CN206289999U - A kind of new attaching scaffold - Google Patents

A kind of new attaching scaffold Download PDF

Info

Publication number
CN206289999U
CN206289999U CN201621435022.1U CN201621435022U CN206289999U CN 206289999 U CN206289999 U CN 206289999U CN 201621435022 U CN201621435022 U CN 201621435022U CN 206289999 U CN206289999 U CN 206289999U
Authority
CN
China
Prior art keywords
fixed
steel
vertical main
main framework
connection fastener
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621435022.1U
Other languages
Chinese (zh)
Inventor
赵守申
蒋万福
岳寅
张德鹏
王润玲
王玉平
马小兰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201621435022.1U priority Critical patent/CN206289999U/en
Application granted granted Critical
Publication of CN206289999U publication Critical patent/CN206289999U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of new attaching scaffold, including vertical main framework, at least the horizontal load-bearing truss of two-layer, attachment guider, vertical main framework includes guide rail, attachment guider includes that level adheres to girder steel and pulley, level is adhered to steel girder erection pulley and is connected with guide rail, anti-fall steel mesh is fixed with the outside of vertical main framework, is fixed on the framework steel pipe column of vertical main framework by the first connection fastener, the first connection fastener includes buckling parts and connecting portion.Be fixed on anti-fall steel mesh on horizontal load-bearing truss by the first connection fastener by the utility model, it is more firm by the way of bolt fixation, effectively reduce the generation of anti-fall steel mesh dropping situations, the base plate set in bottom is used for preventing widget from being slid from scaffold, the utility model has simple structure, safe advantage.

Description

A kind of new attaching scaffold
Technical field
The utility model is related to build instrument field, and in particular to a kind of new attaching scaffold.
Background technology
Attachment type raise scaffold equipment is the new type scaffold technology that beginning of this century fast development is got up, and China is constructed Technological progress has material impact.High-rise working is changed into lower operation by it, and hanging operation is changed into support body inside processing, is had Significant low-carbon (LC), high-tech content and it is more economical, safer, more convenient the features such as.
The basic skill of attaching scaffold is disclosed in the patent document of the Patent No. 201310195181.3 for having authorized Art feature, including vertical main framework, horizontal load-bearing truss, attachment guider, safety anti-falling device, vertical main framework is by several sections Main frame is formed by connecting, and horizontal load-bearing truss is made up of cross bar, brace, vertical rod, attachment guider by attachment special bolt and Level attachment girder steel, guide wheel group composition, horizontal load-bearing truss are fixed on level attachment girder steel by attachment special bolt, and safety is anti- Fall device is made up of guide rail and the catching device on level attachment girder steel, and guide rail is fixed on vertical main framework, and level is attached Steel girder erection guide wheel and be connected with the guide rail on support body.
Anti-fall steel mesh is generally secured on the outside of existing vertical main framework, the fixed form of anti-fall steel mesh is multifarious, But undesirable the easily causing of fixed effect comes off, falling risk is caused, and because construction worker is on horizontal load-bearing truss Building operation is carried out, easily some widgets are accidentally dropped landing in operation, worker causes danger to ground.
Common rotary buckle includes two buckling parts of rotatable connection.
Utility model content
The utility model purpose is to provide for a kind of anti-fall steel mesh good fixing effect, prevents widget from falling from scaffold The new attaching scaffold for falling.
To achieve these goals, this uses new use following technical scheme:A kind of new attaching scaffold, including The horizontal load-bearing truss of vertical main framework, at least two-layer, attachment guider, the vertical main framework include guide rail, the attachment Guider includes that level adheres to girder steel and pulley, and level attachment steel girder erection pulley is simultaneously connected with the guide rail, described perpendicular To anti-fall steel mesh is fixed with the outside of main frame, the anti-fall steel mesh includes keel and is laid with the rectangular steel plates in hole, the square Shape edges of plate is extended with for fixed boss, and the keel include end to end rectangular square tube, the square tube Tie point be welded and fixed by set square, be connected with supporting square tube between two tie points positioned on diagonal, it is described Keel are weldingly fixed on the anti-fall steel mesh, and the boss is fixed on the frame of the vertical main framework by the first connection fastener On frame steel pipe column, first connection fastener includes buckling parts and connecting portion, and the buckling parts is for the common of joint steel pipe One of buckling parts of rotary buckle, the connecting portion rectangular steel pipe, the side wall of the rectangular steel pipe is weldingly fixed on institute Buckling parts is stated, the through hole passed through for bolt is offered on two other relative side wall of the rectangular tube, the boss passes through First connection fastener described in bolt connection.
Preferably, steel basketry piece is fixed with the horizontal load-bearing truss, the steel basketry piece is fixed by the second connection fastener On the horizontal load-bearing truss, second connection fastener is one of button of the common rotary buckle for joint steel pipe Conjunction portion.
Preferably, it is laid with regular hexagon hole in the rectangular steel plates.
Preferably, the bottom of the vertical main framework is fixed with base plate, and the base plate is laid with for anti-skidding lug boss, Support frame is welded with the downside of the base plate, support frame as described above is formed by connecting by square tubes soldering.
Preferably, the steel basketry piece is the steel mesh with diamond hole.
Be fixed on the anti-fall steel mesh on the vertical main framework by first connection fastener by the utility model, is adopted The mode fixed with bolt is more firm, effectively reduces the generation of anti-fall steel mesh dropping situations, at the bottom that bottom is set Plate is used for preventing widget from being slid from scaffold, and the utility model has simple structure, safe advantage.
Brief description of the drawings
Fig. 1 is the dimensional structure diagram of the utility model embodiment.
Fig. 2 is A portions partial enlarged drawing in Fig. 1.
Fig. 3 is the structural representation of the first connection fastener in the utility model embodiment.
Fig. 4 is the structural representation of base plate in the utility model embodiment.
Fig. 5 is the structural representation of anti-fall steel mesh in the utility model embodiment.
Specific embodiment
Technical solutions of the utility model are further elaborated with reference to specific embodiment.
Such as the embodiment of a kind of new attaching scaffold in Fig. 1 ~ 3, including vertical main framework 1, at least two-layer level Load-bearing truss 2, attachment guider 3, vertical main framework 1 include guide rail 4, attachment guider 3 include level attachment girder steel and Pulley, level attachment steel girder erection pulley is simultaneously connected with guide rail 4, and level attachment girder steel is fixed on building body 5, horizontal load Steel basketry piece 6 is fixed with truss 2, steel basketry piece 6 is the steel mesh with diamond hole, and steel basketry piece 6 is fixed by the second connection fastener 16 On horizontal load-bearing truss 2, the outside of vertical main framework 1 is fixed with anti-fall steel mesh 11, and anti-fall steel mesh 11 includes keel 12 and cloth The rectangular steel plates 13 in regular hexagon hole are provided with, the edge of rectangular steel plates 13 is extended with for fixed boss 14, and keel 12 are wrapped End to end rectangular square tube is included, the tie point of square tube is welded and fixed by set square, two tie points on diagonal Between be connected with supporting square tube, the one side that rectangular steel plates are weldingly fixed on, boss 14 is fixed on perpendicular by the first connection fastener 7 On steel pipe to main frame 1, the first connection fastener 7 includes buckling parts 8 and connecting portion 9, and connecting portion 9 is rectangular steel pipe, rectangular steel pipe Side wall be weldingly fixed on buckling parts 8, offered on two other relative side wall of rectangular steel pipe for bolt pass through it is logical Hole 10, buckling parts 8 is fastened on the steel pipe of vertical main framework 1.The bottom of vertical main framework 1 is fixed with base plate 15, base plate 15 are laid with cross projection, for anti-skidding, support frame 17 are welded with the downside of base plate 15, and support frame 17 is by square tube It is made of welded connection.
Wherein, the second connection fastener 16 is identical with the structure of buckling parts 8.
Undocumented technology is prior art in the utility model.
The present embodiment is the optimum embodiment of technical solutions of the utility model, but is not to the utility model claim Further restriction, any deterioration or equivalent variations all should belong within the utility model scope of the claims.

Claims (5)

1. a kind of new attaching scaffold, including vertical main framework, at least horizontal load-bearing truss of two-layer, attachment guider, The vertical main framework includes guide rail, and the attachment guider includes that level adheres to girder steel and pulley, level attachment girder steel peace Dress pulley is simultaneously connected with the guide rail, it is characterised in that:Anti-fall steel mesh is fixed with the outside of the vertical main framework, it is described anti- Pendant steel mesh includes keel and is laid with the rectangular steel plates in hole, and the edge of the rectangular steel plates is extended with for fixed boss, The keel include end to end rectangular square tube, and the tie point of the square tube is welded and fixed by set square, positioned at diagonal Supporting square tube is connected with line between two tie points, the keel are weldingly fixed on the anti-fall steel mesh, described convex Platform is fixed on the framework steel pipe column of the vertical main framework by the first connection fastener, and first connection fastener includes fastening Portion and connecting portion, the buckling parts are one of buckling parts of the common rotary buckle for joint steel pipe, the connecting portion Rectangular steel pipe, the side wall of the rectangular steel pipe is weldingly fixed on the buckling parts, and two other of the rectangular tube is relative The through hole passed through for bolt is offered on the wall of side, the boss is bolted first connection fastener.
2. new attaching scaffold according to claim 1, it is characterised in that:It is fixed with the horizontal load-bearing truss Steel basketry piece, the steel basketry piece is fixed on the horizontal load-bearing truss by the second connection fastener, and second connection fastener is For one of buckling parts of the common rotary buckle of joint steel pipe.
3. new attaching scaffold according to claim 1, it is characterised in that:Positive six are laid with the rectangular steel plates Side shape hole.
4. new attaching scaffold according to claim 1, it is characterised in that:The bottom of the vertical main framework is fixed There is base plate, the base plate is laid with for anti-skidding lug boss, and support frame is welded with the downside of the base plate, described Support frame is formed by connecting by square tubes soldering.
5. new attaching scaffold according to claim 2, it is characterised in that:The steel basketry piece is with diamond hole Steel mesh.
CN201621435022.1U 2016-12-26 2016-12-26 A kind of new attaching scaffold Expired - Fee Related CN206289999U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621435022.1U CN206289999U (en) 2016-12-26 2016-12-26 A kind of new attaching scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621435022.1U CN206289999U (en) 2016-12-26 2016-12-26 A kind of new attaching scaffold

Publications (1)

Publication Number Publication Date
CN206289999U true CN206289999U (en) 2017-06-30

Family

ID=59154694

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621435022.1U Expired - Fee Related CN206289999U (en) 2016-12-26 2016-12-26 A kind of new attaching scaffold

Country Status (1)

Country Link
CN (1) CN206289999U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020056289A (en) * 2018-09-27 2020-04-09 Mogコンサルタント株式会社 High place work method and rope net product for high place work used for the same
CN111648613A (en) * 2020-06-01 2020-09-11 中国建筑第二工程局有限公司 Protection device for be used for outer facade of building structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020056289A (en) * 2018-09-27 2020-04-09 Mogコンサルタント株式会社 High place work method and rope net product for high place work used for the same
CN111648613A (en) * 2020-06-01 2020-09-11 中国建筑第二工程局有限公司 Protection device for be used for outer facade of building structure

Similar Documents

Publication Publication Date Title
CN206016226U (en) Tool type scaffold interlayer guard system
CN107090968A (en) Integrated form attached lifting scaffold and its elevating method
CN206289999U (en) A kind of new attaching scaffold
CN205775852U (en) A kind of active force conversion support for steel structure support moulding bed top
CN106368425A (en) Movable operating platform for cantilever structure and construction method
CN211499713U (en) All-steel attached lifting scaffold
CN205822747U (en) Architectural engineering scaffold
CN203639011U (en) Safety climbing channel for sized tower crane for building engineering
CN211173007U (en) Novel tripod of encorbelmenting
CN205171979U (en) Integrated form all steel lift platform
CN102182324A (en) Anti-falling safety net
CN204238537U (en) A kind of elevated hoistway operation platform
CN203475801U (en) Telescopic steel platform for elevator shaft
CN104278830A (en) Integrated combined scaffold
CN209011528U (en) A kind of all steel attachment type raise scaffold
CN213572927U (en) Movable steel platform with adjustable size and capable of being circulated
CN212926984U (en) Movable suspension operating platform
CN207847037U (en) A kind of high building hydraulic climbing protecting screen
CN203175018U (en) Independent-basket compartment hanger construction platform
CN2276046Y (en) Divided multistage automatic climbing external scaffold
CN207749810U (en) A kind of Novel moveable scaffold
CN206888493U (en) A kind of steel grid structure temporary construction platform device
CN207131062U (en) A kind of job platform
CN206693590U (en) A kind of Quick-mounting aluminium alloy scaffold
CN103758334A (en) Scaffold structure for constructing exterior wall of building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170630

Termination date: 20191226

CF01 Termination of patent right due to non-payment of annual fee