CN114648307A - Project progress real-time feedback system based on wisdom building site platform - Google Patents

Project progress real-time feedback system based on wisdom building site platform Download PDF

Info

Publication number
CN114648307A
CN114648307A CN202210312467.4A CN202210312467A CN114648307A CN 114648307 A CN114648307 A CN 114648307A CN 202210312467 A CN202210312467 A CN 202210312467A CN 114648307 A CN114648307 A CN 114648307A
Authority
CN
China
Prior art keywords
information
project
module
progress
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN202210312467.4A
Other languages
Chinese (zh)
Inventor
杨瑞华
黄科翔
赵磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Yian Digital Information Industry Development Co ltd
Original Assignee
Jiangsu Yian Digital Information Industry Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Yian Digital Information Industry Development Co ltd filed Critical Jiangsu Yian Digital Information Industry Development Co ltd
Priority to CN202210312467.4A priority Critical patent/CN114648307A/en
Publication of CN114648307A publication Critical patent/CN114648307A/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/90Details of database functions independent of the retrieved data types
    • G06F16/904Browsing; Visualisation therefor

Abstract

The invention relates to the technical field of project management of a construction site, in particular to a project progress real-time feedback system based on an intelligent construction site platform, which comprises a personnel information module, a field monitoring module, a progress reporting module, a periodic acceptance module, an expected analysis module and an adjustment pushing module, wherein the personnel information module is used for filling and recording project responsible personnel information, matching the project responsible personnel information with corresponding project topics to generate an electronic information form, the field monitoring module is used for monitoring construction pictures of a project site in real time and arranging and transmitting the construction pictures to the progress reporting module for the project responsible personnel to view, the project progress real-time feedback system can ensure the accuracy and reliability of the project progress information, enables the project progress of the construction site to be visually fed back in real time and can push corresponding overdue risk early warning information and project expected adjustment planning information, and effective decision-making auxiliary basis is provided for personnel to deal with the project expectation of the rectification.

Description

Project progress real-time feedback system based on wisdom building site platform
Technical Field
The invention relates to the technical field of project management of a construction site, in particular to a project progress real-time feedback system based on an intelligent construction site platform.
Background
The construction site is commonly called as a construction site, which refers to construction activities such as house building, civil engineering, equipment installation, pipeline laying and the like for carrying out industrial and civil projects, construction sites occupied by approved people and sites for carrying out safety production, civilized work and construction, including all areas capable of carrying out construction work on land, sea and in the air, project progress feedback of the traditional construction site is not accurate enough in time, reliability of project progress information is difficult to guarantee, and effective decision-making auxiliary basis cannot be provided for personnel to deal with project anticipation for rectification and improvement. In view of this, we propose a project progress real-time feedback system based on an intelligent worksite platform.
Disclosure of Invention
The invention aims to provide a project progress real-time feedback system based on an intelligent construction site platform, and aims to solve the problems that project progress feedback of a traditional construction site provided in the background technology is not timely and accurate enough, reliability of project progress information is difficult to guarantee, and an effective decision-making auxiliary basis cannot be provided for a person to deal with the expectation of a rectification project.
In order to achieve the purpose, the invention provides the following technical scheme:
a project progress real-time feedback system based on an intelligent construction site platform comprises a personnel information module, an on-site monitoring module, a progress reporting module, a periodic acceptance module, an expected analysis module and an adjustment pushing module, wherein,
the personnel information module is used for filling and recording project responsible personnel information, matching the project responsible personnel information with the corresponding project theme and generating an electronic information form;
the field monitoring module is used for monitoring construction pictures of a project field in real time and transmitting the construction pictures to the progress reporting module for project responsible personnel to check;
the progress reporting module is used for reporting and filling project progress information to an electronic information form in the personnel information module by project responsible personnel according to the construction picture monitored in the field monitoring module, and analyzing the project progress information to generate corresponding statistical data chart information;
the regular acceptance module is used for carrying out regular acceptance processing on the project progress information in the progress reporting module;
the expected analysis module is used for predicting the project completion date according to the project progress information checked by the regular check module and pushing corresponding risk early warning information when the predicted project completion date is out of date;
and the rectification pushing module is used for pushing the expected rectification plan information of the corresponding project when the project completion date in the expected analysis module is abnormal.
Preferably, the personnel information module comprises an information registration unit, an information matching unit and a theme storage unit, and the specific operation flow of the personnel information module comprises the following steps:
step a 1: the project responsible personnel register information by using the information registration unit and store the preset project theme content in the theme storage unit;
step a 2: the registered information is read by the information matching unit, the read project responsible personnel information is correspondingly matched with the project subject content in the subject storage unit, and the project responsible personnel information and the project subject content are integrated to generate an electronic information form.
Preferably, the on-site monitoring module includes a monitor and a network transmission device, and the network transmission device is configured to transmit picture information of the monitor for monitoring the project site in real time.
Preferably, the progress reporting module includes an information receiving unit, a screen display unit, and an information reporting unit, and the specific operation flow of the progress reporting module includes the following steps:
step b 1: receiving the construction picture monitored in the field monitoring module by using an information receiving unit;
step b 2: the picture display unit displays the construction picture received by the information receiving unit to project responsible personnel;
step b 3: and reporting the filling project progress information to an electronic information form in the personnel information module by using the information reporting unit, and analyzing the project progress information to generate corresponding statistical data chart information.
Preferably, the regular acceptance module comprises a checking unit, a confirming unit and a reminding unit, the checking unit is used for checking and checking the project progress information and the construction picture in the progress reporting module by personnel regularly, the confirming unit is used for confirming the successful checking information, and the reminding unit is used for generating reminding information when the checking fails.
Preferably, the expected analysis module includes a planning date base, an analysis unit and an early warning unit, and the specific operation flow of the expected analysis module includes the following steps:
step c 1: storing a project completion date for the project in a project date repository;
step c 2: confirming that the project progress information passes the inspection of the periodic inspection module, analyzing and processing the project progress information by the analysis unit, predicting the project completion date, and comparing the predicted project completion date with the planned completion date in the plan date base;
step c 3: and if the predicted project completion date exceeds the plan completion date, the early warning unit pushes corresponding risk early warning information.
Preferably, the rectification and pushing module includes a rectification unit and a pushing unit, the rectification unit is configured to generate expected rectification plan information according to the comparison processing information in the analysis unit, and the pushing unit is configured to push the expected rectification plan information generated by the rectification unit.
Preferably, the progress display module is further included and is used for displaying project progress information and statistical data chart information.
Preferably, the system further comprises a progress archiving module, and the progress archiving module is used for archiving and storing project progress information, statistical data chart information, risk early warning information and project expected reforming plan information.
Compared with the prior art, the invention has the beneficial effects that:
the method and the system can provide construction pictures of a construction site in real time, can ensure the accuracy and reliability of project progress information, can perform visual real-time feedback on the project progress of the construction site, can push corresponding overdue risk early warning information and project expected rectification plan information, and provide effective decision-making auxiliary basis for personnel to deal with the rectification project expectation.
Drawings
FIG. 1 is a schematic view of the structure of the present invention;
FIG. 2 is a schematic diagram of a contemplated analysis module of the present invention;
FIG. 3 is a schematic structural diagram of an improved push module according to the present invention;
FIG. 4 is a schematic flow chart of the operation of the personnel information module in the present invention;
FIG. 5 is a schematic flow chart of the operation of the progress reporting module of the present invention;
FIG. 6 is a schematic flow diagram of the operation of the contemplated analysis module of the present invention.
In the figure: 1. a personnel information module; 11. an information registration unit; 12. an information matching unit; 13. a theme storage unit; 2. a field monitoring module; 21. a monitor; 22. a network transmission device; 3. a progress reporting module; 31. an information receiving unit; 32. a screen display unit; 33. an information reporting unit; 4. a periodic acceptance module; 41. a checking unit; 42. a confirmation unit; 43. a reminding unit; 5. an expectation analysis module; 51. a planning date base; 52. an analysis unit; 53. an early warning unit; 6. a rectification pushing module; 61. a rectification unit; 62. a pushing unit; 7. a progress display module; 8. and a progress filing module.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1 to fig. 6, a technical solution provided by the present invention is:
a project progress real-time feedback system based on an intelligent construction site platform comprises a personnel information module 1, an on-site monitoring module 2, a progress reporting module 3, a periodic acceptance module 4, an expected analysis module 5 and an adjustment pushing module 6, wherein,
the personnel information module 1 is used for filling and recording project responsible personnel information, matching the project responsible personnel information with corresponding project subjects and generating an electronic information form;
the field monitoring module 2 is used for monitoring the construction pictures of the project field in real time and transmitting the construction pictures to the progress reporting module 3 for the project responsible personnel to check;
the progress reporting module 3 is used for reporting and filling the project progress information to an electronic information form in the personnel information module 1 by project responsible personnel according to the construction picture monitored in the field monitoring module 2, and analyzing the project progress information to generate corresponding statistical data chart information;
the regular acceptance module 4 is used for carrying out regular acceptance processing on the project progress information in the progress reporting module 3;
the expected analysis module 5 is used for predicting the project completion date according to the project progress information which is checked by the regular check-in module 4, and pushing corresponding risk early warning information when the predicted project completion date is out of date;
the rectification pushing module 6 is used for pushing the expected rectification plan information of the corresponding project when the project completion date in the expected analysis module 5 is abnormal.
As a preferred implementation manner in this embodiment, the personnel information module 1 includes an information registration unit 11, an information matching unit 12, and a theme storage unit 13, and a specific operation flow of the personnel information module 1 includes the following steps:
step a 1: the project responsible personnel register information by using the information registration unit 11 and store preset project subject contents in the subject storage unit 13;
step a 2: the registered information is read by the information matching unit 12, the read project responsible personnel information is correspondingly matched with the project subject content in the subject storage unit 13, and the project responsible personnel information and the project subject content are integrated to generate an electronic information form.
As a preferred implementation manner in this embodiment, the on-site monitoring module 2 includes a monitor 21 and a network transmission device 22, and the network transmission device 22 is configured to transmit screen information of the monitor 21 for monitoring the project site in real time.
As a preferred implementation manner in this embodiment, the progress reporting module 3 includes an information receiving unit 31, a screen display unit 32, and an information reporting unit 33, and a specific operation flow of the progress reporting module 3 includes the following steps:
step b 1: receiving the construction picture monitored in the site monitoring module 2 by using the information receiving unit 31;
step b 2: the screen display unit 32 displays the construction screen received by the information receiving unit 31 to the project responsible person;
step b 3: the information reporting unit 33 is used to report the filling-in project progress information to the electronic information form in the personnel information module 1, and the project progress information is analyzed to generate corresponding statistical data chart information.
As a preferred embodiment in the present embodiment, the periodic acceptance module 4 includes a checking unit 41, a confirming unit 42, and a prompting unit 43, the checking unit 41 is used for a person to check and check the project progress information in the progress reporting module 3 with the construction picture periodically, the confirming unit 42 is used for confirming the verification success information, and the prompting unit 43 is used for generating the prompting information when the verification fails.
As a preferred implementation manner in this embodiment, the expected analysis module 5 includes a planning date library 51, an analysis unit 52 and an early warning unit 53, and a specific operation flow of the expected analysis module 5 includes the following steps:
step c 1: storing the planned completion date of the project in the planned date repository 51;
step c 2: the confirmed project progress information is checked and passed by the regular checking and accepting module 4, the analysis unit 52 analyzes and processes the project progress information, predicts the project completion date, and compares the predicted project completion date with the planned completion date in the planned date base 51;
step c 3: if the predicted project completion date exceeds the planned completion date, the warning unit 53 pushes corresponding risk warning information.
As a preferred implementation manner in this embodiment, the rectification and pushing module 6 includes a rectification unit 61 and a pushing unit 62, the rectification unit 61 is configured to generate expected rectification plan information according to the comparison processing information in the analyzing unit 52, and the pushing unit 62 is configured to push the expected rectification plan information generated by the rectification unit 61.
As a preferred implementation manner in this embodiment, the system further includes a progress display module 7, and the progress display module 7 is configured to display the project progress information and the statistical data chart information.
As a preferred implementation manner in this embodiment, the system further includes a progress archiving module 8, and the progress archiving module 8 is configured to archive and store the project progress information, the statistical data chart information, the risk early warning information, and the project expected modification plan information.
In conclusion, the method and the system can provide a construction picture of a construction site in real time, can ensure the accuracy and reliability of project progress information, can perform visual real-time feedback on the project progress of the construction site, can push corresponding overdue risk early warning information and project expected rectification plan information, and provide effective decision-making auxiliary basis for personnel to deal with the rectification project expectation.
The foregoing shows and describes the general principles, essential features, and advantages of the invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments, and the above embodiments and descriptions are only preferred examples of the present invention and are not intended to limit the present invention, and that various changes and modifications may be made without departing from the spirit and scope of the present invention, which fall within the scope of the claimed invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (9)

1. The utility model provides a real-time feedback system of project progress based on wisdom building site platform which characterized in that: comprises a personnel information module (1), an on-site monitoring module (2), a progress reporting module (3), a periodic acceptance module (4), an expected analysis module (5) and an improvement pushing module (6), wherein,
the personnel information module (1) is used for filling and recording project responsible personnel information, matching the project responsible personnel information with corresponding project subjects and generating an electronic information form;
the field monitoring module (2) is used for monitoring construction pictures of a project field in real time and transmitting the construction pictures to the progress reporting module (3) for project responsible personnel to check;
the progress reporting module (3) is used for reporting and filling project progress information to an electronic information form in the personnel information module (1) by project responsible personnel according to the construction picture monitored in the field monitoring module (2), and analyzing the project progress information to generate corresponding statistical data chart information;
the regular acceptance module (4) is used for carrying out regular acceptance processing on the project progress information in the progress reporting module (3);
the expected analysis module (5) is used for predicting the project completion date according to the project progress information checked and passed by the regular checking and accepting module (4), and pushing corresponding risk early warning information when the predicted project completion date is out of date;
the rectification pushing module (6) is used for pushing the expected rectification plan information of the corresponding project when the project completion date in the expected analysis module (5) is abnormal.
2. The intelligent worksite platform-based project schedule real-time feedback system of claim 1, wherein: the personnel information module (1) comprises an information registration unit (11), an information matching unit (12) and a theme storage unit (13), and the specific operation process of the personnel information module (1) comprises the following steps:
step a 1: the project responsible personnel register information by using an information registration unit (11) and store preset project subject contents in a subject storage unit (13);
step a 2: the registered information is read by an information matching unit (12), the read project responsible personnel information is correspondingly matched with the project subject content in a subject storage unit (13), and the project responsible personnel information and the project subject content are integrated to generate an electronic information form.
3. The intelligent worksite platform-based project progress real-time feedback system of claim 1, wherein: the on-site monitoring module (2) comprises a monitor (21) and a network transmission device (22), wherein the network transmission device (22) is used for transmitting picture information of the monitor (21) for monitoring the project site in real time.
4. The intelligent worksite platform-based project schedule real-time feedback system of claim 1, wherein: the progress reporting module (3) comprises an information receiving unit (31), a picture display unit (32) and an information reporting unit (33), and the specific operation process of the progress reporting module (3) comprises the following steps:
step b 1: receiving the construction picture monitored in the site monitoring module (2) by using an information receiving unit (31);
step b 2: the picture display unit (32) displays the construction picture received by the information receiving unit (31) to project responsible personnel;
step b 3: and reporting the filling project progress information to an electronic information form in the personnel information module (1) by using an information reporting unit (33), and analyzing the project progress information to generate corresponding statistical data chart information.
5. The intelligent worksite platform-based project schedule real-time feedback system of claim 1, wherein: the regular acceptance module (4) comprises a checking unit (41), a confirming unit (42) and a reminding unit (43), wherein the checking unit (41) is used for checking and checking project progress information and construction pictures in the progress reporting module (3) by personnel regularly, the confirming unit (42) is used for confirming successful checking information, and the reminding unit (43) is used for generating reminding information when the checking fails.
6. The intelligent worksite platform-based project schedule real-time feedback system of claim 1, wherein: the expected analysis module (5) comprises a planning date base (51), an analysis unit (52) and an early warning unit (53), and the specific operation flow of the expected analysis module (5) comprises the following steps:
step c 1: storing a planned completion date of the project in a planned date repository (51);
step c 2: the method comprises the steps that the project progress information is confirmed to pass the inspection of a regular acceptance module (4), an analysis unit (52) analyzes and processes the project progress information, project completion dates are predicted, and the predicted project completion dates are compared with project completion dates in a plan date base (51);
step c 3: if the predicted project completion date exceeds the planned completion date, the early warning unit (53) pushes corresponding risk early warning information.
7. The intelligent worksite platform-based project schedule real-time feedback system of claim 1 or 6, wherein: the rectification and pushing module (6) comprises a rectification unit (61) and a pushing unit (62), wherein the rectification unit (61) is used for generating expected rectification plan information according to the comparison processing information in the analysis unit (52), and the pushing unit (62) is used for pushing the expected rectification plan information generated by the rectification unit (61).
8. The intelligent worksite platform-based project schedule real-time feedback system of claim 1, wherein: the progress display system further comprises a progress display module (7), wherein the progress display module (7) is used for displaying project progress information and statistical data chart information.
9. The intelligent worksite platform-based project schedule real-time feedback system of claim 1, wherein: the system further comprises a progress archiving module (8), and the progress archiving module (8) is used for archiving and storing project progress information, statistical data chart information, risk early warning information and project expected reforming plan information.
CN202210312467.4A 2022-03-28 2022-03-28 Project progress real-time feedback system based on wisdom building site platform Withdrawn CN114648307A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210312467.4A CN114648307A (en) 2022-03-28 2022-03-28 Project progress real-time feedback system based on wisdom building site platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210312467.4A CN114648307A (en) 2022-03-28 2022-03-28 Project progress real-time feedback system based on wisdom building site platform

Publications (1)

Publication Number Publication Date
CN114648307A true CN114648307A (en) 2022-06-21

Family

ID=81994985

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210312467.4A Withdrawn CN114648307A (en) 2022-03-28 2022-03-28 Project progress real-time feedback system based on wisdom building site platform

Country Status (1)

Country Link
CN (1) CN114648307A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115905494A (en) * 2022-12-02 2023-04-04 汇通达网络股份有限公司 Question feedback system and method based on intelligent matching mechanism
CN116245478A (en) * 2023-01-13 2023-06-09 江门市交通建设投资集团有限公司 Intelligent building site vision management and control system based on machine vision technology
CN117391341A (en) * 2023-09-28 2024-01-12 中交广州航道局有限公司 Construction progress management system for offshore sand taking and spreading project

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115905494A (en) * 2022-12-02 2023-04-04 汇通达网络股份有限公司 Question feedback system and method based on intelligent matching mechanism
CN116245478A (en) * 2023-01-13 2023-06-09 江门市交通建设投资集团有限公司 Intelligent building site vision management and control system based on machine vision technology
CN117391341A (en) * 2023-09-28 2024-01-12 中交广州航道局有限公司 Construction progress management system for offshore sand taking and spreading project

Similar Documents

Publication Publication Date Title
CN114648307A (en) Project progress real-time feedback system based on wisdom building site platform
CN108915771B (en) Cloud control mine comprehensive management system
CN110276530A (en) A kind of intelligent engineering operation and maintenance supervising method
US20220300840A1 (en) System to monitor and process water-related data
CN108830462A (en) A kind of pipe gallery wisdom operation management platform and method
CN111768123A (en) Visual management system for power distribution network construction site
CN112966903A (en) Dangerous chemical safety production risk monitoring and early warning system and method
CN110287859A (en) A kind of personnel's material dispatching system based on artificial intelligence technology
CN208888869U (en) It is a kind of based on internet+external coordination construction team safety control platform
CN114639183B (en) Intelligent inspection method, system, computer equipment and medium based on element
CN107657390A (en) A kind of special safety equipment hidden danger management and control big data monitoring system and monitoring method
CN111178709A (en) Full life cycle management system of aluminum electrolysis equipment and repair reporting method thereof
CN109117526A (en) One kind being suitable for mechanical system maintenance of equipment and guides data record and analysis system
CN107693997B (en) Fire fighting equipment detection and maintenance management system and management method
Xu et al. Effectiveness study of artificial intelligent facility system in maintaining building fire safety (case study: typical public building cases of fire-fighting facilities management in China)
CN111476330B (en) Remote monitoring and installation guidance system and method for manufacturing of electrical equipment of transformer substation
CN112419683A (en) Machine room equipment monitoring method and system
CN116629673A (en) Multi-working-surface complex construction site intelligent management system
CN206726273U (en) A kind of mobile operation and DSS
CN114067472A (en) Substation arrival authorization management system and method
Fang et al. Design and Development of Industrial Safety APPs
CN113779125A (en) Construction safety information management method and system
Yin et al. Theoretical research based on the application of safety information management in power construction site
US20220405672A1 (en) System for management of facility construction and maintenance
Dehai Development and Research of Equipment Information Management System of Thermal Power Plant

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20220621

WW01 Invention patent application withdrawn after publication