CN108764810A - Method, control device and the storage medium of task management - Google Patents

Method, control device and the storage medium of task management Download PDF

Info

Publication number
CN108764810A
CN108764810A CN201810292786.7A CN201810292786A CN108764810A CN 108764810 A CN108764810 A CN 108764810A CN 201810292786 A CN201810292786 A CN 201810292786A CN 108764810 A CN108764810 A CN 108764810A
Authority
CN
China
Prior art keywords
task
bit stream
mission bit
information
management
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810292786.7A
Other languages
Chinese (zh)
Inventor
朱鹏炜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Qianhai Zhonghui World Network Technology Co Ltd
Original Assignee
Shenzhen Qianhai Zhonghui World Network Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Qianhai Zhonghui World Network Technology Co Ltd filed Critical Shenzhen Qianhai Zhonghui World Network Technology Co Ltd
Priority to CN201810292786.7A priority Critical patent/CN108764810A/en
Publication of CN108764810A publication Critical patent/CN108764810A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/101Collaborative creation, e.g. joint development of products or services

Abstract

The invention discloses a kind of method of task management, the method for the task management includes the following steps:When receiving mission bit stream, the associated user of the task is obtained according to the mission bit stream;The mission bit stream is associated with to the corresponding user information of associated user of the task, wherein the associated user of the task includes task owner and task auditor;When the receiving terminal transmission of the task checks request, obtain the mission bit stream that the task checks user information correlation in request, the mission bit stream is sent to the terminal, wherein the mission bit stream includes at least task completeness, the relevant user information of task definition and task.The invention also discloses a kind of control device of task management and storage mediums.The present invention improves the accuracy of task management because task owner can check mission bit stream in the entire process of task.

Description

Method, control device and the storage medium of task management
Technical field
The present invention relates to the method for office administration field more particularly to task management, control device and storage mediums.
Background technology
With the development of office networked, more and more task management tools are used for the management of task.
The task management method that current task management tool provides, usually after the completion of task, the person liable of task The related content of the task is just committed to server, auditor audits the task after capable of just checking task related content Evaluation;And during task carries out, task auditor can not check the mission bit streams such as Task Progress, so as to cause task management Inaccurately.
The above is only used to facilitate the understanding of the technical scheme, and is not represented and is recognized that the above is existing skill Art.
Invention content
The main purpose of the present invention is to provide a kind of methods of task management, it is intended to which solving current task auditor can not Check the mission bit stream during task carries out, the inaccurate problem of task management.
To achieve the above object, the present invention provides a kind of method of task management, the method for the task management include with Lower step:
When receiving mission bit stream, the associated user of the task is obtained according to the mission bit stream;
The mission bit stream is associated with to the corresponding user information of associated user of the task, wherein the task Associated user includes task owner and task auditor;
When the receiving terminal transmission of the task checks request, obtains the task and check user information correlation in request The mission bit stream is sent to the terminal by mission bit stream, wherein the mission bit stream includes at least task completeness, appoints The relevant user information for the content and task of being engaged in.
Preferably, the method for the task management further includes:
When receiving the task more new command of terminal transmission, the task is updated according to the task more new command and is believed Breath;
Task auditor is obtained according to the mission bit stream, task update notifying information is sent to the task auditor.
Preferably, the method for the task management further includes:
When the receiving terminal transmission of the task comments on request, judge that task comment asks whether corresponding task is completed;
When judging that the task does not complete, the first interface is sent to the terminal;
When judging that the task is completed, second contact surface is sent to the terminal, wherein the second contact surface includes to appoint Business incentive message.
Preferably, described when judging that the task does not complete, to the terminal send the step of task comments on interface it Afterwards, further include:
When receiving the task comment information that terminal is sent based on first interface, obtains task comment information and correspond to Task, the corresponding mission bit stream of the task is associated with the task comment information;
Task owner is obtained according to the mission bit stream, sending task to the task owner comments on prompting message.
Preferably, described when judging that the task is completed, to after the step of terminal transmission second contact surface, also Including:
When receiving the task incentive message that terminal is sent based on the second contact surface, obtains task incentive message and correspond to Task, the corresponding mission bit stream of the task is associated with the task incentive message;
Task owner is obtained according to the mission bit stream, the task owner is updated according to the task incentive message Task bonus data.
Preferably, the described the step of mission bit stream is associated with the corresponding user information of the associated user to the task Later, further include:
Progress reminder time is obtained according to the mission bit stream, progress reminder time is associated with the mission bit stream;
When system time meets the progress reminder time, the progress reminder time associated mission bit stream is obtained;
Judge whether the task has been completed according to the task completeness in the mission bit stream;
When judging that the task does not complete, progress prompting message is sent to the task owner of the task.
Preferably, the method for the task management is further comprising the steps of:
In the plan information that terminal is sent, the type of the plan information is obtained, wherein the type of the plan information Including daily planning information, all plan informations and monthly plan information;
Corresponding plan reward is obtained according to the type of the plan information;
The plan bonus data of the associated user of plan information is updated according to the plan reward.
Preferably, the method for the task management further includes:
When inquiry request is ranked in the reward for receiving terminal transmission, the group that the reward seniority among brothers and sisters inquiry request includes is obtained Knit Schema information;
The bonus data of all users in the organizational structure is obtained, reward ranking list is generated, wherein the reward is ranked List includes target reward ranking list and plan reward ranking list;
The reward ranking list is sent to the terminal.
In addition, to achieve the above object, the present invention also provides a kind of control devices of task management, which is characterized in that institute The control device for stating task management includes:It memory, processor and is stored on the memory and can be on the processor The control program of the task management of operation is realized as described above when the control program of the task management is executed by the processor Task management method the step of.
In addition, to achieve the above object, the present invention also provides a kind of storage mediums, which is characterized in that the storage medium On be stored with the control program of task management, realized when the control program of the task management is executed by processor as described above The step of method of task management.
A kind of method for task management that the embodiment of the present invention proposes, server receive mission bit stream, which are believed Association to the associated user of task including task auditor including user information, when receive that terminal sends checks request When, the corresponding mission bit stream of task that the task checks user information correlation in request is obtained, the mission bit stream is sent To the terminal, so that the related personnel of the task including task auditor can be in the entire progress process of task In check mission bit stream, improve the accuracy of task management.
Description of the drawings
Fig. 1 is the structural schematic diagram of the control device for the task management that the embodiment of the present invention is related to;
Fig. 2 is the flow diagram of the first embodiment of the method for task management of the present invention;
Fig. 3 is the flow diagram of the second embodiment of the method for task management of the present invention;
Fig. 4 is the flow diagram of the 3rd embodiment of the method for task management of the present invention;
Fig. 5 is the flow diagram of the fourth embodiment of the method for task management of the present invention.
The embodiments will be further described with reference to the accompanying drawings for the realization, the function and the advantages of the object of the present invention.
Specific implementation mode
It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not intended to limit the present invention.
The primary solutions of the embodiment of the present invention are:When receiving mission bit stream, obtained according to the mission bit stream The associated user of the task;The mission bit stream is associated with to the corresponding user information of associated user of the task, wherein The associated user of the task includes task owner and task auditor;When the receiving terminal transmission of the task checks request When, the mission bit stream that the task checks user information correlation in request is obtained, the mission bit stream is sent to the terminal, Wherein, the mission bit stream includes at least task completeness, the relevant user information of task definition and task.
Since task auditor can not check that the mission bit stream during task progress, task management be not smart in the prior art Really.
The present invention provides a solution so that the associated user of the task including task auditor can be in office Mission bit stream is checked in the entire process of business, improves the accuracy of task management.
As a kind of implementation, the present embodiments relate to the hardware configuration of control device of task management can be as Shown in Fig. 1.
As shown in Figure 1, the terminal may include:Processor 1001, such as CPU, network interface 1004, user interface 1003, memory 1005, communication bus 1002.Wherein, communication bus 1002 is for realizing the connection communication between these components. User interface 1003 may include display screen (Display), input unit such as keyboard (Keyboard), optional user interface 1003 can also include standard wireline interface and wireless interface.Network interface 1004 may include optionally that the wired of standard connects Mouth, wireless interface (such as WI-FI interfaces).Memory 1005 can be high-speed RAM memory, can also be stable memory (non-volatile memory), such as magnetic disk storage.Memory 1005 optionally can also be independently of aforementioned processor 1001 storage device.
It will be understood by those skilled in the art that the restriction of the not structure paired terminal of terminal structure shown in Fig. 1, can wrap It includes than illustrating more or fewer components, either combines certain components or different components arrangement.
As shown in Figure 1, as may include that operating system, network are logical in a kind of memory 1005 of computer storage media Believe module, Subscriber Interface Module SIM and the control program of task management.
In terminal shown in Fig. 1, network interface 1004 is mainly used for connecting background server, is carried out with background server Data communicate;User interface 1003 is mainly used for connecting client (user terminal), with client into row data communication;And processor 1001 can be used for calling the control program of the task management stored in memory 1005, and execute following operation:
When receiving mission bit stream, the associated user of the task is obtained according to the mission bit stream;
The mission bit stream is associated with to the corresponding user information of associated user of the task, wherein the task Associated user includes task owner and task auditor;
When the receiving terminal transmission of the task checks request, obtains the task and check user information correlation in request The mission bit stream is sent to the terminal by mission bit stream, wherein the mission bit stream includes at least task completeness, appoints The relevant user information for the content and task of being engaged in.
Further, processor 1001 can call the control program of the task management stored in memory 1005, also hold The following operation of row:
When receiving the task more new command of terminal transmission, the task is updated according to the task more new command and is believed Breath;
Task auditor is obtained according to the mission bit stream, task update notifying information is sent to the task auditor.
Further, processor 1001 can call the control program of the task management stored in memory 1005, also hold The following operation of row:
When the receiving terminal transmission of the task comments on request, judge that task comment asks whether corresponding task is completed;
When judging that the task does not complete, the first interface is sent to the terminal;
When judging that the task is completed, second contact surface is sent to the terminal, wherein the second contact surface includes to appoint Business incentive message.
Further, processor 1001 can call the control program of the task management stored in memory 1005, also hold The following operation of row:
When receiving the task comment information that terminal is sent based on first interface, obtains task comment information and correspond to Task, the corresponding mission bit stream of the task is associated with the task comment information;
Task owner is obtained according to the mission bit stream, sending task to the task owner comments on prompting message.
Further, processor 1001 can call the control program of the task management stored in memory 1005, also hold The following operation of row:
When receiving the task incentive message that terminal is sent based on the second contact surface, obtains task incentive message and correspond to Task, the corresponding mission bit stream of the task is associated with the task incentive message;
Task owner is obtained according to the mission bit stream, the task owner is updated according to the task incentive message Task bonus data.
Further, processor 1001 can call the control program of the task management stored in memory 1005, also hold The following operation of row:
Progress reminder time is obtained according to the mission bit stream, progress reminder time is associated with the mission bit stream;
When system time meets the progress reminder time, the progress reminder time associated mission bit stream is obtained;
Judge whether the task has been completed according to the task completeness in the mission bit stream;
When judging that the task does not complete, progress prompting message is sent to the task owner of the task.
Further, processor 1001 can call the control program of the task management stored in memory 1005, also hold The following operation of row:
In the plan information that terminal is sent, the type of the plan information is obtained, wherein the type of the plan information Including daily planning information, all plan informations and monthly plan information;
Corresponding plan reward is obtained according to the type of the plan information;
The plan bonus data of the associated user of plan information is updated according to the plan reward.
Further, processor 1001 can call the control program of the task management stored in memory 1005, also hold The following operation of row:
When inquiry request is ranked in the reward for receiving terminal transmission, the group that the reward seniority among brothers and sisters inquiry request includes is obtained Knit Schema information;
The bonus data of all users in the organizational structure is obtained, reward ranking list is generated, wherein the reward is ranked List includes target reward ranking list and plan reward ranking list;
The reward ranking list is sent to the terminal.
The present invention receives mission bit stream according to said program, server, which is coupled to and is audited including task The user information of the associated user of task including people obtains the task and looks into when receiving when checking request of terminal transmission The corresponding mission bit stream of task for seeing user information correlation in request, is sent to the terminal, to make by the mission bit stream The related personnel for obtaining the task including task auditor can check mission bit stream during the entire progress of task, carry The high accuracy of task management.
It is the flow diagram of the first embodiment of the method for task management of the present invention, the task pipe with reference to Fig. 2, Fig. 2 The method of reason includes:
Step S10 obtains the associated user of the task according to the mission bit stream when receiving mission bit stream
It does the method that invention provides task management and is mainly used for APP systems, it can also be used to other systems.The present invention, which provides, to be appointed The terminal that the method for business management is related to includes but not limited to mobile phone, tablet computer and computer etc., is pre-loaded in the terminal Relevant APP, user inputs username and password on the APP, after verification correctly logs in the APP, when user needs to create When building task, the corresponding button is clicked on menu, is sent and is created task requests to server, server receives described create and appoints After business request, terminal where to user, which is sent, to be created task interface and is shown in terminal, and establishment task is carried out for user Relevant operation.
User's input on the establishment task interface creates the establishment that mission bit stream carries out task, and establishment task needs to input Mission bit stream can voluntarily be arranged as the case may be, be not particularly limited herein, for example, create mission bit stream may include task Content, task completeness, job start time, expected concluding time, task owner, task auditor and related accessories etc.. It clicks and submits after the input of user's completion relevant information, mission bit stream is sent to server by terminal, and server receives described After mission bit stream, obtain the associated user for task of including in mission bit stream, the associated user of task include task owner and Task auditor.
The mission bit stream is associated with to the corresponding user information of associated user of the task, wherein institute by step S20 The associated user for stating task includes task owner and task auditor;
In the method for task management provided by the invention, the associated user of task includes task owner and task audit People, and a task can have multiple tasks person liable, be responsible for the processing of task;Can equally there be multiple tasks auditor, take responsibility Business process carries out evaluation to task and is audited to the task after the completion of task.Task only needs to be blamed by one of task It lets people and is created, include the information of the associated user of all tasks of the task in above-mentioned mission bit stream, appoint specifically, creating Add task owner and task auditor when business respectively on task creation interface.
After server receives mission bit stream and gets the associated user of task, by all of mission bit stream and the task The corresponding user information of associated user is associated, so that associated user can check the mission bit stream.
Step S30 obtains the task and checks that user believes in request when the receiving terminal transmission of the task checks request Associated mission bit stream is ceased, the mission bit stream is sent to the terminal, wherein it is complete that the mission bit stream includes at least task The relevant user information of Cheng Du, task definition and task.
After task creation, since mission bit stream is associated with the user information of the associated user of task, The associated user of the task can check the mission bit stream of task.After user logs in, by the terminal of login System menu clicks the needing to check of the task, transmission checks request to server.Server receives check request after, according to looking into It sees that the user information in request finds out the corresponding mission bit stream of task of the user information correlation, and the user information is sent The terminal logged in user is shown.Wherein it is preferred to which the completeness of the task in the mission bit stream is with a progress bar and hundred The form of ratio is divided to show.
The update further, in this embodiment task owner can modify to mission bit stream, with more new task into Journey.Specifically, when the task that server receives terminal transmission updates request, server please be got pair according to task update Answering for task, further obtain the task task update interface, be sent to terminal, for task owner by the task more The service-oriented device in New Territory sends task fresh information.It is attached that task owner can update execution upload on interface in the task The operations such as part, incoming task dynamic and modification task completeness, wherein preferably, the task completeness is a progress bar, Task owner drags the modification that progress bar carries out task completeness by means;After the completion of aforesaid operations, task owner is logical It crosses terminal and the more new command of the task comprising aforesaid operations content is sent to server, server receives task more new command Afterwards, the mission bit stream of the user information correlation is got according to the user information in task more new command, then more according to task Mission bit stream described in the content update that new command includes.After the completion of mission bit stream, the task audit that mission bit stream includes is obtained People's information sends task update notifying information to task auditor, has content update with task described in reminding task auditor.It can With understanding, after mission bit stream updates, the mission bit stream that user subsequently views is updated mission bit stream.It can be with Understand, when the task completeness in task fresh information is 100%, the task more new command i.e. task completion refer to It enables, it is 100% that server gets task completeness according to task more new command, that is, judges that task has been completed, according to above-mentioned After instructing more new task information, sends task to the auditor of the task and complete prompting message, reminding task auditor's correlation is appointed Business has been completed, and is audited as early as possible.
In the present embodiment, server receives mission bit stream, which is coupled to including task auditor Task associated user user information, when receive terminal transmission when checking request, obtain the task and check request The corresponding mission bit stream of task of middle user information correlation, is sent to the terminal, so that including by the mission bit stream The related personnel of task including task auditor can check mission bit stream during the entire progress of task, improve and appoint The accuracy of business management.
It is the flow diagram of the second embodiment of the method for task management of the present invention with reference to Fig. 3, Fig. 3, it is real based on first Example is applied, the method for the task management further includes:
Step S40 judges that the corresponding task of task comment request is when the receiving terminal transmission of the task comments on request No completion;
Step S50 sends the first interface when judging that the task is not completed to the terminal;
Step S60 sends second contact surface, wherein second boundary when judging that the task is completed to the terminal Bread incentive message containing task.
In the present embodiment, during task carries out and after the completion of task, task audit per capita can comment on task, Wherein, during task carries out, task auditor can only issue comment information;And after the completion of task, task auditor can To issue comment information and incentive message.Specifically, when server receives the task comment request of terminal transmission, judge this Business comment asks whether corresponding task has been completed, and sends corresponding interface to terminal according to the performance of task.Tool Body sends the first interface when judging that the task is not completed to the terminal, due at this time can't be to task owner Granting task is rewarded, therefore first interface does not include task incentive message;When judging that the task is completed, to the end End sends second contact surface, and task auditor can audit the task and according to task performance to task responsibilities at this time Human hair puts corresponding reward, therefore the second contact surface includes task incentive message.
Step S70 obtains task comment when receiving the task comment information that terminal is sent based on first interface The corresponding mission bit stream of the task is associated with by the corresponding task of information with the task comment information;
Step S80 obtains task owner according to the mission bit stream, and sending task comment to the task owner carries Awake information.
When judging that task does not complete, terminal receives the first interface of server transmission, and user passes through first boundary Face inputs comment information, is sent to server;After server receives task comment information, task comment information correspondence is obtained Task, the corresponding mission bit stream of the task is associated with the task comment information, so that the associated user of task can Check the comment.Then the task owner that the task is got further according to mission bit stream sends task to the task owner Comment is reminded, and is had and the relevant comment of the task with reminding task person liable so that task owner can check in time.Into One step, when task auditor has delivered task-based appraisal, task comment letter associated with mission bit stream is stored in server When breath, then when the associated user of task checks mission bit stream, server can be by the mission bit stream and associated task-based appraisal It is sent to the terminal of associated user simultaneously.
Step S90 obtains task reward when receiving the task incentive message that terminal is sent based on the second contact surface The corresponding mission bit stream of the task is associated with by the corresponding task of information with the task incentive message;
Step S100 obtains task owner according to the mission bit stream, according to task incentive message update The task bonus data of task owner.
When judgement task has been completed, terminal receives the second contact surface of server transmission, and user is on second boundary After face edits task incentive message, the task incentive message is sent to by server by terminal.Server reception is taken office It is engaged in after incentive message, obtains the corresponding task of task incentive message, the corresponding mission bit stream of the task and the task are encouraged Information association is encouraged, is checked for the associated user of task.Meanwhile server gets appointing for the task according to the mission bit stream Be engaged in person liable, and the task bonus data of the task owner is updated according to the task incentive message.Further, work as task Auditor has delivered task incentive message and has then appointed when storing task incentive message associated with mission bit stream in server When the associated user of business checks mission bit stream, server can send out the mission bit stream and associated task incentive message simultaneously It send to the terminal of associated user.
Wherein, the task incentive message can it is a kind of tool elephant form granting, for example, the task reward can be with void The form granting of quasi- tomato has the optional four kinds of tomato icons of size on the audit interface, from small to large respectively it is 1 corresponding, 2 A, 3 and 4 tomatoes reward, the reward of task is completed as task owner, and auditor clicks corresponding tomato icon choosing Select the reward of being provided for task.
Technical solution provided in this embodiment when server receives task comment request, judges task comment request pair Whether answering for task has been completed, and when judging that task does not complete, the first boundary not comprising task incentive message is sent to terminal Face;When judgement task has been completed, the second contact surface for including mission bit stream is sent to terminal, so that task auditor's energy Different evaluations is carried out to task in task progress and after the completion of task, realizes the management of task more scientificly.
It is the flow diagram of the 3rd embodiment of the method for task management of the present invention with reference to Fig. 4, Fig. 4, is based on the first He Second embodiment after the step S20, further includes:
Step S110 obtains progress reminder time according to the mission bit stream, progress reminder time and the task is believed Manner of breathing is associated with;
Step S120 obtains associated of the progress reminder time when system time meets the progress reminder time Business information;
Step S130 judges whether the task has been completed according to the task completeness in the mission bit stream;
Step S140 sends progress to the task owner of the task and reminds letter when judging that the task is not completed Breath.
Technical solution provided by the invention can preset one or more time point or one after task creation Period, when system reaches preset time point or preset time period, if task does not complete also, server is blamed to task Transmission progress of leting people is reminded.
Specifically, after server receives the mission bit stream that terminal is sent, according to the Estimated Time Of Completion in mission bit stream Automatically generating reminder time, it is to be understood that the deadline generates the mode of reminder time and can voluntarily be arranged on the estimation, It does not do specific setting herein, such as time point of the Estimated Time Of Completion before three days can be set for reminder time, or setting is pre- Meter deadline this period of first three day is reminder time.After reminder time generates, server is related to mission bit stream by it Connection.When the system time arriving reminding time, server obtains reminder time associated mission bit stream, according in mission bit stream Task completeness judges whether task has been completed, when task does not complete, to the task owner of the task send task into Degree is reminded.It can be voluntarily arranged according to actual conditions it should be understood that sending the mode that Task Progress is reminded, do not done herein specific Limitation;For example, could be provided as:If reminder time is time point, system message is sent to task owner;If reminded Time is a period, can be in the continuously display prompting icon of task owner's terminal interface.
In technical solution provided in this embodiment, when arrival preset time point or preset time period, task remains unfulfilled When, server sends Task Progress prompting message to user, to remind user to complete task, to preferably realize task Management.
With reference to Fig. 5, Fig. 5 is the 4th of the method for the task management of the present invention flow diagram for applying example, is based on first to the The method of three embodiments, the task management further includes:
Step S150 obtains the type of the plan information, wherein the plan in the plan information that terminal is sent The type of information includes daily planning information, all plan informations and monthly plan information;
Step S160 obtains corresponding plan reward according to the type of the plan information;
Step S170 updates the plan bonus data of the associated user of plan information according to the plan reward.
The method of task management provided by the invention, other than it can realize the management of task, additionally it is possible to realize user The management of plan.
When user needs to create plan, clicks menu acquisition plan and create interface, create in the plan and edited on interface Plan information, the plan information can include but is not limited to plan time/period, program content and related accessories etc., After the completion of editor, user is intended to information by terminal and is sent to server.After server receives plan information, according to plan Information judges the type of plan, wherein the type planned includes three kinds of daily planning, week plan and monthly plan, then according to server In the plan type that prestores and the mapping table of plan reward obtain user's upload plan and plan to reward accordingly.It is getting After plan reward, server obtains user information according to plan information, further the plan bonus data of acquisition user, and according to The plan bonus data of the plan reward update user, so that user checks.Plan reward can with it is a kind of tool as Form embodies, for example, plan reward can be showed in the form of virtual apple, the correspondence of plan type and reward can be set It is set to:The reward that daily planning can get a virtual apple is created, the reward that week plan can get two virtual apples, wound are created Build the reward that monthly plan can get three virtual apples.
Further, for the management preferably to realize a plan, the period of establishment plan can be prestored in server, User can only create plan within a preset period of time, and further, the period that different types of plan can create plan is different, Further, the preset time period of establishment plan can be voluntarily arranged in user.For example, the preset time period of establishment plan can be done Following setting:The same day 18:00 to the second day 9:00 can create plan in second day, and this Saturday, two days Sundays can create next week plan, Next monthly plan can be created in last three days of this month.After server receives the request of user's establishment plan, the request is obtained In include the type of plan that creates of need, whether current time is judged in establishing in the period of the type plan, when sentencing When determining current time in the period for creating the type, the establishment interface of the plan of the type is sent to user terminal, with The plan is created for user;When judging current time not within the period for creating the type, sends and count to user terminal Draw the prompting message that can not be created.It is understood that the items such as summary of user can also be according to the manager of the plan Method is managed.
Further, in the present embodiment, user can not only check that individual task obtains the corresponding reward of single plan, can To check the task reward sum and reward sum of oneself, the bonus data seniority among brothers and sisters in oneself department or company can also look at List.Specifically, user sends reward ranking list inquiry request by terminal to server, includes that need to check in inquiry request The type information and organizational structure information of reward, after server receives inquiry request, according to the organizational structure in inquiry request Acquisition of information further obtains the bonus data of the type of these users to the associated all users of the organizational structure, and It sorts according to bonus data and generates bonus data ranking list, be sent to the user terminal and checked for user.For example, when user need to check When the task reward ranking list in flow portion, the task that server receives all users for obtaining flow portion after inquiry request is rewarded Data sort according to task bonus data and generate ranking list, and the ranking list is sent to the user terminal and is shown.
Technical solution provided in this embodiment obtains the plan when server receives the plan information of terminal transmission The type of information obtains corresponding plan reward according to the type of the plan information, is then rewarded and updated according to the plan The plan bonus data of the associated user of plan information, to realize the planning management of user simultaneously.
In addition, the embodiment of the present invention also proposes a kind of storage medium, the control of task management is stored on the storage medium Processing procedure sequence, the control program of the task management realizes the task management described in embodiment as above method when being executed by processor The step of.
It should be noted that herein, the terms "include", "comprise" or its any other variant are intended to non-row His property includes, so that process, method, article or system including a series of elements include not only those elements, and And further include other elements that are not explicitly listed, or further include for this process, method, article or system institute it is intrinsic Element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that including this There is also other identical elements in the process of element, method, article or system.
The embodiments of the present invention are for illustration only, can not represent the quality of embodiment.
Through the above description of the embodiments, those skilled in the art can be understood that above-described embodiment side Method can add the mode of required general hardware platform to realize by software, naturally it is also possible to by hardware, but in many cases The former is more preferably embodiment.Based on this understanding, technical scheme of the present invention substantially in other words does the prior art Going out the part of contribution can be expressed in the form of software products, which is stored in one as described above In storage medium (such as ROM/RAM, magnetic disc, CD), including some instructions use so that a station terminal equipment (can be mobile phone, Computer, server, air conditioner or network equipment etc.) execute method described in each embodiment of the present invention.
It these are only the preferred embodiment of the present invention, be not intended to limit the scope of the invention, it is every to utilize this hair Equivalent structure or equivalent flow shift made by bright specification and accompanying drawing content is applied directly or indirectly in other relevant skills Art field, is included within the scope of the present invention.

Claims (10)

1. a kind of method of task management, which is characterized in that the method for the task management includes the following steps:
When receiving mission bit stream, the associated user of the task is obtained according to the mission bit stream;
The mission bit stream is associated with to the corresponding user information of associated user of the task, wherein the correlation of the task User includes task owner and task auditor;
When the receiving terminal transmission of the task checks request, the task that the task checks user information correlation in request is obtained The mission bit stream is sent to the terminal by information, wherein the mission bit stream is including at least in task completeness, task Hold the relevant user information with task.
2. the method for task management as described in claim 1, which is characterized in that the method for the task management further includes:
When receiving the task more new command of terminal transmission, the mission bit stream is updated according to the task more new command;
Task auditor is obtained according to the mission bit stream, task update notifying information is sent to the task auditor.
3. the method for task management as described in claim 1, which is characterized in that the method for the task management further includes:
When the receiving terminal transmission of the task comments on request, judge that task comment asks whether corresponding task is completed;
When judging that the task does not complete, the first interface is sent to the terminal;
When judging that the task is completed, second contact surface is sent to the terminal, wherein the second contact surface is encouraged comprising task Encourage information.
4. the method for task management as claimed in claim 3, which is characterized in that it is described when judging that the task does not complete, After sending the step of task comments on interface to the terminal, further include:
When receiving the task comment information that terminal is sent based on first interface, corresponding of task comment information is obtained Business, the corresponding mission bit stream of the task is associated with the task comment information;
Task owner is obtained according to the mission bit stream, sending task to the task owner comments on prompting message.
5. the method for task management as claimed in claim 3, which is characterized in that it is described when judging that the task is completed, After the step of sending second contact surface to the terminal, further include:
When receiving the task incentive message that terminal is sent based on the second contact surface, corresponding of task incentive message is obtained Business, the corresponding mission bit stream of the task is associated with the task incentive message;
Task owner is obtained according to the mission bit stream, appointing for the task owner is updated according to the task incentive message Business bonus data.
6. the method for task management as described in any one in claim 1-5, which is characterized in that described to close the mission bit stream After the step of being coupled to associated user's corresponding user information of the task, further include:
Progress reminder time is obtained according to the mission bit stream, progress reminder time is associated with the mission bit stream;
When system time meets the progress reminder time, the progress reminder time associated mission bit stream is obtained;
Judge whether the task has been completed according to the task completeness in the mission bit stream;
When judging that the task does not complete, progress prompting message is sent to the task owner of the task.
7. the method for task management as claimed in claim 5, which is characterized in that the method for the task management further includes following Step:
When receiving the plan information of terminal transmission, the type of the plan information is obtained, wherein the class of the plan information Type includes daily planning information, all plan informations and monthly plan information;
Corresponding plan reward is obtained according to the type of the plan information;
The plan bonus data of the associated user of plan information is updated according to the plan reward.
8. the method for task management as claimed in claim 7, which is characterized in that the method for the task management further includes:
When inquiry request is ranked in the reward for receiving terminal transmission, the group stretching frame that the reward seniority among brothers and sisters inquiry request includes is obtained Structure information;
The bonus data of all users in the organizational structure is obtained, reward ranking list is generated, wherein the reward ranking list packet Include target reward ranking list and plan reward ranking list;
The reward ranking list is sent to the terminal.
9. a kind of control device of task management, which is characterized in that the control device of the task management includes:Memory, place Reason device and the control program for being stored in the task management that can be run on the memory and on the processor, the task pipe The method such as task management described in any item of the claim 1 to 8 is realized when the control program of reason is executed by the processor The step of.
10. a kind of storage medium, which is characterized in that it is stored with the control program of task management on the storage medium, described The control program of business management realizes the method such as task management described in any item of the claim 1 to 8 when being executed by processor The step of.
CN201810292786.7A 2018-04-02 2018-04-02 Method, control device and the storage medium of task management Pending CN108764810A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810292786.7A CN108764810A (en) 2018-04-02 2018-04-02 Method, control device and the storage medium of task management

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810292786.7A CN108764810A (en) 2018-04-02 2018-04-02 Method, control device and the storage medium of task management

Publications (1)

Publication Number Publication Date
CN108764810A true CN108764810A (en) 2018-11-06

Family

ID=63981080

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810292786.7A Pending CN108764810A (en) 2018-04-02 2018-04-02 Method, control device and the storage medium of task management

Country Status (1)

Country Link
CN (1) CN108764810A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109636341A (en) * 2018-12-14 2019-04-16 平安城市建设科技(深圳)有限公司 Agenda managing method, device, equipment and computer readable storage medium
CN109636357A (en) * 2018-12-25 2019-04-16 北京致远互联软件股份有限公司 Cooperation plan method and system
CN110060025A (en) * 2019-03-15 2019-07-26 平安城市建设科技(深圳)有限公司 Configuration method, device, equipment and the computer storage medium of task workbench
CN110322221A (en) * 2019-06-28 2019-10-11 广州微易软件有限公司 A kind of means of communication based on task
CN111178650A (en) * 2018-11-12 2020-05-19 程宇章 Task interaction method, device and terminal
CN112101748A (en) * 2020-08-28 2020-12-18 湖南三湘银行股份有限公司 Operation and maintenance task management method and device
CN112199007A (en) * 2020-09-01 2021-01-08 北京达佳互联信息技术有限公司 Menu display method and device, electronic equipment and storage medium

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102523173A (en) * 2011-12-01 2012-06-27 上海量明科技发展有限公司 Method and system for sharing document update reminding
CN102567841A (en) * 2011-11-23 2012-07-11 杭州精尚投资管理有限公司 Project supervision system and method
CN102567829A (en) * 2010-12-22 2012-07-11 海洋王照明科技股份有限公司 Method and system for task management
CN103136618A (en) * 2011-11-29 2013-06-05 北京建龙重工集团有限公司 On-line management method for project progress plan
CN103136161A (en) * 2011-11-29 2013-06-05 北京建龙重工集团有限公司 On-line management method of checking and tracking of job schedule abnormalities
CN103778510A (en) * 2014-01-23 2014-05-07 北京荣之联科技股份有限公司 Task management method and device for quantifying task value
CN104318354A (en) * 2014-10-11 2015-01-28 北京网秦天下科技有限公司 Task information processing method and system
CN105117845A (en) * 2015-08-25 2015-12-02 长沙市麓智信息科技有限公司 Patent agency internal management system
CN106027628A (en) * 2016-05-13 2016-10-12 王晚丁 Method, device and system for tracking task execution status
CN106251271A (en) * 2016-07-29 2016-12-21 北京云海寰宇信息技术有限责任公司 City intelligent management platform
CN107146074A (en) * 2017-05-27 2017-09-08 深圳市名通科技股份有限公司 Work order task cooperation processing method, device and computer-readable recording medium
CN107203395A (en) * 2017-05-19 2017-09-26 北京京东尚科信息技术有限公司 Resource graded method, device and computer-readable recording medium and electronic equipment
CN107330771A (en) * 2017-07-24 2017-11-07 杨润丁 Task management method and device

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102567829A (en) * 2010-12-22 2012-07-11 海洋王照明科技股份有限公司 Method and system for task management
CN102567841A (en) * 2011-11-23 2012-07-11 杭州精尚投资管理有限公司 Project supervision system and method
CN103136618A (en) * 2011-11-29 2013-06-05 北京建龙重工集团有限公司 On-line management method for project progress plan
CN103136161A (en) * 2011-11-29 2013-06-05 北京建龙重工集团有限公司 On-line management method of checking and tracking of job schedule abnormalities
CN102523173A (en) * 2011-12-01 2012-06-27 上海量明科技发展有限公司 Method and system for sharing document update reminding
CN103778510A (en) * 2014-01-23 2014-05-07 北京荣之联科技股份有限公司 Task management method and device for quantifying task value
CN104318354A (en) * 2014-10-11 2015-01-28 北京网秦天下科技有限公司 Task information processing method and system
CN105117845A (en) * 2015-08-25 2015-12-02 长沙市麓智信息科技有限公司 Patent agency internal management system
CN106027628A (en) * 2016-05-13 2016-10-12 王晚丁 Method, device and system for tracking task execution status
CN106251271A (en) * 2016-07-29 2016-12-21 北京云海寰宇信息技术有限责任公司 City intelligent management platform
CN107203395A (en) * 2017-05-19 2017-09-26 北京京东尚科信息技术有限公司 Resource graded method, device and computer-readable recording medium and electronic equipment
CN107146074A (en) * 2017-05-27 2017-09-08 深圳市名通科技股份有限公司 Work order task cooperation processing method, device and computer-readable recording medium
CN107330771A (en) * 2017-07-24 2017-11-07 杨润丁 Task management method and device

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111178650A (en) * 2018-11-12 2020-05-19 程宇章 Task interaction method, device and terminal
CN109636341A (en) * 2018-12-14 2019-04-16 平安城市建设科技(深圳)有限公司 Agenda managing method, device, equipment and computer readable storage medium
CN109636357A (en) * 2018-12-25 2019-04-16 北京致远互联软件股份有限公司 Cooperation plan method and system
CN109636357B (en) * 2018-12-25 2024-01-26 北京致远互联软件股份有限公司 Collaborative planning method and system
CN110060025A (en) * 2019-03-15 2019-07-26 平安城市建设科技(深圳)有限公司 Configuration method, device, equipment and the computer storage medium of task workbench
CN110322221A (en) * 2019-06-28 2019-10-11 广州微易软件有限公司 A kind of means of communication based on task
CN112101748A (en) * 2020-08-28 2020-12-18 湖南三湘银行股份有限公司 Operation and maintenance task management method and device
CN112101748B (en) * 2020-08-28 2023-04-18 湖南三湘银行股份有限公司 Operation and maintenance task management method and device
CN112199007A (en) * 2020-09-01 2021-01-08 北京达佳互联信息技术有限公司 Menu display method and device, electronic equipment and storage medium

Similar Documents

Publication Publication Date Title
CN108764810A (en) Method, control device and the storage medium of task management
US8788309B2 (en) Application of cost constraints in event scheduling
US7305441B2 (en) Time-sensitive messages and events
KR100310264B1 (en) Schedule management system
US20100306017A1 (en) Creating, confirming, and managing employee schedules
JP2004535628A (en) System and method for managing events
US7359946B2 (en) System and method for an event planner
US20080178105A1 (en) System and method for planning student assignments
US20070106548A1 (en) Internet based calendar system linking all parties relevant to the automated maintenance of scheduled events
CN108038658A (en) A kind of group group member schedule coordination approach and terminal
CN103065235B (en) Movable presence notification system and method
CN107341643A (en) Visual flow methods of exhibiting and system
JPH0628361A (en) Apparatus and method for data processing
US20180204183A1 (en) Apparatus and method for processing work activity based on work object
US10133682B2 (en) Managing grouped student devices with timed locks
US20160012364A1 (en) Commitment social network system and method
US20120124484A1 (en) System and method for collaboration in project development
US20090070678A1 (en) System and method for collecting and aggregating information
US8626551B2 (en) Motivating equitable behavior in calendar events
US20190392400A1 (en) Social Meeting System
CN110011906A (en) Method, real-time communication device and the computer program product of custom message transmission scheduling
CN105577398A (en) Conference information processing method and apparatus
CN108549988A (en) The treating method and apparatus of problem
CN109146650A (en) Call for bid creation method, device and the storage medium planned
CN109615482A (en) Methods of exhibiting, device and the storage medium of information of lease

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181106

RJ01 Rejection of invention patent application after publication