CN203639011U - Safety climbing channel for sized tower crane for building engineering - Google Patents
Safety climbing channel for sized tower crane for building engineering Download PDFInfo
- Publication number
- CN203639011U CN203639011U CN201320863870.2U CN201320863870U CN203639011U CN 203639011 U CN203639011 U CN 203639011U CN 201320863870 U CN201320863870 U CN 201320863870U CN 203639011 U CN203639011 U CN 203639011U
- Authority
- CN
- China
- Prior art keywords
- main frame
- welded
- steel
- tower crane
- channel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Jib Cranes (AREA)
Abstract
The utility model discloses a safety climbing channel for a sized tower crane for building engineering. The safety climbing channel is characterized in that the bottom parts of a telescopic frame and a main frame are respectively and fixedly provided with a channel plate made of pattern steel pipes; the left sides, the right sides and the upper parts of the telescopic frame and the main frame are respectively provided with protective handrails formed by welding square pipes; the left side and the right side of the main frame are respectively and fixedly provided with two lifting and transporting rings formed by welding round steels; the rear end of the telescopic frame is fixedly provided with two diagonal lifting rings formed by welding round steels; the lifting and transporting rings and the diagonal lifting rings are respectively connected with steel wire ropes; the channel plate is provided with a safety protective door, and the four edges of the protective door are welded by angle steels while the middle part of the protective door is welded by steel wire meshes; two opposite angle steels are respectively welded on the left side and the right side under the front end of the main frame; the bottom ends of every two opposite angle steels are connected by bolts. The safety climbing channel disclosed by the utility model has the advantages that the installation is convenient, the length can be adjusted, the safe and practical climbing channel is safe and convenient for passage and can be repeatedly used, and the loss of the materials is reduced.
Description
Technical field
The utility model relates to construction site safety protection technique field, relates in particular to people's escape way on a kind of building engineering regularization tower crane.
Background technology
Along with modern architecture industry development, construction floor height constantly increases, special upper people's passage generally all will be set up in the gap of adhering to tower crane between building, traditional upper people's passage uses steel tube fastener to set up, people's passage on Wu Zhi six roads need to be set up in general 33 floor height buildings, and not only danger but also be difficult to operation of the operation of setting up passage, that existence is set up is lack of standardization, operating personal is difficult to the situation of checking and accepting, particularly set up the larger position of distance between tower crane and building, brought certain risk to setting up workman.
Utility model content
The utility model object is exactly the defect in order to make up prior art, and people's escape way on a kind of building engineering regularization tower crane is provided.
The utility model is achieved through the following technical solutions:
People's escape way on a kind of building engineering regularization tower crane, include the main frame of being made by channel-section steel and the flexible framework being made into by square tube, the front end of described flexible framework is connected with main frame rear end, bottom at flexible framework and main frame is fixed with respectively the passage flat board by decorative pattern steel pipe manufacturing, the left and right sides of flexible framework and main frame and above be respectively equipped with the protection railing being formed by square tubes soldering, be fixed with respectively two handling suspension ring that are welded by round steel at the left and right sides of main frame, rear end at flexible framework is fixed with two oblique pull suspension ring that are welded by round steel, described handling suspension ring and oblique pull suspension ring are all connected with steel rope, on passage flat board, be provided with four limits by the safety protective door being welded by wire net in the middle of angle steel, below the front end of main frame, left and right sides is welded with respectively two corresponding angle steel, the bottom of every two corresponding angle steel is bolted.
The utility model has the advantages that: the utility model is easy for installation, can adjust length, safe and practical upper people's passage, after tower crane jacking promotes with tower crane self passage of slinging, set up safe and practical upper lower channel at tower crane top standard knot with between building body, make tower crane driver passing through of safe ready more, reusable, reduce spillage of material.
Accompanying drawing explanation
Fig. 1 is the utility model structural representation.
Fig. 2 is angle steel and tower crane connection diagram.
Fig. 3 is oblique pull suspension ring and tower crane connection diagram.
Fig. 4 is passage plate level figure figure.
Fig. 5 main frame both sides handling suspension ring and steel rope connection diagram.
The specific embodiment
As Fig. 1, 2, 3, 4, shown in 5, people's escape way on a kind of building engineering regularization tower crane, include the main frame 1 of being made by channel-section steel and the flexible framework 2 being made into by square tube, the front end of described flexible framework 2 is connected with main frame 1 rear end, bottom at flexible framework 2 and main frame 1 is fixed with respectively the passage flat board 3 by decorative pattern steel pipe manufacturing, the left and right sides of flexible framework 2 and main frame 1 and above be respectively equipped with the protection railing 4 being formed by square tubes soldering, be fixed with respectively two handling suspension ring 5 that are welded by round steel at the left and right sides of main frame 1, rear end at flexible framework 2 is fixed with two oblique pull suspension ring 6 that are welded by round steel, described handling suspension ring 5 and oblique pull suspension ring 6 are all connected with steel rope 7, on passage flat board 3, be provided with four limits by the safety protective door 9 being welded by wire net in the middle of angle steel, below the front end of main frame 1, left and right sides is welded with respectively two corresponding angle steel 10, the bottom of every two corresponding angle steel 10 connects by bolt 11.
Claims (1)
1. people's escape way on a building engineering regularization tower crane, it is characterized in that: include the main frame of being made by channel-section steel and the flexible framework being made into by square tube, the front end of described flexible framework is connected with main frame rear end, bottom at flexible framework and main frame is fixed with respectively the passage flat board by decorative pattern steel pipe manufacturing, the left and right sides of flexible framework and main frame and above be respectively equipped with the protection railing being formed by square tubes soldering, be fixed with respectively two handling suspension ring that are welded by round steel at the left and right sides of main frame, rear end at flexible framework is fixed with two oblique pull suspension ring that are welded by round steel, described handling suspension ring and oblique pull suspension ring are all connected with steel rope, on passage flat board, be provided with four limits by the safety protective door being welded by wire net in the middle of angle steel, below the front end of main frame, left and right sides is welded with respectively two corresponding angle steel, the bottom of every two corresponding angle steel is bolted.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320863870.2U CN203639011U (en) | 2013-12-25 | 2013-12-25 | Safety climbing channel for sized tower crane for building engineering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320863870.2U CN203639011U (en) | 2013-12-25 | 2013-12-25 | Safety climbing channel for sized tower crane for building engineering |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203639011U true CN203639011U (en) | 2014-06-11 |
Family
ID=50870274
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320863870.2U Expired - Fee Related CN203639011U (en) | 2013-12-25 | 2013-12-25 | Safety climbing channel for sized tower crane for building engineering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203639011U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106081949A (en) * | 2016-08-18 | 2016-11-09 | 无锡石油化工起重机有限公司 | The tower crane crane of escape way is installed |
CN107010548A (en) * | 2017-06-17 | 2017-08-04 | 中建二局第二建筑工程有限公司华东分公司 | People's passage and its construction method on a kind of regularization tower crane |
CN108750970A (en) * | 2018-06-07 | 2018-11-06 | 重庆工业职业技术学院 | A kind of tower crane occasional passage and its installation method |
CN110668324A (en) * | 2019-09-27 | 2020-01-10 | 中国一冶集团有限公司 | Tower crane movable passageway system |
CN114105008A (en) * | 2021-12-20 | 2022-03-01 | 中国建筑第二工程局有限公司 | Can have enough to meet need formula tower crane passageway of going up people that climbs along with climbing frame |
-
2013
- 2013-12-25 CN CN201320863870.2U patent/CN203639011U/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106081949A (en) * | 2016-08-18 | 2016-11-09 | 无锡石油化工起重机有限公司 | The tower crane crane of escape way is installed |
CN107010548A (en) * | 2017-06-17 | 2017-08-04 | 中建二局第二建筑工程有限公司华东分公司 | People's passage and its construction method on a kind of regularization tower crane |
CN108750970A (en) * | 2018-06-07 | 2018-11-06 | 重庆工业职业技术学院 | A kind of tower crane occasional passage and its installation method |
CN110668324A (en) * | 2019-09-27 | 2020-01-10 | 中国一冶集团有限公司 | Tower crane movable passageway system |
CN114105008A (en) * | 2021-12-20 | 2022-03-01 | 中国建筑第二工程局有限公司 | Can have enough to meet need formula tower crane passageway of going up people that climbs along with climbing frame |
CN114105008B (en) * | 2021-12-20 | 2023-07-28 | 中国建筑第二工程局有限公司 | Turnover type tower crane manned channel climbing along with climbing frame |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203639011U (en) | Safety climbing channel for sized tower crane for building engineering | |
CN206521197U (en) | A kind of adjustable balance hoisting beam | |
CN202706503U (en) | Electric lifting discharging platform for main building construction | |
CN204199721U (en) | A kind of erecting device for factory building construction high and medium structure | |
CN205224567U (en) | Collapsible foldable elevartor shaft construction platform | |
CN201635379U (en) | Safety platform for installation and construction of roof contour plate hang ceiling | |
CN203905425U (en) | Elevator shaft construction-tool operating platform and safety protection integrated structure | |
CN103397782B (en) | Frame type steel work is installed construction method and the construction equipment of tie-beam | |
CN201420385Y (en) | Overhanging type unloading platform for building construction | |
CN204752026U (en) | Tower crane escape way | |
CN205206284U (en) | But detachably assembled formula elevartor shaft operation platform | |
CN103332624B (en) | A kind of pulley for high-altitude circuit or caliber and installation method thereof | |
CN202787991U (en) | Overhanging passageway for tower crane | |
CN102182324A (en) | Anti-falling safety net | |
CN204059904U (en) | A kind of hoistway operation platform being applied to multi-platform operation | |
CN203383516U (en) | Construction device for installing connecting beam on frame type steel structure | |
CN203096620U (en) | Steel pipe arch rib operation platform | |
CN206346500U (en) | Compact simplified arm extending type straddle truck | |
CN203514813U (en) | Novel overhanging discharging platform | |
CN203486809U (en) | Falling protector of tower crane vertical ladder | |
CN204038917U (en) | Dismountable external hanging service platform | |
CN106185597A (en) | A kind of large-scale Analytic Tower merogenesis special hanger for hoisting and hanging method | |
CN201883923U (en) | Multi-purpose ladder for aloft work | |
CN207158618U (en) | Pipeline welding lift hanger | |
CN205953375U (en) | Can dismantle and tower crane attachment jacking platform of independent assortment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140611 Termination date: 20151225 |
|
EXPY | Termination of patent right or utility model |