CN103136161A - On-line management method of checking and tracking of job schedule abnormalities - Google Patents
On-line management method of checking and tracking of job schedule abnormalities Download PDFInfo
- Publication number
- CN103136161A CN103136161A CN 201210152680 CN201210152680A CN103136161A CN 103136161 A CN103136161 A CN 103136161A CN 201210152680 CN201210152680 CN 201210152680 CN 201210152680 A CN201210152680 A CN 201210152680A CN 103136161 A CN103136161 A CN 103136161A
- Authority
- CN
- China
- Prior art keywords
- abnormal
- progress
- message
- data
- server
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Debugging And Monitoring (AREA)
Abstract
The invention relates to an on-line management method of checking and tracking of job schedule abnormalities. According to the method, based on a remote interaction platform, through interaction and data conversion among a submitting end microcomputer device, an audit end microcomputer device and a server end computer system, on-line analysis of the job schedule abnormalities and on-line checking and tracking of job schedule abnormality data processing are achieved. An object oriented operation interface is published through the server computer system, data is stored in a data base server and shared by all the operators using the platform, operating authorization is controlled through authorization, and when the realtime performance of the data is ensured, the data is controlled not to be changed at will. The on-line management method of the checking and the tracking of the job schedule abnormalities is beneficial to urging a duty officer to process schedule abnormality data in time, and reducing losses caused by unordered abnormality processing.
Description
Technical field
The present invention relates to a kind of abnormal online management method of verifying and following the trail of of project progress, the method is based on a remote interaction platform, mutual and data-switching by submitting to a higher level for approval or revision between end microcomputer device, audit end microcomputer device and server end computer system has realized online verification and the tracking of the abnormal on-line analysis of project progress, project progress dealing of abnormal data.
Background technology
In the prior art, the project progress planning management software that is most widely used is mostly standalone version, extremely there is no a kind of verification and tracking mechanism for the progress that occurs in Process of Engineering Construction, causes the abnormal information of progress in time not circulate a notice of.Chinese patent 01121134.2 discloses a kind of project progress state management method, this project progress state management method is by the Internet, from the terminal A1 of each operation field of multinomial construction work, B1, C1 is passed to the engineering informations such as daily work report and project photograph server and preserves.In server, editing and processing this project information is made into the project progress state complete list and preserves.Engineering construction person is by the Internet, and from terminal A, B, C access this project progress situation complete list, the management of reading.Although be based on the progress control method of internet, but simultaneous display schedule on the internet and performance have just been realized, progress control does not have the combination of realize target and responsibility, the change of the processing of progress abnormal data and schedule objective simultaneously, adjustment lack tight supervision, have brought difficulty for the realization of progress target.So, need to propose a kind of abnormal online management method of verifying and following the trail of of project progress.
Summary of the invention
The object of the invention is to propose a kind of abnormal online management method of verifying and following the trail of of project progress, the method is based on a remote interaction platform, mutual and data-switching by submitting to a higher level for approval or revision between end microcomputer device, audit end microcomputer device and server end computer system has realized online verification and the tracking of the abnormal on-line analysis of project progress, project progress dealing of abnormal data.Issue OO operation interface by server computer system, data are stored in database server, and data sharing is used the operating personnel of this interaction platform to all.It is abnormal that server computer system automatic-prompting progress falls behind, and when abnormality processing was untimely, system can be core automatically to other supervisor of construction of higher one-level.
The objective of the invention is to be achieved through the following technical solutions: a kind of project progress is abnormal to be verified and the online management method of following the trail of, it is to realize by the timing mechanism that a batch of management provides, comprise abnormal verification, follow and urge server and database, extremely verify, follow and urge server and database to form LAN, in abnormal verification, with carrying out the setting of timing mechanism in batch management system in urging service; Described method step comprises:
A, the system that needs is included in exception management and abnormal verification, related with urging server to carry out: the system that includes in other words exception management in will call abnormal verification, the abnormal data receiving interface of urging system to provide is provided when abnormal the generation arranged, the data layout of transmission meets the call format of interface;
B, abnormal verify, with urging server that the abnormal verification input interface of a unification is provided, be responsible for receiving the data result that other system is verified engineering;
C, carry out abnormal the verification with unexpected message and send the operation establishment: data result is verified data standard relatively with abnormal, if have extremely carry out unexpected message and send the operation establishment, described establishment comprises definite anomaly parameter, and described anomaly parameter has abnormal class, abnormal cause, processing time limit and person liable; Wherein, described abnormal class is to define abnormal kind, and abnormal kind is used for distinguishing the abnormal source that produces, and as the supplementary of message, the described processing time limit refers to that the person liable is complete with Message Processing within this time limit to abnormal kind when sending message;
D, Web Service is issued in described establishment be registered to a batch management system, carry out the timing mechanism configuration;
E, carry out unexpected message and send: send message to the person liable of appointment by local net network according to timing mechanism, proceed to verify extremely whether processed, whether exceed the time limit scope of processing, if extremely not processed, can process the transmission grade that the time limit scope promotes unexpected message according to exceeding so.
Purpose of the present invention can also be achieved through the following technical solutions: a kind of project progress is abnormal to be verified and the online management method of following the trail of, mutual personnel carry out information interchange according to a remote interaction platform, and described remote interaction platform comprises a server end computer system, at least one end microcomputer device of submitting to a higher level for approval or revision, at least one audit end microcomputer device; Described server end computer system, the end microcomputer device of submitting to a higher level for approval or revision, audit end microcomputer device are in a wan environment and realize that network connects, described wan environment is based on the net territory environment of INTERNET, and described server end computer system comprises database server, web application server, batch management server and the software that is complementary with described server end computer system; The described end microcomputer device of submitting to a higher level for approval or revision, audit end microcomputer device are separately installed with Management of engineering schedule software; The step of described online management is:
Interface interface routine in A, described batch of described web application server of management server start by set date carries out anomaly analysis to engineering progress data, generates the progress abnormal data; Described progress abnormal data comprises abnormal class numbering, abnormal cause descriptor, abnormality processing time limit, person liable's code;
Setting up in B, described database server has progress abnormality data table, described web application server to call the AM method described progress abnormal data is saved in progress abnormality data table in described database server;
Interface interface routine in C, described web application server is according to the abnormal reminder message of described progress abnormal data establishment progress, and the abnormal reminder message of described progress comprises heading message, progress abnormal data ID, pagefile information, person liable's code, message establishing time;
Setting up in D, described database server has the abnormal reminder message tables of data of progress, described web application server to call the AM method the abnormal reminder message of described progress is saved in the abnormal reminder message tables of data of progress in described database server;
E, project director operate the described end microcomputer device of submitting to a higher level for approval or revision and send the request of a project progress abnormal inquiry to described web application server, described web application server is resolved the project progress abnormal inquiry request that receives, call the AM method and select the abnormal reminder message of qualified progress from described database server, and the abnormal reminder message of progress is sent to the described end microcomputer device of submitting to a higher level for approval or revision;
F, project director operate the described end microcomputer device of submitting to a higher level for approval or revision and receive the abnormal reminder message of described progress, check the progress abnormal data that the abnormal reminder message of described progress is corresponding; The project director operates the described end microcomputer device of submitting to a higher level for approval or revision the progress abnormal data in described database server is processed, and generates progress abnormality processing message; Described progress abnormality processing message comprises progress declaration of exception information, intends treatment measures information, upgrades ps, upgrades the plan completion date;
G, project director operate the described end microcomputer device of submitting to a higher level for approval or revision described progress abnormality processing message are sent to described web application server, and described web application server is called the AM method described progress abnormality processing message is saved in progress abnormality data table in described database server;
Interface interface routine in H, described batch of described web application server of management server start by set date is verified the progress abnormal data in described database server, verifies out the progress abnormal data of not processing within the time limit of setting; Interface interface routine in described web application server is revised the corresponding abnormal reminder message of progress, and the abnormal reminder message of amended progress comprises heading message, progress abnormal data ID, pagefile information, upper-level leader's code, message establishing time;
I, the described audit end of upper-level leader's personnel operation microcomputer device send the request of a project progress abnormal inquiry to described web application server, described web application server is resolved the project progress abnormal inquiry request that receives, call the AM method and select the abnormal reminder message of amended progress from described database server, and the abnormal reminder message of amended progress is sent to described audit end microcomputer device.
The present invention compared with prior art has following advantage:
1, the present invention is based on a remote interaction platform, mutual and data-switching by submitting to a higher level for approval or revision between end microcomputer device, audit end microcomputer device and server end computer system has realized online verification and the tracking of the abnormal on-line analysis of project progress, project progress dealing of abnormal data.
2, the present invention is by the OO operation interface of server end computer system issue, data are stored in database, data sharing is used the operator of this interaction platform to all, by the authorization control operating right, controlled again version and can not arbitrarily change when guaranteeing real-time property.
3, the present invention is by the abnormal information of server end computer system automatic-prompting project progress, and when the abnormal processing of progress was untimely, the server end computer system can be core automatically to other supervisor of construction of higher one-level; Be conducive to urge the person liable in time to process the progress abnormal data, reduce the loss that brings due to unordered abnormality processing.
Below in conjunction with drawings and Examples, the present invention is made a detailed description.
Description of drawings
Fig. 1 is that the embodiment of the present invention one is extremely verified, followed and urge system chart;
Fig. 2 is the system schematic of the embodiment of the present invention two;
Fig. 3 is the FB(flow block) of the embodiment of the present invention two;
Fig. 4 is framed structure and the flow chart of data processing figure of the embodiment of the present invention two;
Fig. 5 is the operation interface of project progress abnormal response and processing in embodiment three.
Embodiment
Embodiment one:
Referring to Fig. 1, the project progress of the present embodiment is abnormal to be verified and the online management method of following the trail of, it is to realize by the timing mechanism that a batch of management system provides, comprise abnormal verification, follow and urge server and database, abnormal verify, with urging server and database to form LAN, extremely verifying, be provided with a batch management system with in urging service; Wherein, the abnormal verification is to verify by 1 pair of Anomaly standard that arranges in advance of abnormal checking system to obtain extremely verifying after data, follow to urge and process 2, the classification storage 2-1 and the unexpected message that comprise abnormal data send, issue into Web Service2-4 after abnormal verification 2-2 and unexpected message transmission 2-3 operation establishment are complete and be registered to batch management system 3, carry out the timing mechanism configuration;
The classification storage of abnormal data: anomaly parameter has abnormal class, abnormal cause, processing time limit, person liable;
Described abnormal class is to define abnormal kind, and abnormal kind is used for distinguishing the abnormal source that produces, abnormal kind when sending message as the supplementary of message;
The processing time limit refers to that the person liable is complete with Message Processing within this time limit;
Unexpected message sends: send message according to timing mechanism to the person liable of appointment.
Whether described abnormal verification comprises that also inspection is extremely whether processed, processing in the time limit, if extremely not processed, can process the transmission grade that the time limit scope promotes unexpected message according to exceeding so.
Concrete steps are:
A, the system that need to include exception management in produce and to call abnormal verification after abnormal, with the abnormal data receiving interface of urging server to provide;
B, abnormal verify, with urging server that the abnormal verification input interface of a unification is provided, interface is responsible for receiving the data result that other system is verified engineering;
C, carry out abnormal the verification with unexpected message and send the operation establishment: data result is verified data standard relatively with abnormal, if have extremely carry out unexpected message and send the operation establishment, described establishment comprises definite anomaly parameter, and described anomaly parameter has abnormal class, abnormal cause, processing time limit and person liable; Wherein, described abnormal class is to define abnormal kind, and abnormal kind is used for distinguishing the abnormal source that produces, and as the supplementary of message, the described processing time limit refers to that the person liable is complete with Message Processing within this time limit to abnormal kind when sending message;
D, Web Service is issued in described establishment be registered to a batch management system, carry out the timing mechanism configuration;
E, carry out unexpected message and send: send message to the person liable of appointment by local net network according to timing mechanism, proceed to verify extremely whether processed, whether process within the processing time limit, if extremely not processed, can process the transmission grade that the time limit scope promotes unexpected message according to exceeding so.
Extremely verify in embodiment and follow and urge system only to be responsible for writing of actual job, the function of job scheduling is done by a batch management system.Described batch of management system is to process according to abnormal classification grade in batches; So abnormal verify with urging function that system mainly provides to comprise the classification storage of abnormal data, extremely verify, unexpected message sends.Abnormal classification storage mainly is to provide a unified interface, calls for other modules.The parameter that needs in interface to import into has abnormal class, abnormal cause, processing time limit, person liable etc., abnormal class mainly defines abnormal kind, because use abnormal verification and follow and urge the module of system many, the purpose one of classifying is convenient abnormal verification and follows and urge the system maintenance personnel to distinguish the source of abnormal generation, the 2nd, abnormal class can be used as the supplementary of message when sending message, is convenient to the message sink people and distinguishes message.The processing time limit refers to that the person liable is complete with Message Processing within this time limit, and these field data provide basis for estimation for abnormal verification operation, and the person liable is the transmission target that unexpected message sends.
The abnormal verification sends the operation establishment with unexpected message and issues into Web Service after complete and be registered to a batch management system, carries out timing mechanism and configures.Described timing mechanism configuration is the rank that transmitting time is set and makes the nominator; Whether extremely whether each abnormal verification be responsible for checking processed, processing in the time limit, if extremely not processed, can process the grade that throws that the time limit scope promotes unexpected message according to exceeding so.Unexpected message throws the operation meeting and sends message according to timing mechanism to the people of appointment.
Embodiment two:
Referring to Fig. 2, Fig. 4, in the present embodiment, a kind of project progress is abnormal to be verified and the online management method of following the trail of, mutual personnel carry out information interchange according to a remote interaction platform, and described remote interaction platform comprises a server end computer system 5, at least one end microcomputer device 4 of submitting to a higher level for approval or revision, at least one audit end microcomputer device; Described server end computer system, the end microcomputer device of submitting to a higher level for approval or revision, audit end microcomputer device are in a wan environment and realize that network connects, described wan environment is based on the net territory environment of INTERNET, and described server end computer system comprises database server, web application server, batch management server and the software that is complementary with described server end computer system; The described end microcomputer device of submitting to a higher level for approval or revision, audit end microcomputer device are separately installed with Management of engineering schedule software.
A preferred disposition of the computer installation that uses in the present embodiment, is as follows:
Server end computer system-rack-mount server:
More than CPU frequency double-core 3000 megahertzes;
More than internal memory 1G;
More than SCSI hard disk 60GB;
Network interface capabilities 1000M.
The end microcomputer device of submitting to a higher level for approval or revision:
More than CPU frequency 1500 megahertzes;
Internal memory is more than 512,000,000;
More than SATA hard disk 40GB;
Network interface capabilities 100M;
128,000,000 display cards.
Audit end microcomputer device:
More than CPU frequency 1500 megahertzes;
Internal memory is more than 512,000,000;
More than SATA hard disk 40GB;
Network interface capabilities 100M;
128,000,000 display cards.
In the present embodiment, an engineering comprises multinomial engineer operation, and every engineer operation all specifies a project director to be responsible for the management of project progress, and a plurality of project directors can share the end microcomputer device of submitting to a higher level for approval or revision; Also can distribute the end microcomputer device of submitting to a higher level for approval or revision for each project director.In the described end microcomputer device of submitting to a higher level for approval or revision, audit end microcomputer device, Management of engineering schedule software is installed all, according to the login account logon server end computer system of distributing, the server end computer system is verified according to the login account number, and is given corresponding use identity and operating right.
In the present embodiment, the server end computer system designs based on multistage server architecture, has the characteristics such as across a network, distributed, dynamic equalization, data distribution, can stable operation on Windows or Linux platform, by expansion servers, allow endless user online.Because the server end computer system adopts server cluster, have the characteristics such as fault recovery, Dynamic Thermal backup, thereby can provide round-the-clock continual service for the user.
Server end computer system in the present embodiment adopts distributed server architecture, support tree type and netted two kinds of servers to set up structure, fault-tolerant by multilevel distributed master, multipoint communication service device Hot Spare, effectively avoided because of the separate unit server failure whole system that causes paralysis on structure.
In the present embodiment, batch management server has been used the job scheduling framework Quartz that increases income, and it is write as by Java fully, and is designed in J2SE and J2EE application.It provides huge dirigibility and has not sacrificed simplicity, and it can create simple or complicated scheduling for carrying out an operation.It has a lot of features, as database support, cluster, and plug-in unit, EJB operation prebuild, JavaMail and other are supported cron-like expression formula etc.In order to facilitate, to configure timing mechanism flexibly, batch management server of the present embodiment has carried out exploitation and the optimization of graphical configuration to Quartz.
Referring to Fig. 2 to Fig. 4, in the present embodiment, the step of described online management is:
Interface interface routine in A, described batch of described web application server of management server start by set date carries out anomaly analysis to engineering progress data, generates the progress abnormal data; Described progress abnormal data comprises abnormal class numbering, abnormal cause descriptor, abnormality processing time limit, person liable's code; Engineering progress data comprises project progress planning data, engineering actual progress data; The project progress planning data comprises operational code, ps, plan completion date, the duration of every operation under this project project, and the linking relationship between the schedule data of every operation, the priority level of every operation is set.Engineering actual progress data comprise actual Percent Complete of operational code, actual starting date, current period, the actual finish date of every operation under this project project.
In the present embodiment, abnormal class in described progress abnormal data numbering is comprised of 1 block code and 3 serial numbers, and block code is set as: A-Authorize to Invest, B-design management, C-expense are controlled, D-gives out a contract for a project contract management, E-material and labour cost analysis, the management of F-construction quality, the environmental protection of G-work peace, H-photo information.
Setting up in B, described database server has progress abnormality data table, described web application server to call the AM method described progress abnormal data is saved in progress abnormality data table in described database server; The preservation of progress abnormal data facilitates inquiry and the management of progress abnormal data according to the preservation of classifying of its abnormal class.
Interface interface routine in C, described web application server is according to the abnormal reminder message of described progress abnormal data establishment progress, and the abnormal reminder message of described progress comprises heading message, progress abnormal data ID, pagefile information, person liable's code, message establishing time; The heading message of abnormal reminder message is generally the synopsis of this message, and progress abnormal data ID is that the progress abnormal data is kept at the address in the progress abnormality data table.The corresponding progress abnormal data of the abnormal reminder message of each progress.
Setting up in D, described database server has the abnormal reminder message tables of data of progress, described web application server to call the AM method the abnormal reminder message of described progress is saved in the abnormal reminder message tables of data of progress in described database server.
E, project director operate the described end microcomputer device of submitting to a higher level for approval or revision and send the request of a project progress abnormal inquiry to described web application server, described web application server is resolved the project progress abnormal inquiry request that receives, call the AM method and select the abnormal reminder message of qualified progress from described database server, and the abnormal reminder message of progress is sent to the described end microcomputer device of submitting to a higher level for approval or revision; The querying condition of the abnormal reminder message of progress is that the person liable's code in the abnormal reminder message of progress is identical with this project responsible official code.
F, project director operate the described end microcomputer device of submitting to a higher level for approval or revision and receive the abnormal reminder message of described progress, check the progress abnormal data that the abnormal reminder message of described progress is corresponding; The project director operates the described end microcomputer device of submitting to a higher level for approval or revision the progress abnormal data in described database server is processed, and generates progress abnormality processing message; Described progress abnormality processing message comprises progress declaration of exception information, intends treatment measures information, upgrades ps, upgrades the plan completion date.
G, project director operate the described end microcomputer device of submitting to a higher level for approval or revision described progress abnormality processing message are sent to described web application server, and described web application server is called the AM method described progress abnormality processing message is saved in progress abnormality data table in described database server.
Interface interface routine in H, described batch of described web application server of management server start by set date is verified the progress abnormal data in described database server, verifies out the progress abnormal data of not processing within the time limit of setting; Interface interface routine in described web application server is revised the corresponding abnormal reminder message of progress, and the abnormal reminder message of amended progress comprises heading message, progress abnormal data ID, pagefile information, upper-level leader's code, message establishing time.
In the present embodiment, by set up the major key of an expression state in the progress abnormal data, major key has that two value: 0-are untreated, 1-processes; The progress abnormal data is verified and is judged by the value to major key.
I, audit end microcomputer device of upper-level leader's personnel operation send the request of a project progress abnormal inquiry to described web application server, described web application server is resolved the project progress abnormal inquiry request that receives, call the AM method and select the abnormal reminder message of amended progress from described database server, and the abnormal reminder message of amended progress is sent to described audit end microcomputer device.The querying condition of the abnormal reminder message of progress is that the upper-level leader's code in the abnormal reminder message of progress is identical with this upper-level leader personnel code.In the present embodiment, according to the setting of enterprise internal management structure, also multistage competent authorities can be set, for every one-level person in charge distributes an audit end microcomputer device.
In the present embodiment, the operation of engineering progress data anomaly analysis and progress abnormal data are verified the operation establishment and are issued into Web Service after complete and be registered in described batch of management server, and described batch of management server realizes that automatically the operation of engineering progress data anomaly analysis and progress abnormal data verify the scheduling of operation.
Embodiment three:
The present embodiment will be made more detailed explanation to the processing of progress abnormal data in embodiment two.
Referring to Fig. 5, in the present embodiment, project director's operation is submitted to a higher level for approval or revision and is held microcomputer device to enter the operation interface of project progress abnormal response and processing, and then the company at option place, project name from drop-down list are clicked inquire button the schedule data of this project are inquired about.
In the present embodiment, the project director operates the described end microcomputer device of submitting to a higher level for approval or revision and calls the gantt.js plug-in unit, the gantt.js plug-in unit loads the XML formatted file of the record progress abnormal data that is sent by web application server, and the form of project progress planning data with chart is presented on the display of the end microcomputer device of submitting to a higher level for approval or revision, after the project director analyzes the progress abnormal data, input progress declaration of exception information and plan treatment measures information, if the selection modification of schedule also needs input upgrade ps and upgrade the plan completion date.Input at last project director's job number of this operation, after all input is completed, click " preservation " button, just set up the progress abnormality processing message of an operation.The progress abnormality processing message of All Jobs is completed in input, clicks " confirmation is submitted to a higher level for approval or revision " button and is submitted to audit screen.Can modify to the progress abnormality processing message in this project at any time before submitting to a higher level for approval or revision.
In the present embodiment, the auditor operates audit end microcomputer device and calls the gantt.js plug-in unit, and the gantt.js plug-in unit loads the XML formatted file of the record progress abnormality processing result that is sent by web application server and shows; The auditor examines progress abnormality processing message, the input audit opinion.The audit opinion by audit will not feed back to the end microcomputer device of submitting to a higher level for approval or revision of submitting audit to, and be submitted to a higher level for approval or revision by project director's operation and hold microcomputer device that progress abnormality processing message is updated and submits to a higher level for approval or revision.Project director's operation is submitted to a higher level for approval or revision the end microcomputer device to checking and writing off by the progress abnormality processing message of audit and the practicable operation of processing.
Claims (2)
1. project progress is abnormal verifies and the online management method of following the trail of, it is to realize by the timing mechanism that a batch of management provides, comprise abnormal verification, follow and urge server and database, extremely verify, follow and urge server and database to form LAN, in abnormal verification, with carrying out the setting of timing mechanism in batch management system in urging service; It is characterized in that: described method step comprises:
A, the system that needs is included in exception management and abnormal verification, related with urging server to carry out: the system that includes in other words exception management in will call abnormal verification, the abnormal data receiving interface of urging system to provide is provided when abnormal the generation arranged, the data layout of transmission meets the call format of interface;
B, abnormal verify, with urging server that the abnormal verification input interface of a unification is provided, be responsible for receiving the data result that other system is verified engineering;
C, carry out abnormal the verification with unexpected message and send the operation establishment: data result is verified data standard relatively with abnormal, if have extremely carry out unexpected message and send the operation establishment, described establishment comprises definite anomaly parameter, and described anomaly parameter has abnormal class, abnormal cause, processing time limit and person liable; Wherein, described abnormal class is to define abnormal kind, and abnormal kind is used for distinguishing the abnormal source that produces, and as the supplementary of message, the described processing time limit refers to that the person liable is complete with Message Processing within this time limit to abnormal kind when sending message;
D, Web Service is issued in described establishment be registered to a batch management system, carry out the timing mechanism configuration;
E, carry out unexpected message and send: send message to the person liable of appointment by local net network according to timing mechanism, proceed to verify extremely whether processed, whether exceed the time limit scope of processing, if extremely not processed, can process the transmission grade that the time limit scope promotes unexpected message according to exceeding so.
2. project progress is abnormal verifies and the online management method of following the trail of, it is characterized in that: mutual personnel carry out information interchange according to a remote interaction platform, and described remote interaction platform comprises a server end computer system, at least one end microcomputer device of submitting to a higher level for approval or revision, at least one audit end microcomputer device; Described server end computer system, the end microcomputer device of submitting to a higher level for approval or revision, audit end microcomputer device are in a wan environment and realize that network connects, described wan environment is based on the net territory environment of INTERNET, and described server end computer system comprises database server, web application server, batch management server and the software that is complementary with described server end computer system; The described end microcomputer device of submitting to a higher level for approval or revision, audit end microcomputer device are separately installed with Management of engineering schedule software; The step of described online management is:
Interface interface routine in A, described batch of described web application server of management server start by set date carries out anomaly analysis to engineering progress data, generates the progress abnormal data; Described progress abnormal data comprises abnormal class numbering, abnormal cause descriptor, abnormality processing time limit, person liable's code;
Setting up in B, described database server has progress abnormality data table, described web application server to call the AM method described progress abnormal data is saved in progress abnormality data table in described database server;
Interface interface routine in C, described web application server is according to the abnormal reminder message of described progress abnormal data establishment progress, and the abnormal reminder message of described progress comprises heading message, progress abnormal data ID, pagefile information, person liable's code, message establishing time;
Setting up in D, described database server has the abnormal reminder message tables of data of progress, described web application server to call the AM method the abnormal reminder message of described progress is saved in the abnormal reminder message tables of data of progress in described database server;
E, project director operate the described end microcomputer device of submitting to a higher level for approval or revision and send the request of a project progress abnormal inquiry to described web application server, described web application server is resolved the project progress abnormal inquiry request that receives, call the AM method and select the abnormal reminder message of qualified progress from described database server, and the abnormal reminder message of progress is sent to the described end microcomputer device of submitting to a higher level for approval or revision;
F, project director operate the described end microcomputer device of submitting to a higher level for approval or revision and receive the abnormal reminder message of described progress, check the progress abnormal data that the abnormal reminder message of described progress is corresponding; The project director operates the described end microcomputer device of submitting to a higher level for approval or revision the progress abnormal data in described database server is processed, and generates progress abnormality processing message; Described progress abnormality processing message comprises progress declaration of exception information, intends treatment measures information, upgrades ps, upgrades the plan completion date;
G, project director operate the described end microcomputer device of submitting to a higher level for approval or revision described progress abnormality processing message are sent to described web application server, and described web application server is called the AM method described progress abnormality processing message is saved in progress abnormality data table in described database server;
Interface interface routine in H, described batch of described web application server of management server start by set date is verified the progress abnormal data in described database server, verifies out the progress abnormal data of not processing within the time limit of setting; Interface interface routine in described web application server is revised the corresponding abnormal reminder message of progress, and the abnormal reminder message of amended progress comprises heading message, progress abnormal data ID, pagefile information, upper-level leader's code, message establishing time;
I, the described audit end of upper-level leader's personnel operation microcomputer device send the request of a project progress abnormal inquiry to described web application server, described web application server is resolved the project progress abnormal inquiry request that receives, call the AM method and select the abnormal reminder message of amended progress from described database server, and the abnormal reminder message of amended progress is sent to described audit end microcomputer device.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201210152680 CN103136161A (en) | 2011-11-29 | 2012-05-17 | On-line management method of checking and tracking of job schedule abnormalities |
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110386910.4 | 2011-11-29 | ||
CN201110386910 | 2011-11-29 | ||
CN 201210152680 CN103136161A (en) | 2011-11-29 | 2012-05-17 | On-line management method of checking and tracking of job schedule abnormalities |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103136161A true CN103136161A (en) | 2013-06-05 |
Family
ID=48496003
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201210152680 Pending CN103136161A (en) | 2011-11-29 | 2012-05-17 | On-line management method of checking and tracking of job schedule abnormalities |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103136161A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105893265A (en) * | 2016-06-30 | 2016-08-24 | 苏州科大讯飞教育科技有限公司 | Automatic software project detecting system and method |
CN108764810A (en) * | 2018-04-02 | 2018-11-06 | 深圳市前海众惠天下网络科技有限公司 | Method, control device and the storage medium of task management |
CN109669402A (en) * | 2018-09-25 | 2019-04-23 | 平安普惠企业管理有限公司 | Abnormality monitoring method, unit and computer readable storage medium |
CN110782177A (en) * | 2019-11-01 | 2020-02-11 | 北京昊恒天科技有限公司 | Method, device and system for large-scale recording of intelligent device |
CN112529441A (en) * | 2020-12-18 | 2021-03-19 | 北京求实工程管理有限公司 | Engineering project management system |
CN115755785A (en) * | 2022-10-26 | 2023-03-07 | 西安空间无线电技术研究所 | Autonomous task scheduling method and system based on multi-level dynamic priority |
-
2012
- 2012-05-17 CN CN 201210152680 patent/CN103136161A/en active Pending
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105893265A (en) * | 2016-06-30 | 2016-08-24 | 苏州科大讯飞教育科技有限公司 | Automatic software project detecting system and method |
CN105893265B (en) * | 2016-06-30 | 2018-08-28 | 苏州科大讯飞教育科技有限公司 | Software project automatic checkout system and method |
CN108764810A (en) * | 2018-04-02 | 2018-11-06 | 深圳市前海众惠天下网络科技有限公司 | Method, control device and the storage medium of task management |
CN109669402A (en) * | 2018-09-25 | 2019-04-23 | 平安普惠企业管理有限公司 | Abnormality monitoring method, unit and computer readable storage medium |
CN110782177A (en) * | 2019-11-01 | 2020-02-11 | 北京昊恒天科技有限公司 | Method, device and system for large-scale recording of intelligent device |
CN112529441A (en) * | 2020-12-18 | 2021-03-19 | 北京求实工程管理有限公司 | Engineering project management system |
CN115755785A (en) * | 2022-10-26 | 2023-03-07 | 西安空间无线电技术研究所 | Autonomous task scheduling method and system based on multi-level dynamic priority |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20230062655A1 (en) | Systems and methods for data storage and processing | |
CN107341643B (en) | Visual process display method and system | |
CN103136618B (en) | The online management method of construction program | |
WO2022179008A1 (en) | Supply chain finance ai daas algorithm warehouse platform based on blockchain | |
CN103136161A (en) | On-line management method of checking and tracking of job schedule abnormalities | |
CN101079899A (en) | Web services based communications for use with process control systems | |
US10592564B2 (en) | Real-time outage analytics and reliability benchmarking system | |
CN104408587A (en) | Government project management information system | |
CN101770605A (en) | R & D project plan management method and system | |
CN104615617A (en) | Dispatch monitoring information processing system for substation equipment | |
CN110032594B (en) | Customizable data extraction method and device for multi-source database and storage medium | |
US12067579B2 (en) | System to facilitate proprietary data restriction compliance for an enterprise | |
CN111581650B (en) | Business system authority management method, system and electronic equipment | |
CN112104688A (en) | Integrated service type mobile operation terminal application management system | |
CN112905966A (en) | Enterprise standardized information management system | |
CN115169011A (en) | Editing system and application system of airplane assembly outline | |
CN110704280A (en) | Main data monitoring system | |
US20220067659A1 (en) | Research and development system and method | |
Wang et al. | [Retracted] ERP System Design for Hydrogen Equipment Manufacturing Industry Based on Low Code Technology | |
CN103106555B (en) | Maintaining-managing system based on the integration of online off-line and method | |
CN117591079A (en) | Design construction method of enterprise-level integrated operation management system | |
CN104504491A (en) | Meter reading control method and system | |
CN117036062A (en) | Accounting resource calculation method and device | |
CN103279839A (en) | System for controlling strategic plan implementation and budget analysis information based on activities | |
CN113592453B (en) | Information system operation compliance examining method and system based on block chain |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20130605 |