web application, data processing method and system

Similar Documents

Publication Publication Date Title
CN107423223A (en) Test and management system
CN104216912B (en) The implementation method and device of a kind of business form work fluidisation without intrusive mood
US7467198B2 (en) Architectures for netcentric computing systems
CN108415832A (en) Automatic interface testing method, device, equipment and storage medium
CN109828903A (en) Automated testing method, device, computer installation and storage medium
CN107924411A (en) The recovery of UI states in transaction system
CA2388624C (en) Architectures for netcentric computing systems
CN104572122A (en) Software application data generating device and method
CN110188132B (en) Data exchange method and system
CN110909013B (en) Service list generation method, device, equipment and computer readable storage medium
CN110414908A (en) Project examination method, air control approval system and medium based on air control approval system
CN111651431A (en) Database service oriented management flow standardization method
CN107797932A (en) Pay acquisition methods, device and the storage medium of readjustment
CN111064725A (en) Code zero intrusion interface verification method and device
CN108241529A (en) Wages computational methods, application server and computer readable storage medium
CN114548833A (en) Integrated intelligent operation and maintenance control method, system and operation and maintenance platform
CN112559525B (en) Data checking system, method, device and server
CN112651716A (en) Data processing method, device and storage medium
CN112015715A (en) Industrial Internet data management service testing method and system
CN108830549A (en) Attendance management method, apparatus, computer readable storage medium and system
CN113259323B (en) Dual access authority service authentication method, device, system and storage medium
CN112965986A (en) Service consistency processing method, device, equipment and storage medium
CN105955718A (en) Software customization method and system
CN110335016A (en) A kind of distribution cell lean intelligence manufacture management system
CN104391785A (en) Testing method for ERP (Enterprise Resource Planning) data

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20171201

WD01 Invention patent application deemed withdrawn after publication