CN201367686Y - Transporting device for installing louver frame - Google Patents

Transporting device for installing louver frame Download PDF

Info

Publication number
CN201367686Y
CN201367686Y CNU2008201064797U CN200820106479U CN201367686Y CN 201367686 Y CN201367686 Y CN 201367686Y CN U2008201064797 U CNU2008201064797 U CN U2008201064797U CN 200820106479 U CN200820106479 U CN 200820106479U CN 201367686 Y CN201367686 Y CN 201367686Y
Authority
CN
China
Prior art keywords
cross bar
frames
transporting device
lifting
orbits
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008201064797U
Other languages
Chinese (zh)
Inventor
李社增
刘建军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Jingtang Construction Co Ltd
Original Assignee
MCC Jingtang Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Jingtang Construction Co Ltd filed Critical MCC Jingtang Construction Co Ltd
Priority to CNU2008201064797U priority Critical patent/CN201367686Y/en
Application granted granted Critical
Publication of CN201367686Y publication Critical patent/CN201367686Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

A transporting device for installing louver frame belongs to the technical field of building mechanical devices and is used to transport louver frames which need installing in high-rise operation of building projects. The utility model adopts the technical scheme that the transporting device comprises supporting frames, a cross bar, lifting eyes, idler wheels, driving orbits and a manual lifting pulley, the supporting frames are two right-angled triangle steel frames and are oppositely arranged, two right-angle sides of the supporting frames are respectively bottom edges and vertical edges, the bottom edges are arranged on the two parallel driving orbits, two ends of the cross bar are respectively and fixedly connected with the top ends of the two vertical edges, two lifting eyes are respectively fixed on the top ends of the vertical edges, the manual lifting pulley is installed on the lifting eyes, a plurality of idler wheels are arranged on the lower portion of the bottom edges, and the idler wheels are matched with the driving orbits. The louver frame transporting device which adopts the structure has the advantages of simple and reasonable structure, low manufacture cost, rapid and convenient assembly, and the like, can rapidly transport the louver frames to right positions for installation under the condition of rigorous lifting conditions, guarantees the construction progress, and saves the cost.

Description

A kind of conveying arrangement that skylight truss is installed
Technical field
The utility model relates to the equipment of transportation skylight truss in a kind of building operations work high above the ground, belongs to the construction machinery equipment technical field.
Background technology
In the building operations operation, lifting component is indispensable action, generally all uses the plant equipment hoisting and hanging, can finish construction task fast and effectively.It is the operation of finishing in the high-altitude that skylight truss is installed, need in the work skylight truss transportation is put in place, because execution conditions are special, general Transport Machinery equipment can not be marched into the arena, do not satisfy the construction demand at all, and adopt large-scale lifting appliance, though can satisfy construction requirement, but cost is too high, causes the duration progress to be conflicted mutually with cost.
Summary of the invention
Technical problem to be solved in the utility model provide a kind of simple, low cost of manufacture rational in infrastructure, easy to assembly flexibly, can finish the conveying arrangement that skylight truss is installed in the construction work work high above the ground.
The technical scheme that solves the problems of the technologies described above is:
A kind of conveying arrangement that skylight truss is installed, it is made up of support, cross bar, hanger, roller, Crane Rail, manual gin wheel, support is two right angle trigonometry shaped steel frames, staggered relatively, their two right-angle sides are respectively base and stile, the base places on two parallel Crane Rails, fixedly connected with the top of two stiles respectively in the cross bar two ends, two hangers are separately fixed at the top of two stiles, manually gin wheel is lifted on the hanger, a plurality of rollers are arranged at the bottom, base, and roller matches with Crane Rail.
The conveying arrangement of above-mentioned installation skylight truss has ribbed panel between described cross bar and two stiles.
The conveying arrangement of above-mentioned installation skylight truss, the hypotenuse of described two triangle steelframes and the angle on base are 45 °-60 °.
Adopt the skylight truss conveying arrangement of this structure, have advantages such as simple and reasonable, low cost of manufacture, assembling be quick and convenient, under lifting condition exacting terms, construction speed has been guaranteed in the installation that can apace the skylight truss transportation be put in place, has saved cost.
Description of drawings
Fig. 1 is a structural representation of the present utility model;
Fig. 2 is the schematic diagram that the utility model roller and Crane Rail amplify;
Fig. 3 is the schematic diagram of the utility model transportation skylight truss.
Mark is as follows among the figure: support 1, cross bar 2, hanger 3, roller 4, Crane Rail 5, ribbed panel 6, manual gin wheel 7, skylight truss 8
The specific embodiment
Show among the figure that this skylight truss conveying arrangement is made up of support 1, cross bar 2, hanger 3, roller 4, Crane Rail 5, ribbed panel 6, manual gin wheel 7.Support 1 is two right angle trigonometry shaped steel frames, and is staggered relatively, and their two right-angle sides are respectively base and stile, and the angle on hypotenuse and base is 45 °-60 °.
Cross bar 2 is at support 1 top, and its two ends are connected with the top of two stiles of support 1 respectively.
Be connected with ribbed panel 6 between the stile of support 1 and cross bar 2, ribbed panel 6 plays the effect of reinforced support 1 and cross bar 2 connectivity robustness.
Hanger 3 has 2, is separately fixed on two stile tops of support 1, and manually gin wheel 7 is lifted on the hanger.
Below two bases of support 1 a plurality of rollers 4 are arranged, roller 4 is positioned on two parallel Crane Rails 5, and 2 rollers are arranged under each base of the embodiment that shows among the figure.
Support 1 and Crane Rail 5 all are to be made by channel-section steel, and cross bar 2 is steel pipes of usefulness.
In the reality lifting, put in place, influenced construction speed because the restriction of factors such as site condition, lifting machine performance causes skylight truss normally to lift, using large-scale hanging device instead has increased cost again greatly.Now only need skylight truss to be installed is hung the design level plan-position, lay Crane Rail 5 according to the skylight truss plan-position, utilize manual gin wheel 7 that skylight truss is sling, promote support along Crane Rail 5 walkings by manpower then, utilize manual gin wheel 7 to adjust the absolute altitude of skylight trusss after skylight truss transportation put in place, finish the installation of skylight truss.

Claims (3)

1. conveying arrangement that skylight truss is installed, it is characterized in that: it is by support [1], cross bar [2], hanger [3], roller [4], Crane Rail [5], manually gin wheel [7] is formed, support [1] is two right angle trigonometry shaped steel frames, staggered relatively, their two right-angle sides are respectively base and stile, the base places on two parallel Crane Rails [5], fixedly connected with the top of two stiles respectively in cross bar [2] two ends, two hangers [3] are separately fixed at the top of two stiles, manually gin wheel [7] is lifted on the hanger [3], a plurality of rollers [4] are arranged at the bottom, base, and roller [4] matches with Crane Rail [5].
2. the conveying arrangement of installation skylight truss according to claim 1 is characterized in that: between described cross bar [2] and two stiles ribbed panel [6] is arranged.
3. the conveying arrangement of installation skylight truss according to claim 2 is characterized in that: the hypotenuse of described two triangle steelframes and the angle on base are 45 °-60 °.
CNU2008201064797U 2008-11-11 2008-11-11 Transporting device for installing louver frame Expired - Fee Related CN201367686Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008201064797U CN201367686Y (en) 2008-11-11 2008-11-11 Transporting device for installing louver frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008201064797U CN201367686Y (en) 2008-11-11 2008-11-11 Transporting device for installing louver frame

Publications (1)

Publication Number Publication Date
CN201367686Y true CN201367686Y (en) 2009-12-23

Family

ID=41486580

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008201064797U Expired - Fee Related CN201367686Y (en) 2008-11-11 2008-11-11 Transporting device for installing louver frame

Country Status (1)

Country Link
CN (1) CN201367686Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102561615A (en) * 2012-02-16 2012-07-11 成都嘉泽正达金属制造有限公司 Novel movable scaffold and construction method using same
CN107447931A (en) * 2016-05-31 2017-12-08 中国二十冶集团有限公司 The closed factory building roof skylight frame installation method of overlarge area

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102561615A (en) * 2012-02-16 2012-07-11 成都嘉泽正达金属制造有限公司 Novel movable scaffold and construction method using same
CN107447931A (en) * 2016-05-31 2017-12-08 中国二十冶集团有限公司 The closed factory building roof skylight frame installation method of overlarge area
CN107447931B (en) * 2016-05-31 2019-06-14 中国二十冶集团有限公司 The closed factory building roof skylight frame installation method of overlarge area

Similar Documents

Publication Publication Date Title
CN107902545B (en) Horse way air pipe hoisting construction device and construction method
CN203821720U (en) High-altitude large roof panel installing tool trolley
CN205908031U (en) A rail mounted lifting device for high -rise building curtain wall construction
CN202299574U (en) Plug-in type communication base station lifting tower
CN206940275U (en) A kind of steel-structure factory building steel frame roof boarding handling apparatus
CN201367686Y (en) Transporting device for installing louver frame
CN205257861U (en) Portable elevating gear
CN204754160U (en) Rail mounted removes work platform
CN103291078B (en) A kind of steel girder erection equipment
CN211895693U (en) A hoist device for roofing panel removes installation
CN205077842U (en) Multi -use architecture support
CN204802839U (en) Jacking equipment for building
CN202324662U (en) Installation device for foam cement composites
CN202181183U (en) Trolley for installing and overhauling rollers in horizontal type loop
CN201660823U (en) Turf conveyor
CN203867198U (en) Slip equipment for high-rise steel structure transfer layer truss
CN203452285U (en) Horizontal handling pulley for roof panels
CN206903168U (en) A kind of movable up-down builds scaffold by laying bricks or stones
CN204980945U (en) Supplementary tower crane dismounting device
CN204310700U (en) A kind of indoor hoisting crane
CN211713715U (en) Synchronous dislocation method construction hanging basket device for corrugated steel web suspension casting bridge
CN209538759U (en) Applied to the jack up high-building construction workshop on climbing frame
CN206606927U (en) Across running railway line station indoor and outdoor skylight construction transport and auxiliary installation device
CN211169685U (en) Indoor hanger frock that construction used
CN201485204U (en) Gas tank hanging device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20091223

Termination date: 20121111