CN110258359A - 通过吊推支架施工的变高度钢梁施工方法 - Google Patents
通过吊推支架施工的变高度钢梁施工方法 Download PDFInfo
- Publication number
- CN110258359A CN110258359A CN201910700555.XA CN201910700555A CN110258359A CN 110258359 A CN110258359 A CN 110258359A CN 201910700555 A CN201910700555 A CN 201910700555A CN 110258359 A CN110258359 A CN 110258359A
- Authority
- CN
- China
- Prior art keywords
- steel
- girder steel
- construction
- girder
- bridge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
- E01D21/10—Cantilevered erection
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
本发明公开了一种通过吊推支架施工的变高度钢梁施工方法,步骤如下:①预制钢梁节段,架设拼装平台;②拼装第一孔钢梁,同时安装吊推支架,并将钢梁上翼缘的T型钢穿设在吊推支架顶部的滚轮之间向前吊推;③在第一孔钢梁到达第三个桥墩之前,完成第三个桥墩处吊推支架的施工,并在拼装平台上拼装与第一孔钢梁尾部相连的第二孔钢梁,以此实现钢梁的连续吊推;④按照步骤三的方法施工其余跨钢梁和其余墩顶吊推支架,直至第一孔钢梁安装在桥梁末端的桥墩上,完成整座桥梁的钢梁架设工作;⑤拆除拼装平台和吊推支架,完成施工。本发明可以简化变高度钢梁的施工,缩短施工周期,降低施工成本。
Description
技术领域
本发明涉及钢梁施工技术领域,尤其是涉及一种通过吊推支架施工的变高度钢梁施工方法。
背景技术
目前,国内外大多采用顶推法进行钢梁的施工。然而,顶推法对于跨径较小的等高度梁比较适宜;当桥梁跨径增大,为了节省用钢量而采用变高度梁,此时进行顶推施工时,需要通过增减调平钢板或者设置特殊装置的方式满足梁高的变化。
前者是将变高度梁体的底部通过楔形块垫平,然后按照等高度梁的方式进行顶推,该方式操作繁琐、精度低、施工速度慢,且由于不同位置梁高变化各异,楔形块重复使用率低。后者多采用铰接的方式,让梁体在顶推过程中发生转动,例如日本的大井川桥(六跨变高度钢梁桥)就是采用这种施工方式。其施工步骤如下:①预制工厂预制钢梁;②运输至施工现场在支架上进行拼装,拼装一个节段后进行顶推,顶推过程中依据梁高的变化通过一个上下升降和前后可以转动的悬臂外伸装置实时调整顶推设备的高程,在每个墩顶位置都设置一个悬臂外伸装置以实现对钢梁整体顶推;③施工桥面板,形成钢-砼组合梁全截面;④施工桥面铺装以及附属设施。该施工方式存在如下缺点:1、顶推过程中梁体底板几乎全部受到支点的局部荷载作用,易出现局部失稳问题;2、为了避免局部失稳问题,需要增加较多措施,造成工程造价增加;3、钢梁端部高程时刻发生变化,且幅度过大,桥面难以保持水平;4、钢梁不能进行连续顶推;5、由于施工过程中桥梁姿态不断转变,造成施工速度慢;6、悬臂施工过程较长,桥梁风险大。
可见,采用顶推法施工变截面钢混组合梁桥,存在现场作业工序复杂、施工安全系数较低、施工不连续、需要借助辅助工序等技术问题,影响了变截面钢混组合梁桥的推广应用。
发明内容
为了解决上述问题,本发明提供一种易于施工的通过吊推支架施工的变高度钢梁施工方法,具体可采取下述技术方案:
本发明所述的通过吊推支架施工的变高度钢梁施工方法,所述吊推支架包括支腿和顶梁,所述支腿固设在桥墩承台上,所述顶梁与其下方的桥墩构成钢梁通道,所述顶梁上设置有与升降机构相连的门型钢轨道,所述门型钢轨道的内侧相对面上分别设置有通过履带相连的滚轮,所述滚轮由电机驱动,当上翼缘上焊接有T型钢的所述钢梁通过支架时,所述T型钢的腹板位于所述滚轮之间,T型钢的顶板与所述履带上表面相接触;
所述施工方法包括如下步骤:
第一步,按设计要求在钢梁腹板上翼缘上焊接T型钢,进行钢梁节段的预制;同时,在第一桥墩和第二桥墩之间架设拼装平台;
第二步,将钢梁节段运送至施工现场,在拼装平台上拼装第一孔钢梁,同时在第二个桥墩处安装吊推支架;然后,将钢梁上翼缘的T型钢穿设在吊推支架顶部的滚轮之间向前吊推;
第三步,在第一孔钢梁到达第三个桥墩之前,完成第三个桥墩处吊推支架的施工,并在拼装平台上拼装与第一孔钢梁尾部相连的第二孔钢梁,以此实现钢梁的连续吊推;
第四步,按照步骤三的方法施工其余跨钢梁和其余墩顶吊推支架,直至第一孔钢梁安装在桥梁末端的桥墩上,完成整座桥梁的钢梁架设工作;
第五步,拆除拼装平台和吊推支架,完成施工。
本发明提供的通过吊推支架施工的变高度钢梁施工方法,可以简化变高度钢梁的施工,缩短施工周期,降低施工成本。具体优点如下:
1、通过在钢梁上翼缘上焊接T型钢,使T型钢与门型钢轨道的滚轮相配合,从而使桥面在施工过程中能够始终处于水平状态,有效地提高了施工安全系数;
2、水平的桥面便于开展桥面板的铺设作业,降低了桥面板的铺装难度;
3、可实现连续作业,施工速度快;
4、悬臂施工过程短,施工风险小;
5、梁体几乎全部处于受拉状态,不会出现局部失稳的问题;
6、由于吊推施工工艺是把钢梁吊起,其作用点位于钢梁的上翼缘,因此无需使用传统顶推工艺中加装加强肋的增强腹板,降低了永久工程的造价;
7、吊推施工工艺减少了现场变换高度辅助施工作业量,简化了传统变高度钢梁施工工艺;
8、充分利用了桥墩的承载能力,降低了施工难度,能够达到快速安全施工效果;
9、除变高度钢梁外,本施工工艺同样可应用于等高度钢梁的施工。
附图说明
图1是本发明中吊推支架的结构示意图。
图2是图1中的A部放大图。
图3是图2中门型钢轨道部分的B-B向视图。
图4-9是本发明的施工步骤图。
具体实施方式
如图1-3所示,本发明对变高度钢梁进行施工时使用的吊推支架包括支腿1和顶梁2,支腿1与桥墩承台M上的预埋件Q相连,顶梁2与其下方的桥墩P构成钢梁通道,顶梁2的下表面上安装有通过升降机构连接的门型钢轨道3,门型钢轨道3的内侧相对面上分别安装有多组通过履带4连接的滚轮5。每组滚轮5为两个,均通过转轴与门形轨道3侧壁相连。上述升降机构一般采用卷扬机驱动的升降吊索,滚轮5则由安装在门型钢轨道3上的电机驱动。该吊推装置用于变高度钢梁施工时,钢梁N的每个上翼缘上需配合焊接一条沿桥梁纵向设置的T型钢。使用时,卷扬机启动,门型钢轨道3随升降吊索下降,直至其与T型钢位置相对应;然后,通过气缸等顶推设备将T型钢向门型钢轨道3方向平推,使T型钢的腹板6.1恰好位于门型钢轨道3内侧的两排滚轮5之间,且T型钢的顶板6.2与履带4上表面相接触;接着,使卷扬机收卷,将门型钢轨道3吊离下部支撑面,然后启动滚轮5电机,使履带4带动钢梁N前进,实现钢梁N的吊推。
以下以五孔一联的变高度钢梁桥为例,来说明本发明所述的吊推支架施工变高度钢梁的施工方法。主要包括以下步骤(见图4-9):
第一步,按设计要求在钢梁N腹板上翼缘上焊接T型钢,进行钢梁节段的预制,并进行钢梁节段的预拼装;同时,进行基础、桥墩的施工,并在第一个桥墩和第二桥墩之间架设拼装平台R;
第二步,将钢梁节段运送至施工现场,在现场拼装平台R上将钢梁节段拼装成第一孔钢梁,同时在第二个桥墩处安装吊推支架K1;然后,将钢梁N上翼缘的T型钢穿设在吊推支架K1顶部的滚轮5之间向前吊推;
第三步,第一孔钢梁到达第三个桥墩之前,完成第三个桥墩处吊推支架K2的施工,并在拼装平台R上拼装与第一孔钢梁尾部相连的第二孔钢梁,以此实现钢梁N的连续吊推,;
第四步,按照步骤三的方法施工其余跨钢梁和其余墩顶吊推支架,直至第一孔钢梁安装在第六个桥墩上,完成整座桥梁的钢梁架设工作;
第五步,重复施工第三、四步,完成其余桥墩处吊推支架的施工和其余钢梁的施工,通过第一孔钢梁在其余各吊推支架上的依次推进,直至第一孔钢梁安装在第六个桥墩上,完成整座桥梁的钢梁架设工作;
第六步,拆除拼装平台和吊推支架,完成施工。
Claims (1)
1.一种通过吊推支架施工的变高度钢梁施工方法,其特征在于:所述吊推支架包括支腿和顶梁,所述支腿固设在桥墩承台上,所述顶梁与其下方的桥墩构成钢梁通道,所述顶梁上设置有与升降机构相连的门型钢轨道,所述门型钢轨道的内侧相对面上分别设置有通过履带相连的滚轮,所述滚轮由电机驱动,当上翼缘上焊接有T型钢的所述钢梁通过支架时,所述T型钢的腹板位于所述滚轮之间,T型钢的顶板与所述履带上表面相接触;
所述施工方法包括如下步骤:
第一步,按设计要求在钢梁腹板上翼缘上焊接T型钢,进行钢梁节段的预制;同时,在第一桥墩和第二桥墩之间架设拼装平台;
第二步,将钢梁节段运送至施工现场,在拼装平台上拼装第一孔钢梁,同时在第二个桥墩处安装吊推支架;然后,将钢梁上翼缘的T型钢穿设在吊推支架顶部的滚轮之间向前吊推;
第三步,在第一孔钢梁到达第三个桥墩之前,完成第三个桥墩处吊推支架的施工,并在拼装平台上拼装与第一孔钢梁尾部相连的第二孔钢梁,以此实现钢梁的连续吊推;
第四步,按照步骤三的方法施工其余跨钢梁和其余墩顶吊推支架,直至第一孔钢梁安装在桥梁末端的桥墩上,完成整座桥梁的钢梁架设工作;
第五步,拆除拼装平台和吊推支架,完成施工。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910700555.XA CN110258359B (zh) | 2019-07-31 | 2019-07-31 | 通过吊推支架施工的变高度钢梁施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910700555.XA CN110258359B (zh) | 2019-07-31 | 2019-07-31 | 通过吊推支架施工的变高度钢梁施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110258359A true CN110258359A (zh) | 2019-09-20 |
CN110258359B CN110258359B (zh) | 2020-11-06 |
Family
ID=67912543
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910700555.XA Active CN110258359B (zh) | 2019-07-31 | 2019-07-31 | 通过吊推支架施工的变高度钢梁施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110258359B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110644377A (zh) * | 2019-09-30 | 2020-01-03 | 中铁二院工程集团有限责任公司 | 滚轮式梁体顶推施工装置 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201288308Y (zh) * | 2008-12-22 | 2009-08-12 | 湖南路桥建设集团公司 | 一种悬索桥加劲梁架设装置 |
JP2009299418A (ja) * | 2008-06-17 | 2009-12-24 | Kajima Corp | 片持架設用移動作業車の後退撤去方法および後退装置 |
CN104195948A (zh) * | 2014-08-12 | 2014-12-10 | 中国十七冶集团有限公司 | 桥梁悬吊管道顶推安装施工方法 |
CN107604828A (zh) * | 2017-09-15 | 2018-01-19 | 中铁第五勘察设计院集团有限公司 | 双t型梁桥的架桥机 |
CN109778713A (zh) * | 2019-03-25 | 2019-05-21 | 中铁五局集团建筑工程有限责任公司 | 一种钢桁梁桥现场悬吊滑移拼装装置及方法 |
CN109914253A (zh) * | 2019-03-20 | 2019-06-21 | 中交路桥建设有限公司 | 一种悬索桥钢梁空中精准对接系统及方法 |
-
2019
- 2019-07-31 CN CN201910700555.XA patent/CN110258359B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2009299418A (ja) * | 2008-06-17 | 2009-12-24 | Kajima Corp | 片持架設用移動作業車の後退撤去方法および後退装置 |
CN201288308Y (zh) * | 2008-12-22 | 2009-08-12 | 湖南路桥建设集团公司 | 一种悬索桥加劲梁架设装置 |
CN104195948A (zh) * | 2014-08-12 | 2014-12-10 | 中国十七冶集团有限公司 | 桥梁悬吊管道顶推安装施工方法 |
CN107604828A (zh) * | 2017-09-15 | 2018-01-19 | 中铁第五勘察设计院集团有限公司 | 双t型梁桥的架桥机 |
CN109914253A (zh) * | 2019-03-20 | 2019-06-21 | 中交路桥建设有限公司 | 一种悬索桥钢梁空中精准对接系统及方法 |
CN109778713A (zh) * | 2019-03-25 | 2019-05-21 | 中铁五局集团建筑工程有限责任公司 | 一种钢桁梁桥现场悬吊滑移拼装装置及方法 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110644377A (zh) * | 2019-09-30 | 2020-01-03 | 中铁二院工程集团有限责任公司 | 滚轮式梁体顶推施工装置 |
CN110644377B (zh) * | 2019-09-30 | 2021-01-12 | 中铁二院工程集团有限责任公司 | 滚轮式梁体顶推施工装置 |
Also Published As
Publication number | Publication date |
---|---|
CN110258359B (zh) | 2020-11-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109538238B (zh) | 一种隧道拱部预制管片施工装置及控制方法 | |
CN105648916B (zh) | 一种架桥机及该架桥机的架设方法 | |
CN104632251A (zh) | 一体浇筑式模板台车和地下通道混凝土浇筑的施工方法 | |
CN108343087B (zh) | 一种预制构件的运输装配设备系统及其施工方法 | |
CN104060844A (zh) | 高层钢结构转换层桁架滑移设备、提升装置及施工方法 | |
CN107013038A (zh) | 一种大型建筑物屋顶采光中庭的钢结构滑移换柱施工方法 | |
CN103726421A (zh) | 地铁施工用高度及跨度可调式轨道铺设机 | |
CN110904969A (zh) | 一种高陡边坡板廊结构混凝土浇筑滑模系统 | |
CN103074871B (zh) | 一种弧形坡面混凝土滑升模板 | |
CN114808747A (zh) | 一种多功能架桥机及架桥施工方法 | |
CN108396749B (zh) | 一种基坑内钢支撑的安装系统以及安装方法 | |
CN109355983B (zh) | 一种城市轨道的无轨施工方法 | |
CN110258359A (zh) | 通过吊推支架施工的变高度钢梁施工方法 | |
CN203684019U (zh) | 地铁施工用高度及跨度可调式轨道铺设机 | |
CN203961317U (zh) | 可滑移单榀及多榀桁架胎架 | |
CN108625270A (zh) | 导梁门吊安装桥梁预制箱梁施工方法 | |
CN112323657A (zh) | 一种一体化预制桥梁拆除机及预制桥梁拆除方法 | |
CN113818478B (zh) | 一种超重预制管廊安装系统及其施工方法 | |
CN208578065U (zh) | 一种预制构件的运输装配设备系统 | |
CN208870380U (zh) | 用于墙体模板的移动装置及可移动墙体模板 | |
CN209338005U (zh) | 一种架梁施工用移动式高低腿龙门吊 | |
CN108130864B (zh) | 整体装配式桥梁整跨梁运输架设装备 | |
CN209835463U (zh) | 预制桥面板吊装设备 | |
CN205934962U (zh) | 用于地下管廊现浇施工的滑移体系 | |
CN110344334A (zh) | 采用背索式架桥机的两跨连做钢混组合桥梁施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |