CN208518311U - The hanging comprehensive hanger platform of curtain wall half and pallet - Google Patents

The hanging comprehensive hanger platform of curtain wall half and pallet Download PDF

Info

Publication number
CN208518311U
CN208518311U CN201821039958.1U CN201821039958U CN208518311U CN 208518311 U CN208518311 U CN 208518311U CN 201821039958 U CN201821039958 U CN 201821039958U CN 208518311 U CN208518311 U CN 208518311U
Authority
CN
China
Prior art keywords
pallet
curtain wall
upright bar
connector
hanger platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821039958.1U
Other languages
Chinese (zh)
Inventor
吴彬
张树新
阮大为
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENZHEN MAGIC DESIGN AND DECORATION ENGINEERING Co Ltd
Original Assignee
SHENZHEN MAGIC DESIGN AND DECORATION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN MAGIC DESIGN AND DECORATION ENGINEERING Co Ltd filed Critical SHENZHEN MAGIC DESIGN AND DECORATION ENGINEERING Co Ltd
Priority to CN201821039958.1U priority Critical patent/CN208518311U/en
Application granted granted Critical
Publication of CN208518311U publication Critical patent/CN208518311U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides the hanging comprehensive hanger platform of open curtain wall half and pallet.Curtain wall pallet, including pallet and connection ring, the connection ring are arranged on the pallet, and the pallet is equipped with connector, and the connector runs through the pallet, and the connection ring with wirerope for connecting, and the connector with upright bar for connecting.The hanging comprehensive hanger platform of curtain wall half includes guardrail, the upright bar and above-mentioned curtain wall pallet, and the upright bar is fixed on the curtain wall pallet by the connector, and the guardrail is connect with the upright bar.Curtain wall pallet can be fixed on furred ceiling in such a way that upright bar and wirerope overhang using half, so that operator be made to carry out curtain wall operation on curtain wall pallet.Material can be saved, to reduce cost.

Description

The hanging comprehensive hanger platform of curtain wall half and pallet
Technical field
The utility model relates to curtain wall technology fields, the in particular to hanging comprehensive hanger platform of curtain wall half and pallet.
Background technique
With the development of society, curtain wall is built and applied on a large scale, can be met using function most by curtain wall It is changing greatly and pursue construction aesthetic perception.The hanging vestibule furred ceiling of steel construction is generally constructed using full hall scaffold.
It is big to overhang moderate vestibule furred ceiling curtain wall common buildings area, flying height and span, generallys use full hall scaffold It constructs, but the cost of scaffold is relatively high.
In addition, the hanging vestibule furred ceiling of steel structure generallys use scaffold and constructs, usual vestibule two sides main building curtain wall needs same Shi Jinhang constructs or has used completion, and scaffold connecting bar influences curtain wall facade and closes up, to lengthen the construction period, increases and apply Work cost.
Utility model content
The purpose of this utility model is to propose that curtain wall half is hanging to make up above-mentioned at least one deficiency in the prior art Comprehensive hanger platform and curtain wall pallet.
In order to solve the above technical problems, the utility model uses following technical scheme:
Curtain wall pallet, including pallet and connection ring, the connection ring are arranged on the pallet, and the pallet is equipped with connection Mouthful, the connector runs through the pallet, and for connecting with wirerope, the connector is used to connect with upright bar the connection ring It connects.
In some preferred embodiments, the pallet includes support frame and support plate, and the support plate is arranged in institute It states on support frame.
In further preferred embodiment, support frame as described above includes main joist and secondary joist, the main joist and institute State secondary joist connection.
In some preferred embodiments, the pallet is equipped with otic placode, and the connector is located on the otic placode, institute Connection ring is stated to be arranged on the otic placode.
In further preferred embodiment, the otic placode and the pallet are welded, the connection ring and the otic placode Welding, the connection ring are U-shaped ring.
On the other hand, the utility model provides a kind of hanging comprehensive hanger platform of curtain wall half:
The curtain is fixed on by the connector including guardrail, the upright bar and above-mentioned curtain wall pallet, the upright bar On wall pallet, the guardrail is connect with the upright bar.
In some preferred embodiments, the upright bar is detachably connected with the curtain wall pallet.
In further preferred embodiment, the upright bar is connect by scaffold clasp with the curtain wall pallet.
It further include the wirerope in further preferred embodiment;The upright bar also pass through rebar connector with The curtain wall pallet connection;The upright bar is scaffolding steel pipe.
In some preferred embodiments, the quantity of the curtain wall pallet is multiple, is passed through between the curtain wall pallet Junction steel plate connection.
Compared with prior art, the beneficial effects of the utility model have:
Curtain wall pallet can be fixed on furred ceiling in such a way that upright bar and wirerope overhang using half, to make operator Curtain wall operation is carried out on curtain wall pallet.Material can be saved, to reduce cost.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the support frame of the utility model;
Fig. 2 is the structural schematic diagram of the curtain wall pallet of the utility model;
Fig. 3 is the structural schematic diagram of the hanging comprehensive hanger platform of curtain wall half of the utility model;
Fig. 4 is a mounting structure schematic diagram of the hanging comprehensive hanger platform of curtain wall half of the utility model;
Fig. 5 is a kind of structural schematic diagram of variant of the hanging comprehensive hanger platform of curtain wall half of the utility model;
Fig. 6 is a use state diagram of the hanging comprehensive hanger platform of curtain wall half of the utility model;
Fig. 7 is second use state diagram of the hanging comprehensive hanger platform of curtain wall half of the utility model;
Fig. 8 is the third use state diagram of the hanging comprehensive hanger platform of curtain wall half of the utility model;
Fig. 9 is the 4th use state diagram of the hanging comprehensive hanger platform of curtain wall half of the utility model;
Figure 10 is the 5th use state diagram of the hanging comprehensive hanger platform of curtain wall half of the utility model;
Figure 11 is the 6th use state signal of the hanging comprehensive hanger platform of curtain wall half of the utility model.
Specific embodiment
It elaborates below to the embodiments of the present invention.It is emphasized that following the description is only example Property, rather than in order to limit the scope of the utility model and its application.
With reference to Fig. 2, curtain wall pallet 100 includes pallet 1 and connection ring 2.
With reference to Fig. 2, pallet 1 is stood for operation, and the factor for influencing 1 size of pallet includes stress carrying, hang ceiling panel ruler Very little, furred ceiling floor girder steel size and location, in summary influence factor determines the size of pallet 1, typically, the length of pallet 1 For 3000mm, width 2760mm.The concrete form of pallet 1 can have very much, if can load-bearing in the sky, a kind of form Are as follows: Fig. 2 is referred to, pallet 1 includes support frame 11 and support plate 12, and support plate 12 is operation standing surface, can be using steel plate such as With a thickness of the checkered steel plate of 3mm;Support plate 12 is arranged on support frame 11, for example is connected by screw to or welds;With reference to figure 1, support frame 11 includes main joist 111 and secondary joist 112, and main joist 111 is connect with secondary joist 112, for example is welded;It is exemplary, It is used as main joist 111 using the galvanized steel side of 80*80*5mm is logical, using the angle steel of L50*5mm as keel 112.
With reference to Fig. 2, pallet 1 is equipped with connector 10, and connector 10 runs through pallet 1, that is to say, that connector 10 is that setting exists Through-hole on pallet 1.Connector 10 with upright bar 3 for connecting, so that pallet 1 is fixed in the sky.
With reference to Fig. 2 and Fig. 4, connection ring 2 is arranged on pallet 1.Connection ring 2 with wirerope 4 for connecting, so that wirerope 4 with upright bar 3 in high aerial fixed tray 1 together.For convenience of connecting with wirerope 4, connection ring 2 is U-shaped ring, such as can load-bearing 3 The U-shaped ring of ton, certainly, connection ring 2 can also be other shapes, such as o-ring.
With reference to Fig. 2 and Fig. 4, to enhance bonding strength, pallet 1 is equipped with otic placode 5, and steel plate, such as thickness can be used in otic placode 5 For the steel plate of 10mm, otic placode 5 is welded on pallet 1.In this way, connector 10 is also located on otic placode 5, connection ring 2 is also disposed at Exemplary on otic placode 5, connection ring 2 is welded on otic placode 5.After its manufacturing process is such that 1 welding finished product of pallet, pallet 1 Quadrangle at the top of throat thickness be 10mm otic placode 5, then connection ring 2 is welded on otic placode 5.
With reference to Fig. 4 and Fig. 6, curtain wall pallet 100 can be fixed in such a way that upright bar 3 and wirerope 4 overhang using half and hang On top, so that operator be made to carry out curtain wall operation on curtain wall pallet 100.Material can be saved, to reduce cost.
The utility model also provides a kind of curtain wall half hanging comprehensive hanger platform 400 (hereinafter referred to as " hanger platform 400 "): With reference to Fig. 3, including guardrail 6, upright bar 3 and above-mentioned curtain wall pallet 100, upright bar 3 is fixed on curtain wall pallet 100 by connector 10 On namely upright bar 3 and curtain wall pallet 100 by bayonet connection, guardrail 6 is connect with upright bar 3.In this way, guardrail 6 and upright bar 3 are formed Hoop 200.Scaffold tube can be used in guardrail 6 and upright bar 3, for example diameter is the steel pipe of 48mm, and hoop 200 is exactly scaffold basket Frame.The height on surface of the guardrail 6 apart from curtain wall pallet 100 can be 1100mm, and the height of upright bar 3 is then 3000mm.
Curtain wall pallet 100 and hoop 200 can be used as the standard component of the hanging comprehensive hanger platform of curtain wall half, easy to process, have Conducive to reducing cost.
One end of upright bar 3 is fixed on curtain wall pallet 100, and the other end is then fixedly connected with furred ceiling, to make hanger Platform 400 is fixed, and convenient working personnel carry out curtain wall.
Certainly, with reference to Fig. 4, wirerope 4, such as the wirerope of 4 diameter 14mm of setting can also be set, wirerope 4 Both ends are installed on capel 41, wirerope 4 and 41 bayonet connection of capel, and the layout of bayonet meets canonical layout's requirement. With reference to Fig. 4 and Fig. 6, one end of wirerope 4 is connect by capel 41 with the connection ring 2 being arranged on curtain wall pallet 100, steel wire The other end of rope 4 then passes through capel 41 and is fixed on furred ceiling.In this way, using hanger platform 400 being consolidated by the way of hard and soft It is fixed, improve safety.
For convenience of the installation and adjustment in operation process, upright bar 3 is detachably connected with curtain wall pallet 100.It is exemplary, it stands Bar 3 is connect by scaffold clasp 8 with curtain wall pallet 100;With reference to Fig. 4, upright bar 3 is placed in connector 10 and through curtain wall support The lower end of disk 100, upright bar 3 is connect by scaffold clasp 8 with curtain wall pallet 100, and the scaffold clasp 8 in upright bar 3 is arranged in It is clamped from the two sides of curtain wall pallet 100 by curtain wall pallet 100, so that upright bar 3 can hold curtain wall pallet 100.
To increase fixing, upright bar 3 is also connect by rebar connector 9 with curtain wall pallet 100.Specifically, with reference to Fig. 4, Rebar connector 9 is formed by the reinforcement fabrication that diameter is 14mm, and the lower end of upright bar 3 is arranged in rebar connector 9, blocks scaffold Fastener 8 prevents scaffold clasp 8 from deviating under the pressure of curtain wall pallet 100 from the lower end of upright bar 3.
In actual use, if construction area is larger, it is necessary to the hanging comprehensive hanger platform of biggish curtain wall half is built, It this can be implemented so that the quantity of curtain wall pallet 100 is multiple with reference to Fig. 5, correspondingly, hoop 200 is also multiple, curtain wall pallet It is connected between 100 by junction steel plate 300.For example, passing through the company of junction steel plate 300 with a thickness of 10mm between curtain wall pallet 100 It connects, junction steel plate 300 is connect by the bolt of M12 with support frame 11 and such as bolt is mounted on main joist 111.
Curtain wall pallet 100 is fixed on furred ceiling by upright bar 3 and wirerope 4.Wirerope 4 has more, with reference to Fig. 6, steel 4 a part of cord uses oblique pull, and another part uses vertical pulling, to connect curtain wall pallet 100 and furred ceiling.In addition, can also be by curtain Wall pallet 100 is connect to reduce the oblique pull horizontal force of upright bar 3 and wirerope 4 with curtain skeleton, and it is hanging comprehensive to put up curtain wall half Hanger platform, forms half suspension platform of vestibule formula, operating personnel can the operation on platform, for example several rows of aluminium sheet is pacified On furred ceiling.
A part of upright bar after the completion of the operation of the furred ceiling of a part, with reference to Fig. 6 and Fig. 7, on loose unloading hanger platform 400 3, so that the position of upright bar 3 extends to the bottom end setting height such as 1.1 away from hanger platform 400 along the lower end of hanger platform 400 The position of rice, retightens upright bar 3 by connector 10.In this way, operation can be carried out to another part of furred ceiling, for example carry out the The installation of two row's aluminium sheets.After second row aluminium sheet is installed, with reference to Fig. 7, chain block 21, chain block 21 are installed on furred ceiling It is fixed on the fixation steel plate 22 of oblique pull wirerope 4, the wirerope 4 of oblique pull connects chain block 21, and generates tightening force, will stand Bar 3 is disassembled from furred ceiling, extends downwardly upright bar 3, and after upright bar 3 is checked and accepted downwards, the wirerope 4 of vertical pulling keeps original state to draw Firmly hanger platform 400.After upright bar 3 extends downwardly, with reference to Fig. 8 and Fig. 9, chain block 21 is slowly loosened, hanger platform 400 is made One end rotation, for example rotate clockwise, horizontal hanger platform 400 is transferred to plumbness.With reference to Figure 10, by hoist engine 23 It is fixed on ceiling structure floor, for example is fixed on main body steel structure and structure floor, hoist engine 23 is passed through into wirerope 4 in advance Hanger platform 400 is connected, wirerope 4 is made to be in micro- stress.The wirerope 4 of vertical pulling is removed from furred ceiling, loosening pulls Cucurbit 21 makes the weight bearing of hanger platform 400 in hoist engine 23.By remote control hoist engine 23, with reference to Figure 11, by hanger Platform 400 is slowly placed on the ground, and certainly, when hanger platform 400 declines, ground is far from the personnel Ke Tong in job area Cross the descending trajectory for tying up the control hanger platform 400 of the traction rope on hanger platform 400 in advance.And so on, disassembly to high building position It sets, closes up finally by builder's jack in floor.
It can be seen that hanger platform 400 can operation on one side dismantle while, so that the hanger platform 400 of disassembly be installed Elsewhere, construction cost can be reduced and accelerate construction period.
Curtain wall half is hanging to integrate the of simple structure and low cost of hanger platform, and the design of platform meets hanging furred ceiling curtain wall Design lattice requirement.This hanger platform has customizability, and it is suitable to be selected according to specific engine request and construction environment Welded steel, the most reasonable configuration of composition, there is good economy.
For the vertical direction of hanger platform 400 using being rigidly connected between scaffolding steel pipe and floor, horizontal direction passes through company It connects steel plate 300 and multiple hanger platforms 400 is rigidly connected by bolt, can solve the problems, such as that high altitude wind influences to shake, thus Overcome the difficulty of horizontal wind-force.
The above content is specific/preferred embodiment further detailed description of the utility model is combined, no It can assert that the specific implementation of the utility model is only limited to these instructions.For the common skill of the utility model technical field For art personnel, without departing from the concept of the premise utility, the embodiment that these have been described can also be made Some replacements or modifications, and these substitutions or variant all shall be regarded as belonging to the protection scope of the utility model.

Claims (10)

1. curtain wall pallet, it is characterised in that: including pallet and connection ring, the connection ring is arranged on the pallet, the support Disk is equipped with connector, and the connector runs through the pallet, and for connecting with wirerope, the connector is used for the connection ring It is connect with upright bar.
2. curtain wall pallet according to claim 1, it is characterised in that: the pallet includes support frame and support plate, described Support plate is arranged on support frame as described above.
3. curtain wall pallet according to claim 2, it is characterised in that: support frame as described above includes main joist and secondary joist, institute Main joist is stated to connect with the secondary joist.
4. curtain wall pallet according to claim 1, it is characterised in that: the pallet is equipped with otic placode, the connector position In on the otic placode, the connection ring is arranged on the otic placode.
5. curtain wall pallet according to claim 4, it is characterised in that: the otic placode and the pallet weld, the connection Ring and the otic placode weld, and the connection ring is U-shaped ring.
6. the hanging comprehensive hanger platform of curtain wall half, it is characterised in that: including guardrail, the upright bar and according to claim 1 to 5 Curtain wall pallet described in one, the upright bar are fixed on the curtain wall pallet by the connector, the guardrail with it is described Upright bar connection.
7. the hanging comprehensive hanger platform of curtain wall according to claim 6 half, it is characterised in that: the upright bar and the curtain wall Pallet is detachably connected.
8. the hanging comprehensive hanger platform of curtain wall according to claim 7 half, it is characterised in that: the upright bar passes through scaffold Fastener is connect with the curtain wall pallet.
9. the hanging comprehensive hanger platform of curtain wall according to claim 8 half, it is characterised in that: further include the wirerope; The upright bar also passes through rebar connector and connect with the curtain wall pallet;The upright bar is scaffolding steel pipe.
10. according to the hanging comprehensive hanger platform of the described in any item curtain walls of claim 6 to 9 half, it is characterised in that: the curtain wall The quantity of pallet be it is multiple, between the curtain wall pallet by junction steel plate connection.
CN201821039958.1U 2018-06-29 2018-06-29 The hanging comprehensive hanger platform of curtain wall half and pallet Active CN208518311U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821039958.1U CN208518311U (en) 2018-06-29 2018-06-29 The hanging comprehensive hanger platform of curtain wall half and pallet

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821039958.1U CN208518311U (en) 2018-06-29 2018-06-29 The hanging comprehensive hanger platform of curtain wall half and pallet

Publications (1)

Publication Number Publication Date
CN208518311U true CN208518311U (en) 2019-02-19

Family

ID=65337003

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821039958.1U Active CN208518311U (en) 2018-06-29 2018-06-29 The hanging comprehensive hanger platform of curtain wall half and pallet

Country Status (1)

Country Link
CN (1) CN208518311U (en)

Similar Documents

Publication Publication Date Title
CN101397844B (en) Construction method of special section steel concrete composite structure inclined wall mould base engineering
CN110748139B (en) Hanging basket support system
CN209011528U (en) A kind of all steel attachment type raise scaffold
CN101503908B (en) Construction method for spacing suspension cable structural template support platform
CN111255217A (en) Elevator shaft shaping operation platform and operation method thereof
CN108532968A (en) A kind of assembled support device of steel bar truss floor support plate composite floor system
CN202214974U (en) 5.8 m ultrahigh external climbing frame
CN206581577U (en) Using housing construction builder's jack
CN217175627U (en) Large flower-stand beam-riding type hanging basket structure for outer vertical face of commercial skirt house building
CN205502551U (en) Platform is suspended in midair in high altitude large -span vestibule construction
CN211341686U (en) Hanging basket support system
CN102061810B (en) Construction method of safe flat net positioned on periphery of building
CN208518311U (en) The hanging comprehensive hanger platform of curtain wall half and pallet
CN211923466U (en) Elevator shaft regularization operation platform
CN107587711A (en) A kind of regularization assembled overhanging protection canopy and its assembly method
CN208534069U (en) The assembled support device of steel bar truss floor support plate composite floor system
CN110552495A (en) assembled building combined tool type outer protective frame system and construction method thereof
CN110259084A (en) A kind of construction site scaffold
CN2701971Y (en) Dual-purpose tripod for building construction and decoration
CN209618738U (en) The light and small vertical auxiliary stand of heavy-duty hoisting equipment
CN211736308U (en) Self-sliding hanging frame device for mounting steel structure factory building roof inner plate
CN113550550A (en) Overhanging unit type scaffold convenient to assemble and disassemble
CN204754150U (en) Dish -type node formula scaffold
CN211736289U (en) Operation platform
CN220319082U (en) Hanging basket installed on inclined web member of inverted triangle pipe truss

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant