CN211895693U - A hoist device for roofing panel removes installation - Google Patents

A hoist device for roofing panel removes installation Download PDF

Info

Publication number
CN211895693U
CN211895693U CN202020549703.0U CN202020549703U CN211895693U CN 211895693 U CN211895693 U CN 211895693U CN 202020549703 U CN202020549703 U CN 202020549703U CN 211895693 U CN211895693 U CN 211895693U
Authority
CN
China
Prior art keywords
square pipe
fixed plate
plate
frames
plates
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020549703.0U
Other languages
Chinese (zh)
Inventor
刘传鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020549703.0U priority Critical patent/CN211895693U/en
Application granted granted Critical
Publication of CN211895693U publication Critical patent/CN211895693U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model belongs to the technical field of building construction, and discloses a hoisting device for moving installation of roof plates, which comprises two second square pipe racks and two channel steel rails, wherein the two channel steel rails are all positioned below the second square pipe racks, two first square pipe racks are symmetrically installed between the top ends of the two second square pipe racks, two positioning pipes are installed at the two ends of the bottom of the second square pipe racks, and electric hoists are connected with the two ends of the top of the two second square pipe racks, the utility model can assemble a walking type hanger through the first square pipe racks, the second square pipe racks, a track wheel and the positioning pipes, and meanwhile, the plates are hoisted through the electric hoists, and the walking type hanger is pushed to move along the channel steel rails, so that the plates can move on the roof to be laid and installed, further, the transportation and the accurate installation of the plates are realized, and when the difficult problems of hoisting and transportation are solved, greatly reducing the installation cost.

Description

A hoist device for roofing panel removes installation
Technical Field
The utility model belongs to the technical field of the construction, concretely relates to a hoist device for roofing panel removes installation.
Background
The building construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, and also can be a process of changing various lines on a design drawing into a real object in a specified place, and comprises foundation engineering construction, main structure construction, roofing engineering construction, decoration engineering construction and the like. The site of the construction work is called a construction site or a construction site, and is also called a construction site.
At present of high-speed development, large-scale factory buildings and large-scale net rack workshops are pulled out of the ground, the roof area is huge, roof plates are various, the area of general roof plates is large due to the restriction of heat preservation, energy conservation, water drainage, plate structures and the like, the weight is large, large-scale hoisting machinery is inconvenient to install accurately, the cost is high, in addition, when the plates are hoisted by ropes on tools, the plates are easy to incline and rock under the influence of self gravity, and are difficult to fix, and the stability of the device is influenced very much.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a hoist device for roofing panel removes installation to it is very inconvenient to solve the jack-up machinery transportation installation that proposes in the above-mentioned background art, and the cost is higher, and unstable problem when panel hoists.
In order to achieve the above object, the utility model provides a following technical scheme: a hoisting device for movable installation of roof plates comprises two second square pipe racks and two channel steel tracks, wherein the two channel steel tracks are located below the second square pipe racks, the two first square pipe racks are symmetrically installed between the top ends of the two second square pipe racks, positioning pipes are installed at two ends of the bottoms of the two second square pipe racks, electric hoists are connected to two ends of the tops of the two second square pipe racks, the bottoms of the four electric hoists are connected with hoisting rings through chains, a supporting plate is installed between the bottoms of the two adjacent hoisting rings, plates are connected between the bottoms of the two supporting plates, a fixing plate is connected to the bottom of each positioning pipe, high-strength bolts penetrate through the connecting parts of the positioning pipes and the second square pipe racks, positioning holes matched with the high-strength bolts are formed in the side walls of the positioning pipes and the second square pipe racks, track wheels are installed at the bottoms of the fixing plates, and the bottom both ends of fixed plate all are fixed with the slider near one side of rail wheel, the one end that the fixed plate was kept away from to the rail wheel extends to the orbital inside of channel-section steel, the orbital top both ends of channel-section steel all seted up with slider assorted spout.
Preferably, two the fixed plate is all installed at the bottom both ends of backup pad, and the spout has all been seted up at the lateral wall both ends of two backup pads, the fixed plate extends to the inside one end of backup pad and is connected with the spout, and closes soon between fixed plate and the backup pad and be connected with adjust knob, two telescopic cylinder are installed to the below that the lateral wall of fixed plate is close to panel, two telescopic cylinder keeps away from and is connected with the clamp plate between the one end of fixed plate, the position department that just is located between two telescopic cylinder between clamp plate and the fixed plate is connected with the spring.
Preferably, the fixing plate is of an L-shaped structure, and the outer wall of the rail wheel is provided with an anti-skid groove.
Preferably, one side of the pressing plate, which is far away from the spring, is provided with a rubber pad, and the outer wall of the rubber pad is provided with a bulge.
Preferably, the side walls of the two square pipe frames are fixed with reinforcing frames, and the reinforcing frames are located above the high-strength bolts.
Compared with the prior art, the beneficial effects of the utility model are that:
(1) the utility model discloses a walking gallows can be assembled into to first side pipe support, second side pipe support, rail wheel and registration arm, lifts up panel through electric block simultaneously, promotes walking gallows and makes it can be along channel-section steel orbital motion to make panel remove on the roof, so that lay the installation, and then realize transportation and the accurate installation of panel, when having solved hoist and mount transportation difficult problem, very big reduction installation cost.
(2) The utility model discloses a cooperation of clamp plate, flexible section of thick bamboo, spring, fixed plate and backup pad for two backup pads block the both ends of panel respectively, and the quick detachable separation of being convenient for simultaneously, thereby can keep firm when panel is hoisted, prevented that panel from taking place to incline to rock, improved the stability of device greatly.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic structural view of the first square pipe frame and the second square pipe frame of the present invention when they are connected;
FIG. 3 is a schematic structural view of the plate of the present invention when connected to the fixing plate;
FIG. 4 is an enlarged view of portion A of FIG. 1;
FIG. 5 is an enlarged view of portion B of FIG. 1;
in the figure: 1-a first square pipe frame; 2-a second square pipe frame; 3-a reinforcing frame; 4-hoisting rings; 5-adjusting knob; 6-channel steel rails; 7-a plate material; 8-a chute; 9-a spring; 10-fixing the plate; 11-a rail wheel; 12-a fixing plate; 13-a support plate; 14-a positioning tube; 15-high strength bolts; 16-an electric hoist; 17-positioning holes; 18-a platen; 19-a telescopic cylinder; 20-a slide block; 21-chute.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-5, the present invention provides the following technical solutions: a hoisting device for movably installing roof plates comprises two second square pipe frames 2 and two channel steel rails 6, wherein the two channel steel rails 6 are located below the second square pipe frames 2, two first square pipe frames 1 are symmetrically installed between the top ends of the two second square pipe frames 2, positioning pipes 14 are installed at two ends of the bottoms of the two second square pipe frames 2, electric hoists 16 are connected to two ends of the tops of the two second square pipe frames 2, the bottom ends of the four electric hoists 16 are connected with hoisting rings 4 through chains, a supporting plate 13 is installed between the bottoms of the two adjacent hoisting rings 4, a plate 7 is connected between the bottoms of the two supporting plates 13, a fixing plate 12 is connected to the bottom of each positioning pipe 14, a high-strength bolt 15 penetrates through the joint of each positioning pipe 14 and the corresponding second square pipe frame 2, and the height of the second square pipe frames 2 can be adjusted through the matching of the high-strength bolt 15 and the positioning hole 17, the side walls of the positioning pipe 14 and the second square pipe frame 2 are respectively provided with a positioning hole 17 matched with a high-strength bolt 15, the bottom of the fixing plate 12 is provided with a track wheel 11, one side of each of two ends of the bottom of the fixing plate 12, which is close to the track wheel 11, is respectively fixed with a slider 20, the track wheel 11 can be more stable when moving through the matching of the slider 20 and a chute 21, the safety performance of the device is improved, one end of the track wheel 11, which is far away from the fixing plate 12, extends into the channel steel track 6, the two ends of the top of the channel steel track 6 are respectively provided with the chute 21 matched with the sliders 20, when in use, the two channel steel tracks 6 can be laid on a construction roof, then the first square pipe frame 1, the second square pipe frame 2, the track wheel 11 and the positioning pipe 14 are assembled into a walking type hanger, the track wheel 11 at the bottom of the positioning pipe 14 enters the channel steel track 6, the plate 7 can be lifted through, thereby make panel 7 remove on the roof to lay the installation, and then make panel 7 accomplish transportation and accurate installation on the roof through this design, when having solved hoist and mount transportation difficult problem, very big reduction installation cost.
Further, the two ends of the bottom of the two supporting plates 13 are respectively provided with a fixing plate 10, the two ends of the side wall of the two supporting plates 13 are respectively provided with a sliding groove 8, one end of the fixing plate 10 extending into the supporting plate 13 is connected with the sliding groove 8, an adjusting knob 5 is screwed between the fixing plate 10 and the supporting plate 13, two telescopic cylinders 19 are arranged below the side wall of the fixing plate 10 close to the plate 7, a pressing plate 18 is connected between the ends of the two telescopic cylinders 19 far away from the fixing plate 10, a spring 9 is connected between the pressing plate 18 and the fixing plate 10 and between the two telescopic cylinders 19, when the electric hoist is used, a chain at the bottom end of the electric hoist 16 can be hung on the hanging ring 4, the pressing plate 18 is pressed downwards to drive the telescopic cylinders 19 and the spring 9 to contract, then the fixing plate 10 is pushed to slide in the sliding groove 8, and the pressing plate, the pressing plate 18 is abutted against the plate 7 under the rebound of the spring 9 and the support of the telescopic cylinder 19, and then the adjusting knob 5 is screwed down, so that the fixing plate 10 clamps the plate 7, the plate 7 can be stably lifted, the plate 7 is prevented from being inclined and shaken, and the stability of the device is improved.
Further, the fixing plate 10 is of an L-shaped structure, and the outer wall of the rail wheel 11 is provided with an anti-slip groove.
Specifically, one side of the pressing plate 18, which is far away from the spring 9, is provided with a rubber pad, the rubber pad plays a role of skid resistance, and the outer wall of the rubber pad is provided with a protrusion.
Specifically, the side walls of the two second square pipe racks 2 are all fixed with reinforcing frames 3, the reinforcing frames 3 can play a role in stabilizing the second square pipe racks 2, and the reinforcing frames 3 are located at positions above the high-strength bolts 15.
The utility model discloses a theory of operation and use flow: when the utility model is used, firstly, the width between two channel steel tracks 6 is set according to the size of a roof panel, then the two channel steel tracks 6 are laid on a construction roof, then a walking hanger is assembled by a first square pipe frame 1, a second square pipe frame 2 and a positioning pipe 14, a track wheel 11 at the bottom of the positioning pipe 14 enters the channel steel tracks 6, then electric hoists 16 are respectively connected with two ends of the top of the two second square pipe frames 2, the height of the second square pipe frame 2 can be adjusted by matching high-strength bolts 15 and positioning holes 17, then chains at the bottom ends of the four electric hoists 16 are respectively hung on four hanging rings 4, by pressing the pressing plate 18 downwards, the pressing plate 18 drives the telescopic cylinder 19 and the spring 9 to shrink, then the fixing plate 10 is pushed to slide in the chute 8, the pressing plate 18 is released after the side edge of the fixing plate 10 supports the plate 7, the pressing plate 18 is supported by the spring 9 and the telescopic cylinder 19 to tightly support the plate 7, later screw up adjust knob 5, thereby make fixed plate 10 press from both sides tight panel 7, can prevent that panel 7 from taking place the slope and rocking when panel 7 is hoisted, the stability of device has been improved, later the workman can promote the combination gallows and make rail wheel 11 slide in channel steel track 6, thereby make panel 7 remove on the roof, so that lay the installation, and then make panel 7 accomplish transportation and accurate installation on the roof through this design, when having solved hoist and mount transportation difficult problem, very big reduction installation cost, simultaneously through the cooperation of slider 20 with spout 21, it is more stable when can making rail wheel 11 remove, the security performance of device has been improved greatly.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. The utility model provides a hoist device for roofing panel removes installation which characterized in that: the device comprises two second square pipe frames (2) and two channel steel rails (6), wherein the two channel steel rails (6) are located below the second square pipe frames (2), two first square pipe frames (1) are symmetrically installed between the top ends of the two second square pipe frames (2), positioning pipes (14) are installed at two ends of the bottoms of the two second square pipe frames (2), electric hoists (16) are connected to two ends of the tops of the two second square pipe frames (2), the bottoms of the four electric hoists (16) are connected with hoisting rings (4) through chains, supporting plates (13) are installed between the bottoms of the two adjacent hoisting rings (4), plates (7) are connected between the bottoms of the two supporting plates (13), the bottoms of the positioning pipes (14) are connected with fixing plates (12), and high-strength bolts (15) penetrate through the connecting positions of the positioning pipes (14) and the second square pipe frames (2), locating hole (17) with high strength bolt (15) assorted are all seted up with the lateral wall of second side pipe support (2) in registration arm (14), rail wheel (11) are installed to the bottom of fixed plate (12), and one side that the bottom both ends of fixed plate (12) are close to rail wheel (11) all is fixed with slider (20), the one end that fixed plate (12) were kept away from in rail wheel (11) extends to the inside of channel-section steel track (6), the top both ends of channel-section steel track (6) all seted up with slider (20) assorted spout (21).
2. A lifting device for the mobile installation of roofing slabs according to claim 1, characterized in that: two fixed plate (10) are all installed at the bottom both ends of backup pad (13), and spout (8) have all been seted up at the lateral wall both ends of two backup pad (13), fixed plate (10) extend to backup pad (13) inside one end and are connected with spout (8), and close soon between fixed plate (10) and backup pad (13) and be connected with adjust knob (5), two telescopic cylinder (19), two are installed to the below that the lateral wall of fixed plate (10) is close to panel (7) be connected with clamp plate (18) between the one end that fixed plate (10) were kept away from in telescopic cylinder (19), position department between clamp plate (18) and fixed plate (10) and be located between two telescopic cylinder (19) is connected with spring (9).
3. A lifting device for the mobile installation of roofing slabs according to claim 2, characterized in that: the fixing plate (10) is of an L-shaped structure, and the outer wall of the rail wheel (11) is provided with an anti-slip groove.
4. A lifting device for the mobile installation of roofing slabs according to claim 2, characterized in that: and a rubber pad is arranged on one side of the pressing plate (18) far away from the spring (9), and a bulge is arranged on the outer wall of the rubber pad.
5. A lifting device for the mobile installation of roofing slabs according to claim 1, characterized in that: and two reinforcing frames (3) are fixed on the side walls of the second square pipe frames (2), and the reinforcing frames (3) are positioned at the positions above the high-strength bolts (15).
CN202020549703.0U 2020-04-15 2020-04-15 A hoist device for roofing panel removes installation Active CN211895693U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020549703.0U CN211895693U (en) 2020-04-15 2020-04-15 A hoist device for roofing panel removes installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020549703.0U CN211895693U (en) 2020-04-15 2020-04-15 A hoist device for roofing panel removes installation

Publications (1)

Publication Number Publication Date
CN211895693U true CN211895693U (en) 2020-11-10

Family

ID=73277988

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020549703.0U Active CN211895693U (en) 2020-04-15 2020-04-15 A hoist device for roofing panel removes installation

Country Status (1)

Country Link
CN (1) CN211895693U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113309406A (en) * 2021-07-07 2021-08-27 中建三局集团有限公司 Civil aviation engineering assembled movable standard aviation security enclosure and installation method thereof
CN113323407A (en) * 2021-06-16 2021-08-31 重庆电子工程职业学院 Steel bar positioning structure of reinforced concrete prefabricated part for architectural design

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113323407A (en) * 2021-06-16 2021-08-31 重庆电子工程职业学院 Steel bar positioning structure of reinforced concrete prefabricated part for architectural design
CN113323407B (en) * 2021-06-16 2022-12-06 重庆渝宏建筑规划设计有限公司 Steel bar positioning structure of reinforced concrete prefabricated part for architectural design
CN113309406A (en) * 2021-07-07 2021-08-27 中建三局集团有限公司 Civil aviation engineering assembled movable standard aviation security enclosure and installation method thereof

Similar Documents

Publication Publication Date Title
CN211895693U (en) A hoist device for roofing panel removes installation
CN206091365U (en) Construction is with adjustable elevator ramp
CN106522997A (en) Construction trolley for lagging jack in tunnel and underground construction and construction method
CN111472789A (en) Pipe jacking construction process
CN211173157U (en) Bracket for mounting ultrahigh steel beam
CN213356779U (en) Overweight steel column translation transportation installation device
CN202785396U (en) Combined base of tower type crane
CN206903168U (en) A kind of movable up-down builds scaffold by laying bricks or stones
CN205976405U (en) A scaffold frame that slides for face of cylinder double -layer steel nets shell
CN206940275U (en) A kind of steel-structure factory building steel frame roof boarding handling apparatus
DE112014000114T5 (en) Adjustable false floor of a large double-decker conveyor basket and adjustment and movement of the same
CN209538759U (en) Applied to the jack up high-building construction workshop on climbing frame
CN209582179U (en) Construction site placing of material device
CN204224995U (en) Fortune frame railway D beam one chassis
CN206538951U (en) A kind of steelframe precast stair
CN106836770A (en) Possesses the stable type scaffold of hydraulic pressure platform assistance for lifting
CN201367686Y (en) Transporting device for installing louver frame
CN206352299U (en) A kind of cage car device constructed for water seepage mechanism
CN217760059U (en) Steel-wood combined type unilateral formwork structure for urban underpass tunnel
CN218952185U (en) Bearing device of supporting beam in foundation pit
CN204826693U (en) Brick -laying machine
CN210737601U (en) Wall form movable device
CN208844943U (en) A kind of trash repository large span main couple sliding installation system
CN214924230U (en) Portable ALC panel hydraulic pressure mounting plate structure
CN112919314B (en) Device for assisting in translational transportation and installation of overweight steel column and construction method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant