CN201635379U - Safety platform for installation and construction of roof contour plate hang ceiling - Google Patents

Safety platform for installation and construction of roof contour plate hang ceiling Download PDF

Info

Publication number
CN201635379U
CN201635379U CN2009202131859U CN200920213185U CN201635379U CN 201635379 U CN201635379 U CN 201635379U CN 2009202131859 U CN2009202131859 U CN 2009202131859U CN 200920213185 U CN200920213185 U CN 200920213185U CN 201635379 U CN201635379 U CN 201635379U
Authority
CN
China
Prior art keywords
installation
platform
construction
contour plate
hang ceiling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009202131859U
Other languages
Chinese (zh)
Inventor
王鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Original Assignee
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN2009202131859U priority Critical patent/CN201635379U/en
Application granted granted Critical
Publication of CN201635379U publication Critical patent/CN201635379U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model relates to installation and construction of roof hang ceiling, in particular to a safety device for installation and construction of roof hang ceiling. The safety platform for installation and construction of roof contour plate hang ceiling comprises a quadrilateral platform with the surrounding being provided with guardrails; all the guardrails are connected through safety ropes; the four corners of the quadrilateral platform are respectively provided with a steel tube downwards; and the bottom of each steel tube is connected with a nylon wheel which is connected with the building structure top tie bar in a rolling way. The safety platform has simple processing and convenient installation. The device leads to stable sliding, does not damage the structure coating, saves scaffold expense and reduces construction cost.

Description

Roofing contour plate ceiling board installation security platform
Technical field
The utility model relates to roof ceiling board installation, relates in particular to the safety device that the ceiling board installation of a kind of roof is used.
Background technology
In the steel building construction, the operating platform that roofing profiled sheet ceiling board is installed usefulness generally has two kinds of methods, and a kind of is that scaffold (have fixing or move) is set up on ground.Another kind method hangs suspension bracket exactly on roof structure.But above-mentioned two kinds of methods are subjected to place restriction and form of structure restriction can't use said method.
Summary of the invention
The utility model is intended to address the aforementioned drawbacks, and a kind of roofing contour plate ceiling board installation security platform is provided.The utility model processing is simple, easy for installation.Adopt this device to slide steadily, not the damaged structure coating; Save the scaffold expense, reduce construction cost.
The utility model is achieved in that
A kind of roofing contour plate ceiling board installation security platform, it comprises that one four limit is provided with the quadrangle platform of guardrail, each guardrail connects with safety rope, four jiaos of described quadrangle platform separately to having a steel pipe, and each steel pipe bottom is connected with one and rolls and connect the nylon wheel of building structure top tie-rod.
Described roofing contour plate ceiling board installation security platform also is provided with the traction ear on described each steel pipe.
Operating principle of the present utility model is to utilize the mounted structure of factory building as supporting skid rail, according to profiled sheet length setting operation platform quantity and appearance and size, adopts the traction of chain hoist or small winch.The utility model has solved the installation of ceiling board when facility floor has equipment or obstruction to set up scaffold effectively; Can save the scaffold expense that the roof panel lifting is used; The ceiling board handling frame slides on the structure depression bar and adopts the I of nylon wheel frictional resistance to avoid the structure coating damage.
The utility model is simple in structure, is convenient to make, install, and cost is low, and is reusable; Easy and simple to handle, safe in utilization.Under cooperation of the present utility model, the constructor can finish the installation of color steel ceiling board safely, fast, efficiently, has reduced the danger and the construction cost of construction, has guaranteed the construction period.
Description of drawings
Below, further specify the utility model in conjunction with the accompanying drawings:
Fig. 1 is a structural representation of the present utility model.
Fig. 2 is an elevation of the present utility model.
The specific embodiment
As depicted in figs. 1 and 2:
A kind of roofing contour plate ceiling board installation security platform, it comprises that one four limit is provided with the quadrangle platform 1 of guardrail 2, each guardrail 2 connects with safety rope 3, four jiaos of described quadrangle platform separately to having a steel pipe 4, each steel pipe 4 bottom is connected with the nylon wheel 6 of the connection building structure top tie-rod 5 that rolls, and also is provided with traction ear 7 on described each steel pipe 4.Adopt the traction of chain hoist or small winch promptly to can be the roof constructor safe operating platform is provided.

Claims (2)

1. roofing contour plate ceiling board installation security platform, it comprises that one four limit is provided with the quadrangle platform of guardrail, each guardrail connects with safety rope, it is characterized in that, four jiaos of described quadrangle platform separately to having a steel pipe, and each steel pipe bottom is connected with one and rolls and connect the nylon wheel of building structure top tie-rod.
2. roofing contour plate ceiling board installation security platform according to claim 1 is characterized in that, also is provided with the traction ear on described each steel pipe.
CN2009202131859U 2009-12-16 2009-12-16 Safety platform for installation and construction of roof contour plate hang ceiling Expired - Fee Related CN201635379U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009202131859U CN201635379U (en) 2009-12-16 2009-12-16 Safety platform for installation and construction of roof contour plate hang ceiling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009202131859U CN201635379U (en) 2009-12-16 2009-12-16 Safety platform for installation and construction of roof contour plate hang ceiling

Publications (1)

Publication Number Publication Date
CN201635379U true CN201635379U (en) 2010-11-17

Family

ID=43079867

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009202131859U Expired - Fee Related CN201635379U (en) 2009-12-16 2009-12-16 Safety platform for installation and construction of roof contour plate hang ceiling

Country Status (1)

Country Link
CN (1) CN201635379U (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102277956A (en) * 2011-04-28 2011-12-14 浙江鼎力机械有限公司 Extensible high-altitude standing platform
CN102493634A (en) * 2011-11-29 2012-06-13 上海市第四建筑有限公司 Suspended ceiling steel platform device for rebuilding wood structure
CN106193476A (en) * 2015-05-05 2016-12-07 五冶集团上海有限公司 A kind of concealed roofing tile mounting platform
CN106437179A (en) * 2016-11-16 2017-02-22 上海通用金属结构工程有限公司 Device for steel structure roof ceiling floor construction
CN106522565A (en) * 2016-11-16 2017-03-22 上海通用金属结构工程有限公司 Operation platform for steel structure roof ceiling board construction
CN107447931A (en) * 2016-05-31 2017-12-08 中国二十冶集团有限公司 The closed factory building roof skylight frame installation method of overlarge area
CN108316540A (en) * 2018-03-08 2018-07-24 四川泰兴装饰工程有限责任公司 Furred ceiling stone material dry suspending constructs and its construction method
CN108978926A (en) * 2017-05-31 2018-12-11 五冶集团上海有限公司 A kind of installation method of Double-layer profiled steel sheet composite thermal-insulating wall inside profiled sheet

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102277956A (en) * 2011-04-28 2011-12-14 浙江鼎力机械有限公司 Extensible high-altitude standing platform
CN102493634A (en) * 2011-11-29 2012-06-13 上海市第四建筑有限公司 Suspended ceiling steel platform device for rebuilding wood structure
CN102493634B (en) * 2011-11-29 2014-03-05 上海建工四建集团有限公司 Suspended ceiling steel platform device for rebuilding wood structure
CN106193476A (en) * 2015-05-05 2016-12-07 五冶集团上海有限公司 A kind of concealed roofing tile mounting platform
CN107447931A (en) * 2016-05-31 2017-12-08 中国二十冶集团有限公司 The closed factory building roof skylight frame installation method of overlarge area
CN107447931B (en) * 2016-05-31 2019-06-14 中国二十冶集团有限公司 The closed factory building roof skylight frame installation method of overlarge area
CN106437179A (en) * 2016-11-16 2017-02-22 上海通用金属结构工程有限公司 Device for steel structure roof ceiling floor construction
CN106522565A (en) * 2016-11-16 2017-03-22 上海通用金属结构工程有限公司 Operation platform for steel structure roof ceiling board construction
CN108978926A (en) * 2017-05-31 2018-12-11 五冶集团上海有限公司 A kind of installation method of Double-layer profiled steel sheet composite thermal-insulating wall inside profiled sheet
CN108316540A (en) * 2018-03-08 2018-07-24 四川泰兴装饰工程有限责任公司 Furred ceiling stone material dry suspending constructs and its construction method
CN108316540B (en) * 2018-03-08 2020-01-24 四川泰兴装饰工程有限责任公司 Suspended ceiling stone dry hanging structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN201635379U (en) Safety platform for installation and construction of roof contour plate hang ceiling
CA2713161A1 (en) Load transportation system
CN103711301A (en) Construction method and device for two-track movable electric basket and lifting hoist
CN203639011U (en) Safety climbing channel for sized tower crane for building engineering
CN205773024U (en) Convenient pipeline promotes auxiliary device
CN104153586B (en) A kind of suspension cable hangs the construction method of mounting purlines
CN208586885U (en) A kind of novel hanging basket lateral traction bracket
CN202441045U (en) Rail-type electric attached lifting scaffold
CN203359889U (en) Wall plate lifting and installation integrated operation platform
CN202544379U (en) Automatic climbing device
CN205077842U (en) Multi -use architecture support
CN203461720U (en) Simple cantilever hoisting machine
CN203865929U (en) Portable crane
CN103556837B (en) A kind of method realizing steel column at annex place and install
CN203531345U (en) Movable cantilever frame
CN202000647U (en) Base device for lifting scaffold in elevator shaft
CN204038917U (en) Detachable external hanging type operating platform
CN204850396U (en) Foldable elevartor shaft construction support
CN203531354U (en) Underneath type lifting scaffold for high-rise building
CN103741939B (en) The outside climbing type CONSTRUCTION OPERATIONS platform of building and mounting method
CN102733612B (en) Mounting method of electric hoist orbit
CN202831591U (en) Special-shaped truss operation platform capable of hoisting to super high space
CN203531355U (en) Overhead type lifting scaffold for high-rise building
CN201459602U (en) Equipment for bridge construction
CN205575331U (en) Transportation of combination formula borehole operation and communication system that remote control is gone up and down

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101117

Termination date: 20141216

EXPY Termination of patent right or utility model