CN110414812A - A kind of safety risk management visualizing monitor early warning system - Google Patents

A kind of safety risk management visualizing monitor early warning system Download PDF

Info

Publication number
CN110414812A
CN110414812A CN201910648595.4A CN201910648595A CN110414812A CN 110414812 A CN110414812 A CN 110414812A CN 201910648595 A CN201910648595 A CN 201910648595A CN 110414812 A CN110414812 A CN 110414812A
Authority
CN
China
Prior art keywords
early warning
risk management
bim
safety risk
safety
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910648595.4A
Other languages
Chinese (zh)
Inventor
袁帅
黄欣
赵静波
贺常松
田波
孙胜伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 18th Bureau Group Co Ltd
Original Assignee
China Railway 18th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 18th Bureau Group Co Ltd filed Critical China Railway 18th Bureau Group Co Ltd
Priority to CN201910648595.4A priority Critical patent/CN110414812A/en
Publication of CN110414812A publication Critical patent/CN110414812A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • G06Q10/063114Status monitoring or status determination for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Theoretical Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Physics & Mathematics (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Educational Administration (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Alarm Systems (AREA)

Abstract

The invention discloses a kind of safety risk management visualizing monitor early warning system, the safety risk management system includes positioning system, fence, signal base station, electronic chip equipment;BIM model realization Whole Process Simulation, load fence, the information in signal base station;In implementation process early warning can be carried out to dangerous situation;Security preparedness carries out BIM simulation, and security preparedness module is placed in BIM platform;Generation accident starts emergency preplan;Automatic cruising route is arranged according to prediction scheme in unmanned plane, starts shooting when early warning simultaneously;Each terminal of emergency preplan shows and receives system command at the first time, receives feedback after instruction, to feeding back behind hilllock;Safety education before work may be implemented through the invention, reinforce early warning in work progress, reduce accident;Safety risk management visualizing monitor early warning system of the invention combines real time monitoring to realize and traces into personal process management, excludes security risk in time, and can carry out early warning to the generation of accident.

Description

A kind of safety risk management visualizing monitor early warning system
Technical field
The present invention relates to the correlative technology fields for carrying out early warning in Construction of Civil Engineering implementation process to dangerous situation, specifically It is related to a kind of safety risk management visualizing monitor early warning system.
Background technique
In building construction process, safety accident takes place frequently, and extensive management can not effectively carry out accident prevention, promotes accident Intelligent emergent management level after generation.House municipal works work safety accident 692 occurs altogether and rises, is dead for the whole nation in 2017 807 people, than 2016 accidents play number and increase by 58, death toll 72 people of increase, rise 9.15% and 9.80% respectively.2017 The whole nation occur altogether house municipal works production safety risen compared with major break down 23, dead 90 people, than 2016 accidents rise number reduce 4, Death toll reduces by 4 people, declines 14.81% and 4.26% respectively, the great and above accident does not occur.2017, house municipal administration Engineering work safety accident rises according to Type division, high fall accident 331, accounts for the 47.83% of sum;Object strike accident 82 It rises, accounts for the 11.85% of sum;Cave-in accident 81 rises, and accounts for the 11.71% of sum;Lifting injury accident 72 rises, and accounts for sum 10.40%;Mechanical accident 33 rises, and accounts for the 4.77% of sum;Electric shock, vehicle injury, poisoning and asphyxia, fire and explosion and Other types accident 93 rises, and accounts for the 13.44% of sum.
The situation is tense for the construction safety production in the whole nation, needs to improve construction safety supervision level and efficiency, lead to It crosses information-based means and reinforces site staff's monitoring, prevent that (such as unauthorized personnel enters arbitrarily, in violation of rules and regulations by Non-technical factor to greatest extent Without safety cap, operation after drinking, without card operation, in violation of rules and regulations get fire) caused by construction industry accident;At present for site staff's Safety management is mainly the management mode of extensive style, and the management of manual oversight is carried out by construction safety person, technically more advanced Single Bluetooth technology etc. is predominantly used at present.A kind of wisdom site staff management system of 107748945 A of CN, including intelligence Energy terminal, to the wireless charging device that intelligent terminal charges, identification system, communication system and supervising platform;The prison Pipe platform includes that government's comprehensive supervision platform and wisdom site staff manage platform;Government's comprehensive supervision platform and wisdom work It is connected between ground personal management platform by internet;The identification system setting imports and exports position in building site;It is described logical News system realizes that operator base station and wisdom site staff manage the data between platform and transmit using NB-IoT communication;Wisdom work Ground personnel management system includes intelligent terminal, to the wireless charging device that intelligent terminal charges, identification system, communication system And supervising platform.The supervising platform includes that government's comprehensive supervision platform and wisdom site staff manage platform;The government Comprehensive supervision platform and wisdom site staff manage and are connected between platform by internet.The intelligent terminal is intelligent and safe Cap, Intelligent bracelet, chest card or other portable wearable devices.The identification system setting imports and exports position in building site, Position shown in gate inhibition, the identification system is using identification systems such as face identification system or fingerprint recognition systems. The communication system realizes that operator base station and wisdom site staff manage the data between platform and transmit using NB-IoT communication. NB-IoT mechanics of communication is based on common network basis, low in cost without still further constructing network communication equipment, is provided simultaneously with height Data aggregation and low power consumption characteristic, transmission use 180kHzUE uplink and downlink radio frequency bandwidth;Downlink is identical as LTE, subcarrier spacing 15K;Uplink is using SC-FDMA and single-tone and two kinds of multi-tone configurations.Using the data of NB-IoT communication transfer It is small data, transmission is relatively reliable, low in energy consumption.It is pre- not monitor display tracking in real time for wisdom site staff's management system Alert mode;Wisdom site staff's management system, erection procedure is more complex, and multiple spot is laid in Large Construction structures and compares consumption Take material resources cost;Wisdom site staff's management system, the problem of being located in terms of electric power is continued a journey in conjunction with bluetooth.
There is presently no the system for carrying out intelligent management to high-altitude working safety risk, the present invention provides a kind of high altitude operation Security risk carries out intelligent management system, and real time monitoring early warning isotype can be combined by locating and tracking, realizes intelligent management High-altitude working safety risk, and visualization and accuracy are high.
Summary of the invention
The technical solution adopted by the present invention purpose is:
1) security preparedness carries out BIM simulation, and security preparedness module is placed in BIM platform;
2) early warning can be carried out to dangerous situation in implementation process, accident starting emergency preplan occurs;
3) video monitoring system is placed in BIM platform, follows with model realization with visual angle;
4) automatic cruising route is arranged according to prediction scheme in unmanned plane, starts shooting when early warning simultaneously.
5) simultaneously, fence binding signal base station and personnel, equipment electronic chip equipment, including safety shoe, bracelet Etc. locating and tracking.
The technical solution adopted by the present invention is a kind of safety risk management visualizing monitor early warning system, the security risk Management system includes positioning system, and fence, signal base station, electronic chip equipment, electronic chip equipment includes safety shoe, hand Ring etc.;BIM model realization Whole Process Simulation, load fence, the information in signal base station;It can be to danger in implementation process Dangerous situation condition carries out early warning;Security preparedness carries out BIM simulation, and security preparedness module is placed in BIM platform;The video monitoring system For video monitoring system is placed in BIM platform, followed with BIM model realization with visual angle;Generation accident starts emergency preplan;Nobody Automatic cruising route is arranged according to prediction scheme in machine, starts shooting when early warning simultaneously;Each terminal of emergency preplan shows and receives at the first time To system command, feedback after instruction is received, to feeding back behind hilllock;
As described in Figure 2, BIM platform includes security risk warning module;The fence, signal base station personnel, equipment Electronic chip equipment, including acquisition has intelligent terminal user's information, including name in safety shoe, bracelet etc., the age and Gender;The positioning system carries out in real time in such a way that Beidou built in the above equipment/GPS satellite positioning is in conjunction with video monitoring Positioning, and real-time positioning information is sent to high-altitude working safety risk management system by communication module;The above equipment can The sign information of real-time monitoring worker, sign information include blood pressure, heart rate, body temperature and aerobic saturation degree index;The letter that will be measured Breath is sent to high-altitude working safety risk management system by communication module;
Application method of the invention is as follows: high-altitude working safety risk management system of the invention includes fence, letter Number base station personnel, equipment electronic chip equipment, including safety shoe, bracelet etc..Wherein, fence, signal base station personnel, set Standby electronic chip is equipped, including safety shoe, bracelet etc. are used to install and wear for high altitude operation personnel, and effect is tracking and positioning High altitude operation personnel positions, physical trait, physical location, activity trajectory record the relevant personnel's arriving, from the time in any place It is optimized into safety management system with range of information, data record feedbacks such as net cycle times and is implemented into field management In.
Meanwhile safety risk management module is established by BIM platform for high altitude operation risk prediction scheme, typing high-altitude in advance Operating risk prediction scheme simultaneously carries out simulation comparison, and warning function is analyzed and be arranged to for being likely to occur the problem of, in conjunction with scene Real-time tracking monitors feedback mechanism, and automatic cruising route is arranged according to prediction scheme in unmanned plane, starts shooting simultaneously when early warning, continuous complete Kind management scenario.
Following function may be implemented in system through the invention: safety education before work, reinforces early warning in work progress, reduces Accident occurs;Start emergency preplan in time after the accident, reduces loss to the greatest extent;First visual angle of generation accident records, with mould It is quasi- to be compared, risk management and control level is improved, realizes warning function, it is horizontal to promote prediction scheme.It inquires and shows at any point in time Number, distribution situation and the identity information in some place;Locating and tracking records physical location, the active rail of one or more personnel Mark, in order to which personnel are reasonably checked and rated and managed;Safety risk management visualizing monitor early warning system knot of the invention It closes real time monitoring and realizes the process management for tracing into individual, exclude security risk in time, and can carry out to the generation of accident pre- It is alert.
Compared to traditional high-altitude working safety risk management mode, live a large amount of manpower and the branch of time are saved It expends out;
Compared to traditional high-altitude working safety risk management mode, the accurate of high-altitude working safety risk management is improved Degree and reliability;
It, being capable of real-time display high-altitude working safety risk management compared to traditional high-altitude working safety risk management mode The specific location of object and clear to people's simple interface;
Compared to traditional high-altitude working safety risk management mode, real-time display system is formed using real-time display platform System;
Compared to traditional high-altitude working safety risk management mode, by BIM secondary development, integrated in BIM model Monitoring and warning system real-time interface;
Detailed description of the invention
A kind of schematic illustration of the safety risk management visualizing monitor early warning system based on BIM of Fig. 1.
Fig. 2 is a kind of structural schematic diagram of safety risk management visualizing monitor early warning system based on BIM.
Specific embodiment
As shown in Figure 1, a kind of safety risk management visualizing monitor early warning system, the safety risk management system include Positioning system, fence, signal base station, electronic chip equipment, electronic chip equipment includes safety shoe, bracelet etc.;BIM mould Type realizes Whole Process Simulation, the information in load fence, signal base station;Dangerous situation can be carried out in implementation process pre- It is alert;Security preparedness carries out BIM simulation, and security preparedness module is placed in BIM platform;The video monitoring system is by video monitoring System is placed in BIM platform, follows with BIM model realization with visual angle;Generation accident starts emergency preplan;Unmanned plane is set according to prediction scheme Set automatic cruising route, when early warning starts shooting simultaneously;Each terminal of emergency preplan shows and receives system command at the first time, receives Feedback after to instruction, to feeding back behind hilllock;
As described in Figure 2, BIM platform includes security risk warning module;The fence, signal base station personnel, equipment Electronic chip equipment, including acquisition has intelligent terminal user's information, including name in safety shoe, bracelet etc., the age and Gender;The positioning system carries out in real time in such a way that Beidou built in the above equipment/GPS satellite positioning is in conjunction with video monitoring Positioning, and real-time positioning information is sent to high-altitude working safety risk management system by communication module;The above equipment can The sign information of real-time monitoring worker, sign information include blood pressure, heart rate, body temperature and aerobic saturation degree index;The letter that will be measured Breath is sent to high-altitude working safety risk management system by communication module;
Application method of the invention is as follows: high-altitude working safety risk management system of the invention includes fence, letter Number base station personnel, equipment electronic chip equipment, including safety shoe, bracelet etc..Wherein, fence, signal base station personnel, set Standby electronic chip is equipped, including safety shoe, bracelet etc. are used to install and wear for high altitude operation personnel, and effect is tracking and positioning High altitude operation personnel positions, physical trait, physical location, activity trajectory record the relevant personnel's arriving, from the time in any place It is optimized into safety management system with range of information, data record feedbacks such as net cycle times and is implemented into field management In.
Meanwhile safety risk management module is established by BIM platform for high altitude operation risk prediction scheme, typing high-altitude in advance Operating risk prediction scheme simultaneously carries out simulation comparison, and warning function is analyzed and be arranged to for being likely to occur the problem of, in conjunction with scene Real-time tracking monitors feedback mechanism, and automatic cruising route is arranged according to prediction scheme in unmanned plane, starts shooting simultaneously when early warning, continuous complete Kind management scenario.
Following function may be implemented in system through the invention: safety education before work, reinforces early warning in work progress, reduces Accident occurs;Start emergency preplan in time after the accident, reduces loss to the greatest extent;First visual angle of generation accident records, with mould It is quasi- to be compared, risk management and control level is improved, realizes warning function, it is horizontal to promote prediction scheme.It inquires and shows at any point in time Number, distribution situation and the identity information in some place;Locating and tracking records physical location, the active rail of one or more personnel Mark, in order to which personnel are reasonably checked and rated and managed;Safety risk management visualizing monitor early warning system knot of the invention It closes real time monitoring and realizes the process management for tracing into individual, exclude security risk in time, and can carry out to the generation of accident pre- It is alert.

Claims (3)

1. a kind of safety risk management visualizing monitor early warning system, it is characterised in that: including positioning system, fence, letter Number base station, electronic chip equipment, electronic chip equipment include safety shoe, bracelet;BIM model realization Whole Process Simulation, load electricity Information in sub- fence, signal base station;In implementation process early warning can be carried out to dangerous situation;Security preparedness carries out BIM simulation, Security preparedness module is placed in BIM platform;The video monitoring system is that video monitoring system is placed in BIM platform, with BIM mould Type realization is followed with visual angle;Generation accident starts emergency preplan;Automatic cruising route is arranged according to prediction scheme in unmanned plane, and when early warning is same Shi Qidong shooting;Each terminal of emergency preplan shows and receives system command at the first time, receives feedback after instruction, to anti-behind hilllock Feedback.
2. a kind of safety risk management visualizing monitor early warning system according to claim 1, it is characterised in that: BIM is flat Platform includes security risk warning module;The fence, signal base station personnel, equipment electronic chip equipment, including safety shoe, Acquisition has intelligent terminal user's information, including name, age and gender in bracelet etc.;More than the positioning system uses Beidou built in equipment/mode of the GPS satellite positioning in conjunction with video monitoring is positioned in real time, and real-time positioning information is passed through Communication module is sent to high-altitude working safety risk management system;The above equipment is capable of the sign information of real-time monitoring worker, body Reference breath includes blood pressure, heart rate, body temperature and aerobic saturation degree index;The information measured is sent to high-altitude by communication module to make Industry safety risk management system.
3. a kind of safety risk management visualizing monitor early warning system according to claim 1, it is characterised in that: for height Idle job risk prediction scheme establishes safety risk management module by BIM platform, and the risk of typing high altitude operation in advance prediction scheme simultaneously carries out Simulation compares, and warning function is analyzed and be arranged to for being likely to occur the problem of, monitors feedback machine in conjunction with live real-time tracking Automatic cruising route is arranged according to prediction scheme in system, unmanned plane, starts shooting simultaneously when early warning, constantly improve management scenario.
CN201910648595.4A 2019-07-18 2019-07-18 A kind of safety risk management visualizing monitor early warning system Pending CN110414812A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910648595.4A CN110414812A (en) 2019-07-18 2019-07-18 A kind of safety risk management visualizing monitor early warning system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910648595.4A CN110414812A (en) 2019-07-18 2019-07-18 A kind of safety risk management visualizing monitor early warning system

Publications (1)

Publication Number Publication Date
CN110414812A true CN110414812A (en) 2019-11-05

Family

ID=68361823

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910648595.4A Pending CN110414812A (en) 2019-07-18 2019-07-18 A kind of safety risk management visualizing monitor early warning system

Country Status (1)

Country Link
CN (1) CN110414812A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113222420A (en) * 2021-05-18 2021-08-06 上海城建信息科技有限公司 Intelligent sensing monitoring and early warning system for operation of underground complex
CN113706120A (en) * 2021-09-02 2021-11-26 浙江众合科技股份有限公司 Method and system for processing emergency measures in subway station emergency
CN116245478A (en) * 2023-01-13 2023-06-09 江门市交通建设投资集团有限公司 Intelligent building site vision management and control system based on machine vision technology

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108615204A (en) * 2018-05-06 2018-10-02 北京工业大学 A kind of building based on BIM and UWB faces side hole safety management system and method
CN108920750A (en) * 2018-05-24 2018-11-30 武汉八维时空信息技术股份有限公司 The fusion of engineering-built Dynamic and Multi dimensional information and cooperation interaction system
CN110008618A (en) * 2019-04-15 2019-07-12 华夏天信(北京)智能低碳技术研究院有限公司 A kind of emergency aided decision system based on GIS and BIM

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108615204A (en) * 2018-05-06 2018-10-02 北京工业大学 A kind of building based on BIM and UWB faces side hole safety management system and method
CN108920750A (en) * 2018-05-24 2018-11-30 武汉八维时空信息技术股份有限公司 The fusion of engineering-built Dynamic and Multi dimensional information and cooperation interaction system
CN110008618A (en) * 2019-04-15 2019-07-12 华夏天信(北京)智能低碳技术研究院有限公司 A kind of emergency aided decision system based on GIS and BIM

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
周建亮等: "BIM技术在安全事故应急救援预案工作中的应用初探", 《土木建筑工程信息技术》 *
周文等: "基于BIM和GIS的综合管廊智能化管理平台研究与实现", 《地理信息世界》 *
张爱军等: "无人机在施工管理及BIM中的应用", 《市政技术》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113222420A (en) * 2021-05-18 2021-08-06 上海城建信息科技有限公司 Intelligent sensing monitoring and early warning system for operation of underground complex
CN113706120A (en) * 2021-09-02 2021-11-26 浙江众合科技股份有限公司 Method and system for processing emergency measures in subway station emergency
CN116245478A (en) * 2023-01-13 2023-06-09 江门市交通建设投资集团有限公司 Intelligent building site vision management and control system based on machine vision technology

Similar Documents

Publication Publication Date Title
CN110321809A (en) A kind of substation's operation field monitoring method and device based on deep learning
CN107748945A (en) A kind of wisdom site staff management system
CN110414812A (en) A kind of safety risk management visualizing monitor early warning system
CN100596355C (en) Intelligent management system for coal mine production safety
CN107041590A (en) A kind of intelligent and safe donning system
CN107146168A (en) Wisdom building site management system based on universe frequency conversion positioning Yu self-identifying technology
CN203720890U (en) Wearable polling terminal
CN110957811B (en) Full-flow intelligent monitoring method and system for temporary grounding wire
CN106657293A (en) Data collection terminal, system and method
CN107274724A (en) A kind of monitoring unmanned system relayed based on ad-hoc network with gsm communication
CN204069358U (en) Constructing tunnel personnel positioning management system
CN110009261A (en) A kind of power transmission project construction field real time commanding system
CN105898898A (en) Information monitoring system based on wireless sensor network
CN102880847B (en) Novel coal mine downhole positioning system based on leaky cable
CN108189865A (en) A kind of wearable alarm system and means of defence for railway
CN110958561B (en) Scene recorder in-place supervision method suitable for electric power operation site
CN111035098A (en) Intelligent safety helmet for wind power plant
CN107479574A (en) A kind of unmanned plane management-control method and device based on mobile communication technology
CN106444684A (en) Electrical equipment operating environment data acquisition and telecontrol comprehensive linkage device and use method
CN108205694A (en) A kind of construction site operating personnel's alignment system based on chromatography beacon
CN114462882A (en) Safety protection system for water conservancy construction based on internet of things
CN110727688A (en) Key personnel gridding service management system
CN118196624A (en) Intelligent safety helmet identification system and method for construction site
CN107545610A (en) A kind of workmen deploys to ensure effective monitoring and control of illegal activities safely system
CN110312104A (en) A kind of high-altitude installation exercise efficiency Visualized management system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20191105

RJ01 Rejection of invention patent application after publication