CN107288352B - The transport of the closed shed dormer roof boarding of overlarge area and installation method - Google Patents

The transport of the closed shed dormer roof boarding of overlarge area and installation method Download PDF

Info

Publication number
CN107288352B
CN107288352B CN201610193812.1A CN201610193812A CN107288352B CN 107288352 B CN107288352 B CN 107288352B CN 201610193812 A CN201610193812 A CN 201610193812A CN 107288352 B CN107288352 B CN 107288352B
Authority
CN
China
Prior art keywords
roof boarding
skylight
installation
travelling bogie
transport
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610193812.1A
Other languages
Chinese (zh)
Other versions
CN107288352A (en
Inventor
李佰西
林锡森
郭微微
谭星
黄晓亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Original Assignee
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201610193812.1A priority Critical patent/CN107288352B/en
Publication of CN107288352A publication Critical patent/CN107288352A/en
Application granted granted Critical
Publication of CN107288352B publication Critical patent/CN107288352B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The transport of specifically a kind of closed shed dormer roof boarding of overlarge area of the present invention and installation method;Including being laid with groined type guide rail on the factory building roof plate of skylight frame periphery and configuring truck crane;Installation carriage and travelling bogie are set up on groined type guide rail;Travelling bogie is pushed into truck crane side along groined type guide rail;Skylight roof boarding is hoisted on travelling bogie using truck crane;Travelling bogie is elapsed to installation carriage;Installation carriage slings lightweight concrete skylight roof boarding;The installation carriage for being lifted with skylight roof boarding is elapsed to the installation site of roof boarding, is transferred using jack tune to carrying out that operation is welded and fixed on skylight frame.This transport and installation method, which do not need the installation speed for using large-scale crane or tower crane to make skylight roof boarding in construction, to be accelerated, and is effectively reduced a large amount of high altitude operation, is reduced the generation of site safety accident.

Description

The transport of the closed shed dormer roof boarding of overlarge area and installation method
Technical field
The present invention relates to the realm of building construction, the transport of specifically a kind of closed shed dormer roof boarding of overlarge area And installation method.
Background technique
Construction market is become increasingly prosperous in recent years, higher and higher to the requirement in terms of building products energy-saving and environmental protection.Lightweight coagulation Native steel framework plate is able to satisfy the material requirements in terms of the increasing energy-saving and environmental protection of construction market, be widely used in industrial premises and In the wallboard and roof boarding of the buildings such as residential houses.Due to most of industrial premises and civil buildings all have roof system area it is big, Height height and substantially totally enclosed feature, skylight roof boarding installation problem is increasingly prominent, how to overcome this special knot The high-altitude installation problem of structure environment, which has become current construction, to be solved the problems, such as.
At this stage, traditional truck crane and tower crane cannot solve well on traditional ground large hanging device and roofing The certainly above problem, there are co-ordination amount is big, safety is poor, and boundary of works area is limited, and the construction period is long, large-scale crane machine-team waste Seriously, mounting cost is big, and since lightweight concrete roof boarding bearing capacity is poor, can not also carry the weight of large-scale crane.
Summary of the invention
The object of the present invention is to provide one kind convenient for the closed shed dormer roof boarding installation of overlarge area and transport Operational method.
In order to achieve the above object, the present invention is implemented as follows:
A kind of transport of the closed shed dormer roof boarding of overlarge area and installation method, including
Step 1, according to the size of femerell size, skylight the size of the cover plate and skylight frame skylight frame periphery workshop room Groined type guide rail is laid on panel;
Step 2 sets up installation carriage and travelling bogie on groined type guide rail;Wherein, it is arranged on installation carriage Four jacks in distributed rectangular, the jack is for lifting skylight roof boarding;
Travelling bogie is pushed to truck crane side along groined type guide rail by step 3;
Lightweight concrete skylight roof boarding is hoisted on travelling bogie by step 4 using truck crane;
Step 5 elapses travelling bogie to installation carriage;
Step 6, installation carriage are sling lightweight concrete skylight roof boarding using jack;
Step 7 elapses the installation carriage for being lifted with lightweight concrete skylight roof boarding to lightweight concrete skylight roofing The installation site of plate adjusts the gradient of lightweight concrete skylight roof boarding using jack and is transferred to carrying out on skylight frame Operation is welded and fixed.
The transport of the closed shed dormer roof boarding of the overlarge area and installation method are installed described in step 3 Trolley, travelling bogie are in tower structure and are equipped with idler wheel in its bottom.
The transport of the closed shed dormer roof boarding of the overlarge area and installation method, groined type guide rail are adopted It makes of channel steel, is attached between track using angle steel, it is cross connectivity structure that the handover of track longitudinally, laterally, which goes out,.
The structure of transport, installation carriage and track used by this transport and installation method is simple, production easy to process simultaneously And it does not need in construction using large-scale crane or tower crane, and then save lifting expense;But also the installation speed of skylight roof boarding Degree is accelerated, and has contracted short installation period;A large amount of high altitude operation is effectively reduced, the generation of site safety accident is reduced.
Detailed description of the invention
Fig. 1 is skylight roof boarding lifting schematic diagram in this method.
Fig. 2 is the combining structure schematic diagram of travelling bogie, installation carriage and track in this method.
Specific embodiment
The present invention is further illustrated below by way of specific embodiment.
As shown in Figure 1 and Figure 2, a kind of transport of the closed shed dormer roof boarding of overlarge area and installation method, including
Step 1, the workshop peripheral in skylight frame 1 according to the size of femerell size, skylight the size of the cover plate and skylight frame 1 Groined type guide rail 4 is laid on roof boarding 2;
Step 2 sets up installation carriage 5 and travelling bogie 6 on groined type guide rail 4;Wherein, on installation carriage 5 Four jacks 7 in distributed rectangular are set, and the jack 7 is for lifting skylight roof boarding 8;
Travelling bogie 6 is pushed to truck crane side along groined type guide rail 4 by step 3;
Lightweight concrete skylight roof boarding 8 is hoisted on travelling bogie 6 by step 4 using truck crane;
Step 5 elapses travelling bogie 6 to 5 lower section of installation carriage;
Step 6, installation carriage 5 are sling lightweight concrete skylight roof boarding 8 using jack 7;
Step 7 elapses the installation carriage 5 for being lifted with lightweight concrete skylight roof boarding 8 to lightweight concrete skylight room The installation site of panel 8 adjusts the gradient of lightweight concrete skylight roof boarding 8 using jack 7 and is transferred to skylight frame 1 On carry out that operation is welded and fixed.
In above-mentioned construction method,
As shown in Fig. 2, the steel-pipe welding that construction site is respectively adopted in the main body of installation carriage 5 and travelling bogie 6 forms, packet Include four steel pipe posts, upper layer and lower layer horizontal tube and support tube.The length, width and height size of installation carriage main body is according to skylight frame size And depending on the gradient, out 500mm wider than skylight frame, while the gauge two sides that ensure to walk are uniform, the length and width of travelling bogie main body For high size depending on skylight the size of the cover plate and the skylight frame gradient, length height is significantly less than installation vehicle, width and installation vehicle With width, such travelling bogie can be placed in the carry and hoist for below installation carriage and then being convenient for skylight roof boarding.
For the walking for being easily installed trolley 5, travelling bogie 6, rolled in the root weld of installation carriage 5,6 main body of travelling bogie Race simultaneously installs idler wheel 9, makes footbrake to ensure safety on race, roller widths are slightly less than groove steel rail width, it is ensured that Idler wheel accessible walking in orbit.
For being made for the groined type guide rail of installation carriage, travelling bogie traveling of channel steel, used between track Angle steel is attached, and it is cross connectivity structure that the handover of track longitudinally, laterally, which goes out,.
The body top face of the travelling bogie is equipped with skid-prevention button, prevents from being arranged in the skylight roof boarding at the top of travelling bogie It is slided because of the gradient.
The structure of transport, installation carriage and track used by this transport and installation method is simple, production easy to process simultaneously And it does not need in construction using large-scale crane or tower crane, and then save lifting expense;But also the installation speed of skylight roof boarding Degree is accelerated, and has contracted short installation period;A large amount of high altitude operation is effectively reduced, the generation of site safety accident is reduced.

Claims (3)

1. transport and the installation method of a kind of closed shed dormer roof boarding of overlarge area, it is characterized in that: including:
Step 1, the factory building roof plate according to the size of femerell size, skylight the size of the cover plate and skylight frame in skylight frame periphery Upper laying groined type guide rail;
Step 2 sets up installation carriage and travelling bogie on groined type guide rail;Wherein, four are arranged on installation carriage In the jack of distributed rectangular, the jack is for lifting skylight roof boarding;
Travelling bogie is pushed to truck crane side along groined type guide rail by step 3;
Lightweight concrete skylight roof boarding is hoisted on travelling bogie by step 4 using truck crane;
Step 5 elapses travelling bogie to installation carriage;
Step 6, installation carriage are sling lightweight concrete skylight roof boarding using jack;
Step 7 elapses the installation carriage for being lifted with lightweight concrete skylight roof boarding to lightweight concrete skylight roof boarding Installation site adjusts the gradient of lightweight concrete skylight roof boarding using jack and is transferred to being welded on skylight frame Fixed operation.
2. transport and the installation method of the closed shed dormer roof boarding of overlarge area according to claim 1, special Sign is: installation carriage described in step 2, travelling bogie are in tower structure and are equipped with idler wheel in its bottom.
3. transport and the installation method of the closed shed dormer roof boarding of overlarge area according to claim 1, special Sign is: groined type guide rail is made of channel steel, is attached between track using angle steel, the handover of track longitudinally, laterally Place is cross connectivity structure.
CN201610193812.1A 2016-03-31 2016-03-31 The transport of the closed shed dormer roof boarding of overlarge area and installation method Active CN107288352B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610193812.1A CN107288352B (en) 2016-03-31 2016-03-31 The transport of the closed shed dormer roof boarding of overlarge area and installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610193812.1A CN107288352B (en) 2016-03-31 2016-03-31 The transport of the closed shed dormer roof boarding of overlarge area and installation method

Publications (2)

Publication Number Publication Date
CN107288352A CN107288352A (en) 2017-10-24
CN107288352B true CN107288352B (en) 2019-07-30

Family

ID=60087850

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610193812.1A Active CN107288352B (en) 2016-03-31 2016-03-31 The transport of the closed shed dormer roof boarding of overlarge area and installation method

Country Status (1)

Country Link
CN (1) CN107288352B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109838055A (en) * 2017-11-24 2019-06-04 中建安装工程有限公司 High-altitude is installed by steel frame and light concrete face-board for room special mounting vehicle
CN109256736A (en) * 2018-09-14 2019-01-22 中国冶集团有限公司 A kind of wire box built-in process and positioning device
CN111336314A (en) * 2020-04-26 2020-06-26 中国二十二冶集团有限公司 Large-caliber pipeline roof installation device and construction method thereof
CN115538790A (en) * 2022-09-02 2022-12-30 广州市机电安装有限公司 Installation method of long and narrow hyperboloid steel roof
CN115596217A (en) * 2022-11-28 2023-01-13 中国二十二冶集团有限公司(Cn) Integral installation method for three-hinged arch skylight frame of steel structure factory building

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08333813A (en) * 1995-06-07 1996-12-17 Takenaka Komuten Co Ltd Building method of building unit for vertical and horizontal conveying
CN201560539U (en) * 2009-09-30 2010-08-25 中太建设集团股份有限公司 Tool car for long-span net rack roof space plate
CN201857761U (en) * 2010-08-10 2011-06-08 中建五局工业设备安装有限公司 Hoisting and sliding device and hoisting and sliding equipment
CN202324662U (en) * 2011-12-02 2012-07-11 中国建筑第七工程局有限公司 Installation device for foam cement composites
CN203393923U (en) * 2013-07-15 2014-01-15 中国二冶集团有限公司 Mobile transportation trolley for color plates
CN203821720U (en) * 2014-05-14 2014-09-10 中建八局第三建设有限公司 High-altitude large roof panel installing tool trolley

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08333813A (en) * 1995-06-07 1996-12-17 Takenaka Komuten Co Ltd Building method of building unit for vertical and horizontal conveying
CN201560539U (en) * 2009-09-30 2010-08-25 中太建设集团股份有限公司 Tool car for long-span net rack roof space plate
CN201857761U (en) * 2010-08-10 2011-06-08 中建五局工业设备安装有限公司 Hoisting and sliding device and hoisting and sliding equipment
CN202324662U (en) * 2011-12-02 2012-07-11 中国建筑第七工程局有限公司 Installation device for foam cement composites
CN203393923U (en) * 2013-07-15 2014-01-15 中国二冶集团有限公司 Mobile transportation trolley for color plates
CN203821720U (en) * 2014-05-14 2014-09-10 中建八局第三建设有限公司 High-altitude large roof panel installing tool trolley

Also Published As

Publication number Publication date
CN107288352A (en) 2017-10-24

Similar Documents

Publication Publication Date Title
CN107288352B (en) The transport of the closed shed dormer roof boarding of overlarge area and installation method
CN103711301A (en) Construction method and device for two-track movable electric basket and lifting hoist
CN103572699A (en) Novel road bridge girder erection machine
CN103899093A (en) Step-by-step hoisting construction method of mega-frame steel truss beam
CN103896127A (en) Connecting structure of construction hoist and building climbing formwork frame
CN204691326U (en) Multifunctional mobile component processing plant
CN108661328A (en) A kind of shaped steel girder transferring installation method
CN203383520U (en) Deep foundation pit canopy
CN210177913U (en) Slidable wall color plate mounting device
CN202370263U (en) Roof plate carrier vehicle
CN203257070U (en) Slippage frame operating platform for gallery daylighting roof curtain wall installation
CN105625732A (en) Supporting-free construction method of ultrahigh overhung steel-structure truss
CN203795459U (en) Foundation structure of tower crane for high-altitude roofs
CN203581022U (en) GIS (geographic information system) equipment conveying device
CN206189928U (en) Between slidingtype building engineering processing vehicle
CN203257106U (en) Multifunctional power-driven walking type walking system
CN215291562U (en) Device for high-rise building construction by adopting cantilever crane
CN205688820U (en) A kind of installation system of high-rise building large area cell cube curtain wall block
CN204873485U (en) River course is bridge crane usefulness walking portal frame for pier
CN204174850U (en) High-altitude stereo cross-operation chassis
CN207658895U (en) Working at height glass hanging equipment
CN207228604U (en) A kind of unilateral suspension type aerial movement steel platform
CN203257009U (en) Simple cart for gallery daylighting roof curtain wall glass transport
CN107386684A (en) One kind removes raise-lower hydraulic locomotive
CN107447931A (en) The closed factory building roof skylight frame installation method of overlarge area

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant