CN107447931A - The closed factory building roof skylight frame installation method of overlarge area - Google Patents

The closed factory building roof skylight frame installation method of overlarge area Download PDF

Info

Publication number
CN107447931A
CN107447931A CN201610375947.XA CN201610375947A CN107447931A CN 107447931 A CN107447931 A CN 107447931A CN 201610375947 A CN201610375947 A CN 201610375947A CN 107447931 A CN107447931 A CN 107447931A
Authority
CN
China
Prior art keywords
stroller
installation
travelling bogie
track
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610375947.XA
Other languages
Chinese (zh)
Other versions
CN107447931B (en
Inventor
李佰西
林锡森
郭微微
鲍袖明
黄晓亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Original Assignee
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201610375947.XA priority Critical patent/CN107447931B/en
Publication of CN107447931A publication Critical patent/CN107447931A/en
Application granted granted Critical
Publication of CN107447931B publication Critical patent/CN107447931B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/0007Implements for finishing work on buildings for mounting doors, windows or frames; their fitting
    • E04F21/0015Implements for finishing work on buildings for mounting doors, windows or frames; their fitting for mounting frames
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D13/00Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage ; Sky-lights
    • E04D13/03Sky-lights; Domes; Ventilating sky-lights

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention relates to the closed factory building of overlarge area.A kind of closed factory building roof skylight frame installation method of overlarge area, it comprises the following steps:Step 1, travelling bogie and the making for installing stroller, step 2, travelling bogie, the Track desigh for installing stroller;Step 3, travelling bogie are in place;Step 4, installing louver frame.The present invention it is simple in construction, equal can gather materials on the spot and it is easy to process make, it is cheap.

Description

The closed factory building roof skylight frame installation method of overlarge area
Technical field
The present invention relates to the closed factory building of overlarge area, more particularly to the closed factory building roof skylight frame of overlarge area.
Background technology
Industrial building is become increasingly prosperous with the development of construction market in recent years, and increasing function integrated overlarge area factory building instead of the not high medium and small factory building of original mechanical intelligent.But because the factory building of extensive large area all has the characteristics of roof system area is big, height is high and factory building roof is closed, the installation problem of skylight structure increasingly highlights on its roofing, and how overcoming the high-altitude of this special construction environment to install problem must solve the problems, such as current construction.
At this stage, traditional truck crane and tower crane can not solve the above problems well on traditional ground large hanging device and roofing, it is big to there is co-ordination amount, security is poor, and boundary of works area is limited, construction period length, large-scale crane machine-team wastes serious, mounting cost is big, and due to factory building roof plate bearing capacity is relatively low, the latter can not realize at all.
The content of the invention
A kind of it is contemplated that the defects of overcoming prior art, there is provided closed factory building roof skylight frame installation method of overlarge area.The present invention it is simple in construction, equal can gather materials on the spot and it is easy to process make, it is cheap.
The present invention kind closed factory building roof skylight frame installation method of overlarge area, it comprises the following steps:
Step 1, travelling bogie and the making for installing stroller, including:
(1)Travelling bogie is steel pipe shrouding, it is made using building site fastener type scaffold tubes, including six rollers, two rotating bars, installation stroller is square steel base, formed using square steel tube welding production, including the cat ladder and two groups of jacks that 2 square steel columns, four rolling, left and right sides worm steel are welded;
(2)Travelling bogie, the roller installation for installing stroller:In the column root of each steel pipe support;Welding roll groove, roller is installed, footbrake is made on race to ensure safety, travelling bogie roller widths are slightly less than groove steel rail width, it is ensured that roller accessible walking in orbit, installation cart roller are the concave for being with train wheel track form;
(3)Lift jack installation:1 group of 2t jack is hung respectively close to cat ladder region in installation stroller upper level transverse tube, for hanging skylight frame;
Step 2, travelling bogie in mounting technique, the Track desigh for installing stroller, including:The track of travelling bogie uses channel-section steel, is attached between track using angle steel, track laying is on roof boarding;Installation stroller track uses angle steel, and track connection pads small square steel plates as track pad under track using welding every 2.5 meters;
Step 3, travelling bogie is in place in mounting technique, including:It is artificial to promote travelling bogie to run to truck crane feeding port position, skylight frame is hoisted on travelling bogie by truck crane, travelling bogie loads 2 ~ 3 skylight frames every time, specified location is advanced into after dolly charging, rotating bar is put down, blanking slide is formed, by artificial slow discharging, or stroller to be installed directly lifts by crane in situ etc. for not discharging;
Step 4, installing louver frame, including:After installation stroller has hung skylight frame, personnel will install stroller and carry out to skylight frame installation position, slowly put down jack after in place, until three skylight frame pin accurately fall on skylight bearing, fixed jack, carry out erecting and welding;There is the cat ladder frame that worm steel is welded at left and right sides of installation stroller.
Present invention installation principle is simple, easily operation;Large-scale crane or tower crane need not be used, lifting cost is saved and uses;Installation rate is fast, shortens installation period;Substantial amounts of work high above the ground is effectively reduced, reduces the generation of site safety accident;Applicability is wide, and generalization is strong.
Embodiment
A kind of closed factory building roof skylight frame installation method of overlarge area of the present invention, it includes
1. the making of travelling bogie and installation stroller in mounting technique:
(1)The Φ 48x3.5 fastener type scaffold tubes that travelling bogie is commonly used using building site are made, including 6 rollers, two rotating bars, installation stroller is formed using 100*3 square steel tube welding production, including the cat ladder and 2 groups of jacks that 2 square steel columns, 4 rollers, the worm steels of left and right sides Φ 25 are welded.
(2)Travelling bogie, the roller installation for installing stroller:In the column root of each steel pipe support(Travelling bogie is steel pipe shrouding, and installation stroller is square steel base)Welding roll groove, roller is installed, footbrake is made on race to ensure safety, travelling bogie roller widths are slightly less than groove steel rail width, it is ensured that roller accessible walking in orbit, installation cart roller is concave, with train wheel track form.
(3)Lift jack installation:1 group of 2t jack is hung respectively close to cat ladder region in installation stroller upper level transverse tube, for hanging skylight frame.
2. travelling bogie, the Track desigh of installation stroller in mounting technique:The track of travelling bogie using L50x5 angle steel using [20# channel-section steels, being attached between track, track laying is on roof boarding;Installation stroller track uses L50x5 angle steel, and track connection pads small square steel plates as track pad under track using welding every 2.5 meters.
3. travelling bogie is in place in mounting technique:It is artificial to promote travelling bogie to run to 25t truck crane feeding ports position, skylight frame is hoisted on travelling bogie by 25t truck cranes, travelling bogie can load 2 ~ 3 skylight frames every time, specified location is advanced into after dolly charging, rotating bar is put down, form blanking slide, by artificial slow discharging, also can not discharging stroller to be installed directly lifts by crane in situ etc..
4. installing louver frame technology:After installation stroller has hung skylight frame, personnel will install stroller and carry out to skylight frame installation position, slowly put down jack after in place, until three skylight frame pin accurately fall on skylight bearing, just fix jack, carry out erecting and welding.There is the cat ladder frame that the worm steels of Φ 25 are welded at left and right sides of installation stroller.

Claims (1)

1. a kind of closed factory building roof skylight frame installation method of overlarge area, it is characterised in that it comprises the following steps:
Step 1, travelling bogie and the making for installing stroller, including:
(1)Travelling bogie is steel pipe shrouding, it is made using building site fastener type scaffold tubes, including six rollers, two rotating bars, installation stroller is square steel base, formed using square steel tube welding production, including the cat ladder and two groups of jacks that 2 square steel columns, four rolling, left and right sides worm steel are welded;
(2)Travelling bogie, the roller installation for installing stroller:In the column root of each steel pipe support;Welding roll groove, roller is installed, footbrake is made on race to ensure safety, travelling bogie roller widths are slightly less than groove steel rail width, it is ensured that roller accessible walking in orbit, installation cart roller are the concave for being with train wheel track form;
(3)Lift jack installation:1 group of 2t jack is hung respectively close to cat ladder region in installation stroller upper level transverse tube, for hanging skylight frame;
Step 2, travelling bogie, the Track desigh for installing stroller, including:The track of travelling bogie uses channel-section steel, is attached between track using angle steel, track laying is on roof boarding;Installation stroller track uses angle steel, and track connection pads small square steel plates as track pad under track using welding every 2.5 meters;
Step 3, travelling bogie is in place, including:It is artificial to promote travelling bogie to run to truck crane feeding port position, skylight frame is hoisted on travelling bogie by truck crane, travelling bogie loads 2 ~ 3 skylight frames every time, specified location is advanced into after dolly charging, rotating bar is put down, blanking slide is formed, by artificial slow discharging, or stroller to be installed directly lifts by crane in situ etc. for not discharging;
Step 4, installing louver frame, including:After installation stroller has hung skylight frame, personnel will install stroller and carry out to skylight frame installation position, slowly put down jack after in place, until three skylight frame pin accurately fall on skylight bearing, fixed jack, carry out erecting and welding;There is the cat ladder frame that worm steel is welded at left and right sides of installation stroller.
CN201610375947.XA 2016-05-31 2016-05-31 The closed factory building roof skylight frame installation method of overlarge area Active CN107447931B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610375947.XA CN107447931B (en) 2016-05-31 2016-05-31 The closed factory building roof skylight frame installation method of overlarge area

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610375947.XA CN107447931B (en) 2016-05-31 2016-05-31 The closed factory building roof skylight frame installation method of overlarge area

Publications (2)

Publication Number Publication Date
CN107447931A true CN107447931A (en) 2017-12-08
CN107447931B CN107447931B (en) 2019-06-14

Family

ID=60485105

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610375947.XA Active CN107447931B (en) 2016-05-31 2016-05-31 The closed factory building roof skylight frame installation method of overlarge area

Country Status (1)

Country Link
CN (1) CN107447931B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113802780A (en) * 2021-09-26 2021-12-17 山东雅博科技股份有限公司 Construction method of skylight fixing frame
CN115596217A (en) * 2022-11-28 2023-01-13 中国二十二冶集团有限公司(Cn) Integral installation method for three-hinged arch skylight frame of steel structure factory building

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2522509Y (en) * 2001-12-12 2002-11-27 华胤(厦门)钢业有限公司 Roof covering metal plate mounting apparatus
US7069704B2 (en) * 2002-11-20 2006-07-04 Pendley Timothy M Roofing rail transportation system
JP2008013929A (en) * 2006-07-03 2008-01-24 Max Co Ltd Carrying carriage and guide rail for carrying carriage
CN201367686Y (en) * 2008-11-11 2009-12-23 中冶京唐建设有限公司 Transporting device for installing louver frame
CN201635379U (en) * 2009-12-16 2010-11-17 中国二十冶集团有限公司 Safety platform for installation and construction of roof contour plate hang ceiling
CN201835454U (en) * 2010-11-01 2011-05-18 广州市恒盛建设工程有限公司 Horizontal transport vehicle for super-long roof panels
CN203567769U (en) * 2013-09-27 2014-04-30 中国二十冶集团有限公司 Rail transport trolley for steel structure roof

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2522509Y (en) * 2001-12-12 2002-11-27 华胤(厦门)钢业有限公司 Roof covering metal plate mounting apparatus
US7069704B2 (en) * 2002-11-20 2006-07-04 Pendley Timothy M Roofing rail transportation system
JP2008013929A (en) * 2006-07-03 2008-01-24 Max Co Ltd Carrying carriage and guide rail for carrying carriage
CN201367686Y (en) * 2008-11-11 2009-12-23 中冶京唐建设有限公司 Transporting device for installing louver frame
CN201635379U (en) * 2009-12-16 2010-11-17 中国二十冶集团有限公司 Safety platform for installation and construction of roof contour plate hang ceiling
CN201835454U (en) * 2010-11-01 2011-05-18 广州市恒盛建设工程有限公司 Horizontal transport vehicle for super-long roof panels
CN203567769U (en) * 2013-09-27 2014-04-30 中国二十冶集团有限公司 Rail transport trolley for steel structure roof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113802780A (en) * 2021-09-26 2021-12-17 山东雅博科技股份有限公司 Construction method of skylight fixing frame
CN115596217A (en) * 2022-11-28 2023-01-13 中国二十二冶集团有限公司(Cn) Integral installation method for three-hinged arch skylight frame of steel structure factory building

Also Published As

Publication number Publication date
CN107447931B (en) 2019-06-14

Similar Documents

Publication Publication Date Title
CN103711301A (en) Construction method and device for two-track movable electric basket and lifting hoist
CN103572699A (en) Novel road bridge girder erection machine
CN108190757B (en) Barrel frame supporting type steel platform and tower crane integral jacking device and jacking method thereof
CN107288352B (en) The transport of the closed shed dormer roof boarding of overlarge area and installation method
CN107762159A (en) Large-span steel truss high-altitude sliding in place method
CN104989111B (en) Steel construction high level construction method for hanging
CN107447931A (en) The closed factory building roof skylight frame installation method of overlarge area
CN105019664A (en) High-altitude sliding installation method for box room type electric room
CN103669882A (en) Method for conducting component installation with steel wire ropes serving as rails in industrial factory building
CN103774841A (en) Track type sliding formwork device
CN108131018A (en) A kind of large mill housing installation and the construction method removed
CN103898270A (en) Flip-over type installation method of steel converter
CN205369229U (en) But walking hoisting frame suitable for manual hole digging pile steel reinforcement cage is laid
CN211173157U (en) Bracket for mounting ultrahigh steel beam
CN108625292B (en) Template assembling platform of prefabricated stand column
CN104550243A (en) Rotary hoisting method of bracket of large rolling mill stand
WO2023070257A1 (en) Intelligent hoisting robot
CN201933423U (en) Movable type protecting canopy frame
CN205575534U (en) Lattice formula groined type support body lifting means
CN201647844U (en) Beam lifting station without abutments
CN209874433U (en) Assembly type integral moving operation frame
CN203361170U (en) Supporting upright column pile for building foundation pit support
CN206319622U (en) A kind of roof system steel truss sliding rail
CN206581951U (en) A kind of tunnel pin-connected panel preliminary bracing lifts chassis
CN203922468U (en) A kind of monorail crane that depends on steel platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant