CN203359889U - Wall plate lifting and installation integrated operation platform - Google Patents

Wall plate lifting and installation integrated operation platform Download PDF

Info

Publication number
CN203359889U
CN203359889U CN 201320307558 CN201320307558U CN203359889U CN 203359889 U CN203359889 U CN 203359889U CN 201320307558 CN201320307558 CN 201320307558 CN 201320307558 U CN201320307558 U CN 201320307558U CN 203359889 U CN203359889 U CN 203359889U
Authority
CN
China
Prior art keywords
type scaffold
winch
wall plate
guide wheel
operation platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320307558
Other languages
Chinese (zh)
Inventor
阮晶
周曹国
陈俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Original Assignee
Shanghai Baoye Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Group Corp Ltd filed Critical Shanghai Baoye Group Corp Ltd
Priority to CN 201320307558 priority Critical patent/CN203359889U/en
Application granted granted Critical
Publication of CN203359889U publication Critical patent/CN203359889U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Movable Scaffolding (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to the field of building wall body construction facilities, in particular to a wall plate lifting and installation integrated operation platform which comprises a moving door-type scaffold. The wall plate lifting and installation integrated operation platform is characterized by further comprising a winch, a guide wheel, a steel cable, a lifting hook and a balancing weight. The balancing weight and the winch are arranged at the bottom of the moving door type scaffold. The guide wheel is arranged on the top of the moving door type scaffold. The steel cable penetrates through the guide wheel, one end of the steel cable is connected with the winch and the lifting hook is lifted at the other end of the steel cable. With the above design, the wall plate lifting and installation integrated operation platform is small in occupied area and flexible in use, improves installation efficiency of a wall plate or similar plates, saves labor and construction cost and reduces potential safety risks.

Description

Wallboard promotes and installs integrated service platform
Technical field
The utility model relates to construction wall construction installation field, is specially a kind of wallboard and promotes and install integrated service platform.
Background technology
Wall board width commonly used is 600mm, is highly floor height, more than the monolithic wallboard weight reaches 300kg; Prior art is installed similar sheet material and is mainly realized by manpower, and the monolithic wallboard relies on the manpower mode that common needs 4 ~ 6 people are installed and can realize, so, inefficiency and potential safety hazard are great.
Summary of the invention
The purpose of this utility model is, has altogether a kind ofly can expediently wallboard is promoted to state in place from ground and fixing service platform is installed, thus erection & lift efficiency reduce potential safety hazard.
In order to achieve the above object, the utility model is achieved in that
A kind of wallboard promotes and integrated service platform is installed, and it comprises mobile door-type scaffold, also comprises winch, guide wheel, wirerope, suspension hook and clump weight; Clump weight, winch all are located at mobile door-type scaffold bottom; Guide wheel is located at mobile door-type scaffold top, and wirerope is through guide wheel, and an end is connected with winch, other end suspension hook.
Described wallboard promotes and installs integrated service platform; Mobile door-type scaffold is the assembly type scaffold, and it comprises the door frame shaped pedestal that built by steel pipe combination and the pulley of pedestal bottom.
The utility model adopts above-mentioned design, and its floor area is less, use is flexible; Can improve the installation effectiveness of wallboard or similar sheet material, save manpower, save laid down cost and reduce potential safety hazard.
The accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
The specific embodiment
Below further illustrate the utility model by specific embodiment.
As shown in Figure 1, a kind of wallboard promotes and integrated service platform is installed, and it comprises mobile door-type scaffold 1, also comprises winch 2, guide wheel 7, wirerope 5, suspension hook 4 and clump weight 3; Clump weight 3, winch 2 all are located at mobile door-type scaffold 1 bottom; Guide wheel 7 is located at mobile door-type scaffold 1 top, and wirerope 5 is connected with winch 2 through guide wheel 7 one ends, other end suspension hook 4.
Described wallboard promotes and installs integrated service platform; Mobile door-type scaffold 1 is the assembly type scaffold, and it comprises the door frame shaped pedestal that built by steel pipe combination and the pulley 6 of pedestal bottom.
The utility model adopts above-mentioned design, during use, the door frame shaped pedestal height of mobile door-type scaffold also completes mobile gate-type scaffold according to the wallboard height adjustment, utilize transportation means by conveying sheet to by mobile door-type scaffold side, utilize winch by suspension hook, sheet material just to be carried on the ground, manually coordinate the sheet material dropping place to attachment point, proofread and correct fixing; So, facilitated the installation of sheet material, operation in place, so, for the installation of wallboard provides convenience.

Claims (2)

1. a wallboard promotes and integrated service platform is installed, and it comprises mobile door-type scaffold, it is characterized in that: also comprise winch, guide wheel, wirerope, suspension hook and clump weight; Clump weight, winch all are located at mobile door-type scaffold bottom; Guide wheel is located at mobile door-type scaffold top, and wirerope is through guide wheel, and an end is connected with winch, other end suspension hook.
2. wallboard according to claim 1 promotes and installs integrated service platform; It is characterized in that: mobile door-type scaffold is the assembly type scaffold, and it comprises the door frame shaped pedestal that built by steel pipe combination and the pulley of pedestal bottom.
CN 201320307558 2013-05-31 2013-05-31 Wall plate lifting and installation integrated operation platform Expired - Fee Related CN203359889U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320307558 CN203359889U (en) 2013-05-31 2013-05-31 Wall plate lifting and installation integrated operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320307558 CN203359889U (en) 2013-05-31 2013-05-31 Wall plate lifting and installation integrated operation platform

Publications (1)

Publication Number Publication Date
CN203359889U true CN203359889U (en) 2013-12-25

Family

ID=49807682

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320307558 Expired - Fee Related CN203359889U (en) 2013-05-31 2013-05-31 Wall plate lifting and installation integrated operation platform

Country Status (1)

Country Link
CN (1) CN203359889U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103950010A (en) * 2014-05-14 2014-07-30 湖州市千金丝织厂 Auxiliary device for disassembly of machine head roller of cotton cleaner
CN112520612A (en) * 2020-12-07 2021-03-19 上海宝冶集团有限公司 Installation vehicle for rail top sealing valve of subway shielding door
CN115405112A (en) * 2022-09-19 2022-11-29 中建八局第三建设有限公司 Hoisting device for high-rise ALC (automatic level control) plate installation and using method thereof
TWI810467B (en) * 2020-06-18 2023-08-01 惠亞工程股份有限公司 Combined aerial work elevator

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103950010A (en) * 2014-05-14 2014-07-30 湖州市千金丝织厂 Auxiliary device for disassembly of machine head roller of cotton cleaner
CN103950010B (en) * 2014-05-14 2015-09-23 湖州市千金丝织厂 A kind of scutcher headstock roller dismounting auxiliary equipment
TWI810467B (en) * 2020-06-18 2023-08-01 惠亞工程股份有限公司 Combined aerial work elevator
CN112520612A (en) * 2020-12-07 2021-03-19 上海宝冶集团有限公司 Installation vehicle for rail top sealing valve of subway shielding door
CN115405112A (en) * 2022-09-19 2022-11-29 中建八局第三建设有限公司 Hoisting device for high-rise ALC (automatic level control) plate installation and using method thereof

Similar Documents

Publication Publication Date Title
CN203359889U (en) Wall plate lifting and installation integrated operation platform
CN103790390B (en) Glass plate hoisting system for large-span dome glass curtain wall construction and construction method thereof
CN201635379U (en) Safety platform for installation and construction of roof contour plate hang ceiling
CN102862919A (en) Vehicle-mounted tower crane
CN102493666A (en) High-altitude translation installation and construction method for super-large super-heavy member
CN202299574U (en) Plug-in type communication base station lifting tower
CN203794533U (en) Light portable mobile lifting equipment
CN205773024U (en) Convenient pipeline promotes auxiliary device
MX2021010866A (en) Vertical slip form construction system with multi-function platform, and method of constructing a building therewith.
CN104895336A (en) Method for installing steel beam of stiff hybrid structure in place
CN102677907A (en) Method for manually installing steel beam at top of silo
CN205442496U (en) High -rise building roof curtain lifting device
CN208964491U (en) A kind of ground iron wind pipe, gantry install mobile lifting device
CN101660660B (en) Novel installing method of gas cabinet
CN109095409A (en) A kind of ground iron wind pipe, gantry install mobile lift
CN204609308U (en) A kind of passage limited position concrete rail transporter
CN203461720U (en) Simple cantilever hoisting machine
CN103470057B (en) A kind of high-altitude component hoisting construction method
CN103016843B (en) Pipeline mounting machine and construction method thereof
CN102383613B (en) Hoisting construction method for steel roof truss of main power house of power plant and special hoisting device
CN204023826U (en) Magnetic crane lifting rubber earthquake isolation support
CN204324748U (en) A kind of large-scale gas storage holder Steel Structure Installation hoisting device
CN204754246U (en) Prefabricated wallboard of prefabricated assembly type structure device of taking one's place fast
CN203781713U (en) High slope support material transport device
CN203430138U (en) Ejecting column used for reversely mounting steel stack cylinder

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131225