CN103279839A - System for controlling strategic plan implementation and budget analysis information based on activities - Google Patents

System for controlling strategic plan implementation and budget analysis information based on activities Download PDF

Info

Publication number
CN103279839A
CN103279839A CN2013102251870A CN201310225187A CN103279839A CN 103279839 A CN103279839 A CN 103279839A CN 2013102251870 A CN2013102251870 A CN 2013102251870A CN 201310225187 A CN201310225187 A CN 201310225187A CN 103279839 A CN103279839 A CN 103279839A
Authority
CN
China
Prior art keywords
budget
strategic
server
management
module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013102251870A
Other languages
Chinese (zh)
Inventor
王民
吴江龙
孙建忠
张启亮
魏兵
赵成彦
付思敏
于红雨
罗旭东
张翀
李标
王武
孙长山
刘世壮
李忠福
彭飞
单长森
王新宝
许建全
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Construction Machinery Branch of XCMG
Original Assignee
Construction Machinery Branch of XCMG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Construction Machinery Branch of XCMG filed Critical Construction Machinery Branch of XCMG
Priority to CN2013102251870A priority Critical patent/CN103279839A/en
Publication of CN103279839A publication Critical patent/CN103279839A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Financial Or Insurance-Related Operations Such As Payment And Settlement (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a system for controlling strategic plan implementation and budget analysis information based on activities. The system comprises an interface display device, a strategy performance management system, a server, a data warehouse and an input device, wherein the interface display device is connected with the strategy performance management system through a data line, the strategy performance management system is connected with the server through a data line, and the server is connected with the data warehouse through a network, and connected with the input device through a data line. According to the system for controlling the strategic plan implementation and budget analysis information based on the activities, rolling tracking to a strategy, monitoring implementation of planning and budget activities and integrated monitoring on capital budgets and expense budgets according to the cash basis and the accrual basis can be achieved, the authority grading management requirements of enterprise strategy management and control are combined, delicacy management on strategic planning landing is achieved, and dynamic monitoring on implementation conditions of various links of enterprise management is achieved.

Description

A kind of strategic plan based on activity is carried out and the budget analysis management information system
Technical field
The present invention relates to a kind of information managing and control system, specifically is that a kind of strategic plan based on activity is carried out and the budget analysis management information system.
Background technology
At present, group company is to the management of enterprise strategic programming, operating plan and the yearly budget of each subsidiary company, mainly be each subsidiary company submit planning voluntarily to and the group that regularly various planning and budget reported for work after, by group various planning and the budget of all subsidiary companies are put in order and are analyzed.Because these information all are that people by different subsidiary companies or group comes management and control, transmission between subsidiary company and group also needs the regular hour, so there is following problem in existing management and control system: the corporate strategy target is decomposed and is lacked effective means of tracking, there is hysteresis phenomenon in operation management and control data message, the disconnection of yearly budget and monthly budget; While is based on " two skins " phenomenon of expense budget establishment with the capital budgeting of cash basis of accrual basis, the model that lacks effective budget equalization, can't finish the production-sales-stock in the enterprise operation process is carried out the model balance by information approach, can not carry out real-time management and monitoring to each subsidiary company's plan and practical operation situation.
Summary of the invention
Problem at above-mentioned prior art existence, the invention provides a kind of strategic plan based on activity carries out and the budget analysis management information system, can realize the fine-grained management to rolling tracking, plan and the budget activity of strategy, the integrated monitoring of capital budgeting and expense budget, realize the execution of each link of dynamic monitoring enterprise operation, and the performance appraisal situation of budget enforcement.
To achieve these goals, the present invention is a kind of to be carried out and the budget analysis management information system based on the strategic plan based on activity, comprise interface display apparatus, strategic performance management system, server, data warehouse and input media, interface display apparatus is connected with strategic performance management system by data line, strategy performance management system is connected with server by data line, server be connected with data warehouse by network, and be connected with input media by data line.
Also comprise card reader and ID (identity number) card, described card reader is connected with server by data line.
Described strategic performance management system comprises that identification module, strategic plan administration module, annual plan are connected with monthly plan that the management and control module of module, expense budget and capital budgeting, strategy are carried out classification management and control module, strategy is carried out monitoring module and performance appraisal analysis module, and above-mentioned module is connected with server with interface display apparatus respectively.
The invention has the beneficial effects as follows: can realize the fine-grained management of rolling tracking, plan and budget activity to strategy by this system, the integrated monitoring of capital budgeting and expense budget is realized the implementation status of each link of dynamic monitoring enterprise operation and the performance appraisal situation of budget enforcement.
Description of drawings
Fig. 1 is electric theory diagram of the present invention;
Fig. 2 is the present invention's strategy performance management system principle diagram.
Embodiment
The invention will be further described below in conjunction with accompanying drawing.
As shown in Figure 1, this strategic plan based on activity is carried out and the budget analysis management information system, comprise interface display apparatus, strategic performance management system, server, data warehouse and input media, described interface display apparatus is used for showing the interface of each module correspondence; Described data warehouse is used for strategic plan and the budget information of all subsidiary companies of storage; Described input media mainly carries out back-stage management and control, exchanges data and transmission between each module of management and control; Interface display apparatus is connected with strategic performance management system by data line, and strategic performance management system is connected with server by data line, server be connected with data warehouse by network, and be connected with input media by data line.
As a kind of improved procedure of the present invention, also can comprise card reader and ID (identity number) card, described card reader is connected with server by data line, the identity information that has the holder in the ID (identity number) card, the holder can be placed on this ID (identity number) card on the card reader by swiping the card to realize authentication, verify and directly to carry out associative operation to it after qualified, need not to carry out the checking of identity by interface display apparatus input identity code name and password again, operate simpler.
As shown in Figure 2, described strategic performance management system comprises that identification module, strategic plan administration module, annual plan are connected with monthly plan that the management and control module of module, expense budget and capital budgeting, strategy are carried out classification management and control module, strategy is carried out monitoring module and performance appraisal analysis module, and above-mentioned module is connected with server with interface display apparatus respectively.
Wherein, described identification module be used for having the right in each branch office of registration the operator identity information, check whether each user has the right to enter this system and restriction enters the associative operation that can carry out after this system;
Described strategic plan administration module is used for the information of registration and management all items activity, and each project activity mainly comprises project name, the contents of a project, project income, PROJECT TIME and item amount five elements; And operating budget and the financial financial charges budget concrete according to each special project stroke;
Described annual plan is connected module and be used for realizes being connected of strategic annual plan and monthly plan with monthly plan, annual plan produces an internal system order number with each project activity in the strategic plan administration module, monthly plan is controlled according to the inside order number that annual plan produces, simultaneously in order to solve the many-one relationship of annual plan and monthly plan, the inside order that monthly plan is produced is connected, thereby realized the related of annual plan and monthly plan, stopped the phenomenon of " two skins " by system;
The management and control module of described expense budget and capital budgeting is used for realizing to the expense of each project scheduling generation and the budget of fund, be used for the monitoring to expense budget and capital budgeting simultaneously, because there being the phenomenon of the budget data bore difference that produces according to accrual basis and cash basis in the real business really, so for evading the management and control of expense budget and capital budgeting, utilize different editions to control by system module, and according to different subject systems, by the monitoring of an inner order realization to expense budget and capital budgeting;
Described strategy is carried out the data message that classification management and control module is used for the actual implementation status of each project activity of typing, be used for limiting the relevant review operation that the operator can carry out, according to who be benefited, the principle of whose audit, whose approval, whose execution, put in order according to specialty line, service line simultaneously, and examine according to Permission Levels separately, guarantee that strategy carries out the activity authority of monitoring and examine and close rule and effectively;
Described strategic plan execution monitoring module is used for planned budget data and the actual data of carrying out are carried out alternately, compared, and realizes the real-time monitoring of budget, makes plan information not only play reference role in process of service execution, has also given play to control effectiveness simultaneously;
Described performance appraisal analysis module be used for regularly to the implementation status of each project activity summarize, analysis and performance appraisal.Company manager can rationally adjust expectation value in conjunction with the examination analysis result, and strategic objective, the budget in next month or the coming year are suitably adjusted.
At first, system user can carry out identity verification with the identity information input by ID (identity number) card or by input media, can as requested the project activity plan information be imported and deposit in the data in server storehouse by input media after entering system, if the project information of input does not meet the requirement of five elements, then remind the user to import failure by interface display apparatus.After entering system, the operator can operate other modules by interface display apparatus, realizes various functions such as management and inquiry.Annual plan is connected module and expense budget and capital budgeting with monthly plan management and control module is according to the inner order number of the project activity information automatic creation system of typing, decompose it whole year and concrete month, realize expense that this project scheduling produces by accrual basis or cash basis and the budget of fund simultaneously; Be that system carries out data pick-up, export all kinds of business plans and fund planning by the strategic plan administration module, can export all kinds of resource distribution situations according to the business plan of input and the demand in conjunction with budget equalization model and concrete activity of fund planning, the priority level of clear and definite all kinds of activities, by the required consumes resources situation of all kinds of activities of input, finally determine the budget of all kinds of resource activity then.
The budget of all kinds of resource activity is generated concrete control device in strategic performance management system, make all kinds of activities all control, and carry out monitoring module according to strategic plan concrete movable actual execution data are imported, simultaneously with the contrast of itself and budget, the monitoring situation of clear and definite all kinds of activities is carried out with the decomposition of initial strategic objective and will be analyzed the detailed programs activity according to reality at last.Finally, can realize the fine-grained management of rolling tracking, plan and budget activity to strategy by this system, the integrated monitoring of capital budgeting and expense budget is realized the implementation status of each link of dynamic monitoring enterprise operation and the performance appraisal situation of budget enforcement.

Claims (3)

1. the strategic plan based on activity is carried out and the budget analysis management information system, it is characterized in that, comprise interface display apparatus, strategic performance management system, server, data warehouse and input media, interface display apparatus is connected with strategic performance management system by data line, strategy performance management system is connected with server by data line, server be connected with data warehouse by network, and be connected with input media by data line.
2. a kind of strategic plan based on activity according to claim 1 is carried out and the budget analysis management information system, it is characterized in that also comprise card reader and ID (identity number) card, described card reader is connected with server by data line.
3. a kind of strategic plan based on activity according to claim 1 and 2 is carried out and the budget analysis management information system, it is characterized in that, described strategic performance management system comprises that identification module, strategic plan administration module, annual plan are connected the management and control module of module, expense budget and capital budgeting, strategy and carry out classification management and control module, the strategy of monitoring and carry out monitoring module and performance appraisal analysis module with monthly plan, and above-mentioned module is connected with server with interface display apparatus respectively.
CN2013102251870A 2013-06-06 2013-06-06 System for controlling strategic plan implementation and budget analysis information based on activities Pending CN103279839A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013102251870A CN103279839A (en) 2013-06-06 2013-06-06 System for controlling strategic plan implementation and budget analysis information based on activities

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013102251870A CN103279839A (en) 2013-06-06 2013-06-06 System for controlling strategic plan implementation and budget analysis information based on activities

Publications (1)

Publication Number Publication Date
CN103279839A true CN103279839A (en) 2013-09-04

Family

ID=49062350

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013102251870A Pending CN103279839A (en) 2013-06-06 2013-06-06 System for controlling strategic plan implementation and budget analysis information based on activities

Country Status (1)

Country Link
CN (1) CN103279839A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105225029A (en) * 2015-08-27 2016-01-06 北京国电通网络技术有限公司 Budget enforcement on-line monitoring method, device and company's operation monitoring system
CN109255510A (en) * 2018-05-18 2019-01-22 侯峰 It is executed and budget analysis management information system and method based on movable plan
CN110490399A (en) * 2018-11-27 2019-11-22 中国航天系统科学与工程研究院 Software data manages processing system
CN110490398A (en) * 2018-11-27 2019-11-22 中国航天系统科学与工程研究院 Software data processing system

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1501296A (en) * 2002-11-15 2004-06-02 英业达股份有限公司 Project executive personnel management system and method of the same

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1501296A (en) * 2002-11-15 2004-06-02 英业达股份有限公司 Project executive personnel management system and method of the same

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105225029A (en) * 2015-08-27 2016-01-06 北京国电通网络技术有限公司 Budget enforcement on-line monitoring method, device and company's operation monitoring system
CN109255510A (en) * 2018-05-18 2019-01-22 侯峰 It is executed and budget analysis management information system and method based on movable plan
CN110490399A (en) * 2018-11-27 2019-11-22 中国航天系统科学与工程研究院 Software data manages processing system
CN110490398A (en) * 2018-11-27 2019-11-22 中国航天系统科学与工程研究院 Software data processing system

Similar Documents

Publication Publication Date Title
US11138540B2 (en) Creating digital workers in organizations
CN104200536A (en) Attendance-checking system and attendance-checking method based on wechat platform
Zhang et al. Analysis of supply chain finance based on blockchain
CN105184144A (en) Multi-system privilege management method
CN113205415B (en) Financial process automation method and system based on RPA and block chain technology
Drljača et al. Frameworks for audit of an information system in practice
KR20200114188A (en) Electronic voting method using smart contract based block chain And system
Soin et al. Management control and uncertainty: Risk management in universities
Luo et al. Overview of intelligent online banking system based on HERCULES architecture
CN103279839A (en) System for controlling strategic plan implementation and budget analysis information based on activities
De Filippi Blockchain technology as an instrument for global governance
Zhang Challenges and strategies of promoting cloud accounting
Marotta et al. Convergence and divergence of regulatory compliance and cybersecurity.
CN108876584A (en) A kind of personnel's revenue control and Individual Income Tax accounting system, method and electronic equipment
Zhao et al. Token economy: A new form economy with decentralized mutual trust and collective governance
CN112016892A (en) Project management system integrated with multiple systems
Viecco et al. Information T echnology Governance Model, Based on Risk Management and Information Security for Colombian Public Universities: Case on Study University of La Guajira
CN114493519A (en) Flexible employment business processing method, system, device and equipment based on block chain platform
Zheng et al. Addressing the challenges of government service provision with AI
Kapić INTERNAL SUPERVISION, INTERNAL CONTROL AND INTERNAL AUDIT.
Luo et al. Research on CPA auditing reform Strategy under the background of artificial intelligence
CN114626934A (en) Block chain-based multi-level wind control system and control method
Artemenko et al. Digital transformation of an institutional environment
Wang Block Chain+ Accounting: Applications, Challenges and Countermeasures Research
CN110675300B (en) Public service platform for public institutions

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20130904