CN108316540A - Furred ceiling stone material dry suspending constructs and its construction method - Google Patents

Furred ceiling stone material dry suspending constructs and its construction method Download PDF

Info

Publication number
CN108316540A
CN108316540A CN201810191890.7A CN201810191890A CN108316540A CN 108316540 A CN108316540 A CN 108316540A CN 201810191890 A CN201810191890 A CN 201810191890A CN 108316540 A CN108316540 A CN 108316540A
Authority
CN
China
Prior art keywords
furred ceiling
stone material
pendant
ceiling stone
rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810191890.7A
Other languages
Chinese (zh)
Other versions
CN108316540B (en
Inventor
胡伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Taixing Decoration Engineering Co Ltd
Original Assignee
Sichuan Taixing Decoration Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Taixing Decoration Engineering Co Ltd filed Critical Sichuan Taixing Decoration Engineering Co Ltd
Priority to CN201810191890.7A priority Critical patent/CN108316540B/en
Publication of CN108316540A publication Critical patent/CN108316540A/en
Application granted granted Critical
Publication of CN108316540B publication Critical patent/CN108316540B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/18Means for suspending the supporting construction
    • E04B9/20Means for suspending the supporting construction adjustable
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/22Connection of slabs, panels, sheets or the like to the supporting construction
    • E04B9/28Connection of slabs, panels, sheets or the like to the supporting construction with the slabs, panels, sheets or the like having grooves engaging with horizontal flanges of the supporting construction or accessory means connected thereto

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Finishing Walls (AREA)

Abstract

The invention discloses a kind of furred ceiling stone material dry suspending construction and its construction methods, cladding construction includes crossbeam, the furred ceiling stone material of rectangle, it further include the first pendant, second pendant, rigid rope, push up pendant, first pendant and the second pendant are symmetrically installed on two-by-two on four angles of furred ceiling stone material, first pendant is provided with inserted block on the side wall of furred ceiling stone material, second pendant offers slot on the side wall of furred ceiling stone material, inserted block is used for and the slot grafting on adjacent furred ceiling stone material, it is provided with wheel body on second pendant, one end of rigid rope is connected to the second pendant on adjacent furred ceiling stone material, after the other end of rigid rope is around the wheel body on residing furred ceiling stone material, it is connected on the pendant of top.This furred ceiling stone material dry suspending constructs and its construction method can largely prevent from generating gap between adjacent furred ceiling stone material, improves construction quality;And it is easy construction, efficient, and this cladding construction need not use any adhesive to carry out additional reinforcement, it is environmentally protective.

Description

Furred ceiling stone material dry suspending constructs and its construction method
Technical field
The present invention relates to the cladding construction of stone material, more particularly to a kind of furred ceiling stone material dry suspending construction and its construction method.
Background technology
Furred ceiling stone material, which refers to, hangs on indoor top, the stone material for being used when ceiling, and furred ceiling stone material is widely used in greatly The occasions such as hall, meeting room.Cladding finger furred ceiling stone material need not rely on glue or cement, directly use a kind of fixed peace of metalwork Dress mode.
Existing Authorization Notice No. is that the Chinese invention patent application of CN103388372B discloses a kind of furred ceiling stone material dry suspending Construction and its construction method, the structure include furred ceiling stone material and pendant, and the opposite sides side of furred ceiling stone material is provided with groove, furred ceiling stone Material upper surface is bonded with notch reinforcing plate along the two sides of fluting;Pendant is U-shaped pendant, and U-shaped pendant is open blocks relatively two-by-two The opposite sides side of furred ceiling stone material, length and the furred ceiling stone material length of side of U-shaped pendant are adapted, and the top both ends of U-shaped pendant respectively have One slotted hole parallel with pendant length direction, the following of U-shaped pendant are narrower than top, are horizontally inserted into the recessed of furred ceiling stone material below In slot.Furred ceiling stone material can be installed on the crossbeam at top within doors by the invention, but in manufacture and work progress, if bolt There is deviation in positioning, then is susceptible to gap between furred ceiling stone material, which is difficult to eliminate, and causes construction quality poor.
Invention content
In view of the deficienciess of the prior art, the one of the present invention is designed to provide a kind of furred ceiling stone material dry suspending construction, Gap is less prone between furred ceiling stone material, construction quality is good.
The present invention above-mentioned technical purpose technical scheme is that:A kind of furred ceiling stone material dry suspending structure It makes, includes the furred ceiling stone material of crossbeam, rectangle, further include the first pendant, the second pendant, rigid rope, the top extension being fixed on crossbeam Part, first pendant and the second pendant are symmetrically installed on two-by-two on four angles of furred ceiling stone material, and first pendant deviates from Inserted block is provided on the side wall of furred ceiling stone material, second pendant offers slot on the side wall of furred ceiling stone material, described to insert Block be used for the slot grafting on adjacent furred ceiling stone material, wheel body, one end of the rigidity rope are provided on second pendant The second pendant being connected on adjacent furred ceiling stone material, the other end of the rigidity rope is around the wheel body on residing furred ceiling stone material Afterwards, it is connected on the pendant of top, the angle that the rigidity rope is formed around wheel body is acute angle.
Through the above technical solutions, the cooperation of slot and inserted block generates stringer movement, rigid rope for limiting furred ceiling stone material Gravity for carrying furred ceiling stone material;After this furred ceiling stone material dry suspending construction installs, rigid rope is formed by bending acute angle-shaped, rigidity Rope receives pulling force effect, and the first pendant on the second pendant and residing furred ceiling stone material on adjacent furred ceiling stone material is driven to offset Tightly, then it between adjacent furred ceiling stone material there are pressing force, can largely prevent from generating seam between adjacent furred ceiling stone material Gap improves construction quality.
Preferably, first pendant includes the first mounting plate, and punched out is offered on first mounting plate, described rigid Sex cords passes through punched out.
Through the above technical solutions, rigid rope is limited in punched out by the first pendant, the work of insurance is on the one hand played With on the other hand capable of limiting adjacent two blocks of furred ceiling stone materials and generate horizontal sliding.
Preferably, second pendant includes two the second mounting plates, there are gap between two second mounting plates, Two the second mounting plates are provided with installation bolt, the end of the rigidity rope is equipped with lantern ring, and the installation bolt is used In penetrating in lantern ring.
It is dismounted through the above technical solutions, rigid rope can be realized easily with the second pendant.
Preferably, the size of the lantern ring is more than punched out.
Through the above technical solutions, lantern ring can not pass through punched out, and when making the cladding construction of every set in discrete state, lantern ring The outside of the first mounting plate can be always positioned at, when installation is convenient to be connect with the installation bolt on adjacent furred ceiling stone material.
Preferably, the rigid rope includes upper rope, lower rope, regulating part, and the bottom end of the upper rope is fixed with thread segment, institute The top for stating lower rope is fixed with lower thread segment, and the thread rotary orientation of the upper thread segment and lower thread segment is on the contrary, the regulating part is logical Both ends are crossed to be threadedly coupled with upper thread segment and lower thread segment respectively.
Through the above technical solutions, rotating regulating part relative to upper rope and lower rope, regulating part is in upper thread segment and lower screw thread Under the threaded function of section, drive thread segment and lower thread segment close to each other or be located remotely from each other, to adjust the overall length of rigid rope Degree;When installing this cladding construction, people easily can carry out leveling by regulating part to furred ceiling stone material.
Preferably, the top pendant is located at the surface of adjacent two pieces of furred ceilings stone material intersection.
Through the above technical solutions, right angled triangle is formed at the both ends of rigid rope, inflection point three, the right angled triangle One right-angle side is in perpendicular, then this cladding construction is reasonable for structure, and force-bearing situation is preferable, not rapid wear after installing It is bad.
Preferably, further include bracing piece, one end of the bracing piece is secured by bolts on the pendant of top, the bracing piece The other end be secured by bolts in top pendant below the second pendant on.
Through the above technical solutions, bracing piece is used for the cladding construction of additional reinforcement sheet;When furred ceiling stone material is by outer force-disturbance When, bracing piece can prevent this cladding construction from generating shaking to a certain extent.
Another object of the present invention is to provide a kind of construction method constructed applied to above-mentioned furred ceiling stone material dry suspending, packets Include following steps:
Step 1:The first pendant and the second pendant are installed on every block of furred ceiling stone material in advance, top pendant is installed on crossbeam;
Step 2:First block of furred ceiling stone material is sling, rigid rope is fixed on the pendant of top, the side wall of furred ceiling stone material is fixed on On wall, and furred ceiling stone material is adjusted to horizontality;
Step 3:Next block of furred ceiling stone material is sling, the upper end of two rigid ropes is fixed on the pendant of top, inserted block is aligned and is inserted into In the slot of preceding piece of furred ceiling stone material, top pendant is made to be located at the surface of front and back two pieces of furred ceilings stone material intersection in work progress;
Step 4:Before the lower end of rigid rope is fixed on by installation bolt on the second pendant of the furred ceiling stone material of block;
Step 5:The length that two rigid ropes are adjusted by regulating part, makes front and back two blocks of furred ceiling stone materials be generally aligned in the same plane;
Step 6:Bracing piece is installed between top pendant and the second pendant immediately below it;
Step 7:Step 3 is repeated to step 6, completes the installation of remaining furred ceiling stone material.
Through the above technical solutions, this construction method is relatively simple, furred ceiling stone material need not be lifted for a long time in work progress, Improve construction efficiency.
In conclusion the present invention having the beneficial effect that in contrast to the prior art:This furred ceiling stone material dry suspending constructs and its construction Method can largely prevent from generating gap between adjacent furred ceiling stone material, improve construction quality;And easy construction, efficiency It is high.
Description of the drawings
Fig. 1 is the stereogram that the furred ceiling stone material dry suspending of embodiment constructs, and mainly protrudes the overall structure of this cladding construction;
Fig. 2 is the enlarged drawing that pendant is pushed up in embodiment, the structure of main prominent top pendant;
Fig. 3 is the Local map of embodiment, the structure of main prominent first pendant and the second pendant;
Fig. 4 is the Local map of rigid rope, the composition of main prominent rigid rope;
Fig. 5 is the schematic diagram of this cladding construction, the force structure of the cladding construction of main presentation sheet.
Reference numeral:1, crossbeam;2, furred ceiling stone material;3, the first pendant;4, the second pendant;11, pendant is pushed up;5, rigid rope; 12, top fastening bolt;41, the second mounting plate;42, installation bolt;43, wheel body;44, slot;31, the first mounting plate;311, punched out; 32, inserted block;51, lantern ring;52, upper rope;53, lower rope;54, regulating part;521, upper thread segment;531, lower thread segment;6, bracing piece.
Specific implementation mode
Below in conjunction with attached drawing, invention is further described in detail.
This specific embodiment is only explanation of the invention, is not limitation of the present invention, people in the art Member can as needed make the present embodiment the modification of not creative contribution after reading this specification, but as long as at this It is all protected by Patent Law in the right of invention.
As shown in Figure 1, a kind of furred ceiling stone material dry suspending construction, includes the furred ceiling stone material 2 of crossbeam 1, several rectangles.Furred ceiling stone material First pendant 3 and two the second pendants 4 there are two being bolted in 2 plate face, the first pendant 3 and the second pendant 4 are two-by-two It is symmetrically installed on four angles of furred ceiling stone material 2.The underrun bolt of crossbeam 1 is fixed with top pendant 11, crossbeam 1 and furred ceiling Stone material 2 is fixed by the rigid rope 5 being arranged between.
As depicted in figs. 1 and 2, the section of top pendant 11 is inverted U-shaped, and the two side of top pendant 11 is provided with top Bolt 12, top fastening bolt 12 are fastened by nut.Top pendant 11 is located at the surface of 2 intersection of adjacent two blocks of furred ceiling stone materials.
As shown in figure 3, the second pendant 4 includes two the second mounting plates 41 being mutually parallel, two the second mounting plates 41 it Between there are gap, then the section of the second pendant 4 takes the shape of the letter U.Two the second mounting plates 41 are provided with installation bolt 42, Link position is located at close to the side of adjacent furred ceiling stone material 2;It is further fixed on wheel body 43, wheel body between two the second mounting plates 41 The 43 plate face inclination relative to furred ceiling stone material 2.Second pendant 4 offers slot 44 on the side wall of adjacent furred ceiling stone material 2, The length direction of slot 44 is in the horizontal direction.
First pendant 3 includes the first mounting plate 31, and the plate face of the first mounting plate 31 is vertical with the plate face of furred ceiling stone material 2.The Punched out 311 is offered on one mounting plate 31, the position of punched out 311 is corresponding with the installation bolt 42 on adjacent furred ceiling stone material 2. First pendant 3 is integrally fixed with inserted block 32 on the side wall of adjacent furred ceiling stone material 2, and inserted block 32 can be inserted into slot 44, from And it limits two blocks of adjacent furred ceiling stone materials 2 and generates length travel.
As shown in figures 1 and 3,5 quantity of rigid rope on every block of furred ceiling stone material 2 is two, and two rigid ropes 5 correspond to respectively In two group of first pendant 3 and the second pendant 4.The both ends of every rigid rope 5 are both provided with lantern ring 51, and one lantern ring 51 is sheathed on top On bolt 12, for being fixed with top pendant 11;Another lantern ring 51 is sheathed in the installation bolt 42 on adjacent furred ceiling stone material 2, is used It is fixed in the second pendant 4 on adjacent furred ceiling stone material 2.Rigid rope 5 pass through punched out 311 and bypass wheel body 43, rigid rope 5 around The angle for crossing the formation of wheel body 43 is acute angle.Punched out 311 is for limiting rigid rope 5, to limit two blocks of adjacent furred ceiling stones Material 2 generates horizontal sliding.The size of lantern ring 51 is more than punched out 311, and lantern ring 51 can not pass through punched out 311, in this way, making When often covering cladding construction in discrete state, lantern ring 51 can be always positioned at the outside of the first mounting plate 31, convenient and phase when installation Installation bolt 42 on adjacent furred ceiling stone material 2 connects.
As shown in Figure 1 and Figure 4, rigid rope 5 includes upper rope 52, lower rope 53, regulating part 54, and the bottom end of upper rope 52 is coaxially fixed There are upper thread segment 521, the top of lower rope 53 to be coaxially fixed with lower thread segment 531, the spiral shell of upper thread segment 521 and lower thread segment 531 Line is oppositely oriented.Regulating part 54 be rectangle frame like structure, regulating part 54 by both ends respectively with upper thread segment 521 and lower screw thread Section 531 is threadedly coupled, and the axis of the axis of upper thread segment 521 and lower thread segment 531 overlaps.
Regulating part 54 is rotated relative to upper rope 52 and lower rope 53, and regulating part 54 is in upper thread segment 521 and lower thread segment 531 Under threaded function, drive thread segment 521 and lower thread segment 531 close to each other or be located remotely from each other, to adjust the total of rigid rope 5 Length.When installing this cladding construction, people easily can carry out leveling by regulating part 54 to furred ceiling stone material 2, or make furred ceiling stone Material 2 is distributed in constant slope, expands the scope of application of this cladding construction.
As shown in Figure 1, it is provided with bracing piece 6 between pendant 11 and the second pendant 4 immediately below it, bracing piece 6 Both ends offer hole, and one end of bracing piece 6 is fixed on by top fastening bolt 12 on the pendant 11 of top, and the other end of bracing piece 6 passes through peace Dress bolt 42 is fixed on the second pendant 4.Rigid rope 5 installs bracing piece 6 again after installation is complete, and bracing piece 6 is used for additional reinforcement This cladding construction, under normal circumstances the gravity of furred ceiling stone material 2 undertaken completely by rigid rope 5, bracing piece 6, which is in, not to stress or slightly The state of stress;When furred ceiling stone material 2 is by outer force-disturbance, bracing piece 6 can prevent this cladding construction from generating to a certain extent It shakes.
A kind of construction method constructed applied to above-mentioned furred ceiling stone material dry suspending, includes the following steps:
Step 1:The first pendant 3 and the second pendant 4 are installed on every block of furred ceiling stone material 2 in advance, top is installed on crossbeam 1 Pendant 11;
Step 2:First block of furred ceiling stone material 2 is sling, rigid rope 5 is fixed on the pendant 11 of top, by the side wall of furred ceiling stone material 2 It is fixed on wall, and adjusts furred ceiling stone material 2 to horizontality;
Step 3:Next block of furred ceiling stone material 2 is sling, the upper end of two rigid ropes 5 is fixed on the pendant 11 of top, inserted block 32 is right Before standard is inserted into the slot 44 of the furred ceiling stone material 2 of block, top pendant 11 is made to be located at front and back two blocks of furred ceiling stone materials 2 boundary in work progress The surface at place;
Step 4:Before the lower end of rigid rope 5 is fixed on by installation bolt 42 on second pendant 4 of the furred ceiling stone material 2 of block;
Step 5:The length that two rigid ropes 5 are adjusted by regulating part 54, makes front and back two blocks of furred ceiling stone materials 2 be generally aligned in the same plane;
Step 6:Bracing piece 6 is installed between top pendant 11 and the second pendant 4 immediately below it;
Step 7:Step 3 is repeated to step 6, completes the installation of remaining furred ceiling stone material 2.
As shown in figure 5, after this cladding construction installs, rigid rope 5 receives pulling force effect, and rigid rope 5 is hung adjacent The first pendant 3 on the second pendant 4 and residing furred ceiling stone material 2 on apex stone material 2 offsets, then between adjacent furred ceiling stone material 2 There are pressing force, it can largely prevent from generating gap between adjacent furred ceiling stone material 2, improve construction quality;This construction Method is relatively simple, need not lift furred ceiling stone material 2 for a long time in work progress, improve construction efficiency.Sheet is cladding to be constructed and shows There is technology to compare, it is environmentally protective without using any adhesive to carry out additional reinforcement.
The above is only the exemplary embodiment of the present invention, protection domain and is not intended to limit the present invention, this hair Bright protection domain is determined by the attached claims.

Claims (8)

1. a kind of furred ceiling stone material dry suspending construction, includes the furred ceiling stone material (2) of crossbeam (1), rectangle, it is characterized in that:Further include first The top pendant (11) that pendant (3), the second pendant (4), rigidity rope (5), is fixed on crossbeam (1), first pendant (3) and Two pendants (4) are symmetrically installed on two-by-two on four angles of furred ceiling stone material (2), and first pendant (3) deviates from furred ceiling stone material (2) Side wall on be provided with inserted block (32), second pendant (4) offers slot (44) on the side wall of furred ceiling stone material (2), The inserted block (32) be used for slot (44) grafting on adjacent furred ceiling stone material (2), be provided with wheel on second pendant (4) One end of body (43), the rigidity rope (5) is connected to the second pendant (4) on adjacent furred ceiling stone material (2), the rigidity rope (5) it after the other end is around the wheel body (43) on residing furred ceiling stone material (2), is connected on top pendant (11), the rigidity rope (5) it is acute angle to bypass the angle that wheel body (43) is formed.
2. furred ceiling stone material dry suspending construction according to claim 1, it is characterized in that:First pendant (3) includes the first peace Loading board (31), punched out (311) is offered on first mounting plate (31), and the rigidity rope (5) passes through punched out (311).
3. furred ceiling stone material dry suspending construction according to claim 2, it is characterized in that:Second pendant (4) includes two the Two mounting plates (41), there are gaps between two second mounting plates (41), are set also cross two the second mounting plates (41) It is equipped with installation bolt (42), the end of the rigidity rope (5) is equipped with lantern ring (51), and the installation bolt (42) is for penetrating lantern ring (51) in.
4. furred ceiling stone material dry suspending construction according to claim 3, it is characterized in that:The size of the lantern ring (51), which is more than, to be pierced by Hole (311).
5. furred ceiling stone material dry suspending construction according to claim 1, it is characterized in that:It is described rigidity rope (5) include upper rope (52), The bottom end of lower rope (53), regulating part (54), the upper rope (52) is fixed with thread segment (521), the top of the lower rope (53) It is fixed with lower thread segment (531), the thread rotary orientation of the upper thread segment (521) and lower thread segment (531) is on the contrary, the regulating part (54) it is threadedly coupled respectively with upper thread segment (521) and lower thread segment (531) by both ends.
6. furred ceiling stone material dry suspending construction according to claim 1, it is characterized in that:The top pendant (11) is located at adjacent two pieces The surface of furred ceiling stone material (2) intersection.
7. furred ceiling stone material dry suspending construction according to claim 6, it is characterized in that:Further include bracing piece (6), the bracing piece (6) one end is secured by bolts on top pendant (11), and the other end of the bracing piece (6) is secured by bolts in top pendant (11) on the second pendant (4) below.
8. a kind of construction method constructed applied to above-mentioned furred ceiling stone material dry suspending, it is characterized in that:Include the following steps:
Step 1:The first pendant (3) and the second pendant (4) are installed on every piece of furred ceiling stone material (2) in advance, on crossbeam (1) Install top pendant (11);
Step 2:First piece of furred ceiling stone material (2) is sling, rigid rope (5) is fixed on top pendant (11), by furred ceiling stone material (2) side wall is fixed on wall, and adjusts furred ceiling stone material (2) to horizontality;
Step 3:Next piece of furred ceiling stone material (2) is sling, the upper end of two rigid ropes (5) is fixed on top pendant (11), will be inserted Before block (32) alignment is inserted into the slot (44) of the furred ceiling stone material (2) of block, top pendant (11) is made to be located at front and back two in work progress The surface of block furred ceiling stone material (2) intersection;
Step 4:Second pendant of the furred ceiling stone material (2) of block before the lower end of rigid rope (5) is fixed on by installation bolt (42) (4) on;
Step 5:The length that two rigid ropes (5) are adjusted by regulating part (54) makes front and back two blocks of furred ceiling stone materials (2) be located at same One plane;
Step 6:The installation bracing piece (6) between top pendant (11) and the second pendant (4) immediately below it;
Step 7:Step 3 is repeated to step 6, completes the installation of remaining furred ceiling stone material (2).
CN201810191890.7A 2018-03-08 2018-03-08 Suspended ceiling stone dry hanging structure and construction method thereof Expired - Fee Related CN108316540B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810191890.7A CN108316540B (en) 2018-03-08 2018-03-08 Suspended ceiling stone dry hanging structure and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810191890.7A CN108316540B (en) 2018-03-08 2018-03-08 Suspended ceiling stone dry hanging structure and construction method thereof

Publications (2)

Publication Number Publication Date
CN108316540A true CN108316540A (en) 2018-07-24
CN108316540B CN108316540B (en) 2020-01-24

Family

ID=62901599

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810191890.7A Expired - Fee Related CN108316540B (en) 2018-03-08 2018-03-08 Suspended ceiling stone dry hanging structure and construction method thereof

Country Status (1)

Country Link
CN (1) CN108316540B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112177225A (en) * 2020-08-31 2021-01-05 深圳市尚石设计有限公司 Stable structure of large-scale decoration pendant
CN112282173A (en) * 2020-10-30 2021-01-29 金螳螂精装科技(苏州)有限公司 Assembly type mounting structure of circular arch modeling suspended ceiling

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1993218A (en) * 2004-07-02 2007-07-04 埃克塞特工程责任有限公司 Process for structurally joining modular hollow columns or rods generically elongated in shape and the product obtained
JP2010248843A (en) * 2009-04-17 2010-11-04 Shimizu Corp Suspension tool for wiring and piping materials
CN201635379U (en) * 2009-12-16 2010-11-17 中国二十冶集团有限公司 Safety platform for installation and construction of roof contour plate hang ceiling
CN103195202A (en) * 2013-04-18 2013-07-10 洪思滨 Adjustable suspended ceiling
CN204081081U (en) * 2014-09-30 2015-01-07 中国建筑股份有限公司 A kind of furred ceiling of novel crack resistence and wall connecting node structure
CN205189211U (en) * 2015-10-23 2016-04-27 浙江中南建设集团有限公司 Connection structure in furred ceiling stone material curtain system
CN105544835A (en) * 2015-12-18 2016-05-04 上海都市绿色工程有限公司 Truss with load adjustable
CN206346524U (en) * 2017-01-05 2017-07-21 浙江省二建建设集团有限公司 Portable job shop
CN107152115A (en) * 2016-03-03 2017-09-12 北新集团建材股份有限公司 Mineral wool board sector ceiling suspension system
CN206844456U (en) * 2017-06-08 2018-01-05 上海旭博建筑装饰工程有限公司 Cladding suspended ceiling structure

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1993218A (en) * 2004-07-02 2007-07-04 埃克塞特工程责任有限公司 Process for structurally joining modular hollow columns or rods generically elongated in shape and the product obtained
JP2010248843A (en) * 2009-04-17 2010-11-04 Shimizu Corp Suspension tool for wiring and piping materials
CN201635379U (en) * 2009-12-16 2010-11-17 中国二十冶集团有限公司 Safety platform for installation and construction of roof contour plate hang ceiling
CN103195202A (en) * 2013-04-18 2013-07-10 洪思滨 Adjustable suspended ceiling
CN204081081U (en) * 2014-09-30 2015-01-07 中国建筑股份有限公司 A kind of furred ceiling of novel crack resistence and wall connecting node structure
CN205189211U (en) * 2015-10-23 2016-04-27 浙江中南建设集团有限公司 Connection structure in furred ceiling stone material curtain system
CN105544835A (en) * 2015-12-18 2016-05-04 上海都市绿色工程有限公司 Truss with load adjustable
CN107152115A (en) * 2016-03-03 2017-09-12 北新集团建材股份有限公司 Mineral wool board sector ceiling suspension system
CN206346524U (en) * 2017-01-05 2017-07-21 浙江省二建建设集团有限公司 Portable job shop
CN206844456U (en) * 2017-06-08 2018-01-05 上海旭博建筑装饰工程有限公司 Cladding suspended ceiling structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112177225A (en) * 2020-08-31 2021-01-05 深圳市尚石设计有限公司 Stable structure of large-scale decoration pendant
CN112177225B (en) * 2020-08-31 2021-11-19 深圳市尚石设计有限公司 Stable structure of large-scale decoration pendant
CN112282173A (en) * 2020-10-30 2021-01-29 金螳螂精装科技(苏州)有限公司 Assembly type mounting structure of circular arch modeling suspended ceiling

Also Published As

Publication number Publication date
CN108316540B (en) 2020-01-24

Similar Documents

Publication Publication Date Title
CN106869445B (en) The adjustable wallboard mounting device in front
US9885184B2 (en) Stucco crack reduction at corners
CN108316540A (en) Furred ceiling stone material dry suspending constructs and its construction method
CN106414880B (en) Shower doors regulating device and shower doors
CN112962858B (en) Quick ceiling mounting structure and ceiling mounting method
TW201002919A (en) Hidden deck fastener
CN208152459U (en) A kind of quick cladding installation infrastructure of decoration material
CN205088823U (en) Hanging piece for stone curtain wall
CN104088391A (en) Hanging piece used for low-rise high-integration suspended ceiling
CN109372176B (en) Suspended ceiling and suspended ceiling mounting method
CN108240089A (en) Metope component and metope installation method
CN107100332A (en) A kind of modular aluminium sheet shading system encorbelmented
US20190301172A1 (en) Facade fastening system
CN206941939U (en) Top surface decoration panel installs interface arrangment
CN206625432U (en) Adjustable type lightgage steel joist
CN206752694U (en) The attachment structure of perpendicular lightgage steel joist
CN215368108U (en) Adjustable curtain wall connecting frame
CN210117889U (en) Wall surface curved surface parquet aluminum plate assembled mounting system
CN207739451U (en) A kind of concealed single cord clip tool of full glass curtain wall
CN204781774U (en) Stone material mounting structure
CN209353541U (en) The support of frame curtain wall
US20160168908A1 (en) Shade storage and deployment scheme
CN209082786U (en) A kind of composite plate back of the body bolt cladding system
CN207863390U (en) A kind of stone decorating surface exposed corner end cap
CN207453356U (en) A kind of wood facing mounting structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200124