CN104328851B - Curtain wall - Google Patents

Curtain wall Download PDF

Info

Publication number
CN104328851B
CN104328851B CN201410608795.4A CN201410608795A CN104328851B CN 104328851 B CN104328851 B CN 104328851B CN 201410608795 A CN201410608795 A CN 201410608795A CN 104328851 B CN104328851 B CN 104328851B
Authority
CN
China
Prior art keywords
adjustment member
hook
curtain wall
space
suspension member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410608795.4A
Other languages
Chinese (zh)
Other versions
CN104328851A (en
Inventor
蔡金栋
洪晓晖
陈仁朝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian construction engineering Refco Group Ltd
Fujian seven Construction Group Co., Ltd.
Original Assignee
FUJIAN CONSTRUCTION ENGINEERING GROUP Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FUJIAN CONSTRUCTION ENGINEERING GROUP Co filed Critical FUJIAN CONSTRUCTION ENGINEERING GROUP Co
Priority to CN201410608795.4A priority Critical patent/CN104328851B/en
Publication of CN104328851A publication Critical patent/CN104328851A/en
Application granted granted Critical
Publication of CN104328851B publication Critical patent/CN104328851B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Finishing Walls (AREA)

Abstract

The invention provides a curtain wall which comprises a beam body hanging piece device, an adjustment assembling device, a panel connection device and a decoration panel, wherein the beam body hanging piece device comprises a T-shaped hanging piece, a first fixed clamping buckle and a first chemical bolt; the adjustment assembling device comprises a front-and-back adjustment member and a space adjustment member; the space adjustment member is connected to a hook or a hanging hole of the T-shaped hanging piece; the front-and-back adjustment member is connected to the space adjustment member; the panel connection device comprises an embedding nail, an embedding nail hole and a fastening nut; the embedding nail hole is formed in the back surface of the decoration panel; one end of the embedding nail is connected with the front-and-back adjustment member, and the other end of the embedding nail is inserted into the embedding nail hole and is locked by the fastening nut. The curtain wall disclosed by the invention is provided with a reasonable connection hanging member, so that the hung decoration panel is stressed by a beam body of a building, and the position of the decoration panel is convenient to adjust and replace; the stress is reasonable, and all parts are convenient to detach and can be repeatedly used.

Description

A kind of curtain wall
Technical field
The present invention relates to a kind of curtain wall.
Background technology
Curtain wall (Curtain Wall) also known as building curtain wall, curtain wall, are that commonly used one kind of modern architecture is stood Face, is typically made up of materials such as metal, glass, stone material and artificial boards, installed in the outermost layer of building, effect such as wall Body, attractive in appearance, Radix Saposhnikoviae, rain-proof, energy-conservation etc., curtain wall is not subject to any structural load, be only connected with structural slab or post bear deadweight and Opposing blast.
Building trade stone decoration curtain wall engineering generally existing now, employings of other decoration panels also gradually increase.But The technological difficulties for being mounted to this area of curtain wall, current curtain wall install the mainly hanging installation of point, i.e., every piece stone decoration Panel has one or two hitch point, and which is that groove is opened up in bottom after stone decoration panel directly singly drills, then follows closely back of the body bolt with planting One end be located in hole position blend compounds and fix, the other end is followed closely and completes to hang in body of wall, and major part is directly to hang On filling wall, this installation existing defects are:
1st, due to filling wall for non bearing structure, the stone decoration panel on filling wall undertakes weight by wall is filled Amount, increased the burden of filling wall, so as to have impact on the anti-seismic performance of body of wall, there is potential safety hazard;
2nd, the hanging installation of current point is directly installed on body of wall by planting nail back of the body bolt, and the back of the body is planted bolt and do not have adjustment work( Can, and it is not easy to remove, therefore it is difficult to ensure that the curtain wall panel after installing neatly is unified;
3rd, the current plant nail back of the body bolt having adopts T font structures, but the actual only stone material of horizontal edge of its vertical edge both sides Decoration panel is engaged, and another horizontal edge does not work, and plants nail back of the body bolt equivalent to L-type, causes decorative panel of stone material and L-type to plant nail unbalance stress It is even, it is easily damaged.
4th, current point hanging curtain wall use range is not extensive, and installation site is limited by height, is normally only used for Simple smooth building annex position.
In order to save cost, there are part company or individual application country mounting technique patent on the market, and obtained each Level engineering method, the application implementation in architectural engineering.Comprehensive many factorial analysiss, nowadays those patents have and there are many disadvantages End.The design combines these drawbacks and is adjusted, and strives for having more appropriate method to benefit society.
The content of the invention
The technical problem to be solved in the present invention, is to provide a kind of curtain wall, arranges rational connection suspension element, makes suspension Beam body stress of the decoration panel afterwards by building, and the position of decoration panel can conveniently adjust replacing, reasonable stress, Suo Youpei Part facilitates dismounting, beneficial to recycling.
What the present invention was realized in:A kind of curtain wall, by beam body pendant device, adjustment assembly device, panel connector And decoration panel composition;The beam body pendant device includes that T-shaped suspension member, first fix buckle and the first chemical bolt, institute State the first fixation and snap through the first chemical bolt and be fixed on the beam of building and formed a vertical slot, the T-shaped suspension member Including an intersecting bottom surface and a facade, and section is T-shaped, and the bottom surface is plugged in the vertical slot, and facade is opened up There are hook or hanging hole;The adjustment assembly device includes before and after's adjustment member and space allocation component, the space allocation component It is connected on the hook or hanging hole, the adjustment member in front and back is connected on space allocation component;The panel connector Including a plant nail, nail being planted with clamp nut, planting the back side that nail is located at decoration panel, the plant is followed closely one end and adjusted with described in front and back The connection of whole component, the other end are inserted in the plant nail and are locked with clamp nut, then with stone special glue by remaining gap Filling consolidation.
Further, the first fixation buckle includes interior card and outer card, and interior card is closely attached on building, wild card Located at interior card, in the same side, interior card end stretches in a segment distance outside outer Card-terminal portion to piece pressure, and the interior card end with Outer Card-terminal portion is bent to form the vertical slot in opposite directions.Described first fixes interior card and outer card structure of the buckle by split Into, make just assemble and disassemble during T-shaped suspension member the first fixation buckle without to tear open, convenient to operate, vertical slot is used for constraining T-shaped suspension member, Optimum position point can may be selected up and down on metope simultaneously to fix.
Further, before and after described, adjustment member is telescopic bolt component, should before and after adjustment member include sleeve bolt, Pad, turn and nut, the sleeve bolt are provided with female thread and external screw thread, and are connected with the nail of planting by female thread Connect, be connected with nut by external screw thread, and nut, pad and turn lock onto space allocation component on the sleeve bolt. It is connected to by sleeve bolt and plants the position followed closely to adjust adjusting in front and back for decoration panel.
Further, the space allocation component is the unidirectional adjustment member in space;The unidirectional adjustment member in the space is one Flat sheet, is provided with an elongated hole and a up big and down small trapezoidal hook in flat sheet, the hanging hole on the T-shaped suspension member is upper big Under little trapezoidal hanging hole, the trapezoidal hook and the trapezoidal hanging hole coordinate to be fixed, the elongated hole then connect before and after adjustment structure Part.Or:The space allocation component is the two-way adjustment member in space;The two-way adjustment member in the space is included mutually at a right angle Two flat sheets, in a flat sheet arrange a horizontal elongated hole, be provided with a vertical elongated hole in another flat sheet;It is described T-shaped Hook on suspension member is word hook, and word hook also has an opening for tilting upward, the two-way adjustment member in the space Vertical elongated hole is bolted in word hook by draw-in groove, before and after the horizontal elongated hole connection of the two-way adjustment member in the space Adjustment member.
Further, the plant nail includes elongate holes and a circular opening up hole, and the circular opening up hole is located at strip The inner side in hole, and diameter is adaptable with elongate holes longest edge;The nail of planting includes that an ailhead, a thread segment and two are spacing Block, the ailhead are strip, and the ailhead shape size matched with the shape size of the elongate holes, two limited block Simultaneously at a distance of 180 degree, the ailhead is rotated by 90 ° after stretching into elongate holes inner surface positioned at the ailhead, and ailhead can be made long respectively Side two ends are limited in circular opening up hole by two limited blocks, with largest face occlusion orthogonal with decoration panel.So, plant the ailhead two of nail End can be engaged with decoration panel, and force dispersion is uniform, beneficial to protection decoration panel.
Further, the bottom surface of the T-shaped suspension member is provided with the spacing hook of a plurality of words, and the spacing hook of a word also has One inclined opening, and positioned at the spacing hook of a word of T-shaped suspension member upper end opening direction be from a word it is spacing hook most go up End diagonally downward, as curtain wall suspended hanging point device, and positioned at the spacing hook of a word of T-shaped suspension member bottom opening direction be from The spacing hook bottom of one word tilts upward, as curtain wall bottom limit point device.Can be by T by the spacing hook of a word with screw Type suspension member is spacing, makes T-shaped suspension member realize the installation of curtain wall in perpendicular direction as tension member.
The present invention may also include body of wall stopping means, and the body of wall stopping means include the second fixation buckle and second chemical Bolt, second fixation snap through the second chemical bolt and are fixed on the body of wall of building and are formed the second vertical slot, The bottom surface of the T-shaped suspension member is plugged in the described second vertical slot.
It is an advantage of the current invention that:The curtain wall of the present invention, arranges rational connection suspension element, and decoration panel is passed through T Shape suspension member is connected to the beam body of building, makes the decoration panel after suspension by the beam body stress of building, and T-shaped suspension member is by the Two chemical bolt Mulit-point Connections fill wall, have the advantages that firm filled wall, and the present invention is also made by arranging adjustment assembly device The position of decoration panel can conveniently adjust replacing, and reasonable stress, all accessories facilitate dismounting, beneficial to recycling, safely may be used Lean on, it is economical and practical.
Description of the drawings
The present invention is further illustrated in conjunction with the embodiments with reference to the accompanying drawings.
Fig. 1 is the positive structure schematic of curtain wall of the present invention.
Fig. 2 is the side structure schematic diagram of curtain wall of the present invention.
Fig. 3 is the overlooking the structure diagram of curtain wall of the present invention.
Fig. 4 is the structural representation of first, second fixation buckle in beam body pendant device of the present invention.
Fig. 4 a are the positive structure schematics of T-shaped suspension member in beam body pendant device of the present invention.
Fig. 4 b are the section structure schematic diagrams of T-shaped suspension member in beam body pendant device of the present invention.
Fig. 5 is the structural representation of adjustment member before and after the present invention.
Fig. 5 a are adjustment member and the structural representations for planting nail connection status before and after the present invention.
Structural representation during Fig. 6 adjustment members unidirectional for space that are space allocation component of the present invention.
Fig. 6 a are the side structure schematic diagrams of T-shaped suspension member in beam body pendant device of the present invention.
Structural representation during Fig. 7 adjustment members two-way for space that are space allocation component of the present invention.
Fig. 7 a are the schematic top plan views of Fig. 7.
Fig. 7 b are the side structure schematic diagrams of T-shaped suspension member in beam body pendant device of the present invention.
Fig. 7 c are draw-in groove bolt arrangement schematic diagrams in beam body pendant device of the present invention.
Fig. 8 is the structural representation for planting nail in panel connector of the present invention.
Fig. 8 a are the A of Fig. 8 to diagram.
Fig. 9 is the structural representation of plant nail in panel connector of the present invention.
Fig. 9 a are the B of Fig. 9 to diagram.
Figure 10 is plant nail and the end view for planting Bolt-hole fits state in panel connector of the present invention.
Specific embodiment
Refer to shown in Fig. 1 to Figure 10, the curtain wall 100 of the present invention, including decoration panel 1, beam body pendant device 2, adjustment Assembling device 3 and panel connector 4, the beam body pendant device 2 are used for connecting building thing 500, the panel connection dress Put 4 for connection decorate panel 1, the adjustment assembly device 3 is connected between beam body pendant device 2 and panel connector 4.
As shown in Fig. 4 to Fig. 4 b, the beam body pendant device 2 includes that T-shaped suspension member 21, first fixes buckle 22 and first Chemical bolt 23, the first fixation buckle 22 are fixed on the beam 501 of building 500 and are formed by the first chemical bolt 23 One vertical slot 220, referring to Fig. 4 a and Fig. 4 b, the T-shaped suspension member 21 includes an intersecting bottom surface 211 and a facade 212, and disconnected Face is T-shaped, and the bottom surface 211 is plugged in the vertical slot 220, and facade 212 offers hook or hanging hole 213;Such as Fig. 4 Shown, the first fixation buckle 22 includes interior card 221 and outer card 222, and interior card 221 is closely attached on building 500, outward Located at interior card 221, in the same side, 221 end of interior card stretches in a segment distance outside 222 end of outer card to the pressure of card 222, leads to Cross the first chemical bolt 24 to be fixed on beam 501 with interior card 221 and 222 collective effect of outer card, and with 221 end of interior card Portion is bent to form the vertical slot 220 in opposite directions with 222 end of outer card, and the first fixation buckle 22 is arranged to the card of split Buckle structure, not only facilitates assembly and disassembly, is also moved easily, and makes just assemble and disassemble during T-shaped suspension member 21 first fixation buckle 22 without to tear open.
Above-mentioned first fixation buckle 22 and the first chemical bolt 23 are affixed on beam, bear curtain wall with by beam 100 weight, the present invention may also include body of wall stopping means 2 ', the body of wall stopping means 2 ' including second fix buckle 22 ' with And second chemical bolt 23 ', the second fixation buckle 22 ' is fixed on the body of wall of building by the second chemical bolt 23 ' And the second vertical slot 220 ' is formed, the bottom surface of the T-shaped suspension member is plugged in the described second vertical slot 220 '.Body of wall is spacing Device 2 ' is preferably provided multiple, to form multiple fixing points, constrains T-shaped suspension member 21 in other Direction distortions.Described second fixes The structure of buckle 22 ' is completely the same with the first structure for fixing buckle 22, and simply fixed position is different, be on body of wall 502 and It is non-on beam 501, it is spacing to carry out to T-shaped suspension member 21, and the structure of the second fixation buckle 22 ' is easy to movement, it is suitable to find Fix the position of the second chemical bolt 23 ', it is to avoid the I-shaped for being fixed on body of wall 502 is sewed on or building block edge.
The bottom surface 211 of the T-shaped suspension member 21 is provided with the spacing hook 214 of a plurality of words, and the spacing hook of a word 214 also has There is an inclined opening 2140, and the spacing opening direction for linking up with 214 of the word positioned at 21 upper end of T-shaped suspension member is to limit from a word Position is linked up with topmost diagonally downward, and the spacing opening direction for linking up with 214 of the word positioned at 21 bottom of T-shaped suspension member is from a word Spacing hook bottom tilts upward, and makes the T-shaped suspension member 21 can be on perpendicular direction in 214 length by length directions of the spacing hook of a word Dilatation.The 21 spacing adjustment of T-shaped suspension member can be made in perpendicular side by T-shaped suspension member 21 by the spacing hook of a word 214 with limited screw To as curtain wall suspended hanging point device.In addition, the setting of inclined opening 2140, can not exclusively remove all limited screws 6 In the case of, move or remove T-shaped suspension member 21, be easy to operate, 6 position-limiting actions of the limited screw, and hang as curtain wall The big effect of point device lifting, it is therefore necessary on the beam 501 of building 500.
Mainly as shown in figure 3, the adjustment assembly device 3 includes before and after's adjustment member 31 and space allocation component 32, institute State space allocation component 32 to be connected on the hook or hanging hole 213 by bolt assembly, the adjustment member 31 in front and back connects On space allocation component 32.Before and after described, adjustment member 31 is telescopic bolt component, including sleeve bolt 311, pad 312nd, turn 313 and nut 314, the sleeve bolt 311 are provided with female thread and external screw thread, and pass through female thread and institute The plant nail connection of panel connector is stated, is connected with nut 314 by external screw thread, and nut 314, pad 312 and turn 313 Space allocation component 32 is lock onto on the sleeve bolt 311.It is connected to by sleeve bolt 311 and plants the position followed closely to adjust dress The front and back position of decoration panel 1.
As shown in fig. 6, in one embodiment, the space allocation component 32 is the unidirectional adjustment member in space 321;The sky Between unidirectional adjustment member be a flat sheet, be provided with an elongated hole 3211 and a up big and down small trapezoidal hook in flat sheet 3212, as shown in Figure 6 a, the hanging hole 2132 on the T-shaped suspension member 21 be up big and down small trapezoidal hanging hole, the trapezoidal hook 3212 with it is described it is trapezoidal hook or hanging hole 2232 coordinate fix, the elongated hole 3211 then connect before and after adjustment member 31;It is elongated Can realize decorating the unidirectional vertical adjustment of panel 1 in hole 3211.Up big and down small trapezoidal hook 3212 and the trapezoidal hanging hole 2132, can in the presence of deadweight automatic clamping, make to fix more reliable, and convenient disassembly.
As shown in fig. 7, in another embodiment, the space allocation component 32 is the two-way adjustment member in space 322;It is described The two-way adjustment member in space 322 includes two flat sheets 3221 mutually at a right angle, arranges a horizontal elongated hole in a flat sheet 3222 3224, a vertical elongated hole 3223 is provided with another flat sheet 3221;As shown in Figure 7a, the hook on the T-shaped suspension member 21 213 is word hook 2131, and word hook 2131 also has an opening 2130 for tilting upward, described anyhow to elongated hole One of 3223 are connected in word hook by draw-in groove bolt 71 and nut 714, pad 712 and turn 713, second connect Adjustment member 31 in front and back.Laterally elongated hole 3224 can be realized decorating the lateral adjustments of panel, and vertical elongated hole 3223 can be real The vertical adjustment of panel is decorated now.
As shown in figure 8, the panel connector 4 includes plant nail 41, nail 42 planted with clamp nut 43, plant nail 42 The back side of decoration panel 1 is located at, the plant is followed closely 41 one end and is connected with the adjustment member 31 in front and back, and the other end is inserted in the plant Nail 42 is simultaneously locked with clamp nut 43, and gap is consolidated with stone special glue filling.
The plant nail 42 includes elongate holes 421 and a circular opening up hole 422, and the circular opening up hole 422 is located at strip The inner side in shape hole 421, and diameter is adaptable with elongate holes longest edge;The nail 41 of planting includes an ailhead 411, a thread segment 412 and two limited blocks 413, the ailhead 411 is strip, 411 shape size of the ailhead and the elongate holes 421 Shape size is matched, and the inner surface respectively positioned at the ailhead 411 of two limited block 413 is simultaneously at a distance of 180 degree, the ailhead 411 stretch into elongate holes 421 after be rotated by 90 °, 411 long side two ends of ailhead can be made to be limited in circular opening up hole by two limited blocks 413 In 422, to be engaged with 1 orthogonal largest face of decoration panel.So, can sting with decoration panel 1 at 411 two ends of ailhead for planting nail 41 Close, force dispersion is uniform, beneficial to protection decoration panel 1.
The curtain wall of the present invention, arranges rational connection suspension element, decoration panel is connected to building by T-shaped suspension member Beam body, make the decoration panel after suspension by the beam body stress of building, and T-shaped suspension member filled by chemical bolt Mulit-point Connection Wall, has the advantages that firm filled wall, and the present invention also makes the position of decoration panel conveniently can adjust by arranging adjustment assembly device Whole replacing, reasonable stress, all accessories facilitate dismounting, beneficial to recycling, safe and reliable, economical and practical.
Although the foregoing describing the specific embodiment of the present invention, those familiar with the art should manage Solution, the specific embodiment described by us are merely exemplary, rather than for the restriction to the scope of the present invention, are familiar with this The technical staff in field should be covered the present invention's in the equivalent modification and change made according to the spirit of the present invention In scope of the claimed protection.

Claims (7)

1. a kind of curtain wall, it is characterised in that:Including beam body pendant device, adjustment assembly device, panel connector and decoration Panel;
The beam body pendant device includes that T-shaped suspension member, first fix buckle and the first chemical bolt, and described first fixes buckle A vertical slot is fixed on the beam of building and is formed by the first chemical bolt, and the T-shaped suspension member includes an intersecting bottom Face and a facade, and section is T-shaped, the bottom surface is plugged in the vertical slot, and facade offers hook or hanging hole;Institute The bottom surface for stating T-shaped suspension member is provided with the spacing hook of a plurality of words, and the spacing hook of a word also has an inclined opening, and is located at The opening direction of the spacing hook of one word of T-shaped suspension member upper end is to link up with topmost diagonally downward from a word is spacing;And be located at T-shaped The opening direction of the spacing hook of one word of suspension member bottom is to tilt upward from the spacing hook bottom of a word;
The adjustment assembly device includes before and after's adjustment member and space allocation component, and the space allocation component is connected to described On hook or hanging hole, the adjustment member in front and back is connected on space allocation component;
The panel connector includes plant nail, plants nail and clamp nut, plants the back side that nail is located at decoration panel, institute State plant nail one end to be connected with the adjustment member in front and back, the other end is inserted in the plant nail and is locked with clamp nut.
2. a kind of curtain wall as claimed in claim 1, it is characterised in that:The first fixation buckle includes interior card and wild card Piece, interior card are closely attached on building, and outer card pressure is located at interior card, common with interior card and outer card by the first chemical bolt Same-action is fixed on beam, and in the same side, interior card end stretches in a segment distance outside outer Card-terminal portion, and with the interior Card-terminal Portion is bent to form the vertical slot in opposite directions with outer Card-terminal portion.
3. a kind of curtain wall as claimed in claim 1, it is characterised in that:Before and after described, adjustment member is telescopic bolt component, Before and after being somebody's turn to do, adjustment member includes sleeve bolt, pad, turn and nut, and the sleeve bolt is provided with female thread and outer spiral shell Stricture of vagina, and be connected with the nail of planting by female thread, it is connected with nut by external screw thread, and nut, pad and turn is by space Adjustment member is lock onto on the sleeve bolt.
4. a kind of curtain wall as claimed in claim 1, it is characterised in that:The space allocation component unidirectionally adjusts structure for space Part;The unidirectional adjustment member in the space is a flat sheet, is provided with an elongated hole and a up big and down small trapezoidal extension in flat sheet Hook, the hanging hole on the T-shaped suspension member are up big and down small trapezoidal hanging hole, and the trapezoidal hook coordinates solid with the trapezoidal hanging hole Fixed, the elongated hole then connects before and after's adjustment member.
5. a kind of curtain wall as claimed in claim 1, it is characterised in that:The space allocation component is the two-way adjustment structure in space Part;The two-way adjustment member in the space includes two flat sheets mutually at a right angle, arranges a horizontal elongated hole in a flat sheet, another A vertical elongated hole is provided with flat sheet;Hook on the T-shaped suspension member, with an opening for tilting upward, the space The vertical elongated hole of two-way adjustment member is bolted in the hook on T-shaped suspension member by draw-in groove, the two-way adjustment structure in the space Adjustment member before and after the horizontal elongated hole connection of part.
6. a kind of curtain wall as claimed in claim 1, it is characterised in that:
The plant nail includes elongate holes and a circular opening up hole, and the circular opening up hole is located at the inner side of elongate holes, and directly Footpath is adapted with elongate holes longest edge;
The nail of planting includes an ailhead, a thread segment and two limited blocks, and the ailhead is strip, the ailhead shape size Match with the shape size of the elongate holes, two limited block is located at the inner surface of the ailhead respectively and at a distance of 180 degree, The ailhead is rotated by 90 ° after stretching into elongate holes, and the long side two ends of ailhead can be made to be limited in circular opening up hole by two limited blocks, with Largest face occlusion orthogonal with decoration panel.
7. a kind of curtain wall as claimed in claim 1, it is characterised in that:Also include body of wall stopping means, the body of wall stopping means Buckle and the second chemical bolt are fixed including second, second fixation snaps through the second chemical bolt and is fixed on building Body of wall on and form the second vertical slot, the bottom surface of the T-shaped suspension member is plugged in the described second vertical slot.
CN201410608795.4A 2014-10-31 2014-10-31 Curtain wall Active CN104328851B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410608795.4A CN104328851B (en) 2014-10-31 2014-10-31 Curtain wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410608795.4A CN104328851B (en) 2014-10-31 2014-10-31 Curtain wall

Publications (2)

Publication Number Publication Date
CN104328851A CN104328851A (en) 2015-02-04
CN104328851B true CN104328851B (en) 2017-03-22

Family

ID=52403651

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410608795.4A Active CN104328851B (en) 2014-10-31 2014-10-31 Curtain wall

Country Status (1)

Country Link
CN (1) CN104328851B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105089185B (en) * 2015-06-23 2017-04-26 浙江亚厦幕墙有限公司 Connection structure of stand column and transverse beam and connection method utilizing same
CN110306696B (en) * 2019-04-12 2024-08-27 深圳全景空间工业有限公司 Lock piece
CN110056108B (en) * 2019-04-26 2024-02-20 南方雄狮创建集团股份有限公司 Convenient mounting structure of curtain
CN111648507B (en) * 2020-06-10 2022-02-18 南京国豪装饰安装工程股份有限公司 Construction method of fish scale curtain wall

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3014300B2 (en) * 1995-07-25 2000-02-28 セントラル硝子株式会社 Mounting structure of the plate-shaped support bracket on the wall
JP3898062B2 (en) * 2002-01-28 2007-03-28 セントラル硝子株式会社 Glass plate support structure
AT413226B (en) * 2003-05-23 2005-12-15 Walter Dipl Ing Mayer GLASS FACADE FROM FRAMELESSLY GLASS PANELS
CN201620498U (en) * 2010-01-29 2010-11-03 中山盛兴股份有限公司 Unit type curtain wall support
CN102733521A (en) * 2012-06-20 2012-10-17 曾红 Metal hanger of stone curtain wall
CN202990183U (en) * 2012-12-07 2013-06-12 深圳市深装总装饰工程工业有限公司 Frame-type metal sheet curtain wall structure
CN204266422U (en) * 2014-10-31 2015-04-15 福建建工集团总公司 A kind of novel curtain wall

Also Published As

Publication number Publication date
CN104328851A (en) 2015-02-04

Similar Documents

Publication Publication Date Title
CN104328851B (en) Curtain wall
CN103437472B (en) Decorating building stone panel fixing device and construction method
CN104929297B (en) A kind of decoration panel installation of ceiling technique
CN207092312U (en) Marble curtain wall installing structure
CN202139744U (en) Space hyperbolic quadrangular unit type suspended ceiling adapter claw piece
CN105625625A (en) Clamping type keel integrated suspended ceiling structure and installing method
CN105544820B (en) Curtain wall support steel structure and its construction method outside curved surface with spring assembly sunpender
CN104088391A (en) Hanging piece used for low-rise high-integration suspended ceiling
CN111206711A (en) Suspended ceiling structure
CN209177795U (en) The connection structure and elevator shaft of elevator shaft
CN207092308U (en) Stone curtain-wall hanging part device
CN113323238A (en) Adjustable mounting structure for assembled suspended ceiling
CN103452223B (en) The stone panel mounting process of furred ceiling suspension member and use furred ceiling suspension member
CN203947655U (en) A kind of hanging piece for low floor height Integral ceiling
CN204266422U (en) A kind of novel curtain wall
CN217517927U (en) Drop level furred ceiling structure
CN101775866B (en) Suspended ceiling
CN1873151B (en) Tie bar installation in use for suspended ceiling of building
CN206000404U (en) Fire resisting shutter decorates enclosed construction
CN204919911U (en) FT block mount formula stone material curtain
CN206815608U (en) A kind of dome glass curtain wall with sun-shading louver
CN215759921U (en) Adjustable mounting structure for assembled suspended ceiling
CN203440974U (en) Suspended ceiling pendant
CN206737237U (en) Suspension arrangement
CN208293871U (en) Cassette suspender member and hanging piece structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 350000 Fuzhou, Gulou District, Fujian, No. 54, No. 36, landmark Plaza, floor 89

Patentee after: Fujian construction engineering Refco Group Ltd

Address before: 350000 Fuzhou, Gulou District, Fujian, No. 54, No. 36, landmark Plaza, floor 89

Patentee before: FUJIAN CONSTRUCTION ENGINEERING GROUP COMPANY

CP01 Change in the name or title of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20180718

Address after: 350000 floor 36, 89 road 54, Gulou District, Fuzhou, Fujian.

Co-patentee after: Fujian seven Construction Group Co., Ltd.

Patentee after: Fujian construction engineering Refco Group Ltd

Address before: 350000 floor 36, 89 road 54, Gulou District, Fuzhou, Fujian.

Patentee before: Fujian construction engineering Refco Group Ltd

TR01 Transfer of patent right