CN104408587A - Government project management information system - Google Patents
Government project management information system Download PDFInfo
- Publication number
- CN104408587A CN104408587A CN201410819279.6A CN201410819279A CN104408587A CN 104408587 A CN104408587 A CN 104408587A CN 201410819279 A CN201410819279 A CN 201410819279A CN 104408587 A CN104408587 A CN 104408587A
- Authority
- CN
- China
- Prior art keywords
- project
- management
- details
- information
- user
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/10—Services
- G06Q50/26—Government or public services
Abstract
The invention discloses a government project management information system which comprises a login management module, a system management module, a project decision analysis module, a project reserve management module, a project library management module and a major project management module. Compared with the prior art, the government project management information system has the advantages that the problems that the traditional government project management process is low in efficiency, high in error rate, slow in data counting and the like are solved, and the government project management information system is high in practicability and easy to popularize.
Description
Technical field
The present invention relates to field of computer technology, specifically a kind of practical, government-invested project management information system.
Background technology
The design feature of traditional government department is that department stands in great numbers, barrier between different departments, rigidly stratified, administrative information circulation is smooth, information processing means falls behind, lower administration efficiency.Along with the quickening of people's rhythm of life, some problems occurred in traditional government department's office process more and more pay close attention to by people, government aspect also being wished office workflow by optimizing self, strengthening departmental cooperation, being simplified the office efficiency that the mode such as operation procedure and working flow process improves self.The appearance of E-Government, changes transfer mode and the process means of administrative information, and overcome various logistics and hinder and tissue disorder, departmental cooperation is strengthened, and government operation program and working flow process are simplified, and improve government supervisory capability.
Along with popularizing of cyber-net, state affairs being moved to the network platform has become a kind of trend.Utilize computing machine to store information, utilize invisible network to carry and transmission of information, state affairs electronization, informationization have been become when the next item down important process.
In traditional government-invested project management process, project data quantity of information is huge, filing is consulted extremely inconvenient, the project management macroscopic information that leader's needs obtain and relevant data, must go to collect statistics and wait for that relevant departments go to collect statistics from various material, easily and timely cannot obtain information needed, data statistics lacks accuracy and promptness temporarily, cause leader cannot carry out macroscopic view, comprehensively analyze huge data, bring great inconvenience to Project Management.Current bulk items management is still in the handwork stage, not only inefficiency, also usually occurs careless mistake because of the careless of management, therefore designs a set of infosystem about project management, be quite necessary.
Summary of the invention
Technical assignment of the present invention is for above weak point, provides a kind of practical, government-invested project management information system.
A kind of government-invested project management information system, comprises login management module, system management module, project decision analysis module, project backlog control module, project library administration module, main project administration module, wherein:
Described login management module comprises user's login, user exits two modules, and this login management module adopts ssl protocol to provide secure log;
Described system management module comprises user management, log management, rights management, Role Management, DB Backup, database restoration;
Project decision analysis module comprises classification of the items statistics, coordinates project problem, checks and examine and be in charge of project, management deposit project, inquiry and statistical item examination & approval situation;
Described project backlog control module comprises application project, queried for items, examination and approval project, checks Entry Details, revises Entry Details, checks project examination information, statistical item;
Described project library administration module comprises application project, queried for items, examination and approval project, checks Entry Details, revises Entry Details, checks project examination information, Project evaluation, checks project appraisal information, statistical item, Classification Management;
Described main project administration module comprises application main project, inquires about main project, checks main project details, revises main project details, adds up main project, checks main project owner details, revises main project owner details.
Described login management module is used for authenticated and server, guarantees that data are sent to correct client-server; Enciphered data is stolen to prevent data midway; The integrality of service data, guarantees that data are not changed in transmitting procedure; Ssl protocol is added, server/customer end two-way authentication at server end, thus the security of the system of guarantee.
Described server/customer end two-way authentication implementation procedure is:
Generate key store and certificate;
Configuration Tomcat server, makes server support SSL;
Be configured at web project application, make project application support SSL;
Client imports certificate by certification, realizes server-side certificate;
Server end trusted certificate is imported in the root certificate agency of being trusted and goes, realize client certificate.
User management module in described system management module comprise Add User, inquiring user, freeze user, amendment subscriber information module; Log management comprises inquiry log module; Rights management comprises increase, erase right module, and the corresponding web page of this authority, namely when user does not have authority, then cannot operate the page corresponding to this authority; Role Management comprises the authority module of newly-increased role and amendment role; Database on server is kept at this locality by DB Backup; The database script that this locality has been preserved by database restoration reduces.
In described project decision analysis module, classification of the items statistics comprises by scale of investment statistics, by item types statistics, by regional statistics, by industry statistic, adds up submodule on a time period; Coordination project problem module comprise check, increase newly, delete items problem submodule; Check and examine and be in charge of project for showing all project information of returning current login user to administer, details are checked in user's option, perform approval process; Management deposit project comprises all items information of checking in warehouse; Inquiry and statistical item examination & approval situation comprise inquires about according to the different conditions in project examination flow process, adds up according to project year information.
In described project backlog control module, project, for after the details of user's entry item and owner also click submission, is entered submit state and carries out approval process by application project; In queried for items, storehouse belonging to user's option state, project, query type click inquiry after inputting key word, the project information that display is corresponding; Examination and approval project page display items display specifying information, when project examination is by then entering next state, waits for the examination & approval of next node, otherwise project status is set to and does not pass through, and is further processed; Check that Entry Details checks all information of project for user, this information is read-only, and amendment Entry Details allows user to revise project information; Check that project examination information provides user to check the state that project is residing in approval process; Statistical item comprises central authorities, economizes support project, and city's finance at corresponding level drops into or gives investment support project, the statistical content of attracting foreign investment project three aspect.
In described project library administration module, Project evaluation is supplied to state and the details that user treats Project evaluation, and user is by review result record; Classification Management dynamically increases, reduce disparity items type under trade classification; Main project administration module comprises application main project, inquires about main project, checks main project details, revises main project details, adds up main project, checks main project owner details, revises main project owner details; During application project, first send request to server, require to obtain the full detail about affiliated area, trade classification, responsible institution, owner in database; Inquiry main project obtains Query Result by queried for items name keys, and the project name wherein inputted for empty, thus can obtain main projects all in storehouse; Arbitrary project can be clicked and check its details after acquisition Query Result; Modification item object details obtain district sector's information in database in advance, and the amendment page is supported to select every and newly-increased owner; Check the information of all main project owners of owner's acquisition of information.
A kind of government-invested project management information system of the present invention, has the following advantages:
The functions such as a kind of government-invested project management information system of this invention integrates the project application, examination & verification, statistical summaries, report printing, examination & approval are put on record, consulting service, management, supervision, bid administrative supervision, data analysis is comprehensively macroscopical, the efficiency of management is higher, practical, is easy to promote.
Accompanying drawing explanation
Accompanying drawing 1 is system framework figure of the present invention.
Embodiment
Below in conjunction with the drawings and specific embodiments, the invention will be further described.
The present invention proposes a kind of government-invested project management information system, as shown in Figure 1, comprises login management module, system management module, project decision analysis module, project backlog control module, project library administration module, main project administration module, wherein:
Described login management module comprises user's login, user exits two modules, and this login management module adopts ssl protocol to provide secure log, certificate deployment on the server, and client does not have certificate to log in.
Login management module adopts ssl protocol to provide secure log.1, authenticated and server, guarantees that data are sent to correct client-server; 2, enciphered data is stolen to prevent data midway; 3, the integrality of service data, guarantees that data are not changed in transmitting procedure; 4, ssl protocol is added at server end, server/customer end two-way authentication, thus the security of the system of guarantee.
One, server/customer end two-way authentication realization flow.
Two, key store and certificate is generated.
Three, configure Tomcat server, make server support SSL.
Four, be configured at web project application, make project application support SSL.
Five, client imports certificate by certification, realizes server-side certificate.
Six, server end trusted certificate is imported in the root certificate agency of being trusted and go, realize client certificate.
Described system management module comprises user management, log management, rights management, Role Management, DB Backup, database restoration.Wherein:
User management comprises and Adding User, and inquiring user, freezes user, amendment user profile;
Log management comprises inquiry log;
Rights management mainly increases, erase right, and in native system, authority corresponds to web page, if user does not have a certain authority, then cannot operate the page corresponding to this authority;
Role Management comprises the authority of newly-increased role and amendment role;
Database on server can be kept at this locality by DB Backup;
Database restoration selects the local database script preserved to reduce.
Project decision analysis module comprises classification of the items statistics, coordinates project problem, checks and examine and be in charge of project, management deposit project, inquiry and statistical item examination & approval situation, wherein:
Classification of the items statistics comprises by scale of investment statistics, by item types statistics, by regional statistics, by industry statistic, adds up on a time period;
Coordination project problem comprise check, increase newly, delete items problem;
Check and examine and be in charge of project and can show all project information of returning current login user to administer, user option can check details, performs approval process.
Management deposit project comprises all items information of checking in warehouse.
Inquiry and statistical item examination & approval situation comprise inquires about according to the different conditions in project examination flow process, adds up according to project year information.
Described project backlog control module comprises application project, queried for items, examination and approval project, checks Entry Details, revises Entry Details, checks project examination information, statistical item, wherein:
In application project, the details of user's entry item and owner also click submission, and then project enters submit state and carries out approval process.
In queried for items, storehouse belonging to user's option state, project, query type click inquiry after inputting key word, then can show corresponding project information.
The examination and approval project page can display items display specifying information, if project examination by; enter next state, wait for the examination & approval of next node, otherwise project status is set to and does not pass through, and is further processed.
Check that Entry Details allows user to check all information of project, but information is read-only, amendment Entry Details allows user to revise project information.
Check that project examination information provides user to check the state that project is residing in approval process.
Statistical item comprises central authorities, economizes support project, and city's finance at corresponding level drops into or gives investment support project, the statistical content of attracting foreign investment project three aspect.
Described project library administration module comprises application project, queried for items, examination and approval project, checks Entry Details, revises Entry Details, checks project examination information, Project evaluation, checks project appraisal information, statistical item, Classification Management, wherein:
Project evaluation is supplied to state and the details that user treats Project evaluation, and user can by review result record.
Trade classification under Classification Management can dynamically increase, reduce disparity items type (as deposit project, main project etc.) is (as hygiene medical treatment, electronic information, building, petrochemical complex.Electric power etc.).
Main project administration module comprises application main project, inquires about main project, checks main project details, revises main project details, adds up main project, checks main project owner details, revises main project owner details.
During application project, first sending request to server, require to obtain the full detail about affiliated area, trade classification, responsible institution, owner in database, being convenient to like this select for applicant when applying for.
Inquiry main project obtains Query Result by queried for items name keys.The project name of input can be empty, can obtain main projects all in storehouse like this.
Arbitrary project can be clicked and check its details after acquisition Query Result.
Modification item object details will to obtain in database the information such as district sector equally in advance, and the amendment page is supported to select every and newly-increased owner.
Check that owner's information can obtain the information of all main project owners.
Described main project administration module comprises application main project, inquires about main project, checks main project details, revises main project details, adds up main project, checks main project owner details, revises main project owner details.
Amendment owner information can revise the information of the main project owner specified.I.D., as the unique identification of a people, in order to avoid I.D. input error or leakage input, uses regular expression to ensure that the input of I.D. is errorless.
Above-mentioned embodiment is only concrete case of the present invention; scope of patent protection of the present invention includes but not limited to above-mentioned embodiment; claims of any a kind of government-invested project management information system according to the invention and the those of ordinary skill of any described technical field to its suitable change done or replacement, all should fall into scope of patent protection of the present invention.
Claims (7)
1. a government-invested project management information system, is characterized in that, comprises login management module, system management module, project decision analysis module, project backlog control module, project library administration module, main project administration module, wherein:
Described login management module comprises user's login, user exits two modules, and this login management module adopts ssl protocol to provide secure log;
Described system management module comprises user management, log management, rights management, Role Management, DB Backup, database restoration;
Project decision analysis module comprises classification of the items statistics, coordinates project problem, checks and examine and be in charge of project, management deposit project, inquiry and statistical item examination & approval situation;
Described project backlog control module comprises application project, queried for items, examination and approval project, checks Entry Details, revises Entry Details, checks project examination information, statistical item;
Described project library administration module comprises application project, queried for items, examination and approval project, checks Entry Details, revises Entry Details, checks project examination information, Project evaluation, checks project appraisal information, statistical item, Classification Management;
Described main project administration module comprises application main project, inquires about main project, checks main project details, revises main project details, adds up main project, checks main project owner details, revises main project owner details.
2. a kind of government-invested project management information system according to claim 1, is characterized in that, described login management module is used for authenticated and server, guarantees that data are sent to correct client-server; Enciphered data is stolen to prevent data midway; The integrality of service data, guarantees that data are not changed in transmitting procedure; Ssl protocol is added, server/customer end two-way authentication at server end, thus the security of the system of guarantee.
3. a kind of government-invested project management information system according to claim 2, is characterized in that, described server/customer end two-way authentication implementation procedure is:
Generate key store and certificate;
Configuration Tomcat server, makes server support SSL;
Be configured at web project application, make project application support SSL;
Client imports certificate by certification, realizes server-side certificate;
Server end trusted certificate is imported in the root certificate agency of being trusted and goes, realize client certificate.
4. a kind of government-invested project management information system according to claim 1, is characterized in that, the user management module in described system management module comprise Add User, inquiring user, freeze user, amendment subscriber information module; Log management comprises inquiry log module; Rights management comprises increase, erase right module, and the corresponding web page of this authority, namely when user does not have authority, then cannot operate the page corresponding to this authority; Role Management comprises the authority module of newly-increased role and amendment role; Database on server is kept at this locality by DB Backup; The database script that this locality has been preserved by database restoration reduces.
5. a kind of government-invested project management information system according to claim 1, it is characterized in that, in described project decision analysis module, classification of the items statistics comprises by scale of investment statistics, by item types statistics, by regional statistics, by industry statistic, adds up submodule on a time period; Coordination project problem module comprise check, increase newly, delete items problem submodule; Check and examine and be in charge of project for showing all project information of returning current login user to administer, details are checked in user's option, perform approval process; Management deposit project comprises all items information of checking in warehouse; Inquiry and statistical item examination & approval situation comprise inquires about according to the different conditions in project examination flow process, adds up according to project year information.
6. a kind of government-invested project management information system according to claim 1, it is characterized in that, in described project backlog control module, project, for after the details of user's entry item and owner also click submission, is entered submit state and carries out approval process by application project; In queried for items, storehouse belonging to user's option state, project, query type click inquiry after inputting key word, the project information that display is corresponding; Examination and approval project page display items display specifying information, when project examination is by then entering next state, waits for the examination & approval of next node, otherwise project status is set to and does not pass through, and is further processed; Check that Entry Details checks all information of project for user, this information is read-only, and amendment Entry Details allows user to revise project information; Check that project examination information provides user to check the state that project is residing in approval process; Statistical item comprises central authorities, economizes support project, and city's finance at corresponding level drops into or gives investment support project, the statistical content of attracting foreign investment project three aspect.
7. a kind of government-invested project management information system according to claim 1, is characterized in that, in described project library administration module, Project evaluation is supplied to state and the details that user treats Project evaluation, and user is by review result record; Classification Management dynamically increases, reduce disparity items type under trade classification; Main project administration module comprises application main project, inquires about main project, checks main project details, revises main project details, adds up main project, checks main project owner details, revises main project owner details; During application project, first send request to server, require to obtain the full detail about affiliated area, trade classification, responsible institution, owner in database; Inquiry main project obtains Query Result by queried for items name keys, and the project name wherein inputted for empty, thus can obtain main projects all in storehouse; Arbitrary project can be clicked and check its details after acquisition Query Result; Modification item object details obtain district sector's information in database in advance, and the amendment page is supported to select every and newly-increased owner; Check the information of all main project owners of owner's acquisition of information.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410819279.6A CN104408587A (en) | 2014-12-25 | 2014-12-25 | Government project management information system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410819279.6A CN104408587A (en) | 2014-12-25 | 2014-12-25 | Government project management information system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104408587A true CN104408587A (en) | 2015-03-11 |
Family
ID=52646216
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410819279.6A Pending CN104408587A (en) | 2014-12-25 | 2014-12-25 | Government project management information system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104408587A (en) |
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106485468A (en) * | 2016-09-23 | 2017-03-08 | 天津大学 | Based on fuzzy comprehensive assessment and the project management platform of dynamic state feedback mechanism |
CN107292585A (en) * | 2017-06-27 | 2017-10-24 | 国电联合动力技术有限公司 | A kind of development project information management system based on PLM platforms |
CN107392633A (en) * | 2017-09-12 | 2017-11-24 | 安徽易商数码科技有限公司 | A kind of Compulsory Certification of Products supervisory systems |
CN107977827A (en) * | 2017-12-01 | 2018-05-01 | 温州中普科技咨询有限公司 | One kind declares inspection item management system online |
CN108009787A (en) * | 2017-10-23 | 2018-05-08 | 青岛市市北区审计局 | A kind of Audit data comparative analysis management system |
CN108133299A (en) * | 2016-12-01 | 2018-06-08 | 黄玉新 | A kind of smart items manage system |
CN108197293A (en) * | 2018-01-22 | 2018-06-22 | 温州索易软件开发有限公司 | A kind of article of consumption inquiry management system |
CN108241966A (en) * | 2018-01-23 | 2018-07-03 | 广州明城信息服务有限公司 | A kind of use system suitable for technological project management |
CN108268798A (en) * | 2017-06-30 | 2018-07-10 | 勤智数码科技股份有限公司 | A kind of data item authority distributing method and system |
CN108388996A (en) * | 2018-03-08 | 2018-08-10 | 青岛东方深蓝信息科技股份有限公司 | A kind of scientific research service integration management system |
CN108985571A (en) * | 2018-06-20 | 2018-12-11 | 广东电网有限责任公司 | A kind of method of construction project wechat control |
CN109064137A (en) * | 2018-08-02 | 2018-12-21 | 龙马智芯(珠海横琴)科技有限公司 | A kind of project application device, system |
CN109840746A (en) * | 2017-11-29 | 2019-06-04 | 镇江市新创计算机系统集成有限公司 | A kind of investment management system and management method |
CN110264164A (en) * | 2019-06-24 | 2019-09-20 | 肖雪松 | Promotion of item method and system based on visualization inspection |
CN110276587A (en) * | 2019-04-29 | 2019-09-24 | 阿里巴巴集团控股有限公司 | The method, apparatus of project examination calculates equipment and computer readable storage medium |
CN113657871A (en) * | 2021-08-31 | 2021-11-16 | 广东电网有限责任公司东莞供电局 | Scientific and technological innovation project management system and method |
-
2014
- 2014-12-25 CN CN201410819279.6A patent/CN104408587A/en active Pending
Non-Patent Citations (2)
Title |
---|
刘景林: "基于JAAS 安全机制的J2EE Web 系统用户身份认证设计", 《五邑大学学报(自然科学版)》 * |
胡月: "政府项目管理系统的设计与实现", 《万方数据库》 * |
Cited By (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106485468A (en) * | 2016-09-23 | 2017-03-08 | 天津大学 | Based on fuzzy comprehensive assessment and the project management platform of dynamic state feedback mechanism |
CN108133299A (en) * | 2016-12-01 | 2018-06-08 | 黄玉新 | A kind of smart items manage system |
CN107292585A (en) * | 2017-06-27 | 2017-10-24 | 国电联合动力技术有限公司 | A kind of development project information management system based on PLM platforms |
CN108268798A (en) * | 2017-06-30 | 2018-07-10 | 勤智数码科技股份有限公司 | A kind of data item authority distributing method and system |
CN108268798B (en) * | 2017-06-30 | 2023-09-05 | 勤智数码科技股份有限公司 | Data item authority allocation method and system |
CN107392633A (en) * | 2017-09-12 | 2017-11-24 | 安徽易商数码科技有限公司 | A kind of Compulsory Certification of Products supervisory systems |
CN108009787A (en) * | 2017-10-23 | 2018-05-08 | 青岛市市北区审计局 | A kind of Audit data comparative analysis management system |
CN109840746A (en) * | 2017-11-29 | 2019-06-04 | 镇江市新创计算机系统集成有限公司 | A kind of investment management system and management method |
CN107977827A (en) * | 2017-12-01 | 2018-05-01 | 温州中普科技咨询有限公司 | One kind declares inspection item management system online |
CN108197293A (en) * | 2018-01-22 | 2018-06-22 | 温州索易软件开发有限公司 | A kind of article of consumption inquiry management system |
CN108241966A (en) * | 2018-01-23 | 2018-07-03 | 广州明城信息服务有限公司 | A kind of use system suitable for technological project management |
CN108388996A (en) * | 2018-03-08 | 2018-08-10 | 青岛东方深蓝信息科技股份有限公司 | A kind of scientific research service integration management system |
CN108985571A (en) * | 2018-06-20 | 2018-12-11 | 广东电网有限责任公司 | A kind of method of construction project wechat control |
CN109064137A (en) * | 2018-08-02 | 2018-12-21 | 龙马智芯(珠海横琴)科技有限公司 | A kind of project application device, system |
CN110276587A (en) * | 2019-04-29 | 2019-09-24 | 阿里巴巴集团控股有限公司 | The method, apparatus of project examination calculates equipment and computer readable storage medium |
CN110264164A (en) * | 2019-06-24 | 2019-09-20 | 肖雪松 | Promotion of item method and system based on visualization inspection |
CN113657871A (en) * | 2021-08-31 | 2021-11-16 | 广东电网有限责任公司东莞供电局 | Scientific and technological innovation project management system and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104408587A (en) | Government project management information system | |
US11455685B2 (en) | Settlement of securities trades using append only ledgers | |
US10515409B2 (en) | Distributing work load of high-volume per second transactions recorded to append-only ledgers | |
CN112488778A (en) | Bill processing method and related device | |
CN102103777A (en) | Network tax declaration system and tax declaration method thereof for fiscal cash register | |
CN109727123A (en) | User's collage-credit data construction method, device and computer readable storage medium | |
CN106504044A (en) | A kind of billing method and system | |
CN105260841A (en) | Auditing system for power distribution network fault emergency repair receipt | |
CN113205415B (en) | Financial process automation method and system based on RPA and block chain technology | |
Bai et al. | Researchain: union blockchain based scientific research project management system | |
US20220351290A1 (en) | Settlement of securities trades using append only ledgers | |
CN104680402A (en) | Management system and management method thereof for invoicing application form | |
CN102043986A (en) | Online processing system for abnormal electricity information transferring and application method of system | |
CN112487491A (en) | Control method and related device for block chain system | |
CN207571788U (en) | A kind of university's scientific research information sharing system | |
Nguyen et al. | A blockchain-based framework for developing traceability applications towards sustainable agriculture in Vietnam | |
CN109191062A (en) | A kind of power distribution network Computer Aided Design and project management control system | |
CN103136161A (en) | On-line management method of checking and tracking of job schedule abnormalities | |
CN112215710A (en) | Annuity data processing method, block chain system, medium and electronic device | |
CN110362626A (en) | One kind being based on the convenience-for-people inquiry system of block chain network and application method | |
CN109543375A (en) | A kind of remote access financial system with encryption equipment | |
TWI698768B (en) | Csr data verification system with tamper-proof capability, related verification party subsystem, computer program product, and data verification method | |
CN208401889U (en) | A kind of cloud platform management system | |
CN110807583A (en) | Configurable ERP role authority verification system and method based on RBAC | |
CN112365362A (en) | Method for protecting existing IT domain asset data based on power grid by adopting block chain technology |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20150311 |
|
WD01 | Invention patent application deemed withdrawn after publication |