CN209538759U - Applied to the jack up high-building construction workshop on climbing frame - Google Patents

Applied to the jack up high-building construction workshop on climbing frame Download PDF

Info

Publication number
CN209538759U
CN209538759U CN201920139263.9U CN201920139263U CN209538759U CN 209538759 U CN209538759 U CN 209538759U CN 201920139263 U CN201920139263 U CN 201920139263U CN 209538759 U CN209538759 U CN 209538759U
Authority
CN
China
Prior art keywords
jack
building construction
climbing frame
frame
edge column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920139263.9U
Other languages
Chinese (zh)
Inventor
张西
张典福
周向明
张利德
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qianhai Shenzhen Lattice Construction Technology Co Ltd
Original Assignee
Qianhai Shenzhen Lattice Construction Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qianhai Shenzhen Lattice Construction Technology Co Ltd filed Critical Qianhai Shenzhen Lattice Construction Technology Co Ltd
Priority to CN201920139263.9U priority Critical patent/CN209538759U/en
Application granted granted Critical
Publication of CN209538759U publication Critical patent/CN209538759U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a kind of jack up high-building construction workshops applied on climbing frame characterized by comprising edge column, upper frame and roof;The edge column is at least provided with four, the bottom of the edge column is connected with climbing frame, the climbing frame drives the edge column up-down during being gone up and down by driving, the upper frame is set to the top of the edge column, the roof is provided with two pieces and is set to the upper surface of the upper frame, and two pieces of roofs are arranged diagonally downward from centre to two sides.The utility model has the effect of sun-shading rain-proof, the construction environment in improvement high-building construction level, accelerates construction progress indirectly, is conducive to worker's health indirectly.

Description

Applied to the jack up high-building construction workshop on climbing frame
Technical field
The utility model relates to high-building construction technical fields, more particularly, to a kind of jack up applied on climbing frame High-building construction workshop.
Background technique
Climbing frame is called hoisting frame, and it is main several to be divided into fluid pressure type, electrodynamic type, manpower hand pulling type etc. according to its power resources Class.It is the new type scaffold system developed in recent years, is mainly used in high-layer shear force wall formula building.It can be past along building Upper soaring or decline, this system make Construction Formwork & Scaffold Technology take on a new look completely: first is that need not translation frame;Second is that eliminating tearing open for scaffold Dress process (primary assembling then use construction always finish), and not limited by depth of building, be greatly saved manpower and Material.And there is biggish change also for traditional scaffold in security standpoint, the great advantages for development in skyscraper.
But worker is at greatly under outdoor state, Ji Hushi when constructing in the construction level of skyscraper at present It carves in state of being exposed to the sun, is unfavorable for workers ' health, What is more in rainy day situation, can not construct at all, project progress is influenced, therefore And have much room for improvement.
Utility model content
The purpose of the utility model is to provide a kind of jack up high-building construction workshops applied on climbing frame, have and hide Sun keeps off the rain, improves construction environment in high-building construction level, accelerate construction progress indirectly, to be conducive to worker's body indirectly strong The advantages that health.
The above-mentioned purpose of the utility model have the technical scheme that it is a kind of applied on climbing frame from Lift-type high-building construction workshop, comprising: edge column, upper frame and roof;
At least provided with four, the bottom of the edge column is connected the edge column with climbing frame, the climbing frame quilt The edge column up-down is driven during driving lifting, the upper frame is set to the top of the edge column, the roof It is provided with two pieces and is set to the upper surface of the upper frame, two pieces of roofs are arranged diagonally downward from centre to two sides.
By using above-mentioned technical proposal, in conjunction with the sun-shading rain-proof function on roof, construction worker is fearless in construction to be exposed to the sun And heavy rain, the environment of site operation is greatly optimized, is accelerated construction progress indirectly, is conducive to worker's health indirectly, and Edge column, upper frame have preferable support effect to roof, and structure is more secured;Simultaneously by edge column and existing climbing frame It combines, to can be gone up and down together by driving along climbing frame, replacement floor construction after the construction of the top layer of skyscraper When, it is assembled again without disassembly, use is very convenient, has very much application value.
The utility model is further arranged to, and the roof is made of tarpaulin and is pressed on the upper frame by press strip, It removes the press strip and raises the roof for lifting material.
By using above-mentioned technical proposal, the lighter in weight of tarpaulin, built to significantly reduce entire jack up high level The weight for building construction workshop saves the energy consumption driven in its lifting process indirectly, is needing to increase material in construction level When, tarpaulin facilitates hoisting material convenient for starting.
The utility model is further arranged to, and the upper frame is provided with groove compatible with the press strip, the press strip It is fixed on the upper frame by screw or bolt group, the edge on the roof is pressed in the groove by the press strip.
By using above-mentioned technical proposal, the design of groove not only has good spacing barrier effect to press strip, so that After press strip is not easy to loosen, shake, and the edge on roof is pressed in groove by press strip, roof is more secured, is not easy by wind It starts, promotes the stability and safety of the structure.
The utility model is further arranged to, and the outer surface of the edge column is provided with peripheral billboard.
By using above-mentioned technical proposal, the design of peripheral billboard provides preferable location advertising, especially peripheral advertisement Plate is substantially at the extreme higher position of skyscraper, and bandwagon effect is good, has certain Communications Functions.
The utility model is further arranged to, and the bottom of the upper frame is also fixedly installed with moving track, the moving rail Slidable fit has electric block on road, and the electric block is used for transported material.
By using above-mentioned technical proposal, when worker needs to carry material, electric block can be first passed through and hang material It rises, then electric block and material is driven to move along track sliding together, so as to very laborsaving and safe material exists It is shifted in construction level.
The utility model is further arranged to, and the moving track includes: two transverse rails and longitudinal rail, described in two Transverse rails parallel interval arrangement, it is described longitudinal direction rail be located between two transverse rails and by idler wheel realization slidable fit, It is realized and is driven by motor, the electric block slidable fit is freely walked on longitudinal rail and by motor driven.
Electric block can be made in construction level by setting transverse rails and longitudinal rail by using above-mentioned technical proposal The longitudinal and transverse movement in top, can achieve any position of construction level, no mobile quadrangle, the convenient transfer in construction level Material, it is more convenient to use.
The utility model is further arranged to, and the transverse rails and longitudinal rail are all made of I-steel and are made.
By using above-mentioned technical proposal, I-steel materials purchase is convenient and at low cost, while also structural strength is high, It is hardly damaged.
The utility model is further arranged to, and is provided with cross support beam between the adjacent edge column.
By using above-mentioned technical proposal, cross support beam can make to connect between adjacent edge portion column more secured, mention Rise stability, service life and the safety of entire jack up high-building construction workshop.
The utility model is further arranged to, and the middle position of the upper frame is provided with several be supported in construction level Telescopic column.
It is stretched in the bigger situation of span of the jack up high-building construction workshop by using above-mentioned technical proposal Contracting column equally has certain load-bearing effect to upper frame, to cooperate edge column to be supported, so that the jack up is high-rise The structure of construction workshop is more secured, and telescopic column has certain expansion performance, can fit in a certain range Answering property adjusts its height, in order to adjust the distance of upper frame distance construction level, with adapt to various different situations, under the conditions of apply Work.
In conclusion the advantageous effects of the utility model are as follows:
First, in conjunction with the sun-shading rain-proof function on roof, construction worker is fearless in construction to be exposed to the sun and heavy rain, greatly optimizes The environment of site operation, accelerates construction progress indirectly, is conducive to worker's health indirectly, and edge column, upper frame are to room Top has preferable support effect, and structure is more secured;Edge column is combined with existing climbing frame simultaneously, thus in high level After the top layer construction of building, it can be driven and be gone up and down together along climbing frame, when replacement floor is constructed, without dismantling group again Dress, use is very convenient, has very much application value;
Second, can first pass through electric block when worker needs to carry material and sling material, then drive electric block Track sliding is moved along, together with material so as to very laborsaving and safe shift material in construction level.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the assembly relation schematic diagram between upper frame in the utility model, roof and press strip.
Appended drawing reference: 1, edge column;2, upper frame;21, groove;3, roof;4, press strip;5, peripheral billboard;6, mobile Track;61, transverse rails;62, longitudinal rail;7, electric block;8, cross support beam;9, telescopic column.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.
It referring to Fig.1, is a kind of jack up high-building construction workshop applied on climbing frame disclosed by the utility model, packet It includes: edge column 1, upper frame 2 and roof 3.
Edge column 1 is provided with ten and is divided into two rows of arrangements, (in other embodiments edge column 1 can for four, The six roots of sensation is more), the bottom of edge column 1 is connected with climbing frame, and climbing frame drives edge column 1 during being gone up and down by driving Lifting, upper frame 2 are set to the top of edge column 1, and roof 3 is provided with two pieces and is set to the upper surface of upper frame 2, two pieces of roofs 3 It is arranged diagonally downward from centre to two sides.
The outer surface of edge column 1 has been bolted peripheral billboard 5, and the design of peripheral billboard 5 provides preferable Location advertising, especially peripheral billboard 5 is substantially at the extreme higher position of skyscraper, and bandwagon effect is good, has certain a surname Pass function.
The middle position of upper frame 2 is provided with three telescopic columns being supported in construction level 9, stretches in other embodiments The quantity of contracting column 9 can also be for one, two, four or more, in the span of the jack up high-building construction workshop In bigger situation, telescopic column 9 equally has certain load-bearing effect to upper frame 2, so that edge column 1 be cooperated to be propped up Support, so that the structure of the jack up high-building construction workshop is more secured, and telescopic column 9 has certain flexible spy Property, being adapted to property adjusts its height in a certain range, in order to adjust the distance of 2 distance construction level of upper frame, to adapt to Various different situations, under the conditions of construct.
The bottom of upper frame 2 is also fixedly installed with moving track 6, and slidable fit has electric block 7 on moving track 6, electronic Cucurbit 7 is used for transported material, and moving track 6 is provided with two groups and is divided into the two sides of telescopic column 9, needs to carry object in worker When material, electric block 7 can be first passed through and sling material, then driven electric block 7 and material to move along track 6 together and slide It is dynamic, so as to very laborsaving and safe shift material in construction level.
Moving track 6 includes: two transverse rails 61 and longitudinal rail 62, and two 61 parallel interval of transverse rails arrangements are longitudinal Rail 62 is located between two transverse rails 61 and realizes slidable fit by idler wheel, realizes driving by motor, and electric block 7 is sliding It is dynamic to be assemblied on longitudinal rail 62 and freely walked by motor driven.By setting transverse rails 61 and longitudinal rail 62, electricity can be made Dynamic cucurbit 7 can achieve any position of construction level in the longitudinal and transverse movement in top of construction level, and no mobile quadrangle conveniently exists Handling material in construction level, it is more convenient to use.
Transverse rails 61 and longitudinal rail 62 are all made of I-steel and are made, and I-steel materials purchase is convenient and at low cost, simultaneously Also structural strength is high, is hardly damaged.
Cross support beam 8 is provided between adjacent edge column 1, cross support beam 8 can make between adjacent edge portion column 1 Connection is more secured, promotes stability, service life and the safety of entire jack up high-building construction workshop.
Referring to figs. 1 and 2, roof 3 is made of tarpaulin and is pressed on upper frame 2 by press strip 4, and upper frame 2 is by more Steel Combination Welding forms, and removes press strip 4 and raises roof 3 for lifting material, the lighter in weight of tarpaulin, thus significantly The weight for reducing entire jack up high-building construction workshop saves the energy consumption driven in its lifting process indirectly, is needing When increasing material in construction level, tarpaulin facilitates hoisting material convenient for starting.
Groove 21 compatible with press strip 4 is provided on the edge steel of upper frame 2, press strip 4 passes through screw or bolt group It is fixed on upper frame 2, the edge on roof 3 is pressed in groove 21 by press strip 4, and the design of groove 21 not only has press strip 4 good Good spacing barrier effect, so that press strip 4 is not easy to loosen, shake, and the edge on roof 3 is pressed in groove 21 by press strip 4 Later, roof 3 is more secured, is not easy to be started by wind, promotes the stability and safety of the structure.
The implementation principle of the present embodiment are as follows: in conjunction with the sun-shading rain-proof function on roof 3, construction worker is fearless in construction to be exposed to the sun And heavy rain, the environment of site operation is greatly optimized, is accelerated construction progress indirectly, is conducive to worker's health indirectly, and Edge column 1, upper frame 2 have preferable support effect to roof 3, and structure is more secured;Simultaneously by edge column 1 with it is existing Climbing frame combines, to can be gone up and down together by driving along climbing frame after the construction of the top layer of skyscraper, replace floor It when construction, is assembled again without disassembly, use is very convenient, has very much application value.
The embodiment of present embodiment is the preferred embodiment of the utility model, and not limitation is originally practical new according to this The protection scope of type, therefore: the equivalence changes that all structures, shape, principle according to the utility model are done should all be covered by practical Within novel protection scope.

Claims (9)

1. a kind of jack up high-building construction workshop applied on climbing frame characterized by comprising edge column (1), top Frame (2) and roof (3);
The edge column (1) is at least provided with four, and the bottom of the edge column (1) is connected with climbing frame, the climbing frame The edge column (1) is driven to go up and down during being gone up and down by driving, the upper frame (2) is set to the top of the edge column (1) Portion, the roof (3) are provided with two pieces and are set to the upper surface of the upper frame (2), and two pieces of roofs (3) are from centre to two Inclination is arranged obliquely.
2. the jack up high-building construction workshop according to claim 1 applied on climbing frame, which is characterized in that described Roof (3) is made of tarpaulin and is pressed on the upper frame (2) by press strip (4), removes the press strip (4) and raises the room Top (3) is for lifting material.
3. the jack up high-building construction workshop according to claim 2 applied on climbing frame, which is characterized in that described Upper frame (2) is provided with the compatible groove (21) with the press strip (4), and the press strip (4) is fixed by screw or bolt group In on the upper frame (2), the edge of the roof (3) is pressed in the groove (21) by the press strip (4).
4. the jack up high-building construction workshop according to claim 1 applied on climbing frame, which is characterized in that described The outer surface of edge column (1) is provided with peripheral billboard (5).
5. the jack up high-building construction workshop according to claim 1 applied on climbing frame, the bottom of the upper frame (2) Portion is also fixedly installed with moving track (6), and slidable fit has electric block (7), the electric block on the moving track (6) (7) it is used for transported material.
6. the jack up high-building construction workshop according to claim 5 applied on climbing frame, which is characterized in that described Moving track (6) includes: two transverse rails (61) and longitudinal rail (62), and two transverse rails (61) parallel intervals are arranged, The longitudinal direction rail (62) is located between two transverse rails (61) and realizes slidable fit by idler wheel, realized by motor Driving, electric block (7) slidable fit are freely walked on longitudinal rail (62) and by motor driven.
7. the jack up high-building construction workshop according to claim 6 applied on climbing frame, which is characterized in that described Transverse rails (61) and longitudinal rail (62) are all made of I-steel and are made.
8. the jack up high-building construction workshop according to claim 1 applied on climbing frame, which is characterized in that adjacent Cross support beam (8) are provided between the edge column (1).
9. the jack up high-building construction workshop according to claim 1 applied on climbing frame, which is characterized in that described The middle position of upper frame (2) is provided with several telescopic columns (9) being supported in construction level.
CN201920139263.9U 2019-01-26 2019-01-26 Applied to the jack up high-building construction workshop on climbing frame Expired - Fee Related CN209538759U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920139263.9U CN209538759U (en) 2019-01-26 2019-01-26 Applied to the jack up high-building construction workshop on climbing frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920139263.9U CN209538759U (en) 2019-01-26 2019-01-26 Applied to the jack up high-building construction workshop on climbing frame

Publications (1)

Publication Number Publication Date
CN209538759U true CN209538759U (en) 2019-10-25

Family

ID=68271793

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920139263.9U Expired - Fee Related CN209538759U (en) 2019-01-26 2019-01-26 Applied to the jack up high-building construction workshop on climbing frame

Country Status (1)

Country Link
CN (1) CN209538759U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112593695A (en) * 2020-12-18 2021-04-02 王文龙 High-altitude mobile factory

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112593695A (en) * 2020-12-18 2021-04-02 王文龙 High-altitude mobile factory

Similar Documents

Publication Publication Date Title
CN206278874U (en) A kind of construction Special lifting ladder
CN204804298U (en) Building material hoist and mount construction scaffold
CN2828210Y (en) Movable lifting working platform
CN101302888B (en) Dual-purpose wheeled combined scissors fork elevating scaffold with frame
CN209538759U (en) Applied to the jack up high-building construction workshop on climbing frame
CN211114737U (en) A construction operation platform in elevator well for tower crane promotes
CN209703967U (en) A kind of Multifunctional decoration construction bracket
CN111997382A (en) Telescopic steel structure sliding mechanism and sliding method
CN217148358U (en) Linear steel structure lifting device for telescopic narrow space
CN202718380U (en) Hydraulic climbing frame for construction of high-rise building
CN206720680U (en) A kind of roofing color corrugated sheet steel lifting device
CN114215338A (en) High-altitude operation platform for building construction
CN210887994U (en) Multi-use architecture construction platform of adjustable height
CN201065318Y (en) Fork variable folding type accessory frame combined shear fork lift truck
CN206888198U (en) A kind of new self-propelled prefabricated house equipment
CN218320633U (en) Lifting platform for engineering construction
CN2366444Y (en) Mobile type supporting for erecting bridges
CN219585680U (en) Railing hoisting accessory
CN220365277U (en) Device for assisting in translation of hanging basket
CN221053693U (en) Dismounting machine platform of shield machine
CN214424109U (en) Novel can have enough to meet need ground storehouse roof and go back to top to consolidate device
CN216109586U (en) Steel construction platform convenient to combination dismouting
CN208669103U (en) A kind of dust screen fixing bracket
CN218668451U (en) Hanging basket for high-altitude auxiliary installation of aluminum plate
CN219081586U (en) Jacking mobile device and multifunctional rack suitable for intermediate wall construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191025

Termination date: 20210126

CF01 Termination of patent right due to non-payment of annual fee