CN116245478A - Intelligent building site vision management and control system based on machine vision technology - Google Patents

Intelligent building site vision management and control system based on machine vision technology Download PDF

Info

Publication number
CN116245478A
CN116245478A CN202310056414.5A CN202310056414A CN116245478A CN 116245478 A CN116245478 A CN 116245478A CN 202310056414 A CN202310056414 A CN 202310056414A CN 116245478 A CN116245478 A CN 116245478A
Authority
CN
China
Prior art keywords
module
management
analysis
controlled
vision
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202310056414.5A
Other languages
Chinese (zh)
Inventor
李博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangmen Traffic Construction Investment Group Co ltd
Original Assignee
Jiangmen Traffic Construction Investment Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangmen Traffic Construction Investment Group Co ltd filed Critical Jiangmen Traffic Construction Investment Group Co ltd
Priority to CN202310056414.5A priority Critical patent/CN116245478A/en
Publication of CN116245478A publication Critical patent/CN116245478A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0635Risk analysis of enterprise or organisation activities
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06VIMAGE OR VIDEO RECOGNITION OR UNDERSTANDING
    • G06V10/00Arrangements for image or video recognition or understanding
    • G06V10/70Arrangements for image or video recognition or understanding using pattern recognition or machine learning
    • G06V10/764Arrangements for image or video recognition or understanding using pattern recognition or machine learning using classification, e.g. of video objects
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • General Physics & Mathematics (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Health & Medical Sciences (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Computing Systems (AREA)
  • Educational Administration (AREA)
  • Development Economics (AREA)
  • Data Mining & Analysis (AREA)
  • Artificial Intelligence (AREA)
  • Computer Vision & Pattern Recognition (AREA)
  • Game Theory and Decision Science (AREA)
  • Databases & Information Systems (AREA)
  • Evolutionary Computation (AREA)
  • Medical Informatics (AREA)
  • Software Systems (AREA)
  • Multimedia (AREA)
  • Alarm Systems (AREA)

Abstract

The invention discloses an intelligent building site vision management and control system based on a machine vision technology, which comprises a vision supervision module, a central processing module, a background management module, an auxiliary decision module, a management analysis module and an abnormality feedback module, wherein the vision supervision module is in control connection with the central processing module; and an analysis decision module is utilized to automatically generate an exception handling scheme in combination with the on-site state, so that the practicability of the system is improved.

Description

Intelligent building site vision management and control system based on machine vision technology
Technical Field
The invention relates to the technical field of intelligent building site management and control systems, in particular to an intelligent building site vision management and control system based on a machine vision technology.
Background
The intelligent building site is an industry implementation of an intelligent earth concept in the engineering field and is a brand-new engineering full life cycle management concept, the intelligent building site implants more high-tech technologies such as artificial intelligence, sensing technology, virtual reality and the like into various objects such as buildings, machinery, personnel wearing facilities, site entrance and exit ports and the like, the intelligent building site is generally interconnected to form the Internet of things, and then the intelligent building site is integrated with the Internet to realize the integration of engineering management system personnel and engineering construction sites, a management and control system is required to be used for managing the construction process in the construction process of the intelligent building site, the use requirements of people can be basically met by the management and control system of the existing intelligent building site, and certain defects still exist, firstly, the management and control system of the existing intelligent building site is difficult to visually display the construction process, so that the convenience of system construction management is affected; secondly, the existing intelligent site management and control system cannot quickly identify the abnormal condition of the site, and warn constructors, so that the safety performance of the system is reduced; thirdly, the existing intelligent building site management and control system is difficult to combine with the site state, and an exception handling scheme is automatically generated, so that the practicability of the system is affected; it is therefore necessary to design an intelligent worksite vision management and control system based on machine vision technology.
Disclosure of Invention
The invention aims to provide an intelligent building site vision control system based on a machine vision technology, so as to solve the problems in the background technology.
In order to achieve the above purpose, the present invention provides the following technical solutions: the intelligent building site vision management and control system based on the machine vision technology comprises a vision supervision module, a central processing module, a background management module, an auxiliary decision module, a management analysis module and an abnormal feedback module, wherein the vision supervision module is in control connection with the central processing module, the central processing module is respectively in control connection with the background management module and the management analysis module, the management analysis module is in control connection with the abnormal feedback module, the abnormal feedback module is in control connection with the auxiliary decision module, and the auxiliary decision module is in control connection with the central processing module.
Preferably, the visual supervision module is composed of a visual receiving module, a terminal detection module and a feedback transmission module, wherein the visual receiving module and the terminal detection module are both in control connection with the feedback transmission module, and the visual receiving module is in control connection with the terminal detection module.
Preferably, the background management module is composed of a management login module, a management platform module, a visual display module, a platform receiving module, a process recording module, a construction recording module and an abnormal recording module, wherein the management login module is connected with the management platform module in a control manner, and the management platform module is connected with the visual display module, the platform receiving module, the process recording module, the construction recording module and the abnormal recording module in a control manner respectively.
Preferably, the auxiliary decision module comprises an early warning receiving module, a risk assessment module, a loss calculation module, a scheme comparison module, an analysis decision module, a decision plan module and an auxiliary output module, wherein the early warning receiving module is controlled to be connected with the risk assessment module, and the risk assessment module is controlled to be connected with the loss calculation module.
Preferably, the loss calculation module controls the connection scheme comparison module, and the scheme comparison module controls the connection analysis decision module and the decision plan module respectively, and the decision plan module controls the connection auxiliary output module.
Preferably, the management analysis module is composed of a transmission and receiving module, an image processing module, a classification processing module, an analysis output module, a building material supervision module, a process analysis module, a personnel management module and a scheme receiving module, wherein the transmission and receiving module is controlled to be connected with the image processing module, and the image processing module is controlled to be connected with the classification processing module.
Preferably, the classification processing module is controlled to be connected with the analysis processing module, the analysis processing module is controlled to be connected with the analysis output module, the analysis processing module is controlled to be connected with the building material supervision module, the process analysis module and the personnel management module respectively, and the building material supervision module, the process analysis module and the personnel management module are all controlled to be connected with the scheme receiving module.
Preferably, the abnormal feedback module comprises an abnormal receiving module, a hazard analysis module, an early warning processing module, an audible and visual alarm module, a voice output module and an early warning feedback module, wherein the abnormal receiving module is controlled to be connected with the hazard analysis module, the hazard analysis module is respectively controlled to be connected with the early warning processing module, the audible and visual alarm module and the voice output module, and the early warning processing module is controlled to be connected with the early warning feedback module.
Compared with the prior art, the invention has the beneficial effects that: the intelligent building site vision management and control system based on the machine vision technology collects images of a building site by utilizing a vision supervision module, then transmits the images to a management analysis module through a central processing module, processes the images through an image processing module, processes the images in a segmented mode through a classification processing module, analyzes building materials, construction processes and personnel scheduling of the building site by utilizing a building material supervision module, a process analysis module and a personnel management module respectively, transmits analysis results and field images to a background management module, and performs visual display by utilizing a visual display module, and performs visual management and scheduling on the construction site by utilizing a visual display module, so that the convenience of system management is improved, and when construction abnormality is detected, an abnormal instruction is sent through an analysis output module, then an abnormal hazard is analyzed by a hazard analysis module, and abnormal warning is carried out on the site through an early warning processing module, an audible and visual alarm module and a voice output module respectively, so that the safety performance of the system is improved; and then the early warning receiving module receives the early warning instruction, evaluates the construction risk through the risk evaluation module, simulates and calculates abnormal loss through the loss calculation module, and automatically generates an abnormal processing scheme by analyzing the state of the scene combining the decision making module and the decision making plan module, thereby improving the practicability of the system.
Drawings
FIG. 1 is a system flow diagram of the present invention;
FIG. 2 is a system frame diagram of the present invention;
in the figure: 1. a visual supervision module; 2. a central processing module; 3. a background management module; 4. an auxiliary decision-making module; 5. a management analysis module; 6. an anomaly feedback module; 11. a visual receiving module; 12. a terminal detection module; 13. a feedback transmission module; 31. a management login module; 32. a management platform module; 33. a visual display module; 34. a platform receiving module; 35. a process recording module; 36. a construction input module; 37. an anomaly recording module; 41. an early warning receiving module; 42. a risk assessment module; 43. a loss calculation module; 44. scheme comparison module; 45. an analysis decision module; 46. a decision plan module; 47. an auxiliary output module; 51. a transmission receiving module; 52. an image processing module; 53. a classification processing module; 54. an analysis processing module; 55. an analysis output module; 56. a building material supervision module; 57. a process analysis module; 58. a personnel management module; 59. a scheme receiving module; 61. an anomaly receiving module; 62. a hazard analysis module; 63. an early warning processing module; 64. an audible and visual alarm module; 65. a voice output module; 66. and an early warning feedback module.
Detailed Description
The following description of the embodiments of the present invention will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present invention, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
Referring to fig. 1-2, an embodiment of the present invention is provided: the intelligent building site vision management and control system based on machine vision technology comprises a vision supervision module 1, a central processing module 2, a background management module 3, an auxiliary decision module 4, a management analysis module 5 and an abnormal feedback module 6, wherein the vision supervision module 1 is in control connection with the central processing module 2, the central processing module 2 is respectively in control connection with the background management module 3 and the management analysis module 5, the management analysis module 5 is in control connection with the abnormal feedback module 6, the abnormal feedback module 6 is in control connection with the auxiliary decision module 4, the auxiliary decision module 4 is in control connection with the central processing module 2, the vision supervision module 1 consists of a vision receiving module 11, a terminal detection module 12 and a feedback transmission module 13, the vision receiving module 11 and the terminal detection module 12 are both in control connection with the feedback transmission module 13, the vision receiving module 11 is in control connection with the terminal detection module 12, the background management module 3 is composed of a management login module 31, a management platform module 32, a visual display module 33, a platform receiving module 34, a process recording module 35, a construction input module 36 and an abnormal recording module 37, the management login module 31 is controlled to be connected with the management platform module 32, the management platform module 32 is controlled to be connected with the visual display module 33, the platform receiving module 34, the process recording module 35, the construction input module 36 and the abnormal recording module 37 respectively, the auxiliary decision module 4 is composed of an early warning receiving module 41, a risk evaluation module 42, a loss calculation module 43, a scheme comparison module 44, an analysis decision module 45, a decision plan module 46 and an auxiliary output module 47, the early warning receiving module 41 is controlled to be connected with the risk evaluation module 42, the risk evaluation module 42 is controlled to be connected with the loss calculation module 43, the loss calculation module 43 is controlled to be connected with the scheme comparison module 44, and the scheme comparison module 44 is respectively controlled to be connected with the analysis decision module 45 and the decision plan module 46, the decision plan module 46 is controlled to be connected with the auxiliary output module 47, the management analysis module 5 is composed of a transmission receiving module 51, an image processing module 52, a classification processing module 53, an analysis processing module 54, an analysis output module 55, a building material supervision module 56, a process analysis module 57, a personnel management module 58 and a scheme receiving module 59, the transmission receiving module 51 is controlled to be connected with the image processing module 52, the image processing module 52 is controlled to be connected with the classification processing module 53, the classification processing module 53 is controlled to be connected with the analysis processing module 54, the analysis processing module 54 is controlled to be connected with the analysis output module 55, the analysis processing module 54 is respectively controlled to be connected with the building material supervision module 56, the process analysis module 57 and the personnel management module 58, and the building material supervision module 56 are respectively controlled to be connected with the process analysis module 57 and the personnel management module 58, the abnormality feedback module 6 is composed of an abnormality receiving module 61, a hazard analysis module 62, a pre-warning processing module 63, an audible and visual warning module 64, a voice output module 65 and a pre-warning module 66, and an abnormality receiving module 61 are controlled to be connected with the hazard analysis module 62, and the hazard analysis module 62 is controlled to be connected with the early warning module 64 and the auxiliary warning module 64 are controlled to be sent with the pre-warning module 4.
Working principle: when the system is used, the system login is carried out through the management login module 31, the system login is carried out and then the system login is carried out, the data information sent by the system is received through the platform receiving module 34, the construction process is recorded, the construction project is recorded and the construction abnormal information is recorded through the process recording module 35, the construction project recording module 36 and the abnormal recording module 37 respectively, the images of the construction site are collected through the visual supervision module 1, the images are then transmitted to the management analysis module 5 through the central processing module 2, the images are processed through the image processing module 52, the classification processing module 53 carries out sectional processing on the images, the construction site building materials, the construction process and the personnel scheduling are then respectively analyzed through the building material supervision module 56, the process analysis module 57 and the personnel management module 58, the analysis result and the site image are then sent to the background management module 3, the visual display module 33 is used for carrying out visual display, the visual management scheduling is carried out on the construction site based on the visual display module, thereby improving the convenience of system management, and when the construction abnormality is detected, the abnormal command is sent through the analysis output module 55, the analysis module 62 analyzes the abnormal hazard, and the safety performance of the system is respectively improved through the early warning processing module 63 and the voice output module 64; the early warning receiving module 41 receives the early warning instruction, the risk assessment module 42 assesses the construction risk, the loss calculation module 43 simulates and calculates the abnormal loss, and the decision module 45 and the decision plan module 46 are combined with the on-site state to automatically generate an abnormal processing scheme, so that the practicability of the system is improved.
It will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, and that the present invention may be embodied in other specific forms without departing from the spirit or essential characteristics thereof. The present embodiments are, therefore, to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (8)

1. Intelligent building site vision management and control system based on machine vision technique, including vision supervision module (1), central processing module (2), backstage management module (3), auxiliary decision-making module (4), management analysis module (5) and unusual feedback module (6), its characterized in that: the visual supervision module (1) is in control connection with the central processing module (2), the central processing module (2) is respectively in control connection with the background management module (3) and the management analysis module (5), the management analysis module (5) is in control connection with the abnormal feedback module (6), the abnormal feedback module (6) is in control connection with the auxiliary decision module (4), and the auxiliary decision module (4) is in control connection with the central processing module (2).
2. The machine vision technology-based intelligent worksite vision management and control system of claim 1, wherein: the visual supervision module (1) is composed of a visual receiving module (11), a terminal detection module (12) and a feedback transmission module (13), wherein the visual receiving module (11) and the terminal detection module (12) are both controlled to be connected with the feedback transmission module (13), and the visual receiving module (11) is controlled to be connected with the terminal detection module (12).
3. The machine vision technology-based intelligent worksite vision management and control system of claim 1, wherein: the background management module (3) comprises a management login module (31), a management platform module (32), a visual display module (33), a platform receiving module (34), a process recording module (35), a construction input module (36) and an abnormal recording module (37), wherein the management login module (31) is used for controlling the connection of the management platform module (32), and the management platform module (32) is used for respectively controlling the connection of the visual display module (33), the platform receiving module (34), the process recording module (35), the construction input module (36) and the abnormal recording module (37).
4. The machine vision technology-based intelligent worksite vision management and control system of claim 1, wherein: the auxiliary decision module (4) consists of an early warning receiving module (41), a risk assessment module (42), a loss calculation module (43), a scheme comparison module (44), an analysis decision module (45), a decision plan module (46) and an auxiliary output module (47), wherein the early warning receiving module (41) is controlled to be connected with the risk assessment module (42), and the risk assessment module (42) is controlled to be connected with the loss calculation module (43).
5. The machine vision technology-based intelligent worksite vision management and control system of claim 4, wherein: the loss calculation module (43) controls a connection scheme comparison module (44), the scheme comparison module (44) controls a connection analysis decision module (45) and a decision plan module (46) respectively, and the decision plan module (46) controls a connection auxiliary output module (47).
6. The machine vision technology-based intelligent worksite vision management and control system of claim 1, wherein: the management analysis module (5) is composed of a transmission and receiving module (51), an image processing module (52), a classification processing module (53), an analysis processing module (54), an analysis output module (55), a building material supervision module (56), a process analysis module (57), a personnel management module (58) and a scheme receiving module (59), wherein the transmission and receiving module (51) is controlled to be connected with the image processing module (52), and the image processing module (52) is controlled to be connected with the classification processing module (53).
7. The machine vision technology-based intelligent worksite vision management and control system of claim 6, wherein: the classification processing module (53) is controlled to be connected with the analysis processing module (54), the analysis processing module (54) is controlled to be connected with the analysis output module (55), the analysis processing module (54) is controlled to be connected with the building material supervision module (56), the process analysis module (57) and the personnel management module (58) respectively, and the building material supervision module (56), the process analysis module (57) and the personnel management module (58) are controlled to be connected with the scheme receiving module (59).
8. The machine vision technology-based intelligent worksite vision management and control system of claim 1, wherein: the abnormal feedback module (6) is composed of an abnormal receiving module (61), a hazard analysis module (62), an early warning processing module (63), an audible and visual alarm module (64), a voice output module (65) and an early warning feedback module (66), wherein the abnormal receiving module (61) is controlled to be connected with the hazard analysis module (62), the hazard analysis module (62) is respectively controlled to be connected with the early warning processing module (63), the audible and visual alarm module (64) and the voice output module (65), and the early warning processing module (63) is controlled to be connected with the early warning feedback module (66).
CN202310056414.5A 2023-01-13 2023-01-13 Intelligent building site vision management and control system based on machine vision technology Pending CN116245478A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310056414.5A CN116245478A (en) 2023-01-13 2023-01-13 Intelligent building site vision management and control system based on machine vision technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310056414.5A CN116245478A (en) 2023-01-13 2023-01-13 Intelligent building site vision management and control system based on machine vision technology

Publications (1)

Publication Number Publication Date
CN116245478A true CN116245478A (en) 2023-06-09

Family

ID=86632358

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310056414.5A Pending CN116245478A (en) 2023-01-13 2023-01-13 Intelligent building site vision management and control system based on machine vision technology

Country Status (1)

Country Link
CN (1) CN116245478A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104463717A (en) * 2014-12-09 2015-03-25 中国水利水电第十四工程局有限公司 Construction expert information system applicable to extra-large underground cavern group
WO2018014737A1 (en) * 2016-07-21 2018-01-25 深圳光启合众科技有限公司 Artificial intelligence device data processing method, apparatus and system
CN110414812A (en) * 2019-07-18 2019-11-05 中铁十八局集团有限公司 A kind of safety risk management visualizing monitor early warning system
US20210216928A1 (en) * 2020-01-13 2021-07-15 Johnson Controls Technology Company Systems and methods for dynamic risk analysis
WO2021159548A1 (en) * 2020-02-14 2021-08-19 深圳市美舜科技有限公司 Traffic safety early-warning monitoring and alarm apparatus
CN114385100A (en) * 2021-12-08 2022-04-22 深圳市德润赛尔光电有限公司 Multi-screen lock catch state prompting system and method
CN114648307A (en) * 2022-03-28 2022-06-21 江苏一安数字信息产业发展有限公司 Project progress real-time feedback system based on wisdom building site platform
CN114676984A (en) * 2022-03-09 2022-06-28 上海有间建筑科技有限公司 System for construction is built to wisdom

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104463717A (en) * 2014-12-09 2015-03-25 中国水利水电第十四工程局有限公司 Construction expert information system applicable to extra-large underground cavern group
WO2018014737A1 (en) * 2016-07-21 2018-01-25 深圳光启合众科技有限公司 Artificial intelligence device data processing method, apparatus and system
CN110414812A (en) * 2019-07-18 2019-11-05 中铁十八局集团有限公司 A kind of safety risk management visualizing monitor early warning system
US20210216928A1 (en) * 2020-01-13 2021-07-15 Johnson Controls Technology Company Systems and methods for dynamic risk analysis
WO2021159548A1 (en) * 2020-02-14 2021-08-19 深圳市美舜科技有限公司 Traffic safety early-warning monitoring and alarm apparatus
CN114385100A (en) * 2021-12-08 2022-04-22 深圳市德润赛尔光电有限公司 Multi-screen lock catch state prompting system and method
CN114676984A (en) * 2022-03-09 2022-06-28 上海有间建筑科技有限公司 System for construction is built to wisdom
CN114648307A (en) * 2022-03-28 2022-06-21 江苏一安数字信息产业发展有限公司 Project progress real-time feedback system based on wisdom building site platform

Similar Documents

Publication Publication Date Title
CN113344326B (en) System and method for identifying dynamic hidden danger and evaluating risk of special operation site
CN112766909A (en) Intelligent management and control system and method suitable for ship fire safety and computer medium
CN107318039B (en) Intelligent popup window monitoring and warning system
CN109002897A (en) Field operation in transformer substation security management and control system and method based on robot technology
CN113542690B (en) Building construction safety monitoring system and method
CN116432989B (en) Intelligent construction-based construction site safety control system
CN114859839B (en) Coal production safety monitoring system and method
CN111668927A (en) Substation intelligent inspection system based on ubiquitous power Internet of things and control method thereof
CN115562144A (en) Major hazard source safety monitoring and early warning management system based on 5G technology
CN115097790A (en) Workshop personnel model reconstruction and safety protection system based on digital twin technology
CN115169855A (en) Unsafe state detection method based on digital twin workshop mixed data set
CN115526372A (en) Emergency response dispatching command system
CN116245478A (en) Intelligent building site vision management and control system based on machine vision technology
Zhang et al. Belt Deviation Detection System Based on Deep Learning under Complex Working Conditions
WO2024040738A1 (en) Smart park management method and management platform
CN115600800A (en) Enterprise and regional emergency environment event risk assessment system
CN212832233U (en) Elevator guide rail frame safety early warning system based on cloud platform
CN210246807U (en) BIM-based road tunnel real-time monitoring system
CN113673855A (en) Internet of things high-risk operation key element linkage risk perception and management and control system
CN113189896A (en) System and method for carrying out centralized control on operation of underground pipe gallery
CN112714189A (en) Internet of things fire safety detection system and method based on WF-IoT and storage medium thereof
Hu et al. Intelligent Engineering Construction Management: On-Site Construction Management
CN117111540B (en) Environment monitoring and early warning method and system for IO remote control bus module
CN219997573U (en) Three-dimensional visual information system for coal mine production
CN107045319A (en) One kind row inspection storehouse operation area monitoring method and device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination