CN112529441A - Engineering project management system - Google Patents

Engineering project management system Download PDF

Info

Publication number
CN112529441A
CN112529441A CN202011506516.5A CN202011506516A CN112529441A CN 112529441 A CN112529441 A CN 112529441A CN 202011506516 A CN202011506516 A CN 202011506516A CN 112529441 A CN112529441 A CN 112529441A
Authority
CN
China
Prior art keywords
module
engineering
project
budget
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011506516.5A
Other languages
Chinese (zh)
Inventor
张大平
邹雪云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Truths Engineering Management Co ltd
Original Assignee
Beijing Truths Engineering Management Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Truths Engineering Management Co ltd filed Critical Beijing Truths Engineering Management Co ltd
Priority to CN202011506516.5A priority Critical patent/CN112529441A/en
Publication of CN112529441A publication Critical patent/CN112529441A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • G06Q10/063114Status monitoring or status determination for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06313Resource planning in a project environment
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/101Collaborative creation, e.g. joint development of products or services

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Tourism & Hospitality (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Marketing (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Development Economics (AREA)
  • Game Theory and Decision Science (AREA)
  • Educational Administration (AREA)
  • Data Mining & Analysis (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The application relates to an engineering project management system, which comprises an administrator login end, a client, a data acquisition module, an engineering budget module, an engineering settlement module, a storage module and a display module, wherein the administrator login end, the client, the data acquisition module, the engineering budget module, the engineering settlement module, the storage module and the display module are respectively in communication connection with a control module; the administrator login end is used for an administrator to register and login an administrator account; the client is used for the constructor to log in and check related data information; the data acquisition module is used for acquiring engineering data of each node of the engineering; the project budget module is used for estimating all expenses generated by the project; the project settlement module is used for settling the project cost money finished at each current stage; the storage module is used for storing engineering data; the display module is used for displaying an engineering project management system interface and displaying received engineering data. According to the method and the system, the engineering data can be adjusted in real time according to the engineering progress, the administrator can monitor the information in real time, and constructors can inquire the information in real time.

Description

Engineering project management system
Technical Field
The invention relates to the technical field of engineering management, in particular to an engineering project management system.
Background
The existing engineering project has the problems of large volume, short construction period, many process interlude, large personnel flow and the like, the change factors in the engineering project management are many, the management process is complex, the mutual cooperation of multiple departments is involved in the construction process, in the traditional management, the management cost of the engineering project is high, the efficiency is low, the information acquisition is not timely, the final management effect is not ideal, and the normal operation of the engineering project is influenced.
Disclosure of Invention
Aiming at the defects in the prior art, the application aims to provide an engineering project management system which can dynamically manage all departments of an engineering project, realize real-time communication of information among all the departments, dynamically analyze and adjust according to the actual progress of the engineering project and improve the management efficiency.
The above object of the present invention is achieved by the following technical solutions:
a project management system comprises a control module, a manager login end, a client, a data acquisition module, a project budget module, a project settlement module, a storage module and a display module, wherein the control module is respectively in communication connection with the manager login end, the client, the data acquisition module, the project budget module, the project settlement module, the storage module and the display module;
the administrator login end is used for an administrator to register and login an administrator account;
the client is used for the constructors to log in, input and check related data information;
the data acquisition module is used for acquiring engineering data of each node of an engineering;
the project budget module is used for estimating all expenses generated by a project; the data acquisition module acquires engineering data and sends the engineering data to the control module, the control module processes and classifies the engineering data and then transmits the engineering data to the engineering budget module, and the engineering budget module generates the budget of an engineering project according to the processed engineering data;
the project settlement module is used for settling the project cost money finished at each current stage; the data acquisition module acquires engineering data and sends the engineering data to the control module, the control module processes and classifies the engineering data and then transmits the engineering data to the engineering settlement module, and the engineering settlement module generates settlement of an engineering project according to the processed engineering data;
the storage module is used for storing engineering data;
the display module is used for displaying an engineering project management system interface; the administrator login end can call the engineering data of the engineering project management system through the control module and display the engineering data on the display module.
By adopting the technical scheme, the data acquisition module acquires the project data through the data acquisition equipment and sends the project data to the control module, the control module processes and classifies the project data and then transmits the project data to the project budget module and the project settlement module, the project budget module generates the budget of the project according to the processed project data, and the project settlement module calculates the finished project for settlement according to the raw materials and personnel data actually used by the project. The administrator can monitor and inquire the engineering data of each node of the engineering project through the administrator login end; the client constructor can inquire the engineering data of the engineering project in real time through the app on the mobile communication device to know the progress condition of the engineering project, and the system can enable an administrator and constructors to exchange information through the control module, so that information communication among all departments is facilitated.
The invention is further configured to: the control module comprises an engineering change module, and the engineering change module adjusts the engineering budget by inputting changed engineering data by constructors and authorization information input by managers.
By adopting the technical scheme, constructors can work according to the using condition of materials and the change condition of the constructors, after authorized by a manager, relevant engineering data are adjusted in real time, meanwhile, the engineering budget is correspondingly adjusted, a data acquisition module acquires the raw material usage, the actual usage and the residual raw material usage which are acquired by constructors every day, a control module calculates the raw materials used in each period, simultaneously reading the budget amount of the raw materials of the storage module, comparing the actual consumption of the raw materials with the budget amount, calculating the changed consumption of the raw materials according to the consumption, by arranging the card reader on the construction site, the daily on-duty conditions of constructors and managers are recorded, recording the attendance amount of the constructors in real time, calculating the total attendance amount of the constructors according to the attendance amount, generating an attendance table by checking the attendance of the constructors every day, and sending the attendance table to a storage module for storage; the engineering change module dynamically manages the engineering project in real time, and management efficiency of the engineering project is improved.
The invention is further configured to: the engineering data comprises engineering raw materials, equipment, personnel and engineering drawing data.
By adopting the technical scheme, the project data of the project comprises project raw material equipment, personnel and project diagram data, the data is improved for project budget and project settlement, and the accuracy of the budget and the settlement is ensured.
The invention is further configured to: the control module comprises an engineering progress early warning module, the engineering progress early warning module analyzes engineering progress delay according to engineering data and generates early warning information, and the control module calls the engineering progress early warning module to transmit the early warning information to the manager login end and the client in real time.
By adopting the technical scheme, the method has the advantages that,
the invention is further configured to: the control module is in communication connection with the video monitoring module, and the video monitoring module is used for monitoring the condition of the engineering site.
By adopting the technical scheme, the video monitoring module can transmit the condition of the engineering field to the control module in real time and display the condition in the display module, so that a manager can monitor and manage the construction condition of the engineering project, and the system can realize the all-round management of the engineering project.
The invention is further configured to: the project budget module comprises a material budget module, a personnel budget module and a budget list module; the material budget module calculates the material budget according to the engineering quantity of the engineering data and transmits the material budget to the storage module for storage; the personnel budget unit calculates the personnel budget according to the engineering quantity of the engineering data and transmits the personnel budget to the storage module for storage; the budget list module calculates the material budget cost according to the material budget and the market unit price, calculates the personnel budget cost according to the personnel budget and the market average wage, generates a budget list, and the budget list is stored in the storage module through the control module.
By adopting the technical scheme, the material budget module calculates the consumption and specification of the expected required raw materials and the unit price of the raw materials according to the engineering quantity, calculates the budget of each raw material, and finally calculates the total budget of the raw materials and sends the total budget to the storage module; the manual budget module calculates the number of personnel required for early warning and the average wage of current market constructors according to the engineering quantity, calculates the budget cost of personnel, finally calculates the total budget cost of the personnel and sends the total budget cost to the storage module.
The invention is further configured to: the project settlement module comprises a project accounting module and a settlement list module; the engineering accounting module generates a material accounting list according to the total budget amount of raw materials, the actual usage amount of materials, the residual amount of materials and the actual unit price of the materials, which are acquired by the data acquisition module, and the engineering accounting module generates a production personnel accounting list according to the actual usage amount of personnel and the per capita unit price; and the settlement list module is used for generating the actual total material cost and labor cost of the project.
By adopting the technical scheme, the engineering material checking module calculates the total raw material cost according to the actual usage amount and unit price of the raw materials, removes the residual raw materials, obtains the actual raw material cost, and generates a material checking list; obtaining personnel cost through the attendance amount and per-capita unit price of constructors, and generating a personnel accounting list; the sum of the personnel cost and the material cost is the total cost of the project.
The invention is further configured to: the control module is also in communication connection with a personnel management module, and the personnel management module is used for carrying out attendance recording on personnel on duty and personnel off duty through the personnel management module arranged at an entrance and an exit of an engineering project.
By adopting the technical scheme, the personnel used by the engineering project can be accurately counted, the engineering progress can be adjusted in real time, and the smooth proceeding of the engineering is ensured.
In summary, the invention includes at least one of the following beneficial technical effects:
1. the application is connected with the administrator login end and the client through the control module in a communication mode, an administrator can monitor and manage engineering data in real time, a constructor logs in the client to inquire related engineering data and change the engineering data under the authorization of the administrator, engineering management efficiency can be improved, the administrator and a constructor exchange information through the control module, and information communication between all departments is facilitated.
2. According to the project management system and method, the project progress early warning module is arranged, so that automatic analysis can be performed on project progress delay, early warning information is issued, corresponding adjustment can be automatically performed on the project progress, and the management efficiency of the project is improved.
3 the application can change the project data according to the actual project progress of the project under the authorization of the administrator by setting the project change module, and correspondingly adjust the project progress. And realizing dynamic management of engineering projects.
Drawings
FIG. 1 is a block diagram of the system according to the present embodiment;
FIG. 2 is a block diagram of an engineering budget module according to the present embodiment;
fig. 3 is a block diagram of the project settlement module according to the embodiment.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Referring to fig. 1, an engineering project management system includes a control module, an administrator login end, a client, a data acquisition module, an engineering budget module, an engineering settlement module, a storage module, and a display module, where the control module is respectively in communication connection with the administrator login end, the client, the data acquisition module, the engineering budget module, the engineering settlement module, the storage module, and the display module. The administrator login end is used for an administrator to register and login an administrator account, and after the administrator logs in the system, the administrator can call and check the engineering data through the control module according to the authority and can correspondingly authorize the engineering data input and changed by construction constructors. The client is used for constructors to log in and check related data information, the constructors at the client can inquire the engineering data of the engineering project in real time through the app on the mobile communication equipment to know the progress condition of the engineering project, and if personnel management information is input, the personnel attendance condition in the personnel management module can be checked through the control module. The system enables an administrator and a constructor to exchange information through the control module, and facilitates information communication among all departments.
The data acquisition module is used for acquiring the engineering data of each node of the engineering and sending the engineering data to the control module. The engineering data comprises engineering raw materials, equipment, personnel and engineering drawing data, constructors transmit various raw material unit price data, various work type artificial unit price data, various construction equipment lease unit price data and management cost unit price data to the data acquisition module through a computer terminal, and the data related to the engineering drawing is transmitted to the data acquisition module. The control module processes and classifies the project data and then transmits the project data to the project budget module and the project settlement module; the engineering data classification comprises material data, personnel data, equipment data and the like; according to the project book, the material data comprises raw material unit price data, raw material specification data and raw material quantity data, and after the data are transmitted to the project budget module, the project budget module estimates all expenses generated by the project; for example, the material estimation process is to calculate the estimated material cost by using the quantity data of the raw material and the unit price data of the raw material. The personnel estimation cost and equipment estimation cost methods are the same as described above. The project settlement module settles the project cost money finished at each current stage according to the raw materials and personnel data actually used by the project; the storage module is used for storing engineering data; the display module is used for displaying an engineering project management system interface; the administrator login end can call the engineering data of the engineering project management system through the control module and display the engineering data on the display module.
The control module comprises an engineering change module, and the engineering change module adjusts relevant engineering data according to the material use condition and the personnel change condition after the authorization of a manager. Specifically, the constructor can increase or decrease the material and the operator through the computer according to the material using condition and the operator change. The construction personnel also transmit the raw material usage, the actual usage and the residual raw material usage which are taken by the construction personnel every day to the data acquisition module through the computer end, the control module calculates the raw materials used in each period, simultaneously reads the budget amount of the raw materials of the storage module, compares the actual usage with the budget usage, calculates the changed raw material usage according to the usage amount, records the daily on-duty conditions of the construction personnel and the management personnel by arranging a card punch on the construction site, records the attendance amount of the construction personnel in real time, calculates the total attendance amount of the construction personnel according to the attendance amount, generates an attendance table and transmits the attendance table to the storage module for storage; the engineering change module dynamically manages the engineering project in real time, and the management efficiency of the engineering project is improved.
The control module comprises an engineering progress early warning module, the engineering progress early warning module analyzes engineering progress delay according to engineering data and generates early warning information, and the control module calls the engineering progress early warning module to transmit the early warning information to the manager login end and the client in real time. The project progress early warning module can automatically analyze project progress delay and generate early warning information. Specifically, based on the data of a material budget module, a personnel budget module and a budget list module in the engineering budget module, the estimated material consumption, the estimated personnel consumption and the estimated personnel cost are obtained; obtaining a material accounting cost and a personnel accounting cost based on an engineering accounting module in the engineering settlement module; when the difference value of the expected material consumption and the material accounting cost is larger than the set deviation value, the engineering progress early warning module generates early warning information; similarly, when the difference value of the comparison between the personnel budget cost and the personnel accounting cost is larger than the set deviation value, the engineering progress early warning module generates early warning information, the early warning information transmits the early warning information to the manager login end and the client in real time, and prompts a manager and constructors to process in time, if the engineering progress does not reach the preset progress, the personnel allocation can be adjusted in time, and the engineering progress is improved through material supply. The problem of the project progress is timely mastered through the project progress early warning module, factors influencing the project progress are eliminated, and the management level of the project is improved.
The control module is in communication connection with the video monitoring module, and the video monitoring module is used for carrying out video monitoring on an engineering site. The video monitoring module can transmit video information of a project site to the control module in real time and display the video information in the display module, the display module can be used for a manager to watch the video information, and the manager can call the video monitoring module to monitor and manage the construction condition of the project in real time through the control module.
As shown in fig. 2, the engineering budget module includes a material budget module, a personnel budget module, and a budget list module; the material budget module calculates the material budget according to the engineering quantity of the engineering data and transmits the material budget to the storage module for storage; the personnel budget unit calculates the personnel budget according to the engineering quantity of the engineering data and transmits the personnel budget to the storage module for storage; the budget list module calculates the material budget cost according to the material budget consumption and the market unit price, calculates the personnel budget cost according to the personnel estimated consumption and the market average wage, generates a budget list, and the budget list is stored in the storage module through the control module.
The control module is also in communication connection with a personnel management module, and the personnel management module is used for carrying out attendance recording on personnel on duty and personnel off duty through the personnel management module arranged at an entrance and an exit of an engineering project. The method has the advantages that accurate statistics is carried out on personnel used by the engineering project, the engineering progress can be adjusted in real time, materials in the engineering can be reasonably matched with the personnel, and the smooth proceeding of the engineering is guaranteed.
As shown in fig. 3, the project settlement module includes a project accounting module and a settlement list module; the engineering accounting module generates a material accounting list according to the total budget amount of raw materials, the actual usage amount of materials, the residual amount of materials and the actual unit price of the materials, which are acquired by the data acquisition module, and the engineering accounting module generates a production personnel accounting list according to the actual usage amount of personnel and the per capita unit price; and the settlement list module is used for generating the actual total material cost and labor cost of the project.
The engineering accounting module calculates the total raw material cost according to the actual usage amount and unit price of the raw materials, removes the residual raw materials, obtains the actual raw material cost, and generates a material accounting list; obtaining personnel cost through the attendance amount and per-capita unit price of constructors, and generating a personnel accounting list; the sum of the personnel cost and the material cost is the total cost of the project.
The embodiments of the present invention are preferred embodiments of the present invention, and the scope of the present invention is not limited by these embodiments, so: all equivalent changes made according to the structure, shape and principle of the invention are covered by the protection scope of the invention.

Claims (8)

1. An engineering project management system, characterized by: the system comprises a control module, an administrator login end, a client, a data acquisition module, an engineering budget module, an engineering settlement module, a storage module and a display module, wherein the control module is respectively in communication connection with the administrator login end, the client, the data acquisition module, the engineering budget module, the engineering settlement module, the storage module and the display module;
the administrator login end is used for an administrator to register and login an administrator account;
the client is used for the constructors to log in, input and check related data information;
the data acquisition module is used for acquiring engineering data of each node of an engineering;
the project budget module is used for estimating all expenses generated by a project; the data acquisition module acquires engineering data and sends the engineering data to the control module, the control module processes and classifies the engineering data and then transmits the engineering data to the engineering budget module, and the engineering budget module generates the budget of an engineering project according to the processed engineering data;
the project settlement module is used for settling the project cost money finished at each current stage; the data acquisition module acquires engineering data and sends the engineering data to the control module, the control module processes and classifies the engineering data and then transmits the engineering data to the engineering settlement module, and the engineering settlement module generates settlement of an engineering project according to the processed engineering data;
the storage module is used for storing engineering data;
the display module is used for displaying an engineering project management system interface; the administrator login end can call the engineering data of the engineering project management system through the control module and display the engineering data on the display module.
2. The project management system of claim 1, wherein the control module includes a project change module that adjusts the project budget by the constructor entering changed project data and authorization information entered by the administrator.
3. The project management system of claim 1, wherein the project data includes project material, equipment, personnel, and engineering drawing data.
4. The project management system according to claim 1, wherein the control module comprises a project progress early warning module, the project progress early warning module analyzes project progress delay according to project data and generates early warning information, and the control module calls the project progress early warning module to transmit the early warning information to the administrator login end and the client end in real time.
5. The project management system according to claim 1, wherein the control module is communicatively connected with a video monitoring module, the video monitoring module is used for performing video monitoring on the project site, and the video monitoring module transmits video information of the project site to the control module in real time and displays the video information in the display module.
6. The engineering project management system of claim 1, wherein the engineering budgeting module comprises a material budgeting module, a personnel budgeting module, and a budget listing module; the material budget module calculates the material budget according to the engineering quantity of the engineering data and transmits the material budget to the storage module for storage; the personnel budget unit calculates the personnel budget according to the engineering quantity of the engineering data and transmits the personnel budget to the storage module for storage; the budget list module calculates the material budget cost according to the material budget and the market unit price, calculates the personnel budget cost according to the personnel budget and the market average wage, generates a budget list, and the budget list is stored in the storage module through the control module.
7. The project management system of claim 1, wherein the project settlement module comprises a project accounting module and a settlement list module; the engineering accounting module generates a material accounting list through the total budget amount of raw materials, the actual usage amount of materials, the residual amount of materials and the actual unit price of the materials, which are acquired by the data acquisition module, by the control module, and the accounting list is generated by production personnel according to the actual usage amount of personnel and the per capita unit price; and the settlement list module is used for generating the actual total material cost and labor cost of the project.
8. The engineering project management system of claim 1, wherein the control module is further communicatively connected with a personnel management module, and the personnel management module is used for recording attendance of personnel on duty and personnel off duty through an entrance and an exit arranged on the engineering project.
CN202011506516.5A 2020-12-18 2020-12-18 Engineering project management system Pending CN112529441A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011506516.5A CN112529441A (en) 2020-12-18 2020-12-18 Engineering project management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011506516.5A CN112529441A (en) 2020-12-18 2020-12-18 Engineering project management system

Publications (1)

Publication Number Publication Date
CN112529441A true CN112529441A (en) 2021-03-19

Family

ID=75001870

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011506516.5A Pending CN112529441A (en) 2020-12-18 2020-12-18 Engineering project management system

Country Status (1)

Country Link
CN (1) CN112529441A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115511430A (en) * 2022-08-17 2022-12-23 福建永旺建设集团有限公司 Wisdom building site management platform based on thing networking

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020008644A (en) * 2000-07-24 2002-01-31 홍명희 The construction management system and the service method using the system
CN103136161A (en) * 2011-11-29 2013-06-05 北京建龙重工集团有限公司 On-line management method of checking and tracking of job schedule abnormalities
CN109064139A (en) * 2018-08-08 2018-12-21 深圳市弘景装饰工程有限公司 A kind of building decoration engineering management system
CN110570121A (en) * 2019-09-10 2019-12-13 南宁职业技术学院 engineering cost progress management device
CN111507681A (en) * 2020-03-23 2020-08-07 南京熊猫电子股份有限公司 Building engineering integrated management system
CN111626788A (en) * 2020-05-30 2020-09-04 阶梯项目咨询有限公司 Engineering cost management system
CN111813844A (en) * 2020-05-22 2020-10-23 北京合力信工程投资咨询有限公司 Visual management system of engineering

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020008644A (en) * 2000-07-24 2002-01-31 홍명희 The construction management system and the service method using the system
CN103136161A (en) * 2011-11-29 2013-06-05 北京建龙重工集团有限公司 On-line management method of checking and tracking of job schedule abnormalities
CN109064139A (en) * 2018-08-08 2018-12-21 深圳市弘景装饰工程有限公司 A kind of building decoration engineering management system
CN110570121A (en) * 2019-09-10 2019-12-13 南宁职业技术学院 engineering cost progress management device
CN111507681A (en) * 2020-03-23 2020-08-07 南京熊猫电子股份有限公司 Building engineering integrated management system
CN111813844A (en) * 2020-05-22 2020-10-23 北京合力信工程投资咨询有限公司 Visual management system of engineering
CN111626788A (en) * 2020-05-30 2020-09-04 阶梯项目咨询有限公司 Engineering cost management system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115511430A (en) * 2022-08-17 2022-12-23 福建永旺建设集团有限公司 Wisdom building site management platform based on thing networking

Similar Documents

Publication Publication Date Title
CN109800250B (en) System architecture for no longer configuring enterprise central server
CN112529441A (en) Engineering project management system
CN114677044A (en) Management system and method for intelligent building supervision engineering project
CN113452852B (en) Method and device for regulating and controlling number of outbound calls of machine, electronic equipment and storage medium
CN107730089A (en) One kind is used for performance management Balanced scorecard model system
CN107742160B (en) Electromechanical equipment maintenance period self-adaptive prediction method and device
RU122793U1 (en) DEVICE OF AUTOMATED FORMATION, CALCULATION AND ANALYSIS OF WORKERS SALES AT THE PRODUCTION ENTERPRISE
CN112085523A (en) BIM engineering information management method and system
CN116720720A (en) Geotechnical engineering equipment interconnection scheduling management method and system
CN116843163A (en) Management system for building construction progress
CN112581304A (en) Manufacturing workshop informatization management system and use method thereof
CN108090825A (en) A kind of financial budget system and method
CN117037530A (en) Dynamic supervision and analysis method for parking resources
CN110599245A (en) Engineering project cost data management system
CN110705837A (en) Visual engineering construction management system and construction method thereof
CN116993286A (en) Test management system and method based on test progress reverse project progress
CN106960311A (en) A kind of acquisition terminal of creation data, collecting statistical system and method
CN115545560A (en) Wisdom energy visual management platform
CN112505604B (en) Measurement standard field evaluation process monitoring system
CN111210148A (en) Nuclear power station work order work hour management system and method
KR20120075583A (en) System and method for assessing and modifying workshop capacity
CN101556463A (en) Device for automatically monitoring basic energy resource flow and management system thereof
CN113051884B (en) Automatic accounting consultation workbench based on time management
CN117172729B (en) Labor affair subcontracting personnel management system based on big data
CN114723406A (en) Engineering cost estimation system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20210319