CN113668833A - Embedded fixed rail type construction operation platform frame for constructional engineering and installation method - Google Patents
Embedded fixed rail type construction operation platform frame for constructional engineering and installation method Download PDFInfo
- Publication number
- CN113668833A CN113668833A CN202110887563.7A CN202110887563A CN113668833A CN 113668833 A CN113668833 A CN 113668833A CN 202110887563 A CN202110887563 A CN 202110887563A CN 113668833 A CN113668833 A CN 113668833A
- Authority
- CN
- China
- Prior art keywords
- construction
- frame
- rail type
- engineering
- steel rails
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 147
- 238000009434 installation Methods 0.000 title claims abstract description 16
- 238000000034 method Methods 0.000 title claims abstract description 11
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 62
- 239000010959 steel Substances 0.000 claims abstract description 62
- 239000000463 material Substances 0.000 claims abstract description 17
- QNRATNLHPGXHMA-XZHTYLCXSA-N (r)-(6-ethoxyquinolin-4-yl)-[(2s,4s,5r)-5-ethyl-1-azabicyclo[2.2.2]octan-2-yl]methanol;hydrochloride Chemical compound Cl.C([C@H]([C@H](C1)CC)C2)CN1[C@@H]2[C@H](O)C1=CC=NC2=CC=C(OCC)C=C21 QNRATNLHPGXHMA-XZHTYLCXSA-N 0.000 claims abstract description 9
- 239000002131 composite material Substances 0.000 claims description 25
- 230000009194 climbing Effects 0.000 claims description 8
- 239000000835 fiber Substances 0.000 claims description 8
- 239000011159 matrix material Substances 0.000 claims description 8
- 230000003014 reinforcing effect Effects 0.000 claims description 8
- 239000011347 resin Substances 0.000 claims description 8
- 229920005989 resin Polymers 0.000 claims description 8
- 230000000694 effects Effects 0.000 claims description 3
- 241000894006 Bacteria Species 0.000 description 7
- 238000005273 aeration Methods 0.000 description 5
- 239000003814 drug Substances 0.000 description 5
- 239000003795 chemical substances by application Substances 0.000 description 4
- 238000004332 deodorization Methods 0.000 description 3
- 229910003460 diamond Inorganic materials 0.000 description 3
- 239000010432 diamond Substances 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 3
- 244000025254 Cannabis sativa Species 0.000 description 2
- 238000005034 decoration Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- JVTAAEKCZFNVCJ-UHFFFAOYSA-N lactic acid Chemical compound CC(O)C(O)=O JVTAAEKCZFNVCJ-UHFFFAOYSA-N 0.000 description 2
- 239000007921 spray Substances 0.000 description 2
- 241000186361 Actinobacteria <class> Species 0.000 description 1
- 241000193830 Bacillus <bacterium> Species 0.000 description 1
- 235000017166 Bambusa arundinacea Nutrition 0.000 description 1
- 235000017491 Bambusa tulda Nutrition 0.000 description 1
- 239000004343 Calcium peroxide Substances 0.000 description 1
- 241000252229 Carassius auratus Species 0.000 description 1
- 235000007516 Chrysanthemum Nutrition 0.000 description 1
- 244000189548 Chrysanthemum x morifolium Species 0.000 description 1
- 241000196324 Embryophyta Species 0.000 description 1
- 244000082204 Phyllostachys viridis Species 0.000 description 1
- 235000015334 Phyllostachys viridis Nutrition 0.000 description 1
- 240000004808 Saccharomyces cerevisiae Species 0.000 description 1
- 230000004075 alteration Effects 0.000 description 1
- 239000011425 bamboo Substances 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- LHJQIRIGXXHNLA-UHFFFAOYSA-N calcium peroxide Chemical compound [Ca+2].[O-][O-] LHJQIRIGXXHNLA-UHFFFAOYSA-N 0.000 description 1
- 235000019402 calcium peroxide Nutrition 0.000 description 1
- 235000014655 lactic acid Nutrition 0.000 description 1
- 239000004310 lactic acid Substances 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000001546 nitrifying effect Effects 0.000 description 1
- 238000010422 painting Methods 0.000 description 1
- 230000000243 photosynthetic effect Effects 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 230000009897 systematic effect Effects 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/007—Devices and methods for erecting scaffolds, e.g. automatic scaffold erectors
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/14—Railings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G2003/283—Mobile scaffolds; Scaffolds with mobile platforms mobile horizontally
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G2003/286—Mobile scaffolds; Scaffolds with mobile platforms mobile vertically
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/14—Railings
- E04G2005/148—Railings latticed or netted
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Movable Scaffolding (AREA)
Abstract
The invention discloses an embedded fixed rail type construction operation platform frame for constructional engineering and an installation method, and the technical scheme is as follows: the construction method comprises a plurality of horizontal steel rails and a plurality of vertical steel rails which are fixed on the vertical surface of the outer wall of the construction engineering, wherein any one of the horizontal steel rails and the vertical steel rails forms a rail type grid of the vertical surface of the outer wall of the construction engineering through fixedly connecting a rhombic embedded part pre-buried on the wall surface, and any one of the horizontal steel rails and the vertical steel rails is provided with an adjustable wheel set for fixing a construction operation platform and forms a pre-buried fixed rail type construction operation platform of the construction engineering. Compare with traditional steel scaffold, hanging flower basket construction platform frame, column type construction platform that climbs, this kind of building engineering is with pre-buried fixed rail formula construction work platform frame, construction platform frame is because the part has used light high-strength combined material, and installation easy and simple to handle.
Description
Technical Field
The invention relates to the field of buildings, in particular to an embedded fixed rail type construction operation platform frame for constructional engineering and an installation method.
Background
The construction of the building engineering is divided into two parts of main construction and internal and external decoration construction. In construction sites, construction operations such as building, decoration, painting and the like of building facades are usually carried out by adopting scaffold erection or hanging basket erection. The existing technology for installing external scaffolds, high-altitude operation hanging basket platforms and column-type climbing construction operation platforms of buildings has the following problems:
1. the external scaffold is erected manually and fixed in a manner of adhering to a wall body frame, so that the operation is complicated, the construction efficiency is low, and the external scaffold needs to be dismantled after the construction is finished, thereby consuming physical strength;
2. the aerial work hanging basket platform does not need an additional fixing mode, but is poor in wind resistance and load resistance and has larger potential safety hazard through a winch and a steel wire rope climbing system fixed on the top of a building;
3. the setting of column type construction work platform that climbs to the column type base, steel truss column and work platform's operation is comparatively complicated, when the building increases, needs a large amount of steel truss column standard festival and fixed facilities, obviously is less than outside scaffold frame and high altitude construction hanging flower basket platform in the economic nature.
Disclosure of Invention
Aiming at the problems mentioned in the background technology, the invention aims to provide an embedded fixed rail type construction work platform frame for constructional engineering and an installation method thereof, so as to solve the problems mentioned in the background technology.
The technical purpose of the invention is realized by the following technical scheme:
the utility model provides a building engineering is with pre-buried fixed rail formula construction work platform frame, is including fixing a plurality of levels at building engineering outer wall facade to rail and a plurality of perpendicular rail to, arbitrary level is to rail and perpendicular rail form building engineering outer wall facade rail formula net through the pre-buried rhombus built-in fitting fixed connection of wall, arbitrary level is to being provided with the adjustable wheelset of fixed construction work platform and forming building engineering pre-buried fixed rail formula construction work platform on rail and the perpendicular rail to.
Preferably, the construction operation platform consists of a bottom plate frame, a grid frame, a stiffening beam, an upright post, an inclined strut and a handrail; the bottom plate frame, the grid frame, the stiffening cross beam, the upright post, the inclined strut, the reinforcing plate and the handrail are fixedly connected with one another through bolts.
Preferably, the construction operation platform is provided with a power unit, a brake unit, a locking unit, a power supply control box, a cable frame, a material frame, a tool frame, a safety rope and a fixing ring; the power unit, the locking unit, the power control box, the cable frame, the material frame and the tool frame are fixedly connected with the construction operation platform frame through bolts.
Preferably, the construction operation platform operates through the cooperation of the adjustable wheel set and the locking unit.
Preferably, the length of a single section of any one of the horizontal steel rails and the vertical steel rail is calculated according to the distance between the outer wall body and the floor slab of the building engineering.
Preferably, the bottom plate frame and the reinforcing plate are made of steel; the grid frame, the stiffening beam, the upright post and the inclined strut are composite material profiles, and the composite material profiles are fiber reinforced resin matrix composite materials.
Preferably, the cable frame, the material frame and the tool frame are composite material profiles, and the composite material profiles are fiber reinforced resin matrix composite materials.
The invention also provides an installation method of the pre-buried fixed rail type construction work platform frame for the constructional engineering, which comprises the following steps:
s1, building a rail type grid system of the outer wall facade of the building engineering, fixedly connecting a plurality of horizontal steel rails and vertical steel rails with different lengths through rhombic embedded parts pre-embedded in the wall body of the outer wall of the building and a floor plate of the building in advance through bolts, and finishing the construction work of the rail type grid;
s2, when the construction work platform moves to any intersection point of the rail type grid, fixing the stud in the other direction on the clamping shaft of the adjustable wheel set, connecting the adjustable wheel set in the other direction, and then loosening the stud in the current state to complete the switching between the horizontal direction and the vertical direction;
and S3, fixing the construction operation platform on the steel rail in any direction through an adjustable wheel set, and moving and stopping on any horizontal steel rail or vertical steel rail under the driving of a power unit through the matching of a braking unit and a locking unit according to construction requirements to perform construction operation.
S4, when the rail type grid system is erected on the outer wall facade of the building engineering, the part is erected according to the construction progress and the requirement to achieve the climbing type construction effect, and the construction operation can be carried out by repeating the steps S1-S3.
In summary, the invention mainly has the following beneficial effects:
1. compare with traditional steel scaffold, hanging flower basket construction platform frame, column type construction platform that climbs, this kind of building engineering is with pre-buried fixed rail formula construction work platform frame, construction platform frame is because the part has used light high-strength combined material, and installation easy and simple to handle.
2. Compare with traditional hanging flower basket construction platform frame, this kind of building engineering is with pre-buried fixed rail formula construction work platform frame uses the rail formula net with the outer wall is pre-buried fixed as the basis, and construction work platform frame can reliable and stable at any point position operation on rail formula net, and construction position is nimble changeable, and the whole anti-wind anti-loading capacity of construction platform frame is strong, the safety and stability.
3. Compare with traditional steel scaffold, hanging flower basket construction platform frame, column type construction platform that climbs, can set up according to construction progress and technological requirement part with the pre-buried fixed rail formula net of outer wall, flexibility and economic nature are more excellent, and installation and operation are simple and convenient, great increase efficiency of construction and construction quality, reach the good performance that traditional work platform did not possess, have certain popularization nature.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a front view of the connection between a diamond embedded part and a wall floor slab according to the present invention;
FIG. 3 is a cross-sectional view of the connection between a diamond embedded part and a wall floor slab according to the present invention;
FIG. 4 is a schematic view of the rail-type grid of the wall surface of the present invention;
FIG. 5 is a schematic view of the position of the adjustable wheelset and the horizontal rail of the present invention;
FIG. 6 is a schematic view of the position of the adjustable wheelset and the vertical rail of the present invention;
FIG. 7 is a schematic view of an adjustable wheelset configuration of the present invention;
FIG. 8 is a structural diagram of the construction platform of the present invention;
FIG. 9 is a schematic diagram of the location of functional components of the construction work platform according to the present invention;
in the figure: 1. a construction work platform; 2. a horizontal steel rail; 3. a vertically oriented rail; 4. a rhombic embedded part; 41. fastening a screw rod; 42. an anchor rod; 5. a wall body; 6. a floor slab; 7. a rail-type grid; 8. an adjustable wheel set; 81. a roller; 82. a stud; 83. clamping a shaft; 9. a floor frame; 10. a grid frame; 11. a stiffening beam; 12. a column; 13. bracing; 14. a reinforcing plate; 15. an armrest 1; 16. a power unit; 17. a locking unit; 18. a power supply control box; 19. a cable rack; 20. a material rack; 21. a tool holder; 22. a safety cord; 23. and (4) fixing the ring.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Example 1
Referring to fig. 1 to 9, a pre-buried fixed rail type construction work platform frame for construction engineering comprises a plurality of horizontal steel rails 2 and a plurality of vertical steel rails 3 fixed on the vertical surface of the outer wall of the construction engineering, wherein any one of the horizontal steel rails 2 and the vertical steel rails 3 is fixedly connected with each other through a rhombic embedded part 4 pre-buried in the wall surface to form a rail type grid 7 of the vertical surface of the outer wall of the construction engineering, and any one of the horizontal steel rails 2 and the vertical steel rails 3 is provided with an adjustable wheel set 8 for fixing the construction work platform 1 and forms the pre-buried fixed rail type construction work platform 1 of the construction engineering.
The construction work platform 1 comprises a bottom plate frame 9, a grid frame 10, a stiffening crossbeam 11, upright posts 12, inclined struts 13 and handrails; the bottom plate frame 9, the grid frame 10, the stiffening cross beam 11, the upright post 12, the inclined strut 13, the reinforcing plate 14 and the handrail are fixedly connected with one another through bolts.
The construction operation platform 1 is provided with a power unit 16, a brake unit, a locking unit 17, a power supply control box 18, a cable frame 19, a material frame 20, a tool frame 21, a safety rope 22 and a fixing ring 23; the power unit 16, the locking unit 17, the power supply control box 18, the cable frame 19, the material frame 20 and the tool frame 21 are fixedly connected with the construction operation platform 1 through bolts.
The construction operation platform 1 runs through the cooperation of the adjustable wheel set 8 and the locking unit 17.
Wherein, the length of each section of any one of the horizontal steel rails 2 and any one of the vertical steel rails 3 is calculated according to the distance between the outer wall 5 and the floor slab of the building engineering.
Wherein, the bottom plate frame 9 and the reinforcing plate 14 are made of steel; the grid frame 10, the stiffening beam 11, the upright post 12 and the inclined strut 13 are composite material profiles, and the composite material profiles are fiber reinforced resin matrix composite materials.
The cable frame 19, the material frame 20 and the tool frame 21 are composite material profiles, and the composite material profiles are fiber reinforced resin matrix composite materials.
Wherein, compare with traditional steel scaffold frame, hanging flower basket construction platform frame, column type climbing construction platform, this kind of building engineering is with pre-buried fixed rail formula construction work platform frame, construction platform frame is because the part has used the combined material that light weight is high-strength, and installation easy and simple to handle.
Wherein, compare with traditional hanging flower basket construction platform frame, this kind of building engineering is with pre-buried fixed rail formula construction work platform frame uses the rail formula net 7 of fixing with the outer wall is pre-buried as the basis, and construction work platform 1 can be reliable and stable in any one point position operation on rail formula net 7, and the construction position is nimble changeable, and the whole anti-wind anti-loading capacity of construction platform frame is strong, the safety and stability.
Wherein, compare with traditional steel scaffold, hanging flower basket construction platform frame, column type climbing construction platform, can set up according to construction progress and technological requirement part with the pre-buried fixed rail formula net 7 of outer wall, flexibility and economic nature are more excellent, and the installation is easy and simple to handle, great increase efficiency of construction and construction quality, reach the good performance that traditional work platform did not possess, have certain popularization nature.
Example 2
The difference with embodiment 1 lies in that, still provides an installation method of pre-buried fixed rail formula construction work platform frame for building engineering, includes the following steps:
s1, building a rail type grid 7 system of the building engineering outer wall facade, fixedly connecting a plurality of horizontal steel rails 2 and vertical steel rails 3 with different lengths through rhombic embedded parts 4 pre-embedded in the building outer wall 5 and a floor plate in advance through bolts, and finishing the building work of the rail type grid 7;
s2, when the construction work platform 1 moves to any intersection point of the rail type grid 7, fixing the stud 82 in the other direction on the clamping shaft 83 of the adjustable wheel set 8, connecting the adjustable wheel set 8 in the other direction at the moment, and then loosening the stud 82 in the current state to complete the switching between the horizontal direction and the vertical direction;
and S3, fixing the construction platform 1 on a steel rail in any direction through the adjustable wheel set 8, and performing construction operation by driving the power unit 16 and moving and stopping the construction platform on any horizontal steel rail 2 or vertical steel rail 3 through the matching of the braking unit and the locking unit 17 according to construction requirements.
S4, when the rail type grid 7 system is erected on the outer wall facade of the building engineering, the part is erected according to the construction progress and the requirement to achieve the climbing type construction effect, and the construction operation can be carried out by repeating the steps S1-S3.
Example 2
Referring to fig. 1 to 9, an embedded fixed rail type construction work platform frame for construction engineering includes the following steps:
s1, taking temporary plugging measures aiming at the discharge port;
s2, installing an aeration deodorization device;
s3, carrying out environment-friendly medicament splashing treatment.
When temporary plugging measures are taken for the row opening in S1, the temporary plugging device for the row opening is constructed by adopting steel pipe piles, bamboo chips and yellow sand.
When the S2 aeration deodorization equipment is installed, an aeration zone is adopted when the river width is less than 10 m, 1.5kw surge machines are installed when the width of the river channel or lake is more than 10 m, and the installation number is controlled to be not less than 3000 square/platform.
Wherein, when the S3 environment-friendly medicament is sprinkled, the medicament is sprinkled under the condition of aeration operation, and the dosage is 30 ppm.
Wherein the environment-friendly medicament comprises a composition of em bacteria and calcium peroxide, and the em bacteria comprise lactic acid bacteria, bacillus, photosynthetic bacteria, yeast and actinomycetes.
Wherein the em bacteria further comprise one or more of nitrifying bacteria and denitrifying bacteria.
When the environment-friendly agent is sprayed, the ship body is selected to transport the environment-friendly agent, and the pump and the spray head are utilized to spray the environment-friendly agent to the water surface.
Wherein, when the environment-friendly medicament is sprayed, the goldfish grass and the chrysanthemum grass are synchronously added, and the total adding amount is 10 plants per square meter.
The invention provides a systematic water ecological restoration method by using the pre-buried fixed rail type construction operation platform frame for the construction engineering, can achieve the good water ecological restoration purpose by adopting temporary treatment of a discharge port, installation of aeration deodorization equipment and environment-friendly agent splashing.
Example 3
Referring to fig. 1 to 9, as shown in fig. 1 to 9, an embedded fixed rail type construction work platform 1 for construction engineering includes a construction work platform 1, a plurality of horizontal steel rails 2, a plurality of vertical steel rails 3, and a plurality of diamond embedded parts 4. The horizontal and vertical steel rails 3 are fixedly connected through the rhombic embedded parts 4 connected with the building wall 5 to form the building engineering outer wall vertical surface rail type grid 7. The construction operation platform 1 is fixed on a steel rail in any direction through an adjustable wheel set 8. The construction operation platform 1 is provided with a power unit 16, a locking unit 17, a power control box 18, a cable frame 19, a material frame 20, a tool frame 21, a safety rope 22, a fixing ring 23 and the like. The construction operation platform 1 can stably and reliably operate at any point on the rail type grid 7 through the matched operation of the adjustable wheel set 8 and the locking device. The construction operation platform 1 and the rail type grids 7 form an embedded fixed rail type construction operation platform 1 for constructional engineering.
As shown in fig. 2-4. A plurality of horizontal steel rails 3 and a plurality of vertical steel rails 3 are fixed on the vertical face of the exterior wall of the building engineering, and any one of the horizontal steel rails 2 and the vertical steel rail 3 is fixedly connected through a rhombic embedded part 4 embedded in the wall face to form a rail type grid 7 of the vertical face of the exterior wall of the building engineering.
As shown in fig. 5-7. The construction platform 1 is fixed on a steel rail in any direction through an adjustable wheel set 8. When the construction operation platform 1 needs to move horizontally, adjusting the horizontal wheel set; and if the vertical movement is needed, adjusting the vertical wheel set.
As shown in fig. 8. The construction work platform 1 is composed of a bottom plate frame 9, a grid frame 10, a stiffening beam 11, upright posts 12, inclined struts 13 and handrails. Any one of the bottom plate frames 9, the grid frame 10, the stiffening cross beam 11, the upright post 12, the inclined strut 13, the reinforcing plate 14 and the handrail are fixedly connected with one another through bolts.
As shown in fig. 9. The construction operation platform 1 is provided with a power unit 16, a locking unit 17, a power control box 18, a cable frame 19, a material frame 20, a tool frame 21, a safety rope 22, a fixing ring 23 and the like. Any one of the power unit 16, the locking unit 17, the power supply control box 18, the cable frame 19, the material frame 20 and the tool frame 21 is fixedly connected with the construction operation platform 1 through bolts.
In this embodiment, any one of the floor frames 9 is made of steel. Any grid frame 10, stiffening beam 11, upright post 12 and inclined strut 13 can be composite material section bars, and the composite materials are fiber reinforced resin matrix composite materials.
In this embodiment, any one of the cable rack 19, the material rack 20, and the tool rack 21 may be a composite material profile, and the composite material is a fiber reinforced resin matrix composite material.
Compared with a traditional hanging basket construction platform frame, the pre-buried fixed rail type construction operation platform 1 for the construction engineering is based on the rail type grid 7 pre-buried and fixed with the outer wall, the construction operation platform 1 can stably and reliably operate at any position on the rail type grid 7, the construction position is flexible and changeable, and the whole construction platform frame is strong in wind resistance and load resistance and is safe and stable. Meanwhile, compared with a hanging basket construction platform frame and a column type climbing construction platform, the embedded fixed rail type construction operation platform 1 for the building engineering is simple and convenient to install and operate due to the fact that the construction platform frame is made of a light high-strength composite material. The rail type grid 7 fixed with the outer wall in an embedded mode can be partially erected according to construction progress and process requirements, flexibility and economy are better, installation and operation are simple and convenient, construction efficiency and construction quality are greatly improved, excellent performance which cannot be achieved by a traditional operation platform is achieved, and the rail type grid has certain popularization performance.
The connecting piece and the fastener in the invention are generally bolts, and a person skilled in the art can select a proper connecting and fastening part according to actual conditions, which belongs to the conventional technical means and is not detailed.
The standard parts used by the invention can be purchased from the market, the special-shaped parts can be customized according to the description of the specification and the description of the attached drawings, the specific connection mode of each part adopts conventional means such as bolts, rivets and the like mature in the prior art, and machines, parts and equipment adopt conventional models and conventional connection modes in the prior art, and the details are not repeated.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (8)
1. The utility model provides a building engineering is with pre-buried fixed rail formula construction work platform frame which characterized in that: the construction engineering outer wall vertical surface rail type grid structure comprises a plurality of horizontal steel rails (2) and a plurality of vertical steel rails (3) which are fixed on a construction engineering outer wall vertical surface, wherein the horizontal steel rails (2) and the vertical steel rails (3) are fixedly connected through wall pre-buried rhombic embedded parts (4) to form a construction engineering outer wall vertical surface rail type grid (7), and the horizontal steel rails (2) and the vertical steel rails (3) are provided with adjustable wheel sets (8) for fixing a construction operation platform (1) and form a construction engineering pre-buried fixed rail type construction operation platform (1).
2. The embedded fixed rail type construction work platform frame for the constructional engineering as claimed in claim 1, which is characterized in that: the construction work platform (1) consists of a bottom plate frame (9), a grid frame (10), a stiffening crossbeam (11), a stand column (12), an inclined strut (13) and a handrail; the floor frame (9), the grid frame (10), the stiffening cross beam (11), the upright post (12), the inclined strut (13), the reinforcing plate (14) and the handrail are fixedly connected with each other through bolts.
3. The embedded fixed rail type construction work platform frame for the constructional engineering as claimed in claim 1, which is characterized in that: the construction operation platform (1) is provided with a power unit (16), a brake unit, a locking unit (17), a power supply control box (18), a cable frame (19), a material frame (20), a tool frame (21), a safety rope (22) and a fixing ring (23); the power unit (16), the locking unit (17), the power control box (18), the cable frame (19), the material frame (20) and the tool frame (21) are fixedly connected with the construction operation platform (1) through bolts.
4. The embedded fixed rail type construction work platform frame for the constructional engineering as claimed in claim 1, which is characterized in that: the construction operation platform (1) runs through the cooperation of the adjustable wheel set (8) and the locking unit (17).
5. The embedded fixed rail type construction work platform frame for the constructional engineering as claimed in claim 1, which is characterized in that: the length of a single section of any one of the horizontal steel rails (2) and any one of the vertical steel rails (3) is calculated according to the distance between an outer wall body (5) and a floor slab of the building engineering.
6. The embedded fixed rail type construction work platform frame for the constructional engineering as claimed in claim 2, wherein: the bottom plate frame (9) and the reinforcing plate (14) are made of steel; the grid frame (10), the stiffening beam (11), the upright post (12) and the inclined strut (13) are composite material profiles, and the composite material profiles are fiber reinforced resin matrix composite materials.
7. The embedded fixed rail type construction work platform frame for the constructional engineering as claimed in claim 3, wherein: the cable frame (19), the material frame (20) and the tool frame (21) are composite material profiles, and the composite material profiles are made of fiber reinforced resin matrix composite materials.
8. The utility model provides an installation method of pre-buried fixed rail formula construction work platform frame for building engineering which characterized in that: the method comprises the following steps:
s1, building a rail type grid (7) system of the building engineering outer wall facade, fixedly connecting a plurality of horizontal steel rails (2) and vertical steel rails (3) with different lengths through rhombic embedded parts (4) pre-embedded in the building outer wall body (5) and a floor plate in advance through bolts, and completing the building work of the rail type grid (7);
s2, when the construction work platform (1) moves to any intersection point of the rail type grid (7), firstly fixing the stud (82) in the other direction on the clamping shaft (83) of the adjustable wheel set (8), connecting the adjustable wheel set (8) in the other direction at the moment, and then loosening the stud (82) in the current state to complete the switching between the horizontal direction and the vertical direction;
s3, the construction operation platform (1) is fixed on a steel rail in any direction through an adjustable wheel set (8), and is driven by a power unit (16) to move and stop on any horizontal steel rail (2) or vertical steel rail (3) through the matching of a braking unit and a locking unit (17) according to construction requirements, so that construction operation is carried out.
S4, when the rail type grid (7) system of the building engineering outer wall facade is erected, the climbing type construction effect is achieved according to the construction progress and the requirement part, and the construction operation can be carried out by repeating the steps S1-S3.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110887563.7A CN113668833B (en) | 2021-08-03 | 2021-08-03 | Pre-buried fixed rail type construction operation platform frame for building engineering and installation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110887563.7A CN113668833B (en) | 2021-08-03 | 2021-08-03 | Pre-buried fixed rail type construction operation platform frame for building engineering and installation method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN113668833A true CN113668833A (en) | 2021-11-19 |
CN113668833B CN113668833B (en) | 2023-10-27 |
Family
ID=78541486
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110887563.7A Active CN113668833B (en) | 2021-08-03 | 2021-08-03 | Pre-buried fixed rail type construction operation platform frame for building engineering and installation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113668833B (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003293581A (en) * | 2002-04-04 | 2003-10-15 | Nippon Steel Corp | Work scaffolding having slide mechanism |
JP2004003186A (en) * | 2002-05-31 | 2004-01-08 | Sumitomo Mitsui Construction Co Ltd | Building structure with track guide disposed therein |
CN202039589U (en) * | 2011-04-26 | 2011-11-16 | 廊坊凯博建设机械科技有限公司 | Suspended rail suitable for building elevation decoration construction |
CN105672642A (en) * | 2016-03-11 | 2016-06-15 | 上海建工集团股份有限公司 | Dual-guide-frame multistage lifting working platform with adjustable gaps and construction method thereof |
CN209413265U (en) * | 2018-12-06 | 2019-09-20 | 赵建玲 | One kind being suitable for elevation of building decoration construction suspended rail |
CN110541556A (en) * | 2019-09-11 | 2019-12-06 | 云南建投建筑机械有限公司 | Attached lifting scaffold and climbing method |
CN113062579A (en) * | 2021-03-05 | 2021-07-02 | 上海建工一建集团有限公司 | Construction method for reforming existing large-space structure |
-
2021
- 2021-08-03 CN CN202110887563.7A patent/CN113668833B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003293581A (en) * | 2002-04-04 | 2003-10-15 | Nippon Steel Corp | Work scaffolding having slide mechanism |
JP2004003186A (en) * | 2002-05-31 | 2004-01-08 | Sumitomo Mitsui Construction Co Ltd | Building structure with track guide disposed therein |
CN202039589U (en) * | 2011-04-26 | 2011-11-16 | 廊坊凯博建设机械科技有限公司 | Suspended rail suitable for building elevation decoration construction |
CN105672642A (en) * | 2016-03-11 | 2016-06-15 | 上海建工集团股份有限公司 | Dual-guide-frame multistage lifting working platform with adjustable gaps and construction method thereof |
CN209413265U (en) * | 2018-12-06 | 2019-09-20 | 赵建玲 | One kind being suitable for elevation of building decoration construction suspended rail |
CN110541556A (en) * | 2019-09-11 | 2019-12-06 | 云南建投建筑机械有限公司 | Attached lifting scaffold and climbing method |
CN113062579A (en) * | 2021-03-05 | 2021-07-02 | 上海建工一建集团有限公司 | Construction method for reforming existing large-space structure |
Also Published As
Publication number | Publication date |
---|---|
CN113668833B (en) | 2023-10-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201826525U (en) | Climbing shuttering system device for buildings | |
CN206053274U (en) | The external scaffolding device of the perpendicular BAIYE outer visor of skyscraper and glass curtain wall dual-purpose | |
CN101215928A (en) | Attached lifting scaffold trolley type inclining-proof device and method of use thereof | |
CN205046827U (en) | Mobilizable slope operation construction platform | |
CN107268971B (en) | Dual self-lifting type external climbing frame for super high-rise building and application method | |
CN113668833A (en) | Embedded fixed rail type construction operation platform frame for constructional engineering and installation method | |
CN207194487U (en) | Piping lane engineering construction ceiling | |
CN209568688U (en) | A kind of elevating construction platform | |
CN201148725Y (en) | Trolley type inclining-proof device adhering to elevating scaffold | |
CN110952794A (en) | Water-saving cleaning system for building glass curtain wall | |
CN109941933A (en) | A kind of hoisting frame for workshop Pipe installing | |
CN105019657A (en) | Building construction system | |
CN215948858U (en) | Attached lifting scaffold protection platform | |
CN211058272U (en) | Flower basket type overhanging scaffold | |
CN212957545U (en) | Movable operation platform for large caisson construction | |
CN212689494U (en) | Construction platform for building construction | |
CN2209702Y (en) | Saffold | |
CN2276046Y (en) | Divided multistage automatic climbing external scaffold | |
CN204754150U (en) | Dish -type node formula scaffold | |
CN208577945U (en) | A kind of tapered pier template multifunctional operating platform | |
CN203213632U (en) | Movable protective shed | |
CN109944430A (en) | A kind of electric lifting platform construction method for special-shaped exterior walls of buildings operation | |
CN208347279U (en) | A kind of building faces side structural column construction protecting rack | |
CN105003075A (en) | Building construction system | |
CN215048236U (en) | Novel shaped protection passageway of tower crane |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |