CN108316540B - Suspended ceiling stone dry hanging structure and construction method thereof - Google Patents

Suspended ceiling stone dry hanging structure and construction method thereof Download PDF

Info

Publication number
CN108316540B
CN108316540B CN201810191890.7A CN201810191890A CN108316540B CN 108316540 B CN108316540 B CN 108316540B CN 201810191890 A CN201810191890 A CN 201810191890A CN 108316540 B CN108316540 B CN 108316540B
Authority
CN
China
Prior art keywords
ceiling stone
hanging
suspended ceiling
hanging piece
stone
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201810191890.7A
Other languages
Chinese (zh)
Other versions
CN108316540A (en
Inventor
胡伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Taixing Decoration Engineering Co Ltd
Original Assignee
Sichuan Taixing Decoration Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Taixing Decoration Engineering Co Ltd filed Critical Sichuan Taixing Decoration Engineering Co Ltd
Priority to CN201810191890.7A priority Critical patent/CN108316540B/en
Publication of CN108316540A publication Critical patent/CN108316540A/en
Application granted granted Critical
Publication of CN108316540B publication Critical patent/CN108316540B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/18Means for suspending the supporting construction
    • E04B9/20Means for suspending the supporting construction adjustable
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/22Connection of slabs, panels, sheets or the like to the supporting construction
    • E04B9/28Connection of slabs, panels, sheets or the like to the supporting construction with the slabs, panels, sheets or the like having grooves engaging with horizontal flanges of the supporting construction or accessory means connected thereto

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Finishing Walls (AREA)

Abstract

The invention discloses a suspended ceiling stone dry hanging structure and a construction method thereof, wherein the dry hanging structure comprises a cross beam and rectangular suspended ceiling stone, and further comprises a first hanging piece, a second hanging piece, a rigid cable and a top hanging piece, the first hanging piece and the second hanging piece are symmetrically arranged at four corners of the suspended ceiling stone in pairs, an inserting block is arranged on the side wall of the first hanging piece, which deviates from the suspended ceiling stone, a slot is arranged on the side wall of the second hanging piece, which deviates from the suspended ceiling stone, the inserting block is used for being inserted into the slot on the adjacent suspended ceiling stone, a wheel body is arranged on the second hanging piece, one end of the rigid cable is connected to the second hanging piece on the adjacent suspended ceiling stone, and the other end of the rigid cable is connected to the top hanging piece after bypassing the wheel body. The suspended ceiling stone dry hanging structure and the construction method thereof can prevent gaps from being generated between adjacent suspended ceiling stones to a greater extent, and improve the construction quality; the construction is simple and convenient, the efficiency is high, and the dry hanging structure does not need any adhesive for auxiliary reinforcement, and is green and environment-friendly.

Description

Suspended ceiling stone dry hanging structure and construction method thereof
Technical Field
The invention relates to a dry hanging structure of stone, in particular to a suspended ceiling stone dry hanging structure and a construction method thereof.
Background
The suspended ceiling stone refers to stone suspended at the top of a room and used for a suspended ceiling board, and is widely applied to occasions such as a hall and a conference room. The dry hanging means that the suspended ceiling stone is directly fixed by a metal piece without depending on glue or cement.
The prior Chinese patent application with the publication number of CN103388372B discloses a suspended ceiling stone dry-hanging structure and a construction method thereof, wherein the structure comprises suspended ceiling stones and hanging pieces, grooves are arranged on two opposite sides of the suspended ceiling stones, and notch reinforcing plates are bonded on the upper surfaces of the suspended ceiling stones along the two sides of the grooves; the hanging pieces are U-shaped hanging pieces, two openings of each U-shaped hanging piece are oppositely clamped on two opposite side edges of the suspended ceiling stone, the length of each U-shaped hanging piece is matched with the side length of the suspended ceiling stone, two long round holes parallel to the length direction of each hanging piece are respectively arranged at two ends of the upper edge of each U-shaped hanging piece, the lower edge of each U-shaped hanging piece is narrower than the upper edge of each U-shaped hanging piece, and the lower edge of each U-shaped hanging. The suspended ceiling stone can be arranged on the beam at the top in a room, but in the manufacturing and construction processes, if the positioning of the bolts is deviated, gaps are easy to appear among the suspended ceiling stones, and the gaps are difficult to eliminate, so that the construction quality is poor.
Disclosure of Invention
Aiming at the defects in the prior art, the invention aims to provide the suspended ceiling stone dry hanging structure, gaps are not easy to occur between the suspended ceiling stones, and the construction quality is good.
The technical purpose of the invention is realized by the following technical scheme: the utility model provides a furred ceiling stone material hangs structure futilely, includes the furred ceiling stone material of crossbeam, rectangle, still includes first pendant, second pendant, rigid cable, is fixed in the top pendant on the crossbeam, install on four angles of furred ceiling stone material two bisymmetries first pendant and second pendant, first pendant deviates from and is provided with the inserted block on the lateral wall of furred ceiling stone material, the slot has been seted up on the lateral wall that the second pendant deviates from the furred ceiling stone material, the inserted block is used for pegging graft with the slot on the adjacent furred ceiling stone material, be provided with the wheel body on the second pendant, the second pendant on adjacent furred ceiling stone material is connected to the one end of rigid cable, the other end of rigid cable is walked around the wheel body back on the furred ceiling stone material of locating, connects on the top pendant, the rigid cable is walk.
Through the technical scheme, the slot is matched with the insertion block to limit the suspended ceiling stone to move longitudinally, and the rigid cable is used for bearing the gravity of the suspended ceiling stone; this furred ceiling stone material is hung the structure futilely and is accomplished the installation back, and the rigidity cable is crooked to form the acute angle shape, and the rigidity cable has received the pulling force effect to order about second pendant on the adjacent furred ceiling stone material and the first pendant on the furred ceiling stone material of locating to offset tightly, then there is the packing force between the adjacent furred ceiling stone material, can prevent to a great extent to produce the gap between the adjacent furred ceiling stone material, improves construction quality.
Preferably, the first hanging member includes a first mounting plate, the first mounting plate is provided with an exit hole, and the rigid cable passes through the exit hole.
Through above-mentioned technical scheme, first pendant is spacing in the wearing hole with the rigid cable, has played the effect of insurance on the one hand, and on the other hand can restrict two blocks of furred ceiling stones that are adjacent and produce lateral sliding.
Preferably, the second pendant includes two second mounting panels, two leave the space between the second mounting panel, pass two second mounting panels simultaneously and be provided with mounting bolt, the tip of rigid cable is equipped with the lantern ring, mounting bolt is used for penetrating in the lantern ring.
Through above-mentioned technical scheme, rigid cable can conveniently realize the dismouting with the second pendant.
Preferably, the collar is larger in size than the exit hole.
Through above-mentioned technical scheme, the lantern ring can't pass and wear the hole, makes every set hang the structure futilely and when being in the detached state, the lantern ring can be located the outside of first mounting panel all the time, during the installation convenient with adjacent furred ceiling stone material on the construction bolt be connected.
Preferably, the rigid cable comprises an upper cable, a lower cable and an adjusting piece, an upper thread section is fixed at the bottom end of the upper cable, a lower thread section is fixed at the top end of the lower cable, the thread turning directions of the upper thread section and the lower thread section are opposite, and the adjusting piece is in threaded connection with the upper thread section and the lower thread section through two ends respectively.
Through the technical scheme, the adjusting piece is rotated relative to the upper cable and the lower cable, and the adjusting piece drives the upper thread section and the lower thread section to be close to or far away from each other under the action of the threads of the upper thread section and the lower thread section, so that the total length of the rigid cable is adjusted; when installing this dry hanging structure, people can conveniently carry out the leveling to the furred ceiling stone material through the regulating part.
Preferably, the top hanging piece is positioned right above the junction of two adjacent ceiling stones.
Through above-mentioned technical scheme, the both ends of rigid cable, three departments of kink form right triangle, and one of this right triangle's one of right angle limit is in vertical plane, then should hang the rational in infrastructure of structure futilely, and the atress situation is better, and the installation is good the back not fragile.
Preferably, the lifting device further comprises a reinforcing rod, one end of the reinforcing rod is fixed on the top hanging piece through a bolt, and the other end of the reinforcing rod is fixed on a second hanging piece below the top hanging piece through a bolt.
Through the technical scheme, the reinforcing rod is used for assisting in reinforcing the dry hanging structure; when the furred ceiling stone material receives external force disturbance, the stiffener can prevent to a certain extent that originally do the structure of hanging from producing and rocking.
Another object of the present invention is to provide a construction method for the above suspended ceiling stone dry hanging structure, which comprises the following steps:
the method comprises the following steps: mounting a first hanging piece and a second hanging piece on each ceiling stone in advance, and mounting a top hanging piece on the cross beam;
step two: hoisting a first piece of suspended ceiling stone, fixing a rigid cable on a top hanging piece, fixing the side wall of the suspended ceiling stone on a wall, and adjusting the suspended ceiling stone to be in a horizontal state;
step three: hoisting the next ceiling stone, fixing the upper ends of the two rigid cables on the top hanging piece, aligning the insertion block into the slot of the ceiling stone of the front block, and enabling the top hanging piece to be positioned right above the junction of the front ceiling stone and the rear ceiling stone in the construction process;
step four: fixing the lower end of the rigid cable on a second pendant of the suspended ceiling stone of the front block through a mounting bolt;
step five: the lengths of the two rigid cables are adjusted through the adjusting piece, so that the front suspended ceiling stone and the rear suspended ceiling stone are positioned on the same plane;
step six: a reinforcing rod is arranged between the top hanging piece and a second hanging piece positioned right below the top hanging piece;
step seven: and repeating the third step to the sixth step to finish the installation of the rest ceiling stone.
Through the technical scheme, the construction method is simple and convenient, the suspended ceiling stone does not need to be lifted for a long time in the construction process, and the construction efficiency is improved.
In summary, compared with the prior art, the beneficial effects of the invention are as follows: the suspended ceiling stone dry hanging structure and the construction method thereof can prevent gaps from being generated between adjacent suspended ceiling stones to a greater extent, and improve the construction quality; and the construction is simple and convenient, and the efficiency is high.
Drawings
Fig. 1 is a perspective view of a suspended ceiling stone dry hanging structure of an embodiment, mainly highlighting the overall structure of the dry hanging structure;
FIG. 2 is an enlarged view of the top hanger of the embodiment, mainly highlighting the structure of the top hanger;
FIG. 3 is a partial view of the embodiment, mainly highlighting the structure of the first and second hangers;
FIG. 4 is a partial view of a rigid cord, highlighting primarily the composition of the rigid cord;
fig. 5 is a schematic view of the hanging structure, mainly showing a stress structure of the hanging structure.
Reference numerals: 1. a cross beam; 2. suspended ceiling stone; 3. a first hanger; 4. a second hanger; 11. a top hanging piece; 5. a rigid cord; 12. a jack bolt; 41. a second mounting plate; 42. installing a bolt; 43. a wheel body; 44. a slot; 31. a first mounting plate; 311. an outlet hole is formed; 32. inserting a block; 51. a collar; 52. rope feeding; 53. rope descending; 54. an adjustment member; 521. an upper thread section; 531. a lower thread section; 6. a reinforcing rod.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
The present embodiment is only for explaining the present invention, and it is not limited to the present invention, and those skilled in the art can make modifications of the present embodiment without inventive contribution as needed after reading the present specification, but all of them are protected by patent law within the scope of the claims of the present invention.
As shown in fig. 1, the suspended ceiling stone dry hanging structure comprises a beam 1 and a plurality of rectangular suspended ceiling stones 2. Two first hanging pieces 3 and two second hanging pieces 4 are fixed on the surface of the suspended ceiling stone 2 through bolts, and the first hanging pieces 3 and the second hanging pieces 4 are symmetrically arranged at four corners of the suspended ceiling stone 2 in pairs. The bottom surface of the beam 1 is fixed with a top hanging piece 11 through bolts, and the beam 1 and the ceiling stone 2 are fixed through a rigid cable 5 arranged between the beam 1 and the ceiling stone.
As shown in fig. 1 and 2, the top hanger 11 has an inverted U-shaped cross section, and top bolts 12 are provided through both side walls of the top hanger 11, and the top bolts 12 are fastened by nuts. The top hanging piece 11 is positioned right above the junction of two adjacent ceiling stones 2.
As shown in fig. 3, the second hanger 4 includes two second mounting plates 41 parallel to each other, and a gap is left between the two second mounting plates 41, so that the cross section of the second hanger 4 is U-shaped. Meanwhile, mounting bolts 42 are arranged through the two second mounting plates 41, and the connection positions of the mounting bolts are positioned at one side close to the adjacent ceiling stone 2; a wheel body 43 is further fixed between the two second mounting plates 41, and the wheel body 43 is inclined relative to the plate surface of the suspended ceiling stone 2. The side wall of the second hanging member 4 close to the adjacent ceiling stone 2 is provided with a slot 44, and the length direction of the slot 44 is along the horizontal direction.
The first hanging member 3 comprises a first mounting plate 31, and the surface of the first mounting plate 31 is perpendicular to the surface of the suspended ceiling stone 2. The first mounting plate 31 is provided with a through hole 311, and the through hole 311 corresponds to the mounting bolt 42 on the adjacent ceiling stone 2. The first hanging piece 3 is integrally fixed with the inserting block 32 on the side wall close to the adjacent ceiling stone 2, and the inserting block 32 can be inserted into the inserting groove 44, so that the two adjacent ceiling stones 2 are limited to generate longitudinal displacement.
As shown in fig. 1 and 3, the number of the rigid cables 5 on each ceiling stone 2 is two, and the two rigid cables 5 correspond to two groups of the first hanging members 3 and the second hanging members 4, respectively. Two ends of each rigid cable 5 are provided with lantern rings 51, and one lantern ring 51 is sleeved on the top bolt 12 and used for being fixed with the top hanging piece 11; another collar 51 is sleeved on the mounting bolt 42 on the adjacent ceiling stone 2 for fixing with the second hanging member 4 on the adjacent ceiling stone 2. The rigid cable 5 passes through the through hole 311 and around the wheel body 43, and the angle formed by the rigid cable 5 around the wheel body 43 is an acute angle. The through holes 311 are used for limiting the rigid cables 5, so that the two adjacent ceiling stones 2 are limited from sliding transversely. The size of the lantern ring 51 is larger than the through hole 311, and the lantern ring 51 can not pass through the through hole 311, so that the lantern ring 51 can be always positioned on the outer side of the first mounting plate 31 when each set of dry hanging structure is in a separated state, and the mounting bolts 42 on the adjacent ceiling stone 2 are conveniently connected during mounting.
As shown in fig. 1 and 4, the rigid cable 5 includes an upper cable 52, a lower cable 53, and an adjusting member 54, wherein an upper threaded section 521 is coaxially fixed to a bottom end of the upper cable 52, a lower threaded section 531 is coaxially fixed to a top end of the lower cable 53, and the thread directions of the upper threaded section 521 and the lower threaded section 531 are opposite. The adjusting member 54 is a rectangular frame-shaped structure, the adjusting member 54 is respectively in threaded connection with the upper threaded section 521 and the lower threaded section 531 through two ends, and the axis of the upper threaded section 521 coincides with the axis of the lower threaded section 531.
By rotating the adjusting member 54 relative to the upper and lower cables 52 and 53, the adjusting member 54 drives the upper and lower threaded sections 521 and 531 toward and away from each other by the screw action of the upper and lower threaded sections 521 and 531, thereby adjusting the overall length of the rigid cable 5. When installing this and hanging the structure futilely, the people can conveniently carry out the leveling to furred ceiling stone material 2 through adjusting part 54, perhaps makes furred ceiling stone material 2 be certain inclination and distributes, has enlarged this application scope of hanging the structure futilely.
As shown in fig. 1, a reinforcing rod 6 is arranged between the pendant 11 and the second pendant 4 located right below the pendant 11, holes are formed at two ends of the reinforcing rod 6, one end of the reinforcing rod 6 is fixed on the pendant 11 through a top bolt 12, and the other end of the reinforcing rod 6 is fixed on the second pendant 4 through a mounting bolt 42. After the rigid cable 5 is installed, a reinforcing rod 6 is installed, the reinforcing rod 6 is used for assisting in reinforcing the dry hanging structure, the gravity of the suspended ceiling stone 2 is completely borne by the rigid cable 5 under normal conditions, and the reinforcing rod 6 is in an unstressed or slightly stressed state; when furred ceiling stone material 2 received external force disturbance, stiffener 6 can prevent to a certain extent that originally do the structure of hanging from producing and rock.
A construction method applied to the suspended ceiling stone dry hanging structure comprises the following steps:
the method comprises the following steps: a first hanging piece 3 and a second hanging piece 4 are installed on each ceiling stone 2 in advance, and a top hanging piece 11 is installed on the beam 1;
step two: the first ceiling stone 2 is lifted, the rigid cable 5 is fixed on the top hanging piece 11, the side wall of the ceiling stone 2 is fixed on the wall, and the ceiling stone 2 is adjusted to be in a horizontal state;
step three: hoisting the next ceiling stone 2, fixing the upper ends of the two rigid cables 5 on the top suspension member 11, aligning the insertion block 32 into the slot 44 of the ceiling stone 2 of the front block, and enabling the top suspension member 11 to be positioned right above the junction of the front and rear ceiling stones 2 in the construction process;
step four: fixing the lower end of the rigid cable 5 on the second hanging piece 4 of the suspended ceiling stone 2 of the front block through a mounting bolt 42;
step five: the lengths of the two rigid cables 5 are adjusted through the adjusting piece 54, so that the front and rear suspended ceiling stones 2 are positioned on the same plane;
step six: a reinforcing rod 6 is arranged between the top hanging piece 11 and the second hanging piece 4 positioned right below the top hanging piece;
step seven: and repeating the third step to the sixth step to finish the installation of the rest ceiling stone 2.
As shown in fig. 5, after the dry hanging structure is installed, the rigid cable 5 is under the action of tension, the second hanging piece 4 on the adjacent ceiling stone 2 is tightly abutted against the first hanging piece 3 on the ceiling stone 2 by the rigid cable 5, and then pressing force exists between the adjacent ceiling stones 2, so that gaps can be prevented from being generated between the adjacent ceiling stones 2 to a greater extent, and the construction quality is improved; the construction method is simple and convenient, the suspended ceiling stone 2 does not need to be lifted for a long time in the construction process, and the construction efficiency is improved. Compared with the prior art, the dry hanging structure does not need any adhesive for auxiliary reinforcement, and is green and environment-friendly.
The above description is intended to be illustrative of the present invention and not to limit the scope of the invention, which is defined by the claims appended hereto.

Claims (6)

1. The utility model provides a furred ceiling stone material is hung structure futilely, includes furred ceiling stone material (2) of crossbeam (1), rectangle, characterized by: the suspended ceiling stone hanging device is characterized by further comprising first hanging pieces (3), second hanging pieces (4), a rigid cable (5) and top hanging pieces (11) fixed on the cross beam (1), wherein the first hanging pieces (3) and the second hanging pieces (4) are symmetrically arranged on four corners of the suspended ceiling stone (2) in pairs, inserting blocks (32) are arranged on the side walls of the first hanging pieces (3) deviating from the suspended ceiling stone (2), inserting grooves (44) are formed in the side walls of the second hanging pieces (4) deviating from the suspended ceiling stone (2), the inserting blocks (32) are used for being inserted into the adjacent inserting grooves (44) in the suspended ceiling stone (2), wheel bodies (43) are arranged on the second hanging pieces (4), one end of the rigid cable (5) is connected to the second hanging pieces (4) on the adjacent suspended ceiling stone (2), and the other end of the rigid cable (5) bypasses the wheel bodies (43) on the suspended ceiling stone (2), the rigid cable (5) is connected to the top hanging piece (11), and an included angle formed by the rigid cable (5) passing around the wheel body (43) is an acute angle;
the first hanger (3) comprises a first mounting plate (31), an outlet hole (311) is formed in the first mounting plate (31), and the rigid cable (5) passes through the outlet hole (311);
the second pendant (4) comprises two second mounting plates (41), a gap is reserved between the two second mounting plates (41), a mounting bolt (42) penetrates through the two second mounting plates (41), a lantern ring (51) is arranged at the end of the rigid cable (5), and the mounting bolt (42) is used for penetrating into the lantern ring (51).
2. The suspended ceiling stone dry-hanging structure as claimed in claim 1, which is characterized in that: the collar (51) is larger in size than the exit hole (311).
3. The suspended ceiling stone dry-hanging structure as claimed in claim 1, which is characterized in that: the rigid cable (5) comprises an upper cable (52), a lower cable (53) and an adjusting piece (54), an upper thread section (521) is fixed at the bottom end of the upper cable (52), a lower thread section (531) is fixed at the top end of the lower cable (53), the thread screwing directions of the upper thread section (521) and the lower thread section (531) are opposite, and the adjusting piece (54) is in threaded connection with the upper thread section (521) and the lower thread section (531) through two ends respectively.
4. The suspended ceiling stone dry-hanging structure as claimed in claim 1, which is characterized in that: the top hanging piece (11) is positioned right above the junction of the two adjacent ceiling stones (2).
5. The suspended ceiling stone dry-hanging structure as claimed in claim 4, wherein: the novel hanging rack is characterized by further comprising a reinforcing rod (6), one end of the reinforcing rod (6) is fixed on the top hanging piece (11) through a bolt, and the other end of the reinforcing rod (6) is fixed on the second hanging piece (4) below the top hanging piece (11) through a bolt.
6. A construction method applied to the suspended ceiling stone dry hanging structure of any one of claims 1 to 5 is characterized in that: the method comprises the following steps:
the method comprises the following steps: a first hanging piece (3) and a second hanging piece (4) are installed on each ceiling stone (2) in advance, and a top hanging piece (11) is installed on the cross beam (1);
step two: the first ceiling stone (2) is lifted, the rigid cable (5) is fixed on the top hanging piece (11), the side wall of the ceiling stone (2) is fixed on the wall, and the ceiling stone (2) is adjusted to be in a horizontal state;
step three: hoisting the next ceiling stone (2), fixing the upper ends of the two rigid cables (5) on the top hanging piece (11), aligning the inserting block (32) into the slot (44) of the ceiling stone (2) inserted into the front block, and enabling the top hanging piece (11) to be positioned right above the junction of the front ceiling stone (2) and the rear ceiling stone (2) in the construction process;
step four: the lower end of the rigid cable (5) is fixed on a second hanging piece (4) of the front suspended ceiling stone (2) through a mounting bolt (42);
step five: the lengths of the two rigid cables (5) are adjusted through the adjusting piece (54), so that the front and rear suspended ceiling stones (2) are positioned on the same plane;
step six: a reinforcing rod (6) is arranged between the top hanging piece (11) and the second hanging piece (4) which is positioned right below the top hanging piece;
step seven: and repeating the third step to the sixth step to finish the installation of the rest ceiling stone (2).
CN201810191890.7A 2018-03-08 2018-03-08 Suspended ceiling stone dry hanging structure and construction method thereof Expired - Fee Related CN108316540B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810191890.7A CN108316540B (en) 2018-03-08 2018-03-08 Suspended ceiling stone dry hanging structure and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810191890.7A CN108316540B (en) 2018-03-08 2018-03-08 Suspended ceiling stone dry hanging structure and construction method thereof

Publications (2)

Publication Number Publication Date
CN108316540A CN108316540A (en) 2018-07-24
CN108316540B true CN108316540B (en) 2020-01-24

Family

ID=62901599

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810191890.7A Expired - Fee Related CN108316540B (en) 2018-03-08 2018-03-08 Suspended ceiling stone dry hanging structure and construction method thereof

Country Status (1)

Country Link
CN (1) CN108316540B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112177225B (en) * 2020-08-31 2021-11-19 深圳市尚石设计有限公司 Stable structure of large-scale decoration pendant

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010248843A (en) * 2009-04-17 2010-11-04 Shimizu Corp Suspension tool for wiring and piping materials
CN201635379U (en) * 2009-12-16 2010-11-17 中国二十冶集团有限公司 Safety platform for installation and construction of roof contour plate hang ceiling
CN103195202A (en) * 2013-04-18 2013-07-10 洪思滨 Adjustable suspended ceiling
CN204081081U (en) * 2014-09-30 2015-01-07 中国建筑股份有限公司 A kind of furred ceiling of novel crack resistence and wall connecting node structure
CN205189211U (en) * 2015-10-23 2016-04-27 浙江中南建设集团有限公司 Connection structure in furred ceiling stone material curtain system
CN105544835A (en) * 2015-12-18 2016-05-04 上海都市绿色工程有限公司 Truss with load adjustable
CN206346524U (en) * 2017-01-05 2017-07-21 浙江省二建建设集团有限公司 Portable job shop
CN107152115A (en) * 2016-03-03 2017-09-12 北新集团建材股份有限公司 Mineral wool board sector ceiling suspension system
CN206844456U (en) * 2017-06-08 2018-01-05 上海旭博建筑装饰工程有限公司 Cladding suspended ceiling structure

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ITPD20040175A1 (en) * 2004-07-02 2004-10-02 Giuseppe Bottacin PROCEDURE FOR THE STRUCTURAL JOINING OF CABLE MODULES OF GENERICALLY ELONGATED FORM, FOR THE PURPOSE OF PRODUCING COLUMNS OR CAVE RODS AND PRODUCT OBTAINED

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010248843A (en) * 2009-04-17 2010-11-04 Shimizu Corp Suspension tool for wiring and piping materials
CN201635379U (en) * 2009-12-16 2010-11-17 中国二十冶集团有限公司 Safety platform for installation and construction of roof contour plate hang ceiling
CN103195202A (en) * 2013-04-18 2013-07-10 洪思滨 Adjustable suspended ceiling
CN204081081U (en) * 2014-09-30 2015-01-07 中国建筑股份有限公司 A kind of furred ceiling of novel crack resistence and wall connecting node structure
CN205189211U (en) * 2015-10-23 2016-04-27 浙江中南建设集团有限公司 Connection structure in furred ceiling stone material curtain system
CN105544835A (en) * 2015-12-18 2016-05-04 上海都市绿色工程有限公司 Truss with load adjustable
CN107152115A (en) * 2016-03-03 2017-09-12 北新集团建材股份有限公司 Mineral wool board sector ceiling suspension system
CN206346524U (en) * 2017-01-05 2017-07-21 浙江省二建建设集团有限公司 Portable job shop
CN206844456U (en) * 2017-06-08 2018-01-05 上海旭博建筑装饰工程有限公司 Cladding suspended ceiling structure

Also Published As

Publication number Publication date
CN108316540A (en) 2018-07-24

Similar Documents

Publication Publication Date Title
CN111622416B (en) Assembly type suspended ceiling structure of green building
CN106013585A (en) Ceiling cascade device and installation method
CN211622212U (en) Decorate quick mounting structure of furred ceiling
CN209066791U (en) A kind of wall surface dry-hang device
WO2015016426A1 (en) Apparatus for finishing wall
CN105178495B (en) A kind of suspended ceiling keel system and its construction method
CN108316540B (en) Suspended ceiling stone dry hanging structure and construction method thereof
CN211597329U (en) Stone material aluminum honeycomb composite sheet furred ceiling mounting structure
US20080190044A1 (en) Wire rope tension grid improvements
CN112962858A (en) Quick ceiling mounting structure and ceiling mounting method
CN104088391A (en) Hanging piece used for low-rise high-integration suspended ceiling
CN104328851B (en) Curtain wall
CN102561645A (en) Stone hanging and attaching component
CN208456020U (en) A kind of wallboard installing structure convenient for assembly
CN110409686A (en) Spliced furred ceiling and installation method
CN212078409U (en) Suspended ceiling component
CN204609095U (en) The furred ceiling of a kind of furred ceiling connector and use furred ceiling connector
CN105972316A (en) Extensible pore type bridge
CN203905254U (en) Prefabricated installation structure for special-shaped sculpture modelling hung ceiling
CN201546405U (en) Wallboard mounting and fixing device
CN206890308U (en) Hyperboloid light fixture decorative panel
CN211736005U (en) Hanging piece type aluminum ceiling mounting structure
CN202273350U (en) A triangular keel hanging piece structure
CN204983510U (en) Seat is hung to convenient to use's stone material
CN206737237U (en) Suspension arrangement

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200124