CN203257070U - Slippage frame operating platform for gallery daylighting roof curtain wall installation - Google Patents

Slippage frame operating platform for gallery daylighting roof curtain wall installation Download PDF

Info

Publication number
CN203257070U
CN203257070U CN 201320258258 CN201320258258U CN203257070U CN 203257070 U CN203257070 U CN 203257070U CN 201320258258 CN201320258258 CN 201320258258 CN 201320258258 U CN201320258258 U CN 201320258258U CN 203257070 U CN203257070 U CN 203257070U
Authority
CN
China
Prior art keywords
operating platform
curtain wall
slippage frame
roof curtain
frame operating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320258258
Other languages
Chinese (zh)
Inventor
孙晓阳
陈华
张晓勇
陈斌
王海龙
颜卫东
赵桂峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN 201320258258 priority Critical patent/CN203257070U/en
Application granted granted Critical
Publication of CN203257070U publication Critical patent/CN203257070U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a slippage frame operating platform for gallery daylighting roof curtain wall installation. The slippage frame operating platform is a frame body formed by a plurality of steel tubes in an erected mode. A plurality of pulleys are arranged at the bottom of the slippage frame operating platform. Scaffold plates are paved at the top of the slippage frame operating platform. The slippage frame operating platform has the advantages that the structure is simple, machining can be conveniently achieved, finished products can be manufactured in advance, field manufacturing can also be carried out, interior erection of supporting bent frames for installation can be avoided, the cost is reduced, movement can be carried out according to the installation positions, the installation standing positions are provided, the operation is convenient to achieve and flexible, use materials are all materials commonly used in building construction, the technology is simple, the slippage frame operating platform can be repeatedly used, and therefore the cost is saved.

Description

The gallery lighting roof curtain wall is installed with slippage frame operating platform
Technical field
The utility model refers in particular to a kind of gallery lighting roof curtain wall and installs with slippage frame operating platform about a kind of curtain wall fitting operation platform.
Background technology
In China, commercial real estate constantly heats up in recent years, the exploitation of city integrated body emerges in large numbers one after another in each big and medium-sized cities, as the walking gallery that runs through whole indoor pedestrian street in the city integrated body building, for width narrow, the strip that length direction is long, for effectively improving Indoor Natural daylighting effect, most roof parts adopt the glass sunroof form.
At present, most of roofing or corridor lighting roof, after the lifting of employing lifting machine, the auxiliary installation that supporting row frame is carried out keel and glass is set up in inside; But when supporting row frame can't be set up because of a variety of causes in the lighting roof bottom, make troubles then for the installation of lighting roof keel and glass, need to drop into a large amount of costs and solve.How convenient, fast, effective, economic this type of corridor curtain skeleton of solution and the installation of glass, becoming has to be solved, perfect problem.
The utility model content
Because the problems referred to above, the utility model provides a kind of gallery lighting roof curtain wall to install with slippage frame operating platform, described operating platform is to set up the support body that forms by a plurality of steel pipes, and described operating platform bottom is provided with a plurality of pulleys, and described operating platform top is equipped with scaffold floor.
Further, described operating platform comprises:
One steel truss, described steel truss bottom is provided with described pulley;
One handling frame is set up in described steel truss top, and described handling frame top is equipped with described scaffold floor.
Further, described steel truss is set up by lower and upper cross-member, web member and montant welding and is formed, and it is the square tube of rectangle that described lower and upper cross-member, web member and montant adopt the cross section.
Further, described handling frame is set up by vertical rod, leger and the welding of little cross bar and is formed, and described vertical rod, leger and little cross bar adopt common steel tube.
Further, described vertical rod highly exceeds described scaffold floor.
Further, described lower and upper cross-member spacing is 100cm, and described montant spacing is 40-60cm.
Further, described vertical pole ' s span is 80-100cm, and described little cross bar spacing is 150cm-180cm.
Further, the height of described handling frame arranges according to the height sublevel of described gallery lighting roof curtain wall.
Gallery lighting roof curtain wall of the present utility model is installed has following characteristics with slippage frame operating platform:
1, simple in structure, easy to process, but can preset also field fabrication of finished product.
2, can avoid setting up in inside installing and use supporting row frame, Cost reduction.
3, material and the erection method of handling frame employing are all identical with scaffold, need not additionally to buy material and increase work post.
4, can move according to the installation site, the installation erect-position is provided, operation is convenient, flexible;
5, material therefor is common used material in the building operations, and technique is simple, can reuse, and saves cost.
Description of drawings
Fig. 1 is that gallery lighting roof curtain wall of the present utility model is installed the structural representation with slippage frame operating platform.
Fig. 2 is that gallery lighting roof curtain wall of the present utility model is installed the structural representation with the steel truss of slippage frame operating platform.
Fig. 3 is that gallery lighting roof curtain wall of the present utility model is installed the structural representation with the handling frame of slippage frame operating platform.
Fig. 4 is that gallery lighting roof curtain wall of the present utility model is installed with slippage frame operating platform schematic diagram in actual applications.
The specific embodiment
In order to make the purpose of this utility model, technical scheme and advantage clearer, below in conjunction with drawings and Examples, the utility model is further elaborated.Should be appreciated that specific embodiment described herein only in order to explaining the utility model, and be not used in restriction the utility model.
Cooperation is referring to shown in Figure 1, gallery lighting roof curtain wall of the present utility model is installed with slippage frame operating platform 1, is to set up the support body that forms by a plurality of steel pipes, and described operating platform 1 bottom is provided with a plurality of pulleys 2, described operating platform 1 top is equipped with scaffold floor 3, erect-position when being convenient to personnel operation.
Described operating platform 1 further comprises:
As shown in Figure 2, a steel truss 10, described steel truss 10 bottoms are provided with described pulley 2.Described steel truss 10 is set up by lower and upper cross-member 11, web member 12 and montant 13 welding and is formed, and weld seam is the welding of full penetration groove, and it is the square tube of rectangle that described lower and upper cross-member 11, web member 12 and montant 13 adopt the cross section.Described lower and upper cross-member 11 spacings are 100cm, and described montant 13 spacings are 40-60cm.
As shown in Figure 3, a handling frame 20 is set up in described steel truss 10 tops, and described handling frame 20 tops are equipped with described scaffold floor 3.Described handling frame 20 is set up by vertical rod 21, leger 22 and 23 welding of little cross bar and is formed, and weld seam is the welding of full penetration groove, and described vertical rod 21, leger 22 and little cross bar 23 adopt common steel tube.Described vertical rod 21 spacings are 80-100cm, and described little cross bar 23 spacings are 150cm-180cm.Further, the height of described vertical rod 21 exceeds described scaffold floor 3, can doublely do the waist support railing.
Cooperation is referring to shown in Figure 4, the utility model in actual applications, after the 80cm of gallery lighting roof curtain wall 4 concrete bridging piece platform 5 is finished, steel truss 10 and pulley 2 that welding is good utilize tower crane or crane to be placed on the concrete bridging piece platform 5, then on steel truss 10, as shown in Figure 3, height sublevel according to gallery lighting roof curtain wall 4 is set up handling frame 20, and at handling frame 20 laying scaffold floors 3, installation personnel can be stood and carry out the installation of keel and cladding glass on scaffold floor 3, after the installation of gallery lighting roof curtain wall, the installation personnel station is on concrete bridging piece platform 5, promote the installation of gallery lighting roof curtain wall and use slippage frame operating platform 1 to the next position, continue next step installation exercise.If when tighter, can dropping into the lighting roof curtain wall installation of some directors corridor, the duration carries out simultaneously installation exercise with slippage frame operating platform 1.
The above only is preferred embodiment of the present utility model, be not that the utility model is done any pro forma restriction, although the utility model discloses as above with preferred embodiment, yet be not to limit the utility model, any those skilled in the art, in the scope that does not break away from technical solutions of the utility model, when the technology contents that can utilize above-mentioned announcement is made a little change or is modified to the equivalent embodiment of equivalent variations, in every case be the content that does not break away from technical solutions of the utility model, any simple modification that foundation technical spirit of the present utility model is done above embodiment, equivalent variations and modification all still belong in the scope of technical solutions of the utility model.

Claims (8)

1. a gallery lighting roof curtain wall is installed with slippage frame operating platform, it is characterized in that described operating platform is to set up the support body that forms by a plurality of steel pipes, and described operating platform bottom is provided with a plurality of pulleys, and described operating platform top is equipped with scaffold floor.
2. gallery lighting roof curtain wall as claimed in claim 1 is installed with slippage frame operating platform, it is characterized in that described operating platform comprises:
One steel truss, described steel truss bottom is provided with described pulley;
One handling frame is set up in described steel truss top, and described handling frame top is equipped with described scaffold floor.
3. gallery lighting roof curtain wall as claimed in claim 2 is installed with slippage frame operating platform, it is characterized in that described steel truss is set up by lower and upper cross-member, web member and montant welding to form, and it is the square tube of rectangle that described lower and upper cross-member, web member and montant adopt the cross section.
4. gallery lighting roof curtain wall as claimed in claim 2 is installed with slippage frame operating platform, it is characterized in that described handling frame is set up by vertical rod, leger and the welding of little cross bar to form, and described vertical rod, leger and little cross bar adopt common steel tube.
5. gallery lighting roof curtain wall as claimed in claim 4 is installed with slippage frame operating platform, it is characterized in that described vertical rod highly exceeds described scaffold floor.
6. gallery lighting roof curtain wall as claimed in claim 3 is installed with slippage frame operating platform, it is characterized in that described lower and upper cross-member spacing is 100cm, and described montant spacing is 40-60cm.
7. gallery lighting roof curtain wall as claimed in claim 4 is installed with slippage frame operating platform, it is characterized in that described vertical pole ' s span is 80-100cm, and described little cross bar spacing is 150cm-180cm.
8. gallery lighting roof curtain wall as claimed in claim 4 is installed with slippage frame operating platform, it is characterized in that the height of described handling frame is according to the height sublevel setting of described gallery lighting roof curtain wall.
CN 201320258258 2013-05-13 2013-05-13 Slippage frame operating platform for gallery daylighting roof curtain wall installation Expired - Fee Related CN203257070U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320258258 CN203257070U (en) 2013-05-13 2013-05-13 Slippage frame operating platform for gallery daylighting roof curtain wall installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320258258 CN203257070U (en) 2013-05-13 2013-05-13 Slippage frame operating platform for gallery daylighting roof curtain wall installation

Publications (1)

Publication Number Publication Date
CN203257070U true CN203257070U (en) 2013-10-30

Family

ID=49469648

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320258258 Expired - Fee Related CN203257070U (en) 2013-05-13 2013-05-13 Slippage frame operating platform for gallery daylighting roof curtain wall installation

Country Status (1)

Country Link
CN (1) CN203257070U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105501408A (en) * 2015-12-29 2016-04-20 广船国际有限公司 Movable type foot stand
CN105569352A (en) * 2015-12-21 2016-05-11 广州机施建设集团有限公司 Construction method of mobile mounting platform for large-span grid frame
CN113323403A (en) * 2021-05-14 2021-08-31 中国建筑第八工程局有限公司 Roof atrium membrane structure steel truss erecting platform structure and construction method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105569352A (en) * 2015-12-21 2016-05-11 广州机施建设集团有限公司 Construction method of mobile mounting platform for large-span grid frame
CN105501408A (en) * 2015-12-29 2016-04-20 广船国际有限公司 Movable type foot stand
CN105501408B (en) * 2015-12-29 2019-05-14 广船国际有限公司 A kind of movable type foot prop
CN113323403A (en) * 2021-05-14 2021-08-31 中国建筑第八工程局有限公司 Roof atrium membrane structure steel truss erecting platform structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN106939707B (en) A kind of restricted clearance large-scale steel structure supporting platform from method for improving
CN105672642A (en) Dual-guide-frame multistage lifting working platform with adjustable gaps and construction method thereof
CN203257070U (en) Slippage frame operating platform for gallery daylighting roof curtain wall installation
CN107288352B (en) The transport of the closed shed dormer roof boarding of overlarge area and installation method
CN202577571U (en) Structure of inner barrel-outer frame clip-shaped steel framework building
CN105672641A (en) Double-guide-frame multi-stage synchronous lifting working platform and construction method thereof
CN203213019U (en) Long cantilever bent cap cast-in-place construction support system
CN203795459U (en) Foundation structure of tower crane for high-altitude roofs
CN105781092A (en) Single-guide-frame and multi-stage lifting working platform with adjustable interval and construction method thereof
CN210794552U (en) Net rack color steel plate profiling rapid conveying device
CN203394008U (en) Suspension type hanging bracket used on plane truss
CN211341606U (en) Operating platform for structural light well part
CN210508326U (en) Liftable well operation platform
CN204357024U (en) Portable bed board equipment
CN103643790B (en) It is applicable to the self-crawling type operating platform of colossal column
CN209874434U (en) Simple and easy scaffold frame of encorbelmenting of building high latitude
CN206737358U (en) A kind of prefabricated assembled steel reinforced concrete framework elevator shaft structure
CN203257009U (en) Simple cart for gallery daylighting roof curtain wall glass transport
CN203452388U (en) Movable type concrete casting operation platform
CN206846097U (en) A kind of Men Gangyu frameworks separately-loaded pipeline support structure
CN202689583U (en) Sliding frame structure in large area multi-pillar-point bearing reticulated shell construction
CN112227762A (en) Passage structure for transporting materials to high-rise building
CN202064621U (en) Conventionalized operation platform for construction of elevator shaft
CN206458067U (en) Operation platform in high-rise building elevator
CN110284598A (en) The installation method and device of spherical net brace roof structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131030

Termination date: 20190513