CN105672642A - Dual-guide-frame multistage lifting working platform with adjustable gaps and construction method thereof - Google Patents

Dual-guide-frame multistage lifting working platform with adjustable gaps and construction method thereof Download PDF

Info

Publication number
CN105672642A
CN105672642A CN201610140965.XA CN201610140965A CN105672642A CN 105672642 A CN105672642 A CN 105672642A CN 201610140965 A CN201610140965 A CN 201610140965A CN 105672642 A CN105672642 A CN 105672642A
Authority
CN
China
Prior art keywords
saddle
pair
job platform
fixed
horizontal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610140965.XA
Other languages
Chinese (zh)
Inventor
王美华
李荣帅
张文泽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction Group Co Ltd
Original Assignee
Shanghai Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction Group Co Ltd filed Critical Shanghai Construction Group Co Ltd
Priority to CN201610140965.XA priority Critical patent/CN105672642A/en
Publication of CN105672642A publication Critical patent/CN105672642A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions
    • E04G5/046Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on walls

Abstract

The invention discloses a dual-guide-frame multistage lifting working platform with adjustable gaps and a construction method thereof, and relates to the technical field of building construction devices.The problem that an existing dual-guide-frame climbing-type lifting working platform is low in working efficiency is solved.The dual-guide-frame multistage lifting working platform comprises a pair of guide frames, wherein the guide frames are vertically arranged and fixed to the ground and the side face of a building respectively.At least two horizontal working platforms are arranged on the guide frames at gaps, driving gears and power devices of gear and rack driving systems are arranged on all the horizontal working platforms, racks engaged with the driving gears are arranged on the guide frames respectively, and all the horizontal working platforms can be vertically lifted relative to the guide frames.The construction method includes the steps that the pair of vertically-arranged guide frames are fixed to the ground and the building respectively, and the racks are arranged on the guide frames; the at least two horizontal working platforms are assembled, the driving gears and the power devices are installed on all the horizontal working platforms, and the horizontal working platforms are sequentially installed on the guide frames, and can be vertically lifted relative to the guide frames.

Description

Adjustable pair of saddle multistage lifting work platforms of spacing and construction method thereof
Technical field
The present invention relates to construction implement technical field, particularly to a kind of adjustable pair of saddle multistage lifting work platforms of spacing and construction method thereof.
Background technology
Traditional architecture alien invasion is constructed usually by setting up steel pipe scaffold or plug-in driven hanging basket auxiliary construction, sets up steel pipe scaffold and has that material usage is big, the time of setting up is long, is not easy to operation and construction material transport inconvenience, the problems such as potential safety hazard is more; And plug-in driven hanging basket exists that operation support body is unstable, length is shorter, bearing capacity is limited, and external environment (wind etc.) is on problems such as construction quality impact are bigger.
Development along with building industry level, the application of double; two saddle climbing type lifting working platforms is increasingly extensive, which overcoming conventional steel scaffold and the various shortcomings of plug-in driven hanging basket construction, stable working, lifting capacity are big, operation face width, safe and reliable, and improve labor productivity. But, owing to the building structure number of plies is increasing, and working procedure is increasingly sophisticated, and existing pair of saddle climbing type lifting working platform only has a job platform, and work efficiency is low, it is impossible to meet construction needs.
In sum, in current construction implement technical field, how to design the construction lifting platform that a kind of speed of application is fast, mechanization degree is high and seem very necessary.
Summary of the invention
A job platform is only had for existing pair of saddle climbing type lifting working platform, work efficiency is low, the problem that cannot meet construction needs, it is an object of the invention to provide a kind of adjustable pair of saddle multistage lifting work platforms of spacing and construction method thereof, make the multistage horizontal job platform can in different layers synchronous construction operation, also multistage horizontal job platform can be made to realize collaborative work, successively complete each working procedure, thus improving external wall efficiency of construction.
The technical solution adopted for the present invention to solve the technical problems is: adjustable pair of saddle multistage lifting work platforms of spacing include a pair vertically arranged and be fixed on the saddle on ground, described saddle is fixed on the side of building by some wall-attaching equipment;On saddle described in a pair, interval arranges the horizontal job platform of at least two, each described horizontal job platform is respectively provided with driving gear and the power set of gear-rack drive system, described saddle is respectively provided with the tooth bar being meshed with described driving gear of described gear-rack drive system so that each described horizontal job platform all can do vertical lifting motion relative to described saddle.
Preferably, described horizontal job platform includes the fixed frame being sheathed on described saddle a pair, and is fixed on described fixed frame and is saved end to end horizontal-extending platform by some level standards; Described fixed frame is the frame structure being welded by shaped steel and matching with described saddle; Described driving gear is fixed on the inner side of described fixed frame, and is meshed with described tooth bar fixing on described saddle.
Preferably, described level standard joint includes the supporting frame being made up and be truss structure of shaped steel, is fixed on the horizontal pedal at support frame as described above body top, and is vertically fixed on guardrail and the toeguard of support frame as described above body side surface.
Preferably, described saddle is formed by some vertical standard knots are end to end, and the support body of truss structure is made up and is to described vertical standard knot of shaped steel, and between adjacent two described vertical standard knots, bolt connects.
Preferably, the bottom of described saddle is additionally provided with the base being made up and in frame structure of shaped steel, and described base is connected with described saddle bottom bolt.
Preferably, described wall-attaching equipment is made up of shaped steel, and one end of described wall-attaching equipment is connected with described saddle bolt, and the other end of described wall-attaching equipment is locked with the pre-embedded bolt in described side of buildings xoncrete structure.
Preferably, it also includes click drive system, and the ratchet of described click drive system is fixed on described fixed frame, and the crosspiece being meshed with described ratchet of described click drive system is fixed on described saddle.
It addition, present invention also offers the construction method of adjustable pair of saddle multistage lifting work platforms of a kind of spacing, step is as follows:
One, a pair saddle it is vertically arranged to ground and fixes, making described saddle affixed by some wall-attaching equipment with the side of building, and on described saddle, be respectively mounted the tooth bar of gear-rack drive system;
Two, the horizontal job platform of at least two is assembled, each described horizontal job platform installs described gear-rack drive system and drives gear and power set accordingly, and described horizontal job platform is installed on described saddle successively so that each described horizontal job platform all can need to do vertical lifting motion relative to described saddle according to construction.
Preferably, in described step 2, described horizontal job platform includes a pair fixed frame being sheathed on described saddle, and is fixed on described fixed frame and is saved end to end horizontal-extending platform by some level standards; When assembling described horizontal job platform, the driving gear of described gear-rack drive system is first installed in the inner side of described fixed frame, and fixed frame described in a pair is sheathed on respectively on the saddle of the tooth bar being provided with described gear-rack drive system, the gear that drives on described fixed frame is made to be meshed with the tooth bar on described saddle, keep described fixed frame position motionless, meanwhile, lift described horizontal-extending platform and be bolted on described fixed frame.
Effect of the invention is that:
One, adjustable pair of saddle multistage lifting work platforms of the spacing of the present invention, by arranging multistage horizontal job platform on twin columns saddle, and each horizontal job platform is respectively provided be meshed with the tooth bar on saddle drive gear and independent power set, power set can control each horizontal job platform independent work, not only ensure the lifting of each horizontal job platform steadily, and make the multistage horizontal job platform can in different layers synchronous construction operation, also multistage horizontal job platform can be made to realize collaborative work according to construction feature, successively complete each working procedure, thus improving external wall efficiency of construction. adjustable pair of saddle multistage lifting work platforms of the spacing of the present invention is particularly suited for facade and decorates, the work such as whitewashes.
Two, the construction method of adjustable pair of saddle multistage lifting work platforms of spacing of the present invention, first, a pair saddle is fixed with ground and side of buildings respectively and is connected, and on saddle, it is respectively mounted the tooth bar of gear-rack drive system, then, assemble the horizontal job platform of at least two, and be respectively mounted gear-rack drive system and drive gear and power set accordingly, then, horizontal job platform is installed on saddle successively, can move along saddle as vertical lifting, increase along with construction height, can at the tooth bar of the some vertical standard knots of the continuous over installation of present level saddle and corresponding length, horizontal job platform is made to can continue to rise along saddle, to realize the construction operation of follow-up height. by above-mentioned construction method so that multistage horizontal job platform in different layers synchronous construction operation, also can making multistage horizontal job platform realize collaborative work according to construction feature, successively completing each working procedure, thus improving external wall efficiency of construction.
Accompanying drawing explanation
Fig. 1 is the axonometric chart of adjustable pair of saddle multistage lifting work platforms of one embodiment of the invention spacing;
Fig. 2 is the side view of the Y direction of Fig. 1;
Fig. 3 is the side view of the X-direction of Fig. 1;
Fig. 4 is the top view of the Z-direction of Fig. 1.
Detailed description of the invention
The adjustable pair of saddle multistage lifting work platforms of the spacing present invention proposed below in conjunction with the drawings and specific embodiments and construction method thereof further describe. According to description below and claims, advantages and features of the invention will be apparent from. Hereinafter by cited embodiment in conjunction with accompanying drawing, technology contents and the feature of the present invention will be described in detail. Need to additionally illustrating, accompanying drawing all adopts the form simplified very much and all uses non-ratio accurately, only in order to convenience, the purpose aiding in illustrating the embodiment of the present invention lucidly. For sake of convenience, described below " on ", the upper and lower direction of D score and accompanying drawing consistent, but this can not become the restriction of technical solution of the present invention.
Embodiment one: adjustable pair of saddle multistage lifting work platforms 10 of spacing of the present invention is described in conjunction with Fig. 1 to Fig. 4, vertically arranged and be fixed on the saddle 11 on ground 2 including a pair, saddle 11 is fixed on the side of building 1 by some wall-attaching equipment 12; On saddle 11, interval arranges two horizontal job platforms 14, each horizontal job platform 14 is respectively provided with driving gear and the power set (not shown) of gear-rack drive system, a pair saddle 11 is respectively provided with the tooth bar (not shown) being meshed with driving gear of gear-rack drive system so that each horizontal job platform 14 all can do vertical lifting motion relative to a pair saddle 11.The concrete structure of said gear rack drives system and power set and annexation are prior art content, and, they are connected with the signal of work platform hoist system is also prior art content, is no longer specifically described herein.
Increasing for the current architecture configuration number of plies and working procedure is increasingly sophisticated, and existing pair of saddle climbing type lifting working platform only has a horizontal job platform, cause the problem that work efficiency is low, adjustable pair of saddle multistage lifting work platforms 10 of the spacing of the present invention, by arranging multistage horizontal job platform 14 on twin columns saddle 11, and each horizontal job platform 14 is respectively provided be meshed with the tooth bar on saddle 11 drive gear and independent power set, power set can control each horizontal job platform 14 independent work, not only ensure that each horizontal job platform 14 lifts steadily, and make the multistage horizontal job platform 14 can in different layers synchronous construction operation, also multistage horizontal job platform 14 can be made to realize collaborative work according to construction feature, successively complete each working procedure, thus improving external wall efficiency of construction. adjustable pair of saddle multistage lifting work platforms 10 of the spacing of the present invention is particularly suited for facade and decorates, the work such as whitewashes.
Please continue to refer to Fig. 1 to Fig. 4, above-mentioned horizontal job platform 14 includes a pair fixed frame 14a being sheathed on saddle 11, and is fixed on a pair fixed frame 14a and is saved end to end horizontal-extending platform 14b by some level standards; Fixed frame 14a is the frame structure being welded by shaped steel and matching with saddle 11; Drive gear to be fixed on the inner side of fixed frame 14a, and be meshed with tooth bar fixing on saddle 11. Quantity and the length of above-mentioned horizontal-extending platform 14b need to be determined according to the height of building 1 and width. Each horizontal job platform 14 is provided with at least one entrance, and the structure of entrance can be automatically switched off or interlock by automatically controlled mode, to ensure the safety of workmen. Visible, horizontal-extending platform 14b is fixed on saddle 11 by a pair fixed frame 14a, not only increases the stability in the large of horizontal job platform 14 structure, and ensure that the safety that horizontal job platform 14 vertically runs; Horizontal job platform 14 is formed by connecting by some level standards joint head and the tail bolt, can according to the width of the horizontal job platform 14 of the width flexible of building 1, decrease the number of times of adjustable pair of saddle multistage lifting work platforms 10 integral level displacement of spacing, improve work efficiency.
Above-mentioned level standard joint includes the supporting frame being made up and be truss structure of shaped steel, is fixed on the horizontal pedal at supporting frame top, and is vertically fixed on guardrail and the toeguard of supporting frame top. The above-mentioned constituent material of supporting frame and structure make its bearing capacity higher, provide safe and reliable operating platform for workmen.
Above-mentioned saddle 11 is formed by some vertical standard knots are end to end, the support body of truss structure is made up and is to vertical standard knot of shaped steel, the quantity of vertical standard knot and length need according to construction and determine, and between adjacent two vertical standard knots, bolt connects, it is simple to dismantle and install.
Further, the bottom of above-mentioned saddle 11 is additionally provided with the base 15 being made up and in frame structure of shaped steel, and base 15 is connected with saddle 11 bottom bolt. Base 15 can be set to fixed or portable according to the requirement of construction, that is, can affixed some legs bottom base 15, leg is made to be connected with the embedded part bolt on ground 2, or, some rollers are set bottom base 15 so that adjustable pair of saddle multistage lifting work platforms 10 of spacing can need shift position according to construction.
As shown in Fig. 1, Fig. 3 and Fig. 4, above-mentioned wall-attaching equipment 12 is made up of shaped steel, and one end of wall-attaching equipment 12 is connected with saddle 11 bolt, and the other end of wall-attaching equipment 12 is locked with the pre-embedded bolt in the xoncrete structure of building 1 side; The shape of wall-attaching equipment 12 can be I type or V-type etc., the wall-attaching equipment 12 of the present embodiment is V-shaped, it is more beneficial for saddle 11 and is stably supported in building 1 side, adjacent two wall-attaching equipment 12 are arranged at a certain distance, in the present embodiment, saddle 11 is often increased four vertical standard knots and need to be installed one wall-attaching equipment 12, certainly, according to different construction needs, wall-attaching equipment 12 quantity is set and spacing is different, be not construed as limiting herein.
Further, adjustable pair of saddle multistage lifting work platforms 10 of spacing also includes click drive system (not shown), the ratchet of click drive system is fixed on fixed frame 14a, and the crosspiece being meshed with ratchet of click drive system is fixed on saddle 11. Click drive system is it can be avoided that horizontal job platform 14 free falling, and concrete structure and the annexation of above-mentioned click drive system are prior art content, are no longer specifically described herein.
Embodiment two: the construction method of adjustable pair of saddle multistage lifting work platforms of spacing of the present invention is described in conjunction with Fig. 1 to Fig. 4, and step is as follows:
One, a pair saddle 11 it is vertically arranged to ground 2 and fixes, making saddle 11 affixed by some wall-attaching equipment 12 with the side of building 1, and on saddle 11, be respectively mounted the tooth bar of gear-rack drive system;
Two, two horizontal job platforms 14 are assembled, each horizontal job platform 14 is installed gear-rack drive system and drives gear and power set accordingly, and horizontal job platform 14 is installed on saddle 11 successively so that each horizontal job platform 14 all can need to do vertical lifting motion relative to saddle 11 according to construction.
The construction method of adjustable pair of saddle multistage lifting work platforms of spacing of the present invention, first, a pair saddle 11 is fixed with ground 2 and building 1 side respectively and is connected, and on saddle 11, it is respectively mounted the tooth bar of gear-rack drive system, then, assemble the horizontal job platform 14 of at least two, and be respectively mounted gear-rack drive system and drive gear and power set accordingly, then, horizontal job platform 14 is installed on saddle 11 successively, can move along saddle 11 as vertical lifting, increase along with construction height, can at the tooth bar of the some vertical standard knots of the continuous over installation of present level saddle 11 and corresponding length, horizontal job platform 14 is made to can continue to rise along saddle 11, to realize the construction operation of follow-up height. by above-mentioned construction method, make the multistage horizontal job platform 14 can in different layers synchronous construction operation, also multistage horizontal job platform 14 can being made to realize collaborative work according to construction feature, successively completing each working procedure, thus improving external wall efficiency of construction.
Please continue to refer to Fig. 1 to Fig. 4, in above-mentioned steps two, horizontal job platform 14 includes a pair fixed frame 14a being sheathed on saddle 11, and is fixed on fixed frame 14a and is saved end to end horizontal-extending platform 14b by some level standards; Fixed frame 14a is the frame structure being welded by shaped steel and matching with saddle 11; During assembling, first install in the inner side of fixed frame 14a and drive gear, and a pair fixed frame 14a is sheathed on the saddle 11 being provided with tooth bar respectively, the gear that drives on fixed frame 14a is made to be meshed with the tooth bar on saddle 11, keep fixed frame 14a position motionless, meanwhile, lift horizontal-extending platform 14b and be bolted on fixed frame 14a.Horizontal job platform 14 is fixed on saddle 11 by fixed frame 14a, not only constructs convenient, improves the stability in the large of horizontal job platform 14 structure, and ensure that the safety that horizontal job platform 14 vertically runs.
Foregoing description is only the description to present pre-ferred embodiments, not any restriction to the scope of the invention, any change that the those of ordinary skill in field of the present invention does according to the disclosure above content, modification, belongs to the protection domain of claims.

Claims (9)

1. adjustable pair of saddle multistage lifting work platforms of spacing, it is characterised in that including:
A pair vertically arranged and be fixed on the saddle on ground, and described saddle is fixed on the side of building by some wall-attaching equipment;
On saddle described in a pair, interval arranges the horizontal job platform of at least two, each described horizontal job platform is respectively provided with driving gear and the power set of gear-rack drive system, described saddle is respectively provided with the tooth bar being meshed with described driving gear of described gear-rack drive system so that each described horizontal job platform all can do vertical lifting motion relative to described saddle.
2. according to claim 1 pair of saddle multistage lifting work platforms, it is characterized in that: described horizontal job platform includes the fixed frame being sheathed on described saddle a pair, and is fixed on described fixed frame and is saved end to end horizontal-extending platform by some level standards; Described fixed frame is the frame structure being welded by shaped steel and matching with described saddle; Described driving gear is fixed on the inner side of described fixed frame, and is meshed with described tooth bar fixing on described saddle.
3. according to claim 2 pair of saddle multistage lifting work platforms, it is characterized in that: described level standard joint includes being made up of shaped steel and being the supporting frame of truss structure, it is fixed on the horizontal pedal at support frame as described above body top, and is vertically fixed on guardrail and the toeguard of support frame as described above body side surface.
4. according to claim 1 pair of saddle multistage lifting work platforms, it is characterized in that: described saddle is formed by some vertical standard knots are end to end, the support body of truss structure is made up and is to described vertical standard knot of shaped steel, and between adjacent two described vertical standard knots, bolt connects.
5. according to claim 1 pair of saddle multistage lifting work platforms, it is characterised in that: the bottom of described saddle is additionally provided with the base being made up and in frame structure of shaped steel, and described base is connected with described saddle bottom bolt.
6. according to claim 1 pair of saddle multistage lifting work platforms, it is characterized in that: described wall-attaching equipment is made up of shaped steel, one end of described wall-attaching equipment is connected with described saddle bolt, and the other end of described wall-attaching equipment is locked with the pre-embedded bolt in described side of buildings xoncrete structure.
7. the double; two saddle multistage lifting work platformses according to any one of claim 2 to 6, it is characterized in that: also include click drive system, the ratchet of described click drive system is fixed on described fixed frame, and the crosspiece being meshed with described ratchet of described click drive system is fixed on described saddle.
8. the construction method of adjustable pair of saddle multistage lifting work platforms of the spacing as described in any one of claim 1 to 7, step is as follows:
One, a pair saddle it is vertically arranged to ground and fixes, making described saddle affixed by some wall-attaching equipment with the side of building, and on described saddle, be respectively mounted the tooth bar of gear-rack drive system;
Two, the horizontal job platform of at least two is assembled, each described horizontal job platform installs described gear-rack drive system and drives gear and power set accordingly, and described horizontal job platform is installed on described saddle successively so that each described horizontal job platform all can need to do vertical lifting motion relative to described saddle according to construction.
9. construction method according to claim 8, it is characterized in that: in described step 2, described horizontal job platform includes a pair fixed frame being sheathed on described saddle, and is fixed on described fixed frame and is saved end to end horizontal-extending platform by some level standards; When assembling described horizontal job platform, the driving gear of described gear-rack drive system is first installed in the inner side of described fixed frame, and fixed frame described in a pair is sheathed on respectively on the saddle of the tooth bar being provided with described gear-rack drive system, the gear that drives on described fixed frame is made to be meshed with the tooth bar on described saddle, keep described fixed frame position motionless, meanwhile, lift described horizontal-extending platform and be bolted on described fixed frame.
CN201610140965.XA 2016-03-11 2016-03-11 Dual-guide-frame multistage lifting working platform with adjustable gaps and construction method thereof Pending CN105672642A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610140965.XA CN105672642A (en) 2016-03-11 2016-03-11 Dual-guide-frame multistage lifting working platform with adjustable gaps and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610140965.XA CN105672642A (en) 2016-03-11 2016-03-11 Dual-guide-frame multistage lifting working platform with adjustable gaps and construction method thereof

Publications (1)

Publication Number Publication Date
CN105672642A true CN105672642A (en) 2016-06-15

Family

ID=56308250

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610140965.XA Pending CN105672642A (en) 2016-03-11 2016-03-11 Dual-guide-frame multistage lifting working platform with adjustable gaps and construction method thereof

Country Status (1)

Country Link
CN (1) CN105672642A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106906994A (en) * 2017-03-08 2017-06-30 上海建工集团股份有限公司 Saddle climbing type Work platform system and its construction method with lossless wall-attaching equipment
CN107035122A (en) * 2017-03-08 2017-08-11 上海建工集团股份有限公司 A kind of saddle climbing type Work platform system and its construction method
CN108285078A (en) * 2018-03-09 2018-07-17 中建三局集团有限公司 Top supernumerary segment extends downwardly formula transport device and implementation
CN112832503A (en) * 2021-01-05 2021-05-25 常州工学院 Climbing type building construction operation platform outside building and installation method
CN113668833A (en) * 2021-08-03 2021-11-19 常州工学院 Embedded fixed rail type construction operation platform frame for constructional engineering and installation method
WO2024045333A1 (en) * 2022-08-31 2024-03-07 中建三局科创产业发展有限公司 Double-layer multifunctional combined guide frame climbing type working platform

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0525933A (en) * 1991-07-24 1993-02-02 Shimizu Corp Strut type scaffold form lifting device and concrete building frame construction method
CN101148945A (en) * 2007-03-02 2008-03-26 顾粉兵 Building exterior wall finishing automatic lifting workbench
CN103821340A (en) * 2014-03-10 2014-05-28 成都嘉泽正达科技有限公司 Installation method for attached lifting multilayer construction platform
CN204001648U (en) * 2014-08-14 2014-12-10 贺善虎 Column multiple layer up-down scaffold device
CN105155828A (en) * 2015-09-24 2015-12-16 上海建工集团股份有限公司 Lifting platform and four-upright guide rail bracket thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0525933A (en) * 1991-07-24 1993-02-02 Shimizu Corp Strut type scaffold form lifting device and concrete building frame construction method
CN101148945A (en) * 2007-03-02 2008-03-26 顾粉兵 Building exterior wall finishing automatic lifting workbench
CN103821340A (en) * 2014-03-10 2014-05-28 成都嘉泽正达科技有限公司 Installation method for attached lifting multilayer construction platform
CN204001648U (en) * 2014-08-14 2014-12-10 贺善虎 Column multiple layer up-down scaffold device
CN105155828A (en) * 2015-09-24 2015-12-16 上海建工集团股份有限公司 Lifting platform and four-upright guide rail bracket thereof

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106906994A (en) * 2017-03-08 2017-06-30 上海建工集团股份有限公司 Saddle climbing type Work platform system and its construction method with lossless wall-attaching equipment
CN107035122A (en) * 2017-03-08 2017-08-11 上海建工集团股份有限公司 A kind of saddle climbing type Work platform system and its construction method
CN107035122B (en) * 2017-03-08 2023-10-24 上海建工集团股份有限公司 Guide frame climbing type working platform system and construction method thereof
CN106906994B (en) * 2017-03-08 2023-10-24 上海建工集团股份有限公司 Guide frame climbing type working platform system with nondestructive wall attachment device and construction method thereof
CN108285078A (en) * 2018-03-09 2018-07-17 中建三局集团有限公司 Top supernumerary segment extends downwardly formula transport device and implementation
CN112832503A (en) * 2021-01-05 2021-05-25 常州工学院 Climbing type building construction operation platform outside building and installation method
CN113668833A (en) * 2021-08-03 2021-11-19 常州工学院 Embedded fixed rail type construction operation platform frame for constructional engineering and installation method
CN113668833B (en) * 2021-08-03 2023-10-27 常州工学院 Pre-buried fixed rail type construction operation platform frame for building engineering and installation method
WO2024045333A1 (en) * 2022-08-31 2024-03-07 中建三局科创产业发展有限公司 Double-layer multifunctional combined guide frame climbing type working platform

Similar Documents

Publication Publication Date Title
CN105672642A (en) Dual-guide-frame multistage lifting working platform with adjustable gaps and construction method thereof
CN109399432B (en) A kind of hoistway job platform that climbs certainly
CN105672641A (en) Double-guide-frame multi-stage synchronous lifting working platform and construction method thereof
CN205713147U (en) A kind of quick positioning apparatus of precast floor slab
CN105672673A (en) Quick locating device and method for prefabricated floor slabs
CN204958044U (en) No pit car frame and no pit villa elevator
CN104847098A (en) Multi-guide-rail attachment type electric ascending and descending scaffold
CN106044665A (en) Extra heavy component small-space shifting device and implementation method thereof
CN105781091A (en) Adjustable-length single-guide-frame multilevel synchronous lifting working platform and construction method thereof
CN205100531U (en) Lift scaffold support body assembly
CN105781092A (en) Single-guide-frame and multi-stage lifting working platform with adjustable interval and construction method thereof
CN105715030A (en) Single-guide-frame multi-stage lifting working platform with adjustable spacing and length and construction method for single-guide-frame multi-stage lifting working platform
CN105672640A (en) Single-guide-frame multi-stage lifting work platform and construction method thereof
CN209011528U (en) A kind of all steel attachment type raise scaffold
CN101660660B (en) Novel installing method of gas cabinet
CN203257070U (en) Slippage frame operating platform for gallery daylighting roof curtain wall installation
CN105715031A (en) Double-guide-frame multi-stage lifting working platform with adjustable spacing and length and construction method for double-guide-frame multi-stage lifting working platform
CN203257106U (en) Multifunctional power-driven walking type walking system
CN105520681A (en) Pitching-type folding-arm window cleaning machine
CN105804383A (en) Length-adjustable double-guide-frame multistage synchronous lifting working platform and construction method thereof
CN205575534U (en) Lattice formula groined type support body lifting means
CN211499699U (en) Ladder-climbing type operation rack for hanging cage
CN204980945U (en) Supplementary tower crane dismounting device
CN203878957U (en) Protective screen module unit
CN208980193U (en) The curtain wall hanging apparatus of anticollision

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160615