CN203359889U - Wall plate lifting and installation integrated operation platform - Google Patents
Wall plate lifting and installation integrated operation platform Download PDFInfo
- Publication number
- CN203359889U CN203359889U CN 201320307558 CN201320307558U CN203359889U CN 203359889 U CN203359889 U CN 203359889U CN 201320307558 CN201320307558 CN 201320307558 CN 201320307558 U CN201320307558 U CN 201320307558U CN 203359889 U CN203359889 U CN 203359889U
- Authority
- CN
- China
- Prior art keywords
- type scaffold
- winch
- wall plate
- guide wheel
- operation platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Movable Scaffolding (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model relates to the field of building wall body construction facilities, in particular to a wall plate lifting and installation integrated operation platform which comprises a moving door-type scaffold. The wall plate lifting and installation integrated operation platform is characterized by further comprising a winch, a guide wheel, a steel cable, a lifting hook and a balancing weight. The balancing weight and the winch are arranged at the bottom of the moving door type scaffold. The guide wheel is arranged on the top of the moving door type scaffold. The steel cable penetrates through the guide wheel, one end of the steel cable is connected with the winch and the lifting hook is lifted at the other end of the steel cable. With the above design, the wall plate lifting and installation integrated operation platform is small in occupied area and flexible in use, improves installation efficiency of a wall plate or similar plates, saves labor and construction cost and reduces potential safety risks.
Description
Technical field
The utility model relates to construction wall construction installation field, is specially a kind of wallboard and promotes and install integrated service platform.
Background technology
Wall board width commonly used is 600mm, is highly floor height, more than the monolithic wallboard weight reaches 300kg; Prior art is installed similar sheet material and is mainly realized by manpower, and the monolithic wallboard relies on the manpower mode that common needs 4 ~ 6 people are installed and can realize, so, inefficiency and potential safety hazard are great.
Summary of the invention
The purpose of this utility model is, has altogether a kind ofly can expediently wallboard is promoted to state in place from ground and fixing service platform is installed, thus erection & lift efficiency reduce potential safety hazard.
In order to achieve the above object, the utility model is achieved in that
A kind of wallboard promotes and integrated service platform is installed, and it comprises mobile door-type scaffold, also comprises winch, guide wheel, wirerope, suspension hook and clump weight; Clump weight, winch all are located at mobile door-type scaffold bottom; Guide wheel is located at mobile door-type scaffold top, and wirerope is through guide wheel, and an end is connected with winch, other end suspension hook.
Described wallboard promotes and installs integrated service platform; Mobile door-type scaffold is the assembly type scaffold, and it comprises the door frame shaped pedestal that built by steel pipe combination and the pulley of pedestal bottom.
The utility model adopts above-mentioned design, and its floor area is less, use is flexible; Can improve the installation effectiveness of wallboard or similar sheet material, save manpower, save laid down cost and reduce potential safety hazard.
The accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
The specific embodiment
Below further illustrate the utility model by specific embodiment.
As shown in Figure 1, a kind of wallboard promotes and integrated service platform is installed, and it comprises mobile door-type scaffold 1, also comprises winch 2, guide wheel 7, wirerope 5, suspension hook 4 and clump weight 3; Clump weight 3, winch 2 all are located at mobile door-type scaffold 1 bottom; Guide wheel 7 is located at mobile door-type scaffold 1 top, and wirerope 5 is connected with winch 2 through guide wheel 7 one ends, other end suspension hook 4.
Described wallboard promotes and installs integrated service platform; Mobile door-type scaffold 1 is the assembly type scaffold, and it comprises the door frame shaped pedestal that built by steel pipe combination and the pulley 6 of pedestal bottom.
The utility model adopts above-mentioned design, during use, the door frame shaped pedestal height of mobile door-type scaffold also completes mobile gate-type scaffold according to the wallboard height adjustment, utilize transportation means by conveying sheet to by mobile door-type scaffold side, utilize winch by suspension hook, sheet material just to be carried on the ground, manually coordinate the sheet material dropping place to attachment point, proofread and correct fixing; So, facilitated the installation of sheet material, operation in place, so, for the installation of wallboard provides convenience.
Claims (2)
1. a wallboard promotes and integrated service platform is installed, and it comprises mobile door-type scaffold, it is characterized in that: also comprise winch, guide wheel, wirerope, suspension hook and clump weight; Clump weight, winch all are located at mobile door-type scaffold bottom; Guide wheel is located at mobile door-type scaffold top, and wirerope is through guide wheel, and an end is connected with winch, other end suspension hook.
2. wallboard according to claim 1 promotes and installs integrated service platform; It is characterized in that: mobile door-type scaffold is the assembly type scaffold, and it comprises the door frame shaped pedestal that built by steel pipe combination and the pulley of pedestal bottom.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320307558 CN203359889U (en) | 2013-05-31 | 2013-05-31 | Wall plate lifting and installation integrated operation platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320307558 CN203359889U (en) | 2013-05-31 | 2013-05-31 | Wall plate lifting and installation integrated operation platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203359889U true CN203359889U (en) | 2013-12-25 |
Family
ID=49807682
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201320307558 Expired - Fee Related CN203359889U (en) | 2013-05-31 | 2013-05-31 | Wall plate lifting and installation integrated operation platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203359889U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103950010A (en) * | 2014-05-14 | 2014-07-30 | 湖州市千金丝织厂 | Auxiliary device for disassembly of machine head roller of cotton cleaner |
CN112520612A (en) * | 2020-12-07 | 2021-03-19 | 上海宝冶集团有限公司 | Installation vehicle for rail top sealing valve of subway shielding door |
CN115405112A (en) * | 2022-09-19 | 2022-11-29 | 中建八局第三建设有限公司 | Hoisting device for high-rise ALC (automatic level control) plate installation and using method thereof |
TWI810467B (en) * | 2020-06-18 | 2023-08-01 | 惠亞工程股份有限公司 | Combined aerial work elevator |
-
2013
- 2013-05-31 CN CN 201320307558 patent/CN203359889U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103950010A (en) * | 2014-05-14 | 2014-07-30 | 湖州市千金丝织厂 | Auxiliary device for disassembly of machine head roller of cotton cleaner |
CN103950010B (en) * | 2014-05-14 | 2015-09-23 | 湖州市千金丝织厂 | A kind of scutcher headstock roller dismounting auxiliary equipment |
TWI810467B (en) * | 2020-06-18 | 2023-08-01 | 惠亞工程股份有限公司 | Combined aerial work elevator |
CN112520612A (en) * | 2020-12-07 | 2021-03-19 | 上海宝冶集团有限公司 | Installation vehicle for rail top sealing valve of subway shielding door |
CN115405112A (en) * | 2022-09-19 | 2022-11-29 | 中建八局第三建设有限公司 | Hoisting device for high-rise ALC (automatic level control) plate installation and using method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203359889U (en) | Wall plate lifting and installation integrated operation platform | |
CN103790390B (en) | Glass plate hoisting system for large-span dome glass curtain wall construction and construction method thereof | |
CN201635379U (en) | Safety platform for installation and construction of roof contour plate hang ceiling | |
CN102862919A (en) | Vehicle-mounted tower crane | |
CN102493666A (en) | High-altitude translation installation and construction method for super-large super-heavy member | |
CN202299574U (en) | Plug-in type communication base station lifting tower | |
CN203794533U (en) | Light portable mobile lifting equipment | |
CN205773024U (en) | Convenient pipeline promotes auxiliary device | |
MX2021010866A (en) | Vertical slip form construction system with multi-function platform, and method of constructing a building therewith. | |
CN104895336A (en) | Method for installing steel beam of stiff hybrid structure in place | |
CN102677907A (en) | Method for manually installing steel beam at top of silo | |
CN205442496U (en) | High -rise building roof curtain lifting device | |
CN208964491U (en) | A kind of ground iron wind pipe, gantry install mobile lifting device | |
CN101660660B (en) | Novel installing method of gas cabinet | |
CN109095409A (en) | A kind of ground iron wind pipe, gantry install mobile lift | |
CN204609308U (en) | A kind of passage limited position concrete rail transporter | |
CN203461720U (en) | Simple cantilever hoisting machine | |
CN103470057B (en) | A kind of high-altitude component hoisting construction method | |
CN103016843B (en) | Pipeline mounting machine and construction method thereof | |
CN102383613B (en) | Hoisting construction method for steel roof truss of main power house of power plant and special hoisting device | |
CN204023826U (en) | Magnetic crane lifting rubber earthquake isolation support | |
CN204324748U (en) | A kind of large-scale gas storage holder Steel Structure Installation hoisting device | |
CN204754246U (en) | Prefabricated wallboard of prefabricated assembly type structure device of taking one's place fast | |
CN203781713U (en) | High slope support material transport device | |
CN203430138U (en) | Ejecting column used for reversely mounting steel stack cylinder |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20131225 |