CN108316540A - Furred ceiling stone material dry suspending constructs and its construction method - Google Patents
Furred ceiling stone material dry suspending constructs and its construction method Download PDFInfo
- Publication number
- CN108316540A CN108316540A CN201810191890.7A CN201810191890A CN108316540A CN 108316540 A CN108316540 A CN 108316540A CN 201810191890 A CN201810191890 A CN 201810191890A CN 108316540 A CN108316540 A CN 108316540A
- Authority
- CN
- China
- Prior art keywords
- furred ceiling
- stone material
- pendant
- ceiling stone
- rope
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000000463 material Substances 0.000 title claims abstract description 129
- 239000004575 stone Substances 0.000 title claims abstract description 129
- 238000010276 construction Methods 0.000 title claims abstract description 52
- 238000009434 installation Methods 0.000 claims description 20
- 230000001105 regulatory effect Effects 0.000 claims description 17
- 230000001154 acute effect Effects 0.000 claims description 4
- 230000000149 penetrating effect Effects 0.000 claims description 2
- 238000005253 cladding Methods 0.000 abstract description 19
- 230000002787 reinforcement Effects 0.000 abstract description 4
- 239000000853 adhesive Substances 0.000 abstract description 2
- 230000001070 adhesive effect Effects 0.000 abstract description 2
- 230000001681 protective effect Effects 0.000 abstract description 2
- 230000000694 effects Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000005484 gravity Effects 0.000 description 2
- 238000003825 pressing Methods 0.000 description 2
- 238000013475 authorization Methods 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 239000003292 glue Substances 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/18—Means for suspending the supporting construction
- E04B9/20—Means for suspending the supporting construction adjustable
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/22—Connection of slabs, panels, sheets or the like to the supporting construction
- E04B9/28—Connection of slabs, panels, sheets or the like to the supporting construction with the slabs, panels, sheets or the like having grooves engaging with horizontal flanges of the supporting construction or accessory means connected thereto
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Finishing Walls (AREA)
Abstract
The invention discloses a kind of furred ceiling stone material dry suspending construction and its construction methods, cladding construction includes crossbeam, the furred ceiling stone material of rectangle, it further include the first pendant, second pendant, rigid rope, push up pendant, first pendant and the second pendant are symmetrically installed on two-by-two on four angles of furred ceiling stone material, first pendant is provided with inserted block on the side wall of furred ceiling stone material, second pendant offers slot on the side wall of furred ceiling stone material, inserted block is used for and the slot grafting on adjacent furred ceiling stone material, it is provided with wheel body on second pendant, one end of rigid rope is connected to the second pendant on adjacent furred ceiling stone material, after the other end of rigid rope is around the wheel body on residing furred ceiling stone material, it is connected on the pendant of top.This furred ceiling stone material dry suspending constructs and its construction method can largely prevent from generating gap between adjacent furred ceiling stone material, improves construction quality;And it is easy construction, efficient, and this cladding construction need not use any adhesive to carry out additional reinforcement, it is environmentally protective.
Description
Technical field
The present invention relates to the cladding construction of stone material, more particularly to a kind of furred ceiling stone material dry suspending construction and its construction method.
Background technology
Furred ceiling stone material, which refers to, hangs on indoor top, the stone material for being used when ceiling, and furred ceiling stone material is widely used in greatly
The occasions such as hall, meeting room.Cladding finger furred ceiling stone material need not rely on glue or cement, directly use a kind of fixed peace of metalwork
Dress mode.
Existing Authorization Notice No. is that the Chinese invention patent application of CN103388372B discloses a kind of furred ceiling stone material dry suspending
Construction and its construction method, the structure include furred ceiling stone material and pendant, and the opposite sides side of furred ceiling stone material is provided with groove, furred ceiling stone
Material upper surface is bonded with notch reinforcing plate along the two sides of fluting;Pendant is U-shaped pendant, and U-shaped pendant is open blocks relatively two-by-two
The opposite sides side of furred ceiling stone material, length and the furred ceiling stone material length of side of U-shaped pendant are adapted, and the top both ends of U-shaped pendant respectively have
One slotted hole parallel with pendant length direction, the following of U-shaped pendant are narrower than top, are horizontally inserted into the recessed of furred ceiling stone material below
In slot.Furred ceiling stone material can be installed on the crossbeam at top within doors by the invention, but in manufacture and work progress, if bolt
There is deviation in positioning, then is susceptible to gap between furred ceiling stone material, which is difficult to eliminate, and causes construction quality poor.
Invention content
In view of the deficienciess of the prior art, the one of the present invention is designed to provide a kind of furred ceiling stone material dry suspending construction,
Gap is less prone between furred ceiling stone material, construction quality is good.
The present invention above-mentioned technical purpose technical scheme is that:A kind of furred ceiling stone material dry suspending structure
It makes, includes the furred ceiling stone material of crossbeam, rectangle, further include the first pendant, the second pendant, rigid rope, the top extension being fixed on crossbeam
Part, first pendant and the second pendant are symmetrically installed on two-by-two on four angles of furred ceiling stone material, and first pendant deviates from
Inserted block is provided on the side wall of furred ceiling stone material, second pendant offers slot on the side wall of furred ceiling stone material, described to insert
Block be used for the slot grafting on adjacent furred ceiling stone material, wheel body, one end of the rigidity rope are provided on second pendant
The second pendant being connected on adjacent furred ceiling stone material, the other end of the rigidity rope is around the wheel body on residing furred ceiling stone material
Afterwards, it is connected on the pendant of top, the angle that the rigidity rope is formed around wheel body is acute angle.
Through the above technical solutions, the cooperation of slot and inserted block generates stringer movement, rigid rope for limiting furred ceiling stone material
Gravity for carrying furred ceiling stone material;After this furred ceiling stone material dry suspending construction installs, rigid rope is formed by bending acute angle-shaped, rigidity
Rope receives pulling force effect, and the first pendant on the second pendant and residing furred ceiling stone material on adjacent furred ceiling stone material is driven to offset
Tightly, then it between adjacent furred ceiling stone material there are pressing force, can largely prevent from generating seam between adjacent furred ceiling stone material
Gap improves construction quality.
Preferably, first pendant includes the first mounting plate, and punched out is offered on first mounting plate, described rigid
Sex cords passes through punched out.
Through the above technical solutions, rigid rope is limited in punched out by the first pendant, the work of insurance is on the one hand played
With on the other hand capable of limiting adjacent two blocks of furred ceiling stone materials and generate horizontal sliding.
Preferably, second pendant includes two the second mounting plates, there are gap between two second mounting plates,
Two the second mounting plates are provided with installation bolt, the end of the rigidity rope is equipped with lantern ring, and the installation bolt is used
In penetrating in lantern ring.
It is dismounted through the above technical solutions, rigid rope can be realized easily with the second pendant.
Preferably, the size of the lantern ring is more than punched out.
Through the above technical solutions, lantern ring can not pass through punched out, and when making the cladding construction of every set in discrete state, lantern ring
The outside of the first mounting plate can be always positioned at, when installation is convenient to be connect with the installation bolt on adjacent furred ceiling stone material.
Preferably, the rigid rope includes upper rope, lower rope, regulating part, and the bottom end of the upper rope is fixed with thread segment, institute
The top for stating lower rope is fixed with lower thread segment, and the thread rotary orientation of the upper thread segment and lower thread segment is on the contrary, the regulating part is logical
Both ends are crossed to be threadedly coupled with upper thread segment and lower thread segment respectively.
Through the above technical solutions, rotating regulating part relative to upper rope and lower rope, regulating part is in upper thread segment and lower screw thread
Under the threaded function of section, drive thread segment and lower thread segment close to each other or be located remotely from each other, to adjust the overall length of rigid rope
Degree;When installing this cladding construction, people easily can carry out leveling by regulating part to furred ceiling stone material.
Preferably, the top pendant is located at the surface of adjacent two pieces of furred ceilings stone material intersection.
Through the above technical solutions, right angled triangle is formed at the both ends of rigid rope, inflection point three, the right angled triangle
One right-angle side is in perpendicular, then this cladding construction is reasonable for structure, and force-bearing situation is preferable, not rapid wear after installing
It is bad.
Preferably, further include bracing piece, one end of the bracing piece is secured by bolts on the pendant of top, the bracing piece
The other end be secured by bolts in top pendant below the second pendant on.
Through the above technical solutions, bracing piece is used for the cladding construction of additional reinforcement sheet;When furred ceiling stone material is by outer force-disturbance
When, bracing piece can prevent this cladding construction from generating shaking to a certain extent.
Another object of the present invention is to provide a kind of construction method constructed applied to above-mentioned furred ceiling stone material dry suspending, packets
Include following steps:
Step 1:The first pendant and the second pendant are installed on every block of furred ceiling stone material in advance, top pendant is installed on crossbeam;
Step 2:First block of furred ceiling stone material is sling, rigid rope is fixed on the pendant of top, the side wall of furred ceiling stone material is fixed on
On wall, and furred ceiling stone material is adjusted to horizontality;
Step 3:Next block of furred ceiling stone material is sling, the upper end of two rigid ropes is fixed on the pendant of top, inserted block is aligned and is inserted into
In the slot of preceding piece of furred ceiling stone material, top pendant is made to be located at the surface of front and back two pieces of furred ceilings stone material intersection in work progress;
Step 4:Before the lower end of rigid rope is fixed on by installation bolt on the second pendant of the furred ceiling stone material of block;
Step 5:The length that two rigid ropes are adjusted by regulating part, makes front and back two blocks of furred ceiling stone materials be generally aligned in the same plane;
Step 6:Bracing piece is installed between top pendant and the second pendant immediately below it;
Step 7:Step 3 is repeated to step 6, completes the installation of remaining furred ceiling stone material.
Through the above technical solutions, this construction method is relatively simple, furred ceiling stone material need not be lifted for a long time in work progress,
Improve construction efficiency.
In conclusion the present invention having the beneficial effect that in contrast to the prior art:This furred ceiling stone material dry suspending constructs and its construction
Method can largely prevent from generating gap between adjacent furred ceiling stone material, improve construction quality;And easy construction, efficiency
It is high.
Description of the drawings
Fig. 1 is the stereogram that the furred ceiling stone material dry suspending of embodiment constructs, and mainly protrudes the overall structure of this cladding construction;
Fig. 2 is the enlarged drawing that pendant is pushed up in embodiment, the structure of main prominent top pendant;
Fig. 3 is the Local map of embodiment, the structure of main prominent first pendant and the second pendant;
Fig. 4 is the Local map of rigid rope, the composition of main prominent rigid rope;
Fig. 5 is the schematic diagram of this cladding construction, the force structure of the cladding construction of main presentation sheet.
Reference numeral:1, crossbeam;2, furred ceiling stone material;3, the first pendant;4, the second pendant;11, pendant is pushed up;5, rigid rope;
12, top fastening bolt;41, the second mounting plate;42, installation bolt;43, wheel body;44, slot;31, the first mounting plate;311, punched out;
32, inserted block;51, lantern ring;52, upper rope;53, lower rope;54, regulating part;521, upper thread segment;531, lower thread segment;6, bracing piece.
Specific implementation mode
Below in conjunction with attached drawing, invention is further described in detail.
This specific embodiment is only explanation of the invention, is not limitation of the present invention, people in the art
Member can as needed make the present embodiment the modification of not creative contribution after reading this specification, but as long as at this
It is all protected by Patent Law in the right of invention.
As shown in Figure 1, a kind of furred ceiling stone material dry suspending construction, includes the furred ceiling stone material 2 of crossbeam 1, several rectangles.Furred ceiling stone material
First pendant 3 and two the second pendants 4 there are two being bolted in 2 plate face, the first pendant 3 and the second pendant 4 are two-by-two
It is symmetrically installed on four angles of furred ceiling stone material 2.The underrun bolt of crossbeam 1 is fixed with top pendant 11, crossbeam 1 and furred ceiling
Stone material 2 is fixed by the rigid rope 5 being arranged between.
As depicted in figs. 1 and 2, the section of top pendant 11 is inverted U-shaped, and the two side of top pendant 11 is provided with top
Bolt 12, top fastening bolt 12 are fastened by nut.Top pendant 11 is located at the surface of 2 intersection of adjacent two blocks of furred ceiling stone materials.
As shown in figure 3, the second pendant 4 includes two the second mounting plates 41 being mutually parallel, two the second mounting plates 41 it
Between there are gap, then the section of the second pendant 4 takes the shape of the letter U.Two the second mounting plates 41 are provided with installation bolt 42,
Link position is located at close to the side of adjacent furred ceiling stone material 2;It is further fixed on wheel body 43, wheel body between two the second mounting plates 41
The 43 plate face inclination relative to furred ceiling stone material 2.Second pendant 4 offers slot 44 on the side wall of adjacent furred ceiling stone material 2,
The length direction of slot 44 is in the horizontal direction.
First pendant 3 includes the first mounting plate 31, and the plate face of the first mounting plate 31 is vertical with the plate face of furred ceiling stone material 2.The
Punched out 311 is offered on one mounting plate 31, the position of punched out 311 is corresponding with the installation bolt 42 on adjacent furred ceiling stone material 2.
First pendant 3 is integrally fixed with inserted block 32 on the side wall of adjacent furred ceiling stone material 2, and inserted block 32 can be inserted into slot 44, from
And it limits two blocks of adjacent furred ceiling stone materials 2 and generates length travel.
As shown in figures 1 and 3,5 quantity of rigid rope on every block of furred ceiling stone material 2 is two, and two rigid ropes 5 correspond to respectively
In two group of first pendant 3 and the second pendant 4.The both ends of every rigid rope 5 are both provided with lantern ring 51, and one lantern ring 51 is sheathed on top
On bolt 12, for being fixed with top pendant 11;Another lantern ring 51 is sheathed in the installation bolt 42 on adjacent furred ceiling stone material 2, is used
It is fixed in the second pendant 4 on adjacent furred ceiling stone material 2.Rigid rope 5 pass through punched out 311 and bypass wheel body 43, rigid rope 5 around
The angle for crossing the formation of wheel body 43 is acute angle.Punched out 311 is for limiting rigid rope 5, to limit two blocks of adjacent furred ceiling stones
Material 2 generates horizontal sliding.The size of lantern ring 51 is more than punched out 311, and lantern ring 51 can not pass through punched out 311, in this way, making
When often covering cladding construction in discrete state, lantern ring 51 can be always positioned at the outside of the first mounting plate 31, convenient and phase when installation
Installation bolt 42 on adjacent furred ceiling stone material 2 connects.
As shown in Figure 1 and Figure 4, rigid rope 5 includes upper rope 52, lower rope 53, regulating part 54, and the bottom end of upper rope 52 is coaxially fixed
There are upper thread segment 521, the top of lower rope 53 to be coaxially fixed with lower thread segment 531, the spiral shell of upper thread segment 521 and lower thread segment 531
Line is oppositely oriented.Regulating part 54 be rectangle frame like structure, regulating part 54 by both ends respectively with upper thread segment 521 and lower screw thread
Section 531 is threadedly coupled, and the axis of the axis of upper thread segment 521 and lower thread segment 531 overlaps.
Regulating part 54 is rotated relative to upper rope 52 and lower rope 53, and regulating part 54 is in upper thread segment 521 and lower thread segment 531
Under threaded function, drive thread segment 521 and lower thread segment 531 close to each other or be located remotely from each other, to adjust the total of rigid rope 5
Length.When installing this cladding construction, people easily can carry out leveling by regulating part 54 to furred ceiling stone material 2, or make furred ceiling stone
Material 2 is distributed in constant slope, expands the scope of application of this cladding construction.
As shown in Figure 1, it is provided with bracing piece 6 between pendant 11 and the second pendant 4 immediately below it, bracing piece 6
Both ends offer hole, and one end of bracing piece 6 is fixed on by top fastening bolt 12 on the pendant 11 of top, and the other end of bracing piece 6 passes through peace
Dress bolt 42 is fixed on the second pendant 4.Rigid rope 5 installs bracing piece 6 again after installation is complete, and bracing piece 6 is used for additional reinforcement
This cladding construction, under normal circumstances the gravity of furred ceiling stone material 2 undertaken completely by rigid rope 5, bracing piece 6, which is in, not to stress or slightly
The state of stress;When furred ceiling stone material 2 is by outer force-disturbance, bracing piece 6 can prevent this cladding construction from generating to a certain extent
It shakes.
A kind of construction method constructed applied to above-mentioned furred ceiling stone material dry suspending, includes the following steps:
Step 1:The first pendant 3 and the second pendant 4 are installed on every block of furred ceiling stone material 2 in advance, top is installed on crossbeam 1
Pendant 11;
Step 2:First block of furred ceiling stone material 2 is sling, rigid rope 5 is fixed on the pendant 11 of top, by the side wall of furred ceiling stone material 2
It is fixed on wall, and adjusts furred ceiling stone material 2 to horizontality;
Step 3:Next block of furred ceiling stone material 2 is sling, the upper end of two rigid ropes 5 is fixed on the pendant 11 of top, inserted block 32 is right
Before standard is inserted into the slot 44 of the furred ceiling stone material 2 of block, top pendant 11 is made to be located at front and back two blocks of furred ceiling stone materials 2 boundary in work progress
The surface at place;
Step 4:Before the lower end of rigid rope 5 is fixed on by installation bolt 42 on second pendant 4 of the furred ceiling stone material 2 of block;
Step 5:The length that two rigid ropes 5 are adjusted by regulating part 54, makes front and back two blocks of furred ceiling stone materials 2 be generally aligned in the same plane;
Step 6:Bracing piece 6 is installed between top pendant 11 and the second pendant 4 immediately below it;
Step 7:Step 3 is repeated to step 6, completes the installation of remaining furred ceiling stone material 2.
As shown in figure 5, after this cladding construction installs, rigid rope 5 receives pulling force effect, and rigid rope 5 is hung adjacent
The first pendant 3 on the second pendant 4 and residing furred ceiling stone material 2 on apex stone material 2 offsets, then between adjacent furred ceiling stone material 2
There are pressing force, it can largely prevent from generating gap between adjacent furred ceiling stone material 2, improve construction quality;This construction
Method is relatively simple, need not lift furred ceiling stone material 2 for a long time in work progress, improve construction efficiency.Sheet is cladding to be constructed and shows
There is technology to compare, it is environmentally protective without using any adhesive to carry out additional reinforcement.
The above is only the exemplary embodiment of the present invention, protection domain and is not intended to limit the present invention, this hair
Bright protection domain is determined by the attached claims.
Claims (8)
1. a kind of furred ceiling stone material dry suspending construction, includes the furred ceiling stone material (2) of crossbeam (1), rectangle, it is characterized in that:Further include first
The top pendant (11) that pendant (3), the second pendant (4), rigidity rope (5), is fixed on crossbeam (1), first pendant (3) and
Two pendants (4) are symmetrically installed on two-by-two on four angles of furred ceiling stone material (2), and first pendant (3) deviates from furred ceiling stone material (2)
Side wall on be provided with inserted block (32), second pendant (4) offers slot (44) on the side wall of furred ceiling stone material (2),
The inserted block (32) be used for slot (44) grafting on adjacent furred ceiling stone material (2), be provided with wheel on second pendant (4)
One end of body (43), the rigidity rope (5) is connected to the second pendant (4) on adjacent furred ceiling stone material (2), the rigidity rope
(5) it after the other end is around the wheel body (43) on residing furred ceiling stone material (2), is connected on top pendant (11), the rigidity rope
(5) it is acute angle to bypass the angle that wheel body (43) is formed.
2. furred ceiling stone material dry suspending construction according to claim 1, it is characterized in that:First pendant (3) includes the first peace
Loading board (31), punched out (311) is offered on first mounting plate (31), and the rigidity rope (5) passes through punched out (311).
3. furred ceiling stone material dry suspending construction according to claim 2, it is characterized in that:Second pendant (4) includes two the
Two mounting plates (41), there are gaps between two second mounting plates (41), are set also cross two the second mounting plates (41)
It is equipped with installation bolt (42), the end of the rigidity rope (5) is equipped with lantern ring (51), and the installation bolt (42) is for penetrating lantern ring
(51) in.
4. furred ceiling stone material dry suspending construction according to claim 3, it is characterized in that:The size of the lantern ring (51), which is more than, to be pierced by
Hole (311).
5. furred ceiling stone material dry suspending construction according to claim 1, it is characterized in that:It is described rigidity rope (5) include upper rope (52),
The bottom end of lower rope (53), regulating part (54), the upper rope (52) is fixed with thread segment (521), the top of the lower rope (53)
It is fixed with lower thread segment (531), the thread rotary orientation of the upper thread segment (521) and lower thread segment (531) is on the contrary, the regulating part
(54) it is threadedly coupled respectively with upper thread segment (521) and lower thread segment (531) by both ends.
6. furred ceiling stone material dry suspending construction according to claim 1, it is characterized in that:The top pendant (11) is located at adjacent two pieces
The surface of furred ceiling stone material (2) intersection.
7. furred ceiling stone material dry suspending construction according to claim 6, it is characterized in that:Further include bracing piece (6), the bracing piece
(6) one end is secured by bolts on top pendant (11), and the other end of the bracing piece (6) is secured by bolts in top pendant
(11) on the second pendant (4) below.
8. a kind of construction method constructed applied to above-mentioned furred ceiling stone material dry suspending, it is characterized in that:Include the following steps:
Step 1:The first pendant (3) and the second pendant (4) are installed on every piece of furred ceiling stone material (2) in advance, on crossbeam (1)
Install top pendant (11);
Step 2:First piece of furred ceiling stone material (2) is sling, rigid rope (5) is fixed on top pendant (11), by furred ceiling stone material
(2) side wall is fixed on wall, and adjusts furred ceiling stone material (2) to horizontality;
Step 3:Next piece of furred ceiling stone material (2) is sling, the upper end of two rigid ropes (5) is fixed on top pendant (11), will be inserted
Before block (32) alignment is inserted into the slot (44) of the furred ceiling stone material (2) of block, top pendant (11) is made to be located at front and back two in work progress
The surface of block furred ceiling stone material (2) intersection;
Step 4:Second pendant of the furred ceiling stone material (2) of block before the lower end of rigid rope (5) is fixed on by installation bolt (42)
(4) on;
Step 5:The length that two rigid ropes (5) are adjusted by regulating part (54) makes front and back two blocks of furred ceiling stone materials (2) be located at same
One plane;
Step 6:The installation bracing piece (6) between top pendant (11) and the second pendant (4) immediately below it;
Step 7:Step 3 is repeated to step 6, completes the installation of remaining furred ceiling stone material (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810191890.7A CN108316540B (en) | 2018-03-08 | 2018-03-08 | Suspended ceiling stone dry hanging structure and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810191890.7A CN108316540B (en) | 2018-03-08 | 2018-03-08 | Suspended ceiling stone dry hanging structure and construction method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108316540A true CN108316540A (en) | 2018-07-24 |
CN108316540B CN108316540B (en) | 2020-01-24 |
Family
ID=62901599
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810191890.7A Expired - Fee Related CN108316540B (en) | 2018-03-08 | 2018-03-08 | Suspended ceiling stone dry hanging structure and construction method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108316540B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112177225A (en) * | 2020-08-31 | 2021-01-05 | 深圳市尚石设计有限公司 | Stable structure of large-scale decoration pendant |
CN112282173A (en) * | 2020-10-30 | 2021-01-29 | 金螳螂精装科技(苏州)有限公司 | Assembly type mounting structure of circular arch modeling suspended ceiling |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1993218A (en) * | 2004-07-02 | 2007-07-04 | 埃克塞特工程责任有限公司 | Process for structurally joining modular hollow columns or rods generically elongated in shape and the product obtained |
JP2010248843A (en) * | 2009-04-17 | 2010-11-04 | Shimizu Corp | Suspension tool for wiring and piping materials |
CN201635379U (en) * | 2009-12-16 | 2010-11-17 | 中国二十冶集团有限公司 | Safety platform for installation and construction of roof contour plate hang ceiling |
CN103195202A (en) * | 2013-04-18 | 2013-07-10 | 洪思滨 | Adjustable suspended ceiling |
CN204081081U (en) * | 2014-09-30 | 2015-01-07 | 中国建筑股份有限公司 | A kind of furred ceiling of novel crack resistence and wall connecting node structure |
CN205189211U (en) * | 2015-10-23 | 2016-04-27 | 浙江中南建设集团有限公司 | Connection structure in furred ceiling stone material curtain system |
CN105544835A (en) * | 2015-12-18 | 2016-05-04 | 上海都市绿色工程有限公司 | Truss with load adjustable |
CN206346524U (en) * | 2017-01-05 | 2017-07-21 | 浙江省二建建设集团有限公司 | Portable job shop |
CN107152115A (en) * | 2016-03-03 | 2017-09-12 | 北新集团建材股份有限公司 | Mineral wool board sector ceiling suspension system |
CN206844456U (en) * | 2017-06-08 | 2018-01-05 | 上海旭博建筑装饰工程有限公司 | Cladding suspended ceiling structure |
-
2018
- 2018-03-08 CN CN201810191890.7A patent/CN108316540B/en not_active Expired - Fee Related
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1993218A (en) * | 2004-07-02 | 2007-07-04 | 埃克塞特工程责任有限公司 | Process for structurally joining modular hollow columns or rods generically elongated in shape and the product obtained |
JP2010248843A (en) * | 2009-04-17 | 2010-11-04 | Shimizu Corp | Suspension tool for wiring and piping materials |
CN201635379U (en) * | 2009-12-16 | 2010-11-17 | 中国二十冶集团有限公司 | Safety platform for installation and construction of roof contour plate hang ceiling |
CN103195202A (en) * | 2013-04-18 | 2013-07-10 | 洪思滨 | Adjustable suspended ceiling |
CN204081081U (en) * | 2014-09-30 | 2015-01-07 | 中国建筑股份有限公司 | A kind of furred ceiling of novel crack resistence and wall connecting node structure |
CN205189211U (en) * | 2015-10-23 | 2016-04-27 | 浙江中南建设集团有限公司 | Connection structure in furred ceiling stone material curtain system |
CN105544835A (en) * | 2015-12-18 | 2016-05-04 | 上海都市绿色工程有限公司 | Truss with load adjustable |
CN107152115A (en) * | 2016-03-03 | 2017-09-12 | 北新集团建材股份有限公司 | Mineral wool board sector ceiling suspension system |
CN206346524U (en) * | 2017-01-05 | 2017-07-21 | 浙江省二建建设集团有限公司 | Portable job shop |
CN206844456U (en) * | 2017-06-08 | 2018-01-05 | 上海旭博建筑装饰工程有限公司 | Cladding suspended ceiling structure |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112177225A (en) * | 2020-08-31 | 2021-01-05 | 深圳市尚石设计有限公司 | Stable structure of large-scale decoration pendant |
CN112177225B (en) * | 2020-08-31 | 2021-11-19 | 深圳市尚石设计有限公司 | Stable structure of large-scale decoration pendant |
CN112282173A (en) * | 2020-10-30 | 2021-01-29 | 金螳螂精装科技(苏州)有限公司 | Assembly type mounting structure of circular arch modeling suspended ceiling |
Also Published As
Publication number | Publication date |
---|---|
CN108316540B (en) | 2020-01-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106869445B (en) | The adjustable wallboard mounting device in front | |
US9885184B2 (en) | Stucco crack reduction at corners | |
CN108316540A (en) | Furred ceiling stone material dry suspending constructs and its construction method | |
CN106414880B (en) | Shower doors regulating device and shower doors | |
CN112962858B (en) | Quick ceiling mounting structure and ceiling mounting method | |
TW201002919A (en) | Hidden deck fastener | |
CN208152459U (en) | A kind of quick cladding installation infrastructure of decoration material | |
CN205088823U (en) | Hanging piece for stone curtain wall | |
CN104088391A (en) | Hanging piece used for low-rise high-integration suspended ceiling | |
CN109372176B (en) | Suspended ceiling and suspended ceiling mounting method | |
CN108240089A (en) | Metope component and metope installation method | |
CN107100332A (en) | A kind of modular aluminium sheet shading system encorbelmented | |
US20190301172A1 (en) | Facade fastening system | |
CN206941939U (en) | Top surface decoration panel installs interface arrangment | |
CN206625432U (en) | Adjustable type lightgage steel joist | |
CN206752694U (en) | The attachment structure of perpendicular lightgage steel joist | |
CN215368108U (en) | Adjustable curtain wall connecting frame | |
CN210117889U (en) | Wall surface curved surface parquet aluminum plate assembled mounting system | |
CN207739451U (en) | A kind of concealed single cord clip tool of full glass curtain wall | |
CN204781774U (en) | Stone material mounting structure | |
CN209353541U (en) | The support of frame curtain wall | |
US20160168908A1 (en) | Shade storage and deployment scheme | |
CN209082786U (en) | A kind of composite plate back of the body bolt cladding system | |
CN207863390U (en) | A kind of stone decorating surface exposed corner end cap | |
CN207453356U (en) | A kind of wood facing mounting structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |