CN110387954A - A kind of assembled energy-saving New Residence structure and preparation method thereof - Google Patents

A kind of assembled energy-saving New Residence structure and preparation method thereof Download PDF

Info

Publication number
CN110387954A
CN110387954A CN201910714121.5A CN201910714121A CN110387954A CN 110387954 A CN110387954 A CN 110387954A CN 201910714121 A CN201910714121 A CN 201910714121A CN 110387954 A CN110387954 A CN 110387954A
Authority
CN
China
Prior art keywords
prefabricated
prefabricated panel
panel
foundation plate
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910714121.5A
Other languages
Chinese (zh)
Inventor
杨丰国
鞠世进
毛冠男
祝广川
张宇
杨潇妮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yantai Huicheng Industry Co Ltd
Shandong Huisheng Construction Technology Co Ltd
Original Assignee
Yantai Huicheng Industry Co Ltd
Shandong Huisheng Construction Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yantai Huicheng Industry Co Ltd, Shandong Huisheng Construction Technology Co Ltd filed Critical Yantai Huicheng Industry Co Ltd
Priority to CN201910714121.5A priority Critical patent/CN110387954A/en
Publication of CN110387954A publication Critical patent/CN110387954A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/02Structures consisting primarily of load-supporting, block-shaped, or slab-shaped elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/74Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
    • E04B1/76Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/92Protection against other undesired influences or dangers
    • E04B1/94Protection against other undesired influences or dangers against fire
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/24Structural elements or technologies for improving thermal insulation
    • Y02A30/244Structural elements or technologies for improving thermal insulation using natural or recycled building materials, e.g. straw, wool, clay or used tires
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]
    • Y02B30/90Passive houses; Double facade technology

Abstract

The present invention relates to a kind of assembled energy-saving New Residence structures and preparation method thereof, are characterized in that, including prefabricated profiled prefabricated foundation plate, prefabricated panel, integral roofing, floor panels and exterior-wall heat insulation integrated board;Pass through reserved bayonet slot and concrete connection between the prefabricated foundation plate and prefabricated panel;Pass through reserved opening and pre-embedded steel slab between adjacent prefabricated panel and is bolted fixation;Integral roofing successively includes lightgage steel joist, calcium silicate board, waterproof layer, batten, rock-wool heat insulation plate and prefabricated anti-ancient cement tile from inside to outside;Fixation is bolted between the lightgage steel joist of the integral roofing and the pre-embedded steel slab of prefabricated panel.The present invention uses precast construction independent, the prefabrication process of each component is produced in factory, then it is transported to construction site to be assembled, assembly node design substantially shortens construction period rationally and with a certain amount of non-deformability, composition easy operation between each component.

Description

A kind of assembled energy-saving New Residence structure and preparation method thereof
Technical field
The present invention relates to technical field of buildings, are a kind of assembled energy-saving New Residence structure and its production side specifically Method.
Background technique
The more site operations of present countryside housing have long construction period, generate more waste material, style sheet one and construction quality hardly possible The disadvantages of to guarantee.Especially north of china in winter is cold, and building wall, roof beam structure fabrication and installation, roofing tiling, exterior rendering etc. is wet in wall Job execution difficulty is big, at high cost.And rural area tradition craftsman older and leave no successor, so that a set of traditional residence is built There is a serious shortage in the supply by required carpenter, bricklayer, bricklayer's, electrician, Paste Up Man etc., causes the construction period at least in half a year to 1 year or so, And the day and night temperature in the north is big, and masonry panel is caused to be easy cracking, the heat insulating ability, anti-of the brick, barnacle of tradition, local timber structure Pinking is again not satisfactory.
The lightweight steel construction that existing market is being promoted+rock wool heat-preservation system, is difficult to be accepted in form and fire line and peace Full property is poor;Timber structure or weight steel construction assembled New Residence, cost is again too high, is difficult to be received in cost.
Summary of the invention
The present invention is intended to provide a kind of assembled energy-saving New Residence structure and preparation method thereof, the structure is included in production The various prefabricated components made in advance in workshop;The production method is to transport to the various prefabricated components completed in workshop to apply Work on-site assembly assembles convenient and quick construction, and is not limited by external environment.
The technical solution adopted by the invention is as follows:
A kind of assembled energy-saving New Residence structure, is characterized in that, including prefabricated profiled prefabricated foundation plate 2, prefabricated panel 3, integral roofing 4, floor panels 5 and exterior-wall heat insulation integrated board 6;
Wherein, the prefabricated foundation plate 2 is poured the molding prefabricated foundation plate of concrete mold using in workshop;It is described prefabricated Base plate 2 is paved on the top of blinding layer providing integral planar supporting framework, between adjacent prefabricated foundation plate 2 It is mutually butted;
Connecting node between the prefabricated foundation plate 2 and prefabricated panel 3 are as follows: bayonet slot 21, institute are reserved on prefabricated foundation plate 2 The bottom for stating prefabricated panel 3 is plugged in the bayonet slot 21, and tamps fixation by concrete;
The prefabricated panel 3 is poured the molding precast concrete wall panel of concrete mold using in workshop;
Connecting node between adjacent prefabricated panel 3 are as follows: the avris mold of prefabricated panel 3 forms reserved opening 31 and pre-buried Steel plate 32, the pre-embedded steel slab 32 are located in the reserved opening 31, pass through 31 phase of reserved opening between adjacent prefabricated panel 3 Docking, and fixation is connect for be superimposed together two pieces pre-embedded steel slab 32 by wallboard bolt 33;
It can be for a word connects in parallel, T shape vertically connects and several connection types of Angle connection between the prefabricated panel 3;Root According to the different connection types of installation of contiguous prefabricated wallboard 3, the pre-embedded steel slab 32 can use plain plate or gusset;
The integral roofing 4 is the straticulate structure of keel and prefabricated board, from inside to outside successively includes lightgage steel joist 41, silicon Sour calcium plate 42, waterproof layer 43, batten 44, rock-wool heat insulation plate 45 and prefabricated anti-ancient cement tile 46;
Connecting node between the integral roofing 4 and prefabricated panel 3 are as follows: the facade keel and prefabricated panel 3 of lightgage steel joist 41 Pre-embedded steel slab 32 between fixation is bolted;
The floor panels 5 are poured the molding concrete soil floor of concrete mold using in workshop;It is described prefabricatedly Plate 5 is to be layed in the upper surface of prefabricated foundation plate 2 by adjustment height feet 51;
It is by L-type pendant and to be bolted fixation between the prefabricated panel 3 and exterior-wall heat insulation integrated board 6;
Further, the assembled energy-saving New Residence structure can also include inner wall decoration integrated board, the inner wall decoration It by L-type pendant and is bolted between integrated board and wallboard 3, can also directly paste fixation.
A kind of production method of assembled energy-saving New Residence, is characterized in that, comprising the following steps:
S1, shop-fabricated component
Shift to an earlier date pre-formed prefabricated foundation plate 2, prefabricated panel 3, floor panels 5 and exterior-wall heat insulation integrated board 6 in workshop;It is prefabricated complete At lightgage steel joist 41, calcium silicate board 42, waterproof layer 43, batten 44, the rock-wool heat insulation plate 45 and prefabricated for assembling integral roofing 4 Anti- Gu cement tile 46;
The prefabricated foundation plate 2, prefabricated panel 3 and floor panels 5 are utilized in workshop casting concrete mold molding;
S2, site operation
Scene trench digging fluting, lay a good foundation;
S3, it is laid with prefabricated foundation plate
Prefabricated foundation plate 2 is laid in blinding layer, alignment is spliced between contiguous prefabricated base plate 2, completes prefabricated base after levelling The laying construction of plinth plate 2;
S4, installation wallboard
Prefabricated panel 3 is lifted in place, the lower part of prefabricated panel 3 is plugged in the reserved bayonet slot 21 of prefabricated foundation plate 2, adjacent Prefabricated panel 3 between 31 split of reserved opening docking after, 32 phase of pre-embedded steel slab in two 3 reserved openings 31 of prefabricated panel Mutually overlapping, connects fixation for be superimposed together two pieces pre-embedded steel slab 32 by wallboard bolt 33, is sequentially completed adjacent prefabricated After wallboard 3 connects, tamp concrete into the bayonet slot 21 of prefabricated foundation plate 2, complete prefabricated panel 3 and prefabricated foundation plate 2 it Between connection;
S5, installation roofing
It will be connected and fixed between multiple lightgage steel joists 41, form roofing general frame;
The facade keel of lightgage steel joist 41 are plugged in 3 reserved opening 31 of prefabricated panel, by bolt by facade keel and in advance Pre-embedded steel slab 32 in box out mouth 31 connect fixation, complete the connection between roofing lightgage steel joist and prefabricated panel 3;
Calcium silicate board 42, waterproof layer 43, batten 44, rock-wool heat insulation plate 45 and prefabricated anti-ancient cement tile 46 are successively layed in light steel The upper surface of keel complete the construction of integral roofing 4;
The lightgage steel joist 41, calcium silicate board 42, waterproof layer 43, batten 44, rock-wool heat insulation plate 45 and prefabricated anti-ancient cement tile 46 Between pass through default wire hole and screw connection;
S6, installation floor panels
Adjustment height feet 51 is put at the upper surface of prefabricated foundation plate 2 interval, floor panels 5 are layed in adjustment height feet 51 On, split is docked between adjacent floor panels 5;
S7, installation exterior-wall heat insulation integrated board
Exterior-wall heat insulation integrated board is laid on to the outer surface of prefabricated panel 3 by L-type pendant;
S8, installation inner wall decoration integrated board
Inner wall decoration integrated board is laid on to the inner surface of prefabricated panel 3 by L-type pendant.
A kind of assembled energy-saving New Residence structure of the invention, using precast construction independent, each component it is prefabricated Process is produced in factory, is then transported to construction site and is assembled, between each component assembly node design rationally and With a certain amount of non-deformability, composition easy operation, substantially shorten construction period.Product waste material is few, precision is high, sample Formula is more.Site-assembled production method prefabricated in advance is not by season and natural environment influence, even if in the winter of cryogenic conditions It can produce, solve the problems, such as winter construction, while also can solve fabricated construction since temperature leads to the problem of crack.
Detailed description of the invention
A kind of Fig. 1: assembled energy-saving New Residence structure overall schematic of the present invention
Fig. 2: Fig. 1 right view;
Fig. 3: connecting node schematic diagram between prefabricated panel and prefabricated foundation plate;
Fig. 4: connecting node schematic diagram between prefabricated panel and prefabricated panel (to connection status);
Fig. 5: connecting node schematic diagram (connected status) between prefabricated panel and prefabricated panel;
Fig. 6: integral roofing structural schematic diagram;
Fig. 7: connecting node schematic diagram between integral roofing and prefabricated panel;
1, blinding layer in the figure, 2, prefabricated foundation plate, 21, bayonet slot, 3, prefabricated panel, 31, reserved opening, 32, pre-buried steel Plate, 33, wallboard bolt, 4, integral roofing, 41, lightgage steel joist, 42, calcium silicate board, 43, waterproof layer, 44, batten, 45, rock wool guarantor Warm plate, 46, prefabricated anti-ancient cement tile, 5, floor panels, 51, adjustment height feet, 6, exterior-wall heat insulation integrated board.
Specific embodiment
Provide a specific embodiment of the invention below in conjunction with attached drawing, for structure composition of the invention, design principle, Work progress and main points are described in further detail.
Embodiment one
A kind of assembled energy-saving New Residence structure, including it is prefabricated profiled prefabricated foundation plate 2, prefabricated panel 3, integral roofing 4, pre- Floor 5 processed and exterior-wall heat insulation integrated board 6;Wherein, the prefabricated foundation plate 2 is using in workshop casting concrete mold molding Prefabricated foundation plate;The prefabricated foundation plate 2 is paved on the top of blinding layer providing integral planar supporting framework, It is mutually butted between adjacent prefabricated foundation plate 2;Connecting node between the prefabricated foundation plate 2 and prefabricated panel 3 are as follows: prefabricated Bayonet slot 21 is reserved on base plate 2, the bottom of the prefabricated panel 3 is plugged in the bayonet slot 21, and is filled out by concrete It is real fixed;The prefabricated panel 3 is poured the molding precast concrete wall panel of concrete mold using in workshop;Adjacent is pre- Connecting node between wallboard 3 processed are as follows: the avris mold of prefabricated panel 3 forms reserved opening 31 and pre-embedded steel slab 32, described Pre-embedded steel slab 32 is located in the reserved opening 31, is connected to each other between adjacent prefabricated panel 3 by reserved opening 31, and pass through Wallboard bolt 33 connects fixation for be superimposed together two pieces pre-embedded steel slab 32;It can be flat for a word between the prefabricated panel 3 Row connection, T shape vertically connects and several connection types of Angle connection;According to the different connection types of installation of contiguous prefabricated wallboard 3, The pre-embedded steel slab 32 can use plain plate or gusset;The integral roofing 4 is the complex layered knot of keel and prefabricated board Structure successively includes lightgage steel joist 41, calcium silicate board 42, waterproof layer 43, batten 44, rock-wool heat insulation plate 45 and prefabricated from inside to outside Anti- Gu cement tile 46;Connecting node between the integral roofing 4 and prefabricated panel 3 are as follows: the facade keel of lightgage steel joist 41 with Fixation is bolted between the pre-embedded steel slab 32 of prefabricated panel 3;The floor panels 5 are poured coagulation using in workshop The formed in mould concrete soil floor of soil;The floor panels 5 are to be layed in prefabricated foundation plate 2 by adjustment height feet 51 The upper surface of;It is by L-type pendant and to be bolted fixation between the prefabricated panel 3 and exterior-wall heat insulation integrated board 6.
Embodiment two
The present embodiment and embodiment one the difference is that:
The assembled energy-saving New Residence structure, further includes inner wall decoration integrated board 7, the inner wall decoration integrated board 7 and wall It by L-type pendant and is bolted between plate 3, can also directly paste fixation.
Embodiment three
A kind of production method of assembled energy-saving New Residence, comprising the following steps:
S1, shop-fabricated component
Shift to an earlier date pre-formed prefabricated foundation plate 2, prefabricated panel 3, floor panels 5 and exterior-wall heat insulation integrated board 6 in workshop;It is prefabricated complete At lightgage steel joist 41, calcium silicate board 42, waterproof layer 43, batten 44, the rock-wool heat insulation plate 45 and prefabricated for assembling integral roofing 4 Anti- Gu cement tile 46;
The prefabricated foundation plate 2, prefabricated panel 3 and floor panels 5 are utilized in workshop casting concrete mold molding;
S2, site operation
Scene trench digging fluting, lay a good foundation;
S3, it is laid with prefabricated foundation plate
Prefabricated foundation plate 2 is laid in blinding layer, alignment is spliced between contiguous prefabricated base plate 2, completes prefabricated base after levelling The laying construction of plinth plate 2;
S4, installation wallboard
Prefabricated panel 3 is lifted in place, the lower part of prefabricated panel 3 is plugged in the reserved bayonet slot 21 of prefabricated foundation plate 2, adjacent Prefabricated panel 3 between 31 split of reserved opening docking after, 32 phase of pre-embedded steel slab in two 3 reserved openings 31 of prefabricated panel Mutually overlapping, connects fixation for be superimposed together two pieces pre-embedded steel slab 32 by wallboard bolt 33, is sequentially completed adjacent prefabricated After wallboard 3 connects, tamp concrete into the bayonet slot 21 of prefabricated foundation plate 2, complete prefabricated panel 3 and prefabricated foundation plate 2 it Between connection;
S5, installation roofing
It will be connected and fixed between multiple lightgage steel joists 41, form roofing general frame;
The facade keel of lightgage steel joist 41 are plugged in 3 reserved opening 31 of prefabricated panel, by bolt by facade keel and in advance Pre-embedded steel slab 32 in box out mouth 31 connect fixation, complete the connection between roofing lightgage steel joist and prefabricated panel 3;
Calcium silicate board 42, waterproof layer 43, batten 44, rock-wool heat insulation plate 45 and prefabricated anti-ancient cement tile 46 are successively layed in light steel The upper surface of keel complete the construction of integral roofing 4;
The lightgage steel joist 41, calcium silicate board 42, waterproof layer 43, batten 44, rock-wool heat insulation plate 45 and prefabricated anti-ancient cement tile 46 Between pass through default wire hole and screw connection;
S6, installation floor panels
Adjustment height feet 51 is put at the upper surface of prefabricated foundation plate 2 interval, floor panels 5 are layed in adjustment height feet 51 On, split is docked between adjacent floor panels 5;
S7, installation exterior-wall heat insulation integrated board
Exterior-wall heat insulation integrated board is laid on to the outer surface of prefabricated panel 3 by L-type pendant;
S8, installation inner wall decoration integrated board
Inner wall decoration integrated board is laid on to the inner surface of prefabricated panel 3 by L-type pendant.
A kind of assembled energy-saving New Residence structure of the invention and preparation method thereof is built for new rural village New Residence and is set Meter proposes, solves the problems, such as that current rural area tradition craftsman is older and leave no successor, using pre-formed in factory floor The mode of various prefabricated members solves outdoor environment and climate change to many influences of site operation bring, scene dress With efficient and convenient, it can substantially shorten construction period.By base plate, wallboard and floor factory floor inner concrete mold at It is molding to obtain precast concrete foundation plate, precast concrete wall panel and concrete soil floor, concrete mold respectively for type Various plates compare traditional lightweight steel construction+rock wool heat-preservation system, have better fire line and higher safety, compare the wooden knot For structure or weight steel construction assembled New Residence, cost is cheaper.At the scene in work progress, pass through prefabricated components Between connecting node carry out effective assembly connection, all have a certain amount of non-deformability between each assembly node, therefrom Solve the problems, such as that fabricated construction generates crack due to the temperature difference.

Claims (8)

1. a kind of assembled energy-saving New Residence structure, is characterized in that, including prefabricated profiled prefabricated foundation plate (2), prefabricated panel (3), integral roofing (4), floor panels (5) and exterior-wall heat insulation integrated board (6);
Connecting node between the prefabricated foundation plate (2) and prefabricated panel (3) are as follows: prefabricated foundation plate is reserved with bayonet on (2) Slot (21), the bottom of the prefabricated panel (3) is plugged in the bayonet slot (21), and tamps fixation by concrete;
Connecting node between adjacent prefabricated panel (3) are as follows: the avris mold of prefabricated panel (3) forms reserved opening (31) With pre-embedded steel slab (32), the pre-embedded steel slab (32) is located in the reserved opening (31), leads between adjacent prefabricated panel (3) It crosses reserved opening (31) to be connected to each other, and by wallboard bolt (33) that be superimposed together two pieces of pre-embedded steel slabs (32) are solid connecing It is fixed;
The integral roofing (4) is the straticulate structure of keel and prefabricated board, from inside to outside successively includes lightgage steel joist (41), calcium silicate board (42), waterproof layer (43), batten (44), rock-wool heat insulation plate (45) and prefabricated anti-ancient cement tile (46);
Connecting node between the integral roofing (4) and prefabricated panel (3) are as follows: the facade keel of lightgage steel joist (41) with it is prefabricated Fixation is bolted between the pre-embedded steel slab (32) of wallboard (3).
2. a kind of assembled energy-saving New Residence structure as described in claim 1, is characterized in that,
Wherein, the prefabricated foundation plate (2) is poured the molding prefabricated foundation plate of concrete mold using in workshop;It is mated formation It is mutually butted between the top of blinding layer, adjacent prefabricated foundation plate (2).
3. a kind of assembled energy-saving New Residence structure as described in claim 1, is characterized in that,
The prefabricated panel (3) is poured the molding precast concrete wall panel of concrete mold using in workshop.
4. a kind of assembled energy-saving New Residence structure as described in claim 1, is characterized in that,
For a word connects in parallel, T shape vertically connects or Angle connection between the prefabricated panel (3);According to contiguous prefabricated wallboard (3) different connection types, the pre-embedded steel slab (32) use plain plate or gusset.
5. a kind of assembled energy-saving New Residence structure as described in claim 1, is characterized in that,
The floor panels (5) are poured the molding concrete soil floor of concrete mold using in workshop;It is described prefabricated Floor (5) is to be layed in the upper surface of prefabricated foundation plate (2) by adjustment height feet (51).
6. a kind of assembled energy-saving New Residence structure as described in claim 1, is characterized in that,
It is by L-type pendant and to be bolted fixation between the prefabricated panel (3) and exterior-wall heat insulation integrated board (6).
7. a kind of assembled energy-saving New Residence structure as described in claim 1, is characterized in that,
Further include inner wall decoration integrated board, is by L-type pendant and spiral shell between the inner wall decoration integrated board and prefabricated panel (3) Bolt is connected and fixed.
8. a kind of production method of assembled energy-saving New Residence, is characterized in that, comprising the following steps:
S1, shop-fabricated component
Shift to an earlier date pre-formed prefabricated foundation plate (2), prefabricated panel (3), floor panels (5) and exterior-wall heat insulation integrated board in workshop (6);The prefabricated lightgage steel joist (41), calcium silicate board (42), waterproof layer (43), batten completed for assembling integral roofing (4) (44), rock-wool heat insulation plate (45) and prefabricated anti-ancient cement tile (46);
The prefabricated foundation plate (2), prefabricated panel (3) and floor panels (5) be utilized in workshop casting concrete mold at Type;
S2, site operation
Scene trench digging fluting, lay a good foundation;
S3, it is laid with prefabricated foundation plate
Prefabricated foundation plate (2) is laid in blinding layer, alignment is spliced between contiguous prefabricated base plate (2), is completed after levelling pre- The laying construction of base plate (2) processed;
S4, installation wallboard
Prefabricated panel (3) lifting is in place, and the lower part of prefabricated panel (3) is plugged in prefabricated foundation plate (2) reserved bayonet slot (21) in, after reserved opening (31) the split docking between adjacent prefabricated panel (3), two prefabricated panel (3) reserved openings (31) pre-embedded steel slab (32) in is superimposed with each other, by wallboard bolt (33) by be superimposed together two pieces of pre-embedded steel slabs (32) Fixation is connect, after being sequentially completed adjacent prefabricated panel (3) connection, tamps coagulation into the bayonet slot (21) of prefabricated foundation plate (2) Soil completes the connection between prefabricated panel (3) and prefabricated foundation plate (2);
S5, installation roofing
It will be connected and fixed between multiple lightgage steel joists (41), form roofing general frame;
The facade keel of lightgage steel joist (41) are plugged in prefabricated panel (3) reserved opening (31), it is by bolt that facade is imperial Pre-embedded steel slab (32) in bone and reserved opening (31) is completed between roofing lightgage steel joist and prefabricated panel (3) fixation is connect Connection;
Successively by calcium silicate board (42), waterproof layer (43), batten (44), rock-wool heat insulation plate (45) and prefabricated anti-ancient cement tile (46) It is layed in the upper surface of lightgage steel joist, completes the construction of integral roofing (4);
The lightgage steel joist (41), calcium silicate board (42), waterproof layer (43), batten (44), rock-wool heat insulation plate (45) and prefabricated anti- Pass through default wire hole and screw connection between ancient cement tile (46);
S6, installation floor panels
Adjustment height feet (51) are put at the upper surface of prefabricated foundation plate (2) interval, floor panels (5) are layed in adjustment height In feet (51), split is docked between adjacent floor panels (5);
S7, installation exterior-wall heat insulation integrated board
Exterior-wall heat insulation integrated board is laid on to the outer surface of prefabricated panel (3) by L-type pendant;
S8, installation inner wall decoration integrated board
Inner wall decoration integrated board is laid on to the inner surface of prefabricated panel (3) by L-type pendant.
CN201910714121.5A 2019-08-03 2019-08-03 A kind of assembled energy-saving New Residence structure and preparation method thereof Pending CN110387954A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910714121.5A CN110387954A (en) 2019-08-03 2019-08-03 A kind of assembled energy-saving New Residence structure and preparation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910714121.5A CN110387954A (en) 2019-08-03 2019-08-03 A kind of assembled energy-saving New Residence structure and preparation method thereof

Publications (1)

Publication Number Publication Date
CN110387954A true CN110387954A (en) 2019-10-29

Family

ID=68288250

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910714121.5A Pending CN110387954A (en) 2019-08-03 2019-08-03 A kind of assembled energy-saving New Residence structure and preparation method thereof

Country Status (1)

Country Link
CN (1) CN110387954A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113582613A (en) * 2021-07-23 2021-11-02 广东海龙建筑科技有限公司 Conductive inorganic artificial stone and preparation method thereof
CN114908978A (en) * 2022-05-27 2022-08-16 中建八局第三建设有限公司 Design and construction method of assembled antique building steel structure board house system

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104563288A (en) * 2014-10-30 2015-04-29 徐曼 Reinforced concrete frame gridding slab prefabricated energy-saving house
WO2015135440A1 (en) * 2014-03-10 2015-09-17 初明进 Prefabricated concrete wall
CN205530671U (en) * 2016-02-17 2016-08-31 杨雪梅 Light steel house with energy -conserving environmental protection
CN206581283U (en) * 2016-06-22 2017-10-24 上海建工七建集团有限公司 The prefabricated assembled basis of hoarding
CN108824648A (en) * 2018-06-13 2018-11-16 北京乡墅科技有限公司 Space module house
CN210658664U (en) * 2019-08-03 2020-06-02 山东惠晟建筑科技有限公司 Assembled energy-saving new residential structure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015135440A1 (en) * 2014-03-10 2015-09-17 初明进 Prefabricated concrete wall
CN104563288A (en) * 2014-10-30 2015-04-29 徐曼 Reinforced concrete frame gridding slab prefabricated energy-saving house
CN205530671U (en) * 2016-02-17 2016-08-31 杨雪梅 Light steel house with energy -conserving environmental protection
CN206581283U (en) * 2016-06-22 2017-10-24 上海建工七建集团有限公司 The prefabricated assembled basis of hoarding
CN108824648A (en) * 2018-06-13 2018-11-16 北京乡墅科技有限公司 Space module house
CN210658664U (en) * 2019-08-03 2020-06-02 山东惠晟建筑科技有限公司 Assembled energy-saving new residential structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113582613A (en) * 2021-07-23 2021-11-02 广东海龙建筑科技有限公司 Conductive inorganic artificial stone and preparation method thereof
CN114908978A (en) * 2022-05-27 2022-08-16 中建八局第三建设有限公司 Design and construction method of assembled antique building steel structure board house system

Similar Documents

Publication Publication Date Title
CN106013811B (en) A kind of installation method of assembled architecture
CN109072604B (en) Method for constructing multi-storey building using stacked structural steel wall truss
CN104358341B (en) Building brickwork and masonry construction method of building brickwork
CN103821276B (en) A kind of assembled, modular architectural system
EP1992750A1 (en) Prefabricated reinforced-concrete single-family dwelling and method for erecting said dwelling
US8429876B2 (en) Concrete rib construction method
CN109322392B (en) Light steel house and construction method thereof
CN101139849A (en) Modular building component and on-site hoisting building method
CN107130684A (en) A kind of fabricated structure and its construction method
CN105672664A (en) Integral heat insulation wallboard building system
CN210658664U (en) Assembled energy-saving new residential structure
CN106522359A (en) Total-prefabricated rural residential class composite wall structure system and construction method thereof
CN101413300A (en) Gypsum reinforced concrete construction system
CN107419801A (en) A kind of assembled individual layer ALC wood connecting building and its construction method and ALC board manufacturing methods
US20070039265A1 (en) Prefabricated masonry covered structural wall panel
CN110387954A (en) A kind of assembled energy-saving New Residence structure and preparation method thereof
CN109707111B (en) Assembled concrete archaized roof and construction method thereof
CN206681418U (en) The industrialization commercial residential buildings of energy-conserving and environment-protective
CN113585541A (en) Fast-assembling type indoor partition wall and construction method thereof
US3955332A (en) Method of building a structure from bricks and mortar
RU2678750C1 (en) Buildings and structures with bearing monolithic reinforced concrete structures construction method using the reinforced concrete wall panels
CN206396997U (en) Precast wall body, prefabricated unit body and building system
RU2812973C1 (en) Method of construction of buildings
CA1225234A (en) Prefabricated plastered panels for housing
CN206245606U (en) A kind of EPS composite heat-insulation roofs

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination