CN204754246U - Prefabricated wallboard of prefabricated assembly type structure device of taking one's place fast - Google Patents

Prefabricated wallboard of prefabricated assembly type structure device of taking one's place fast Download PDF

Info

Publication number
CN204754246U
CN204754246U CN201420838332.2U CN201420838332U CN204754246U CN 204754246 U CN204754246 U CN 204754246U CN 201420838332 U CN201420838332 U CN 201420838332U CN 204754246 U CN204754246 U CN 204754246U
Authority
CN
China
Prior art keywords
guide rail
horizontal sliding
sliding guide
prefabricated panel
building frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201420838332.2U
Other languages
Chinese (zh)
Inventor
李荣帅
龚剑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction Group Co Ltd
Original Assignee
Shanghai Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction Group Co Ltd filed Critical Shanghai Construction Group Co Ltd
Priority to CN201420838332.2U priority Critical patent/CN204754246U/en
Application granted granted Critical
Publication of CN204754246U publication Critical patent/CN204754246U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a prefabricated wallboard of prefabricated assembly type structure device of taking one's place fast, the device includes: a surface railway sets up in the outside of building frame, a pair of vertical guide rail, vertical spacing set up in surface railway is last, and can along surface railway removes, and a flat push guide rail mechanism, set up perpendicularly in on the vertical guide rail, just flat push guide rail mechanism can along vertical guide rail reciprocates, flat push guide rail mechanism includes flat push guide rail frame and is used for the flat push guide rail crossbeam of the prefabricated wallboard of hoist and mount, flat push guide rail crossbeam can be relative flat push guide rail frame is to the direction removal of being close to or keeping away from the building frame. The utility model discloses take one's place and interim support can once be accomplished, can improve the efficiency of taking one's place of the prefabricated wallboard of prefabricated assembly type structure, solves the accuracy problem of taking one's place of the prefabricated wallboard of prefabricated assembly type structure, it is dangerous to reduce workman high altitude construction.

Description

Prefabrication prefabricated panel pop into place device
Technical field
The utility model relates to the realm of building construction, particularly relates to a kind of prefabrication prefabricated panel pop into place device.
Background technology
At present, the employing cantilever crane in place of existing prefabricated panel, it cannot realize once in place, after can only being lifted to the vicinity in precalculated position, with manually being moved to precalculated position, need thereafter to adopt temporary support to carry out temporary fixed, operating efficiency is low, accuracy in place is very low, and workman's work high above the ground is many, dangerous large.
Therefore, how to provide that high, the in place efficiency of a kind of precision in place is high, the prefabrication prefabricated panel pop into place device of construction safety, become the technical problem that building operations circle needs further improvement and optimization.
Utility model content
The purpose of this utility model is to provide a kind of prefabrication prefabricated panel pop into place device, has the advantage of the high and construction safety of high, the in place precision of efficiency in place.
For solving the problems of the technologies described above, the utility model provides following technical scheme:
A kind of prefabrication prefabricated panel pop into place device, comprising:
One ground rail, is arranged at the outside of building frame;
A pair vertical guide, vertical spacing is arranged on described ground rail, and can move along described ground rail;
One horizontal sliding guide rail mechanism, be vertically installed in described vertical guide, and described horizontal sliding guide rail mechanism can move up and down along described vertical guide, described horizontal sliding guide rail mechanism comprises horizontal sliding guide rail bracket and the horizontal sliding guide rail beam for hoisting prefabricated wallboard, and described horizontal sliding guide rail beam can move to close or away from building frame direction relative to described horizontal sliding guide rail bracket.
Optionally, in above-mentioned prefabrication prefabricated panel pop into place device, described horizontal sliding guide rail bracket comprises: a pair cross slide way and connecting rod, the same side of described a pair cross slide way is fixedly connected with by described connecting rod, the two ends of described horizontal sliding guide rail beam are respectively equipped with the first slide block matched with described a pair cross slide way, described horizontal sliding guide rail bracket is respectively equipped with away from the two ends of the side of described building frame the second slide block matched with described a pair vertical guide, described cross slide way is mutually vertical with described horizontal sliding guide rail beam, described horizontal sliding guide rail beam by move along described a pair cross slide way near or away from described building frame.
Optionally, in above-mentioned prefabrication prefabricated panel pop into place device, the outside at the position near described connecting rod on described a pair cross slide way arranges described second slide block respectively
Optionally, in above-mentioned prefabrication prefabricated panel pop into place device, the base wheel also comprising vertical guide base and roll along described ground rail, described vertical guide base is arranged at the lower end of described vertical guide, and described base wheel is arranged at the both sides of described vertical guide base.
Optionally, in above-mentioned prefabrication prefabricated panel pop into place device, also comprise the first driving mechanism, the second driving mechanism and the 3rd driving mechanism, described first driving mechanism drives described vertical guide to move along described ground rail, described second driving mechanism drives described horizontal sliding guide rail mechanism to move up and down along described a pair vertical guide, and described 3rd driving mechanism drives described horizontal sliding guide rail beam to move to close or away from building frame direction relative to described horizontal sliding guide rail bracket.
Optionally, in above-mentioned prefabrication prefabricated panel pop into place device, described first driving mechanism drives described vertical guide to move along described ground rail by the rotation driving described base and take turns.
Optionally, in above-mentioned prefabrication prefabricated panel pop into place device, described horizontal sliding guide rail bracket comprises: a pair cross slide way and connecting rod, the same side of described a pair cross slide way is fixedly connected with by described connecting rod, the two ends of described horizontal sliding guide rail beam are respectively equipped with the first slide block matched with described a pair cross slide way, described horizontal sliding guide rail bracket is respectively equipped with away from the two ends of the side of described building frame the second slide block matched with described a pair vertical guide, described cross slide way is mutually vertical with described horizontal sliding guide rail beam, described 3rd driving mechanism by drive described horizontal sliding guide rail beam along described a pair cross slide way move realize described horizontal sliding guide rail beam near or away from described building frame.
Optionally, in above-mentioned prefabrication prefabricated panel pop into place device, also comprise attached wall guide rail and a pair attached wall guide rail connecting rod, described attached wall guide rail is fixedly installed on the outside of the prefabricated panel built up outside described building frame, one end of described attached wall guide rail connecting rod is fixedly connected with corresponding vertical guide respectively, the other end is provided with the 3rd slide block matched with described attached wall guide rail, and described 3rd slide block is embedded in described attached wall guide rail and also can moves along described attached wall guide rail.
Optionally, in above-mentioned prefabrication prefabricated panel pop into place device, comprise some connectors, the prefabricated panel built up described in described attached wall guide rail is passed by described some connectors is fixedly attached on described building frame, the corresponding reserved through hole passed through for described connector on the described prefabricated panel built up.
From above disclosed technical scheme, compared with prior art, the beneficial effects of the utility model are as follows:
1, the efficiency in place of prefabrication prefabricated panel and accuracy in place is improved.Can along the vertical guide of described ground rail movement by arranging, setting can along the horizontal sliding guide rail mechanism of described vertical guide movement, described horizontal sliding guide rail mechanism comprises horizontal sliding guide rail bracket and the horizontal sliding guide rail beam for hoisting prefabricated wallboard, described horizontal sliding guide rail beam can move to close or away from building frame direction relative to described horizontal sliding guide rail bracket, substantially to have arrived after prefabricated panel horizontal sliding predetermined installation site, if there is deviation position, then adjusted by the movement of horizontal sliding guide rail mechanism and vertical guide, this position is rested on after adjusting, this positioning apparatus can play the effect of temporary support to this prefabricated panel when installing prefabricated panel, so can facilitate, efficiently the prefabricated panel intending installing is navigated to the predetermined installation position of building frame, adopt cantilever crane to hang near precalculated position compared to existing technology and the temporary support in order to support prefabricated panel is set in addition, effectively improve efficiency in place and precision in place.
2, in placely can once to complete with temporary support.Whole prefabrication prefabricated panel pop into place device not only can by prefabricated panel fast transportation to formulation position, but also before prefabricated panel is mounted to building frame, the effect of support can be played to described prefabricated panel, therefore without the need to arranging temporary support with temporary fixed prefabricated panel as prior art, save the engineering time, reduce construction cost.
3, workman's work high above the ground is reduced dangerous.Owing to prefabricated panel fast, accurately can be navigated to the predetermined installation site of building frame by prefabrication prefabricated panel pop into place device, without the need to by manually moving prefabricated panel to predetermined installation site, and also eliminate the construction of temporary support, therefore, effectively reduce workman's amount of high-altitude operation, and then reduce the danger of workman's work high above the ground.
Accompanying drawing explanation
Fig. 1 is the side elevation structure of the prefabrication prefabricated panel pop into place device of the utility model one embodiment;
Fig. 2 is the positive facade structural representation of the prefabrication prefabricated panel pop into place device of the utility model one embodiment;
Fig. 3 is the assembling schematic diagram of horizontal sliding guide rail mechanism and described vertical guide in the utility model one embodiment.
In figure: 1-ground rail, 2-building frame, 3-vertical guide, 4-prefabricated panel, 5-horizontal sliding guide rail mechanism, 6-horizontal sliding guide rail beam, 7-cross slide way, 8-connecting rod, 9-first slide block, 10-second slide block, 11-vertical guide base, 12-base wheel, 13-attached wall guide rail, 14-attached wall guide rail connecting rod, 15-the 3rd slide block.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the prefabrication prefabricated panel pop into place device that the utility model proposes is described in further detail.According to the following describes and claims, advantage of the present utility model and feature will be clearer.It should be noted that, accompanying drawing all adopts the form that simplifies very much and all uses non-ratio accurately, only in order to object that is convenient, aid illustration the utility model embodiment lucidly.
Composition graphs 1 to Fig. 3, present embodiment discloses a kind of prefabrication prefabricated panel pop into place device, comprising:
One ground rail 1, is arranged at the outside of building frame 2;
A pair vertical guide 3, vertical spacing is arranged on described ground rail 1, and can move along described ground rail 1;
One horizontal sliding guide rail mechanism 5, be vertically installed in described vertical guide 3, and described horizontal sliding guide rail mechanism 5 can move up and down along described vertical guide 3, described horizontal sliding guide rail mechanism 5 comprises horizontal sliding guide rail bracket and the horizontal sliding guide rail beam 6 for hoisting prefabricated wallboard 4, horizontal sliding guide rail beam 6 horizontal cross is arranged, and described horizontal sliding guide rail beam 6 can move to close or away from building frame 2 direction relative to described horizontal sliding guide rail bracket.
The present embodiment can along the vertical guide 3 of described ground rail 1 movement by arranging, setting can along the horizontal sliding guide rail mechanism 5 of described vertical guide 3 movement, described horizontal sliding guide rail mechanism 5 comprises horizontal sliding guide rail bracket and the horizontal sliding guide rail beam 6 for hoisting prefabricated wallboard 4, described horizontal sliding guide rail beam 6 can move to close or away from building frame 2 direction relative to described horizontal sliding guide rail bracket, substantially to have arrived after prefabricated panel 4 horizontal sliding predetermined installation site, if there is deviation position, that just can be adjusted by the movement of horizontal sliding guide rail mechanism 5 and vertical guide 3, predetermined installation site is rested on after adjusting, now whole positioning apparatus can play the effect of temporary support to described prefabricated panel 4, to carry out the installation of prefabricated panel 4, thus can facilitate, efficiently the prefabricated panel 4 intending installing is navigated to the installation position of building frame 2, cantilever crane is adopted prefabricated panel to be hung to the method that temporary support is set near precalculated position again compared to existing technology, effectively improve efficiency in place and precision in place.On the other hand, because whole prefabrication prefabricated panel pop into place device not only can by prefabricated panel 4 fast transportation to precalculated position, but also before prefabricated panel 4 is mounted to building frame 2, the effect of support can be played to described prefabricated panel 4, therefore without the need to arranging temporary support with temporary fixed prefabricated panel as prior art, thus saved the engineering time, reduce construction cost.In addition, owing to prefabricated panel 4 fast, accurately can be navigated to the predetermined installation site of building frame 2 by prefabrication prefabricated panel pop into place device, manually prefabricated panel 4 is moved to predetermined installation site without the need to passing through, therefore the construction of temporary support is eliminated, thus effectively reduce workman's amount of high-altitude operation, and then reduce the danger of workman's work high above the ground.
Optionally, in above-mentioned prefabrication prefabricated panel pop into place device, described horizontal sliding guide rail bracket comprises: a pair cross slide way 7 and connecting rod 8, the same side of described a pair cross slide way 6 is fixedly connected with by described connecting rod 8, the two ends of described horizontal sliding guide rail beam 6 are respectively equipped with the first slide block 9 matched with described a pair cross slide way 7, described first slide block 9 is embedded in corresponding described cross slide way 7 and also can moves along described cross slide way 7, described horizontal sliding guide rail bracket is respectively equipped with away from the two ends of the side of described building frame 2 the second slide block 10 matched with described a pair vertical guide 3, described second slide block 10 is embedded in described vertical guide 3 and also can moves along described vertical guide 3, described cross slide way 7 is mutually vertical with described horizontal sliding guide rail beam 6, described horizontal sliding guide rail beam 6 by move along described a pair cross slide way 7 near or away from described building frame 2, so that the prefabricated panel 4 of suspention is transported to designated mounting position.By arranging the connecting rod 8 for connecting described a pair cross slide way 7, not only can strengthen the strength and stiffness of whole horizontal sliding guide rail bracket, and can ensure that described a pair cross slide way 7 is in same level height all the time, thus described horizontal sliding guide rail beam 6 is made to transport described prefabricated panel 4 more reposefully.
Optionally, in above-mentioned prefabrication prefabricated panel pop into place device, the outside at the position near described connecting rod 8 on described a pair cross slide way 7 arranges described second slide block 10 respectively.Described second slide block 10 is arranged at the outside at the junction of cross slide way 7 and described connecting rod 8 and described horizontal sliding guide rail bracket the most firmly position, the reliability be slidably connected between horizontal sliding guide rail bracket and described vertical guide 3 can be improved.
Optionally, in above-mentioned prefabrication prefabricated panel pop into place device, the base wheel 12 also comprising vertical guide base 11 and roll along described ground rail 1, described vertical guide base 11 is arranged at the lower end of described vertical guide 3, and described base wheel 12 is arranged at the both sides of described vertical guide base 11.By arranging vertical guide base 11 and base wheel 12, being slidably connected between vertical guide 3 with ground rail 1 can be become to roll and be connected, improve mobile efficiency.
Optionally, in above-mentioned prefabrication prefabricated panel pop into place device, also comprise the first driving mechanism, the second driving mechanism and the 3rd driving mechanism, described first driving mechanism drives described vertical guide 3 to move along described ground rail 1, described second driving mechanism drives described horizontal sliding guide rail mechanism to move up and down along described a pair vertical guide 3, and described 3rd driving mechanism drives described horizontal sliding guide rail beam 6 to move to close or away from building frame 2 direction relative to described horizontal sliding guide rail bracket.Described first driving mechanism, the second driving mechanism and the 3rd driving mechanism can facilitate, accurately drive vertical guide 3, horizontal sliding guide rail mechanism 5 and horizontal sliding guide rail beam 6 to move respectively, not only can improve efficiency in place and precision in place further, and workman's construction intensity can be reduced.Due to for driving described first driving mechanism of described vertical guide 3, horizontal sliding guide rail mechanism 5 and horizontal sliding guide rail beam 6, the second driving mechanism and the 3rd driving mechanism to be this area common technology means, therefore do not illustrate, its internal construction and driving principle also do not repeat.
Concrete, in above-mentioned prefabrication prefabricated panel pop into place device, described first driving mechanism drives described vertical guide 3 to move along described ground rail 1 by driving the rotation of described base wheel 12.Described 3rd driving mechanism by drive described horizontal sliding guide rail beam 6 along described a pair cross slide way 7 move realize described horizontal sliding guide rail beam 6 near or away from described building frame 2.
Optionally, in above-mentioned prefabrication prefabricated panel pop into place device, also comprise attached wall guide rail 13 and a pair attached wall guide rail connecting rod 14, described attached wall guide rail 13 is fixedly installed on the outside of the prefabricated panel 4 built up outside described building frame, one end of described attached wall guide rail connecting rod 14 is fixedly connected with corresponding vertical guide 3 respectively, the other end is provided with the 3rd slide block 15 matched with described attached wall guide rail 13, and described 3rd slide block 15 is embedded in described attached wall guide rail 13 and also can moves along described attached wall guide rail 13.By arranging attached wall guide rail 13 and a pair attached wall guide rail connecting rod 14, the stabilized soil pavement of described vertical guide 3 can be strengthened, and then improve safety in utilization and the reliability of whole prefabrication prefabricated panel pop into place device.
Optionally, in above-mentioned prefabrication prefabricated panel pop into place device, comprise some connectors (not shown), the prefabricated panel 4 built up described in described attached wall guide rail 13 is passed by described some connectors is fixedly attached on described building frame 2, the corresponding reserved through hole passed through for described connector on the described prefabricated panel 4 built up.Described attached wall guide rail 12 is connected to building frame 2, the stressed of attached wall guide rail 12 is made to be directly delivered to building frame 2, compare on the prefabricated panel 4 that is only connected to and built up, the stability that attached wall guide rail 12 is installed can be strengthened, thus improve the stability of vertical guide 3, and then improve the reliability of whole prefabrication prefabricated panel pop into place device work.
Please continue to refer to Fig. 1 to Fig. 3, the using method of a kind of prefabrication prefabricated panel of the present embodiment pop into place device, comprises the steps:
The first step, is installed on the side of building frame 2 by prefabrication prefabricated panel pop into place device as described in Example 1;
Second step, is suspended to the below of described horizontal sliding guide rail beam 6 by the prefabricated panel 4 intending installing;
3rd step, moves described a pair vertical guide 3 along described ground rail 1, moves described horizontal sliding guide rail mechanism 5 along described a pair vertical guide 3, make described prefabricated panel 4 just on building frame 2 for installing the position of described prefabricated panel 4;
4th step, described horizontal sliding track cross beam 6 is moved to the direction near described building frame 2 relative to described horizontal sliding guide rail bracket, if there is deviation the position of prefabricated panel 4, by mobile vertical guide 3 and/or horizontal sliding guide rail mechanism 5, prefabricated panel 4 is adjusted to predetermined installation site, described prefabricated panel 4 rests on this predetermined installation site until complete the installation of described prefabricated panel 4.
The present embodiment can along the vertical guide 3 of described ground rail 1 movement by arranging, can along the horizontal sliding guide rail mechanism 5 of described vertical guide 3 movement, described horizontal sliding guide rail mechanism 5 comprises horizontal sliding guide rail bracket and the horizontal sliding guide rail beam 6 for hoisting prefabricated wallboard 4, described horizontal sliding guide rail beam 6 can move to close or away from building frame 2 direction relative to described horizontal sliding guide rail bracket, prefabricated panel 4 follows predetermined installation site of substantially having arrived after horizontal sliding guide rail beam 6 moves, if there is deviation position, that just can be adjusted by mobile horizontal sliding guide rail mechanism 5 and/or vertical guide 3, this position is rested on to carry out the installation of prefabricated panel 4 after adjusting, thus can facilitate, efficiently the prefabricated panel 4 intending installing is navigated to the predetermined installation position of building frame 2, compared to existing technology, employing cantilever crane hangs the method near precalculated position, effectively improve efficiency in place and precision in place.In addition, because whole prefabrication prefabricated panel pop into place device can play the effect of temporary support before prefabricated panel 4 is mounted to building frame 2 to described prefabricated panel 4, therefore without the need to arranging temporary support with temporary fixed prefabricated panel as prior art, thus saved the engineering time, reduce construction cost.In addition, owing to prefabricated panel 4 fast, accurately can be navigated to the predetermined installation site of building frame 2 by prefabrication prefabricated panel pop into place device, manually prefabricated panel 4 is moved to predetermined installation site without the need to passing through, and also eliminate the construction of temporary support, therefore, effectively reduce workman's amount of high-altitude operation, and then reduce the danger of workman's work high above the ground.
Foregoing description is only the description to the utility model preferred embodiment; any restriction not to the utility model scope; any change that the those of ordinary skill in the utility model field does according to above-mentioned disclosure, modification, all belong to the protection domain of claims.

Claims (9)

1. a prefabrication prefabricated panel pop into place device, is characterized in that, comprising:
One ground rail, is arranged at the outside of building frame;
A pair vertical guide, vertical spacing is arranged on described ground rail, and can move along described ground rail;
One horizontal sliding guide rail mechanism, be vertically installed in described vertical guide, and described horizontal sliding guide rail mechanism can move up and down along described vertical guide, described horizontal sliding guide rail mechanism comprises horizontal sliding guide rail bracket and the horizontal sliding guide rail beam for hoisting prefabricated wallboard, and described horizontal sliding guide rail beam can move to close or away from building frame direction relative to described horizontal sliding guide rail bracket.
2. prefabrication prefabricated panel pop into place device as claimed in claim 1, it is characterized in that, described horizontal sliding guide rail bracket comprises: a pair cross slide way and connecting rod, the same side of described a pair cross slide way is fixedly connected with by described connecting rod, the two ends of described horizontal sliding guide rail beam are respectively equipped with the first slide block matched with described a pair cross slide way, described horizontal sliding guide rail bracket is respectively equipped with away from the two ends of the side of described building frame the second slide block matched with described a pair vertical guide, described cross slide way is mutually vertical with described horizontal sliding guide rail beam, described horizontal sliding guide rail beam by move along described a pair cross slide way near or away from described building frame.
3. prefabrication prefabricated panel pop into place device as claimed in claim 2, is characterized in that, the outside at the position near described connecting rod on described a pair cross slide way arranges described second slide block respectively.
4. prefabrication prefabricated panel pop into place device as claimed in claim 1, it is characterized in that, the base wheel also comprising vertical guide base and roll along described ground rail, described vertical guide base is arranged at the lower end of described vertical guide, and described base wheel is arranged at the both sides of described vertical guide base.
5. prefabrication prefabricated panel pop into place device as claimed in claim 4, it is characterized in that, also comprise the first driving mechanism, the second driving mechanism and the 3rd driving mechanism, described first driving mechanism drives described vertical guide to move along described ground rail, described second driving mechanism drives described horizontal sliding guide rail mechanism to move up and down along described a pair vertical guide, and described 3rd driving mechanism drives described horizontal sliding guide rail beam to move to close or away from building frame direction relative to described horizontal sliding guide rail bracket.
6. prefabrication prefabricated panel pop into place device as claimed in claim 5, is characterized in that, described first driving mechanism drives described vertical guide to move along described ground rail by the rotation driving described base and take turns.
7. prefabrication prefabricated panel pop into place device as claimed in claim 5, it is characterized in that, described horizontal sliding guide rail bracket comprises: a pair cross slide way and connecting rod, the same side of described a pair cross slide way is fixedly connected with by described connecting rod, the two ends of described horizontal sliding guide rail beam are respectively equipped with the first slide block matched with described a pair cross slide way, described horizontal sliding guide rail bracket is respectively equipped with away from the two ends of the side of described building frame the second slide block matched with described a pair vertical guide, described cross slide way is mutually vertical with described horizontal sliding guide rail beam, described 3rd driving mechanism by drive described horizontal sliding guide rail beam along described a pair cross slide way move realize described horizontal sliding guide rail beam near or away from described building frame.
8. prefabrication prefabricated panel pop into place device as claimed in claim 1, it is characterized in that, also comprise attached wall guide rail and a pair attached wall guide rail connecting rod, described attached wall guide rail is fixedly installed on the outside of the prefabricated panel built up outside described building frame, one end of described attached wall guide rail connecting rod is fixedly connected with corresponding vertical guide respectively, the other end is provided with the 3rd slide block matched with described attached wall guide rail, and described 3rd slide block is embedded in described attached wall guide rail and also can moves along described attached wall guide rail.
9. prefabrication prefabricated panel pop into place device as claimed in claim 8, it is characterized in that, comprise some connectors, the prefabricated panel built up described in described attached wall guide rail is passed by described some connectors is fixedly attached on described building frame, described in the corresponding reserved through hole passed through for described connector on the prefabricated panel that builds up.
CN201420838332.2U 2014-12-22 2014-12-22 Prefabricated wallboard of prefabricated assembly type structure device of taking one's place fast Withdrawn - After Issue CN204754246U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420838332.2U CN204754246U (en) 2014-12-22 2014-12-22 Prefabricated wallboard of prefabricated assembly type structure device of taking one's place fast

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420838332.2U CN204754246U (en) 2014-12-22 2014-12-22 Prefabricated wallboard of prefabricated assembly type structure device of taking one's place fast

Publications (1)

Publication Number Publication Date
CN204754246U true CN204754246U (en) 2015-11-11

Family

ID=54468969

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420838332.2U Withdrawn - After Issue CN204754246U (en) 2014-12-22 2014-12-22 Prefabricated wallboard of prefabricated assembly type structure device of taking one's place fast

Country Status (1)

Country Link
CN (1) CN204754246U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104563528A (en) * 2014-12-22 2015-04-29 上海建工集团股份有限公司 Rapid in-place device and rapid in-place method for prefabricated wallboard of prefabricated building
CN109184224A (en) * 2018-08-29 2019-01-11 中建二局第二建筑工程有限公司 Superelevation spherical screen installs the construction method of system and superelevation spherical screen

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104563528A (en) * 2014-12-22 2015-04-29 上海建工集团股份有限公司 Rapid in-place device and rapid in-place method for prefabricated wallboard of prefabricated building
CN104563528B (en) * 2014-12-22 2016-10-05 上海建工集团股份有限公司 The quick positioning apparatus of prefabrication prefabricated panel and method
CN109184224A (en) * 2018-08-29 2019-01-11 中建二局第二建筑工程有限公司 Superelevation spherical screen installs the construction method of system and superelevation spherical screen

Similar Documents

Publication Publication Date Title
CN104563528A (en) Rapid in-place device and rapid in-place method for prefabricated wallboard of prefabricated building
CN103669216A (en) Steel box girder scattered-splicing sliding device and installation method
CN105672673A (en) Quick locating device and method for prefabricated floor slabs
CN202248941U (en) Integral lifting, positioning and mounting device for large-scale steel members
CN103935901A (en) Automatic high-rise wall plate hoisting system
CN204510844U (en) A kind of large-span steel girder high-altitude mounting slip device
CN104140037A (en) Wallboard lifting system
CN203559597U (en) Sliding device convenient to operate
CN105016218A (en) Guide rail mechanism fixed to building
CN204754246U (en) Prefabricated wallboard of prefabricated assembly type structure device of taking one's place fast
CN204125841U (en) For the movable Lifting basket of constructing under bridge floor
CN104895336A (en) Method for installing steel beam of stiff hybrid structure in place
CN108277970A (en) Elevator civil construction mobile platform
CN203359889U (en) Wall plate lifting and installation integrated operation platform
CN204938802U (en) For the rail supported system of tower crane
CN208964491U (en) A kind of ground iron wind pipe, gantry install mobile lifting device
CN203877779U (en) High-layer wall plate automatic-hoisting system
CN103726449B (en) Automatically fall Liangping table apparatus and the construction method for changing railway beam thereof
CN103556837B (en) A kind of method realizing steel column at annex place and install
CN103572976B (en) A kind of multi-functional slippage flat car and annular building mounting slip system
CN109095409A (en) A kind of ground iron wind pipe, gantry install mobile lift
CN204938801U (en) The tower crane that is connected can be realized with building
CN105781092A (en) Single-guide-frame and multi-stage lifting working platform with adjustable interval and construction method thereof
CN203769277U (en) Lifting support capable of being disassembled and assembled automatically
CN204781532U (en) Movable steel construction roof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20151111

Effective date of abandoning: 20161005

C25 Abandonment of patent right or utility model to avoid double patenting