CN110259084A - A kind of construction site scaffold - Google Patents

A kind of construction site scaffold Download PDF

Info

Publication number
CN110259084A
CN110259084A CN201910601178.4A CN201910601178A CN110259084A CN 110259084 A CN110259084 A CN 110259084A CN 201910601178 A CN201910601178 A CN 201910601178A CN 110259084 A CN110259084 A CN 110259084A
Authority
CN
China
Prior art keywords
truss
main body
column
column main
construction site
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910601178.4A
Other languages
Chinese (zh)
Inventor
李士忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Qianda Construction Equipment Co Ltd
Original Assignee
Guizhou Qianda Construction Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Qianda Construction Equipment Co Ltd filed Critical Guizhou Qianda Construction Equipment Co Ltd
Priority to CN201910601178.4A priority Critical patent/CN110259084A/en
Publication of CN110259084A publication Critical patent/CN110259084A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/18Scaffolds primarily resting on the ground adjustable in height
    • E04G1/20Scaffolds comprising upright members and provision for supporting cross-members or platforms at different positions therealong
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/02Scaffold feet, e.g. with arrangements for adjustment
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/06Consoles; Brackets
    • E04G5/061Consoles; Brackets specially adapted for attachment to scaffolds

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The present invention relates to technical field of building construction, specifically a kind of construction site scaffold, including column and truss, the column includes column main body, base mechanism is arranged in the column lower body, multiple slot mechanisms have been placed equidistant with along its outer surface in the column body outer surface, the truss includes truss cross bar, truss brace, vertical bar of truss and buckle, the truss cross bar, truss brace and vertical bar of truss combine the main body to form truss, buckle is symmetrically arranged in the truss cross bar both side ends, the truss is snapped connection by buckle and the slot mechanism.The present invention has easy for assemble or unload, and stability is strong, time saving and energy saving, and cost is set up in saving, and safety coefficient is high.

Description

A kind of construction site scaffold
Technical field
The present invention relates to technical field of building construction, specifically a kind of construction site scaffold.
Background technique
It is well known that scaffold is construction and stage is built, cast-in-situ bridge is constructed indispensable tool, scaffold Refer to construction site be worker operation and solving vertically and horizontally transport and the various brackets set up.The generic term of architecture field refers to Exterior wall, interior decoration, cast-in-situ bridge construction or the higher place that can not directly construct of floor are used on construction site.As long as in order to Construction personnel works up and down or the maintenance of perimeter security net and high-altitude installation component, cast-in-situ bridge bracket etc..Some engineerings also use foot Hand cradle is used when template, and furthermore the departments such as our advertising, municipal administration, traffic road bridge, mine are also widely used.
Currently, building for existing building construction scaffold is mainly linked together cross bar and upright bar using fastener, Middle cross bar and upright bar are hollow shape cylinders, and structure function is single, when setting up, it is also necessary to which the Ground Treatment of large area is generally wanted It with concrete on one layer of ground lower berth basis, needs basis to remove after having constructed and restores to the original state, it is long to cause the construction time, and cost increases The disadvantages of adding, and need to buckle cross bar and upright bar using a large amount of fasteners so that peace tear open it is time-consuming and laborious.
Summary of the invention
Place in view of the deficiency of the prior art, the present invention is intended to provide a kind of convenient to assemble and disassemble, time saving and energy saving, structure Scaffold vdiverse in function.
In order to solve the above technical problems, a kind of construction site scaffold of the invention, including column and truss, it is described vertical Column includes column main body, base mechanism is arranged in the column lower body, in the column body outer surface along its appearance Face has been placed equidistant with multiple slot mechanisms, and the truss includes truss cross bar, truss brace, vertical bar of truss and buckle, the purlin Frame cross bar, truss brace and vertical bar of truss combine the main body to form truss, are symmetrical arranged in the truss cross bar both side ends There is buckle, the truss is snapped connection by buckle and the slot mechanism.
The slot mechanism is four card slot being placed equidistant with compositions, and the card slot includes two symmetrically arranged steel plate A It is fixedly connected with one end of steel plate B, two steel plate A with column main body, the other end is fixedly connected with steel plate B, described in two Steel plate A, steel plate B and column body combination form card slot.
The base mechanism includes pedestal and the fixing groove for being fixed on column main body on pedestal, the pedestal lower end It is provided with the mounting base for fixing pedestal on the ground by screw rod, fixation hole is provided in the mounting base, screw rod is worn It crosses fixation hole and base mechanism is fixed on bottom surface.
It is provided with internal screw thread on the inside of the fixing groove, column lower body lateral surface is provided with to match with the internal screw thread External screw thread.
Column main body is hollow structure.
The quantity at least four of the fixation hole, and be placed equidistant in mounting base.
Compared with prior art, the invention has the benefit that
The present invention on column by being arranged multiple slot mechanisms, and the height of the distance between each slot mechanism and truss Match, is snapped connection by the card slot on the buckle and column on truss, so that it is convenient to assemble and disassemble, it no longer needs to come using fastener Truss and upright bar are fixed, and buckle and card slot are the wide trapezium structure in the narrow upper end in lower end, so that buckle fastening, is not easy pine It is dynamic, it is additionally provided with base mechanism, enables column is stable to be installed on ground, prevents from being also easy to produce and shaking because of setting up excessively high The phenomenon that rolling, occurs, and column main body downside and the fixing groove of pedestal upper end are connected through a screw thread, and improves column and is placed in pedestal On stability.
Detailed description of the invention
Fig. 1 is mounting structure schematic diagram of the invention;
Fig. 2 is truss structure schematic diagram of the invention;
Fig. 3 is the column agent structure schematic diagram of invention;
Fig. 4 is the top view of Fig. 3;
Fig. 5 is base mechanism structural schematic diagram of the invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description.
Fig. 1-5, a kind of construction site scaffold of the invention, including column 1 and truss 2 are please referred to, the column 1 wraps Column main body 11 is included, base mechanism 3 is arranged in 11 lower end of column main body, is equidistantly set in 11 outer surface of column main body Multiple slot mechanisms 4 are equipped with, the truss 2 includes truss cross bar 21, truss brace 22, vertical bar of truss 23 and buckle 24, described Truss cross bar 21, truss brace 22 and vertical bar of truss 23 combine the main body for forming truss, in 21 both side ends of truss cross bar It is symmetrically arranged with buckle 24, the truss 2 is snapped connection by the buckle 24 with the slot mechanism 4.
The present invention reuses boom hoisting and hangs column main body 11 by the way that base mechanism 3 to be fixed on ground by screw rod It rises, 11 lower end of column main body is connect with the fixing groove 32 on base mechanism 3, multiple columns are mounted equidistant being separated by one section 1, then truss 2 is sling and is attached it in slot mechanism 4 by buckle 24, the installation of scaffold of the present invention can be realized, When disassembly is desired, also need to only boom hoisting be used first to extract truss 2, then slings column main body 11, finally removed and ground Disassembly can be completed in the fixed base mechanism 3 in face.
The slot mechanism 4 is that four card slots 41 being placed equidistant with form, and the card slot 41 includes two symmetrically arranged Steel plate A411 and steel plate B412, one end of two steel plate A411 are fixedly connected with column main body 11, the other end and steel plate B412 is fixedly connected, and two the steel plate A411, steel plate B412 and the combination of column main body 11 form card slot 5, and realizing can buckle Function, wherein card slot 5 in upper end opening it is big, the small trapezium structure of lower ending opening is trapezoidal convenient for buckle 24 to be snapped in wherein Structure improves stability when buckle.
The base mechanism 3 includes pedestal 31 and the fixing groove 32 for being fixed on column main body 11 on pedestal 31, is led to The setting of fixing groove 32 is crossed, column main body 11 is placed in fixing groove 32 by realization, and 31 lower end of pedestal is provided with for leading to The mounting base 33 that screw rod fixes pedestal 31 on the ground is crossed, plays the role of firm center, being arranged in the mounting base 33 There is fixation hole 34, play the role of fixed mounting 33, screw rod passes through fixation hole 34 and base mechanism 3 is fixed on bottom surface.
Internal screw thread 321 is provided on the inside of the fixing groove 32,11 lower end outside face of column main body is provided with and the interior spiral shell The external screw thread 111 that line 321 matches is improved column main body 11 and is fixed on by the matching of internal screw thread 321 and external screw thread 111 Determine in slot 32, prevent from setting up column main body 11 it is excessively high when, the phenomenon that generation shambles.
The column main body 11 is hollow structure, reduces quality, is readily transported, while reducing cost.
The quantity at least four of the fixation hole 34, and be placed equidistant in mounting base 33, improve mounting base 33 and ground Stability when face is fixedly connected.
Obviously, described embodiment is only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts all other Embodiment shall fall within the protection scope of the present invention.

Claims (6)

1. a kind of construction site scaffold, it is characterised in that: including column (1) and truss (2), the column (1) includes vertical Column main body (11) is arranged with base mechanism (3) in column main body (11) lower end, in described column main body (11) outer surface etc. Away from being provided with multiple slot mechanisms (4), the truss (2) includes truss cross bar (21), truss brace (22), vertical bar of truss (23) With buckle (24), the truss cross bar (21), truss brace (22) and vertical bar of truss (23) combination form the main body of truss, in institute Truss cross bar (21) both side ends are stated to be symmetrically arranged with buckle (24), the truss (2) by the buckle (24) with it is described Slot mechanism (4) snaps connection.
2. construction site scaffold according to claim 1, it is characterised in that: the slot mechanism (4) is four etc. Away from setting card slot (41) composition, the card slot (41) include two symmetrically arranged steel plate A (411) and steel plate B (412), two One end of a steel plate A (411) is fixedly connected with column main body (11), and the other end is fixedly connected with steel plate B (412), and two The steel plate A (411), steel plate B (412) and column main body (11) combination form card slot (5).
3. construction site scaffold according to claim 1, it is characterised in that: the base mechanism (3) includes pedestal (31) and for column main body (11) to be fixed on the fixing groove (32) on pedestal (31), pedestal (31) the lower end setting is useful In being provided with fixation hole in the mounting base (33) fixed pedestal (31) on the ground by screw rod, the mounting base (33) (34), base mechanism (3) is fixed on bottom surface across fixation hole (34) by screw rod.
4. construction site scaffold according to claim 3, it is characterised in that: be provided on the inside of the fixing groove (32) Internal screw thread (321), column main body (11) lower end outside face are provided with the external screw thread (111) to match with the internal screw thread (321).
5. according to the described in any item construction site scaffolds of the claims, it is characterised in that: the column main body It (11) is hollow structure.
6. construction site scaffold according to claim 3, it is characterised in that: the quantity of the fixation hole (34) is at least Four, and be placed equidistant on mounting base (33).
CN201910601178.4A 2019-07-05 2019-07-05 A kind of construction site scaffold Pending CN110259084A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910601178.4A CN110259084A (en) 2019-07-05 2019-07-05 A kind of construction site scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910601178.4A CN110259084A (en) 2019-07-05 2019-07-05 A kind of construction site scaffold

Publications (1)

Publication Number Publication Date
CN110259084A true CN110259084A (en) 2019-09-20

Family

ID=67924538

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910601178.4A Pending CN110259084A (en) 2019-07-05 2019-07-05 A kind of construction site scaffold

Country Status (1)

Country Link
CN (1) CN110259084A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111206509A (en) * 2020-03-04 2020-05-29 重庆铁固工程科技有限公司 Assembled bridge slope-adjusting support system
CN112324157A (en) * 2020-10-27 2021-02-05 长江精工钢结构(集团)股份有限公司 Installation method of electric power synchronous lifting net rack

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2447463Y (en) * 2000-09-30 2001-09-12 梁炎棠 Fastening scaffold
CN101597955A (en) * 2009-04-30 2009-12-09 台山市东扩钢构有限公司 Safety scaffold
CN201687188U (en) * 2010-04-12 2010-12-29 李玉涛 Building scaffold
CN207513144U (en) * 2017-06-30 2018-06-19 中国一冶集团有限公司 A kind of steel fixes scaffold base device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2447463Y (en) * 2000-09-30 2001-09-12 梁炎棠 Fastening scaffold
CN101597955A (en) * 2009-04-30 2009-12-09 台山市东扩钢构有限公司 Safety scaffold
CN201687188U (en) * 2010-04-12 2010-12-29 李玉涛 Building scaffold
CN207513144U (en) * 2017-06-30 2018-06-19 中国一冶集团有限公司 A kind of steel fixes scaffold base device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111206509A (en) * 2020-03-04 2020-05-29 重庆铁固工程科技有限公司 Assembled bridge slope-adjusting support system
CN112324157A (en) * 2020-10-27 2021-02-05 长江精工钢结构(集团)股份有限公司 Installation method of electric power synchronous lifting net rack
CN112324157B (en) * 2020-10-27 2021-12-14 长江精工钢结构(集团)股份有限公司 Installation method of electric power synchronous lifting net rack

Similar Documents

Publication Publication Date Title
CN101942901A (en) Support frame or scaffold and construction method thereof
CN110259084A (en) A kind of construction site scaffold
CN201771172U (en) Support rack or scaffold
WO2023082828A1 (en) Integral duplex lifting device and method for using same
CN211499713U (en) All-steel attached lifting scaffold
CN104372923B (en) Scaffolding
CN206289999U (en) A kind of new attaching scaffold
CN107587711A (en) A kind of regularization assembled overhanging protection canopy and its assembly method
CN212478487U (en) Construction platform for building construction
CN206053269U (en) Bamboo ferrum mixing frame for building
CN210067397U (en) Intelligent integrated all-steel attached lifting scaffold
CN204754150U (en) Dish -type node formula scaffold
CN209353770U (en) High-altitude overhanging formwork protection canopy
CN206769335U (en) A kind of high stability scaffold for building
CN202672762U (en) Truss-type security channel for building construction
CN208518311U (en) The hanging comprehensive hanger platform of curtain wall half and pallet
CN207004029U (en) One kind is multi-functional to be used for wall and slab form ruggedized construction component
CN205502549U (en) Split type scaffold of hanging
CN205822763U (en) A kind of bowl fastening type steel pipe scaffold being easy to assemble
CN206015683U (en) A kind of deep basal pit framework reassembling type stair
CN206917239U (en) A kind of scaffold of expressway construction
CN219327289U (en) Movable formwork support protection frame for outer window roof structure
CN218176690U (en) Fastener type steel pipe support device for bearing reinforcing steel bars
CN216787787U (en) Manual operation platform for tower crane dismantling
CN219060856U (en) Adjustable buckle disc type scaffold

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190920

WD01 Invention patent application deemed withdrawn after publication