CN110216476A - A kind of engine production line for installing water and gas conduit and controlling route - Google Patents

A kind of engine production line for installing water and gas conduit and controlling route Download PDF

Info

Publication number
CN110216476A
CN110216476A CN201910689395.3A CN201910689395A CN110216476A CN 110216476 A CN110216476 A CN 110216476A CN 201910689395 A CN201910689395 A CN 201910689395A CN 110216476 A CN110216476 A CN 110216476A
Authority
CN
China
Prior art keywords
work station
engine
overturning
blanking
route
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910689395.3A
Other languages
Chinese (zh)
Other versions
CN110216476B (en
Inventor
袁为民
雷希强
刘军
陈建璀
陈远平
官新华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huizhou Green Protection Technology Co Ltd
Original Assignee
Huizhou Green Protection Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huizhou Green Protection Technology Co Ltd filed Critical Huizhou Green Protection Technology Co Ltd
Priority to CN201910689395.3A priority Critical patent/CN110216476B/en
Publication of CN110216476A publication Critical patent/CN110216476A/en
Application granted granted Critical
Publication of CN110216476B publication Critical patent/CN110216476B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P21/00Machines for assembling a multiplicity of different parts to compose units, with or without preceding or subsequent working of such parts, e.g. with programme control
    • B23P21/004Machines for assembling a multiplicity of different parts to compose units, with or without preceding or subsequent working of such parts, e.g. with programme control the units passing two or more work-stations whilst being composed

Abstract

The present invention relates to a kind of engine production lines for installing water and gas conduit and controlling route, including sequentially connected feeding work station, for overturning the first overturning work station of engine, for assembling the water route installment work station of waterway pipe component, second overturning work station, for installing the air road installment work station of air road conduit assembly, third overturns work station, for installing the line work station of control route to engine, testing workstation for engine Insulation test, blanking work station for engine blanking, for carrying the Plane Rotation jig of engine, and the AGV vehicle movement system for transporting material.A continuous production line is combined between each work station, Plane Rotation jig can sequentially circulate between each work station, whole continuity is strong, the production time is saved, improve production efficiency, production cost is reduced, while overturning work station can automatically overturn engine, reduces labor intensity.

Description

A kind of engine production line for installing water and gas conduit and controlling route
Technical field
The present invention relates to new energy engine produce and process technical field, and in particular to one kind for install water and gas conduit and Control the engine production line of route.
Background technique
Fossil fuel is the main energy of current whole world consumption, but with the continuous exploitation of the mankind, fossil fuel it is withered It exhausts and is inevitable, currently used fossil fuel has gasoline, diesel oil, natural gas etc., can be added using common fossil energy Acute greenhouse effects, while air can also be polluted.With the continuous progress of technology, people begin to use clearly more and more The clean energy, in automobile industry, new-energy automobile starts to rise.New-energy automobile includes four major types, mixed power electric car (HEV), pure electric automobile (BEV, including solar telephone), fuel cell electric vehicle (FCEV), other new energy are (such as super The high-efficiency energy storage vehicles such as capacitor, flywheel) automobile etc..In fuel cell electric vehicle field, the engine of fuel cell electric vehicle It is the component of its core.During the manufacturing of fuel cell electric vehicle engine, need to carry out waterway pipe component, Air road conduit assembly, and the installation of control route, in the installation process of these components, it is often necessary to by engine cylinder body Being rotated or turned over for all directions is carried out, in order to install each component part according to design.In traditional production process, General different installation procedure is all dispersion, and is distributed in different production spaces, just will be complete after completing a process At the position where the engine transfering to subsequent processing of current process.Such mode continuity is poor, while fuel cell The structure of engine is more complex, when installing waterway pipe and control route, needs to carry out duplicate overturning to engine And rotation was being assembled at present in order to complete the assembly of each pipe-line, and due to the structural complexity of engine itself It is most of in journey still to rely on manually, and also need to repeat lift, grip engine, labor intensity during transhipment Greatly, it takes considerable time, inefficiency virtually increases production cost.
Summary of the invention
To solve the above-mentioned problems, the present invention provides a kind of engine lifes for installing water and gas conduit and controlling route Producing line.
The present invention is realized using following scheme:
A kind of engine production line for installing water and gas conduit and controlling route, including the feeding work for engine feeding It stands, for overturning the first overturning work station of engine, for the water route installment work to engine assembly waterway pipe component It stands, for overturning the second overturning work station of engine, for being installed to the air road of engine installation air road conduit assembly Work station, the third for overturning engine overturn work station, for installing the line work station of control route to engine, use In the testing workstation of engine Insulation test, for the blanking work station of engine blanking, for carrying the plane of engine Rotating jig, and the AGV vehicle movement system for transporting material;The feeding work station, the first overturning work station, water route peace Fill work station, the second overturning work station, air road installment work station, third overturning work station, line work station, test job Stand, blanking work station is sequentially connected setting and the continuous production line of composition one, the Plane Rotation jig from feeding work It stands and sequentially flows to blanking work station;The first overturning work station, the second overturning work station and third overturning work station are respectively provided with There is engine turnover device.
Further, the engine turnover device includes base, and the support frame on base is arranged in, and is arranged in support frame The top frame of upper end, the mobile mechanism being connected in top frame, what is connect with mobile mechanism is used to overturn turning over for engine Rotation mechanism;The engine turnover mechanism includes the overturning substrate connecting with mobile mechanism, is symmetricly set on overturning substrate bottom surface The the first overturning component and the second overturning component for overturning engine of two sides, the first overturning component and the second overturning group Part is mobily connected in the bottom surface of overturning substrate.
Further, the structure of the first overturning component and the second overturning component is identical, includes being mobily connected in The support plate of movable plate bottom surface is arranged in the movable plate for overturning base plate bottom, and the overturning of side inwardly at that low end of the support plate is arranged Seat, and the connecting rod for being used to connect engine being arranged on overturning seat, the overturning seat are rotatably connected with support plate, The side of support plate outwardly is additionally provided with the first actuator for driving overturning seat to rotate;The movable plate is being set to overturning The lower movement of the second actuator driving of substrate bottom surface.
Further, the mobile mechanism includes the straight line mould group being arranged in top frame, is arranged in straight line mould group Mobile foundation, the third actuator for driving turnover mechanism to move along the vertical direction on mobile foundation is set, and For driving the fourth drive member of straight line mould group;The overturning substrate is connected by multiple guide rods with mobile foundation.
Further, first actuator, fourth drive member are motor, and the second actuator is cylinder, third driving Part is electric cylinders.
Further, the Plane Rotation jig includes jig base, and be rotatably connected the turntable on pedestal, setting The multiple folders for being used to clamp engine on a spinstand are arranged in the multiple supporting elements for being used to support engine on a spinstand Pincers, and the handle held for manpower of setting on a spinstand are additionally provided with multiple for lifting in the jig base Handle.
Further, water route installment work station, air road installment work station, line work station are provided at least one A standard workbench, the standard workbench includes board, and the bracket on board is arranged in, and the touch-control being arranged on bracket is shown Screen;It is provided on the base of the engine turnover device and the board of standard workbench for transporting Plane Rotation jig Transport mechanism.
Further, the transport mechanism is double-speed chain, and the middle position of double-speed chain is provided with for positioning plane The positioning component of rotating jig;The positioning component includes the positioning seat being arranged on the rack, and is rotatably connected on positioning seat Locating piece, be arranged in locating piece end for contacting the roller group of jig base.
Further, the feeding work station includes the loading working table connecting with the first overturning work station, and is used for To the feeding manipulator of loading working table handling material;The blanking work station includes the blanking work connecting with testing workstation Platform, the discharging manipulator for discharging.
Further, the AGV vehicle movement system includes the track that ground is arranged in, and multiple AGV in orbit are arranged Vehicle is arranged in the feeding locating rack for being used to position AGV vehicle of feeding work station side, is arranged in around blanking work station and is used for The the first blanking locating rack and the second blanking locating rack of AGV vehicle are positioned, in terms of depression angle, the first blanking locating rack is located at The downside of blanking mechanical hand, the second blanking locating rack are located at the left side of blanking work platform.
The prior art is compared, the invention has the following advantages:
The present invention is provided with feeding work station, the first overturning work station, for the water route of engine assembly waterway pipe component Installment work station, the second overturning work station, for the air road installment work station of engine installation air road conduit assembly, the Three overturning work stations, the line work station for installing control route to engine, the testing workstation for test, blankers It stands, a continuous production line is combined between each work station, the Plane Rotation jig for being placed with engine can be each It sequentially circulates between work station, carry out water and gas conduit and controls the assembling work of the components such as route, whole continuity is strong, it is not necessary to Again continually by engine transfering to different production spaces, the production time is saved, production efficiency is improved, has reduced production Cost, meanwhile, multiple overturning work stations are provided with, engine can be overturn automatically, without using manpower, reduce labour Intensity.On the other hand, it is provided with AGV vehicle movement system in the present invention, improves the effect for shifting product material between different processes Rate.
Detailed description of the invention
Fig. 1 is a kind of one embodiment of engine production line for installing water and gas conduit and controlling route provided by the invention Structural schematic diagram.
Fig. 2 is the structural schematic diagram of the present embodiment engine turnover device.
Fig. 3 is another angle schematic diagram of the present embodiment engine turnover device.
Fig. 4 is the portion the A enlarged drawing of Fig. 2.
Fig. 5 is the structural schematic diagram of the present embodiment standard workbench.
Fig. 6 is the structural schematic diagram of the present embodiment positioning component.
Specific embodiment
For convenient for those skilled in the art understand that the present invention, below in conjunction with specific embodiments and the drawings to the present invention make into One step detailed description.
Referring to figs. 1 to Fig. 6, a kind of engine production line for installing water and gas conduit and controlling route provided by the invention It is used for for overturning the first overturning work station 2 of engine to engine including the feeding work station 1 for engine feeding The water route installment work station 3 for assembling waterway pipe component, for overturning the second overturning work station 21 of engine, for starting Machine installs the air road installment work station 4 of air road conduit assembly, and the third for overturning engine overturns work station 22, is used for The line work station 5 that control route is installed to engine is used for engine for the testing workstation 6 of engine Insulation test The blanking work station 7 of blanking, the AGV vehicle for carrying the Plane Rotation jig 8 of engine, and for transporting material transport system System 9.The feeding work station, the first overturning work station, water route installment work station, the second overturning work station, air road erector It stands, third overturning work station, line work station, testing workstation, blanking work station is sequentially connected setting and composition one is continuous Production line, the Plane Rotation jig sequentially flows to blanking work station from feeding work station.From the point of view of attached drawing one, Feeding work station, the first overturning work station, water route installment work station, the second overturning work station, air road installment work station, third Overturning work station, line work station, testing workstation, blanking work station are set gradually from right to left, and Plane Rotation jig is from the right side To left flowing.
The first overturning work station 2, second overturns work station 21 and third overturning work station 22 is provided with engine Turnover device 23.Engine turnover device 23 includes base 231, the support frame 232 on base is arranged in, setting is on the support frame The top frame 233 at end, the mobile mechanism 234 being connected in top frame, what is connect with mobile mechanism is used to overturn engine Turnover mechanism 235.Support frame is specifically that the support column in four corners of pedestal is arranged in and is arranged in rectangular at the top of support column Frame.The engine turnover mechanism 235 includes the overturning substrate 2351 connecting with mobile mechanism, is symmetricly set on overturning substrate The the first overturning component 2352 and the second overturning component 2353 for overturning engine of bottom surface both side, the first overturning component The bottom surface of overturning substrate is mobily connected in the second overturning component.
First overturning component 2352 is identical with the structure of the second overturning component 2353, includes being mobily connected in overturning base The movable plate 2352a in board bottom portion, is arranged in the support plate 2352b of movable plate bottom surface, setting at that low end of the support plate inwardly side ( I.e. towards the side among overturning substrate) overturning seat 2352c, and be arranged on overturning seat for connecting the company of engine Extension bar 2352d, the overturning seat are rotatably connected with support plate, are additionally provided in the side of support plate outwardly for driving overturning First actuator 2352e of seat rotation;The movable plate is in the case where being set to the second actuator 2352 driving of overturning substrate bottom surface It is mobile.The second actuator uses cylinder in the present embodiment, and because two overturning components are symmetrical arranged, the gas of component is overturn at two When cylinder drives, the overturning seat of two overturning components is mobile simultaneously towards identical direction or opposite direction, realizes clamping or pine It opens.Have on engine and (is also possible to that on the engine matched with connecting rod is installed with the matched hole of connecting rod or opening Connector), it is inserted into for connecting rod.
Mobile mechanism 234 includes the straight line mould group 2341 being arranged in top frame, and the movement in straight line mould group is arranged in The third actuator 2343 for driving turnover mechanism to move along the vertical direction on mobile foundation is arranged in pedestal 2342, with And the fourth drive member 2344 for driving straight line mould group;The overturning substrate 2351 passes through multiple guide rods 2345 and mobile base Seat is connected.In the present embodiment, third actuator 2343 is electric cylinders, and fourth drive member 2344 is motor, and stepper motor can be used. Setting is widely used component there are two straight line mould group, straight line mould group in the present embodiment, is usually connected on precision lead screw A mobile component is connect, no longer does burdensome narration herein.
Plane Rotation jig 8 includes jig base 81, and be rotatably connected the turntable 82 on pedestal, is arranged in turntable On the multiple supporting elements 83 for being used to support engine, be arranged on a spinstand for clamping multiple clamps 84 of engine, And the handle 85 held for manpower of setting on a spinstand, multiple handles for lifting are additionally provided in the jig base Hand 86.Supporting element can be used for supporting engine entirety, while be clamped engine by clamp, avoid engine in mobile mistake It is displaced in journey.In assembling process, staff can rotate turntable by handle, in order to each to engine A position carries out corresponding assembling work.
Water route installment work station 3, air road installment work station 4, line work station 5 are provided with the work of at least one standard Platform 31, the standard workbench include board 311, and the bracket 312 on board is arranged in, the touching display screen on bracket is arranged in 313;It is provided on the base 231 of the engine turnover device 23 and the board of standard workbench for transporting Plane Rotation The transport mechanism 314 of jig.When it is implemented, the standard workbench of each station may be provided with multiple, it is convenient for current Different step in assembling process, such as when installing waterway pipe component carries out the connection of pipeline, pipeline is locked Different step.
Transport mechanism 314 is double-speed chain, and the middle position of double-speed chain is provided with for positioning Plane Rotation jig Positioning component 315;The positioning component includes the positioning seat 3151 being arranged on the rack, and is rotatably connected and determines on positioning seat The roller group 3153 for being used to contact jig base of locating piece end is arranged in position part 3152.Locating piece is rotatably connected fixed On the seat of position, rotation (being embodied in roller group to rise or fall) can be realized by motor or cylinder driving when specific implementation, To realize the purpose for blocking Plane Rotation jig.
Feeding work station 1 includes the loading working table 11 connecting with the first overturning work station 2, and for working to feeding The feeding manipulator 12 of platform handling material;The blanking work station 7 includes the blanking work platform 71 connecting with testing workstation, is used In the discharging manipulator 72 of discharging.Loading working table and blanking work platform can be used similar with standard workbench in the present embodiment Structure, it is each with board and the transport mechanism (eliminating the bracket and display screen in standard workbench) being arranged on board Transport mechanism in work station joins end to end in line, in order to which Plane Rotation jig circulates between each work station.
AGV vehicle movement system 9 includes the track 91 that ground is arranged in, and multiple AGV vehicles 92 in orbit are arranged, and setting exists The feeding locating rack 93 for being used to position AGV vehicle of feeding work station side is arranged in around blanking work station and is used to position AGV The the first blanking locating rack 94 and the second blanking locating rack 95 of vehicle, in terms of depression angle, under the first blanking locating rack is located at Expect the downside of manipulator, the second blanking locating rack is located at the left side of blanking work platform.Track can be according to specific transportation demand It is configured, in the present embodiment, rests against the engine fortune that the AGV vehicle at the first blanking locating rack is used to terminate assembling work Toward subsequent processing, the AGV vehicle at the second blanking locating rack is rested against for transporting empty jig.Feeding locating rack is supplied from a upper work The AGV vehicle that sequence producing line transports engine is stopped, and the engine that assembly is completed in upper process producing line is transported to this production by AGV vehicle At line, loading working table is transported to for feeding manipulator clamping.
In the specific implementation, ABB six axis robot can be used in manipulator.Each component part connects with control computer It connects, control computer is equipped with MES system, and MES forms a connecting link in entire enterprise integration information system, is production activity and pipe The bridge that action message is linked up is managed, it is best to play the part of a promotion production activity during product is from work order to manufactured goods by MES The information conveyer of change.When the event of production occurs, MES makes quick reaction by collected real time information, to reduce Production activity without surcharge, and then the production efficiency of factory is promoted, and data can be uploaded, technological parameter can be traced, For test data, the analysis of process stability is carried out, to be handled in time when process capability reduces, guarantees that product exists Before appearance batch is bad, it is effectively controlled), it is convenient for the control of every process and the setting of parameter.It is being produced When operation, the engine for completing upper process processing operation is transported at feeding locating rack by AGV vehicle, and engine is placed at this time On Plane Rotation jig, Plane Rotation jig is transferred on loading working table together with engine by feeding manipulator (or can be with Transport engine, the holding plane rotating jig at loading working table are then again placed engine by feeding manipulator To at Plane Rotation jig), Plane Rotation jig is sent into the first overturning work station, the hair of the first overturning work station by transport mechanism Motivation turnover device overturns engine, and engine is put back to Plane Rotation jig again after overturning, into water route installment work station, The installation of waterway pipe component is carried out by staff.After waterway pipe component is installed, transport mechanism controls Plane Rotation Tool is transferred to the second overturning work station, and the engine turnover device of the second overturning work station overturns engine, subsequently enters sky Air road conduit assembly is installed at gas circuit installment work station, after air road conduit assembly assembles, overturns work station into third, The engine turnover device of third overturning work station overturns engine, subsequently enters line work station, carries out control route Installation.After route to be controlled installation, testing workstation is entered, tests whole insulating properties, used in insulating properties test Equipment be common detection device in the art, no longer do burdensome narration herein.It is flowed into blanking work station after the completion of test, Engine is transferred to transport on the AGV vehicle of the first blanking locating rack by blanking mechanical hand and moves down process.Blanking mechanical simultaneously Plane Rotation jig is put at the AGV vehicle at the second blanking locating rack by hand, and being transported by AGV vehicle (can transport to and need the jig Initial process at), complete a processing flow.Corresponding material table can be set when specific implementation at each work station, respectively A work station required such as air road pipe fitting, water route pipe fitting, line fittings in assembly can be transported to each work in advance The material table stood.
The present invention is provided with feeding work station, the first overturning work station, for engine assembly waterway pipe component Water route installment work station, the second overturning work station, the air road installment work for installing air road conduit assembly to engine Stand, third overturning work station, for engine install control route line work station, for test testing workstation, Blanking work station is combined into a continuous production line between each work station, and the Plane Rotation jig for being placed with engine can It sequentially circulates between each work station, carry out water and gas conduit and controls the assembling work of the components such as route, whole continuity By force, it is not necessary to again continually by engine transfering to different production spaces, save the production time, improve production efficiency, drop Low production cost, meanwhile, multiple overturning work stations are provided with, engine can be overturn automatically, without using manpower, drop Low labor intensity.On the other hand, it is provided with AGV vehicle movement system in the present invention, improves and shifts product between different processes The efficiency of material.
In the description of the present invention, it is to be understood that, the orientation or positional relationship of instruction is side based on the figure Position or positional relationship, are merely for convenience of description of the present invention and simplification of the description, rather than the device or member of indication or suggestion meaning Part must have a particular orientation, be constructed and operated in a specific orientation, therefore be not considered as limiting the invention.
In addition, term " first ", " second " etc. are used for description purposes only, it is not understood to indicate or imply relatively important Property or implicitly indicate the quantity of indicated technical characteristic.Define " first " as a result, the feature of " second " can be expressed or Person implicitly includes one or more of the features.In the description of the present invention, the meaning of " plurality " is two or two with On, unless otherwise specifically defined.
In the present invention unless specifically defined or limited otherwise, the terms such as term " connection ", " fixation " should do broad sense Understand, for example, it may be being fixedly connected, may be a detachable connection, or is integral;It can be mechanical connection, be also possible to Electrical connection;It can be directly connected, the connection inside two elements or two can also be can be indirectly connected through an intermediary The interaction relationship of a element.For the ordinary skill in the art, above-mentioned art can be understood as the case may be The concrete meaning of language in the present invention.
Although description of this invention combination embodiments above carries out, those skilled in the art Member can carry out many replacements, modifications and variations based on the above contents, be obvious.Therefore, all such substitutions, Improvements and changes are included in scope of the appended claims.

Claims (10)

1. a kind of engine production line for installing water and gas conduit and controlling route, which is characterized in that including being used for engine The feeding work station (1) of feeding is used for for overturning the first overturning work station (2) of engine to engine assembly waterway tube The water route installment work station (3) of road component, for overturning the second overturning work station (21) of engine, for being installed to engine The air road installment work station (4) of air road conduit assembly, for overturn engine third overturn work station (22), for The line work station (5) of engine installation control route, for the testing workstation (6) of engine Insulation test, for starting The blanking work station (7) of machine blanking, for carrying the Plane Rotation jig (8) of engine, and the AGV vehicle for transporting material Movement system (9);The feeding work station, the first overturning work station, water route installment work station, the second overturning work station, air Road installment work station, third overturning work station, line work station, testing workstation, blanking work station are sequentially connected setting and group At a continuous production line, the Plane Rotation jig sequentially flows to blanking work station from feeding work station;Described first Overturning work station (2), the second overturning work station (21) and third overturning work station (22) are provided with engine turnover device (23).
2. the engine production line according to claim 1 for installing water and gas conduit and controlling route, which is characterized in that The engine turnover device (23) includes base (231), the support frame (232) on base is arranged in, setting is on the support frame The top frame (233) at end, the mobile mechanism (234) being connected in top frame, what is connect with mobile mechanism sends out for overturning The turnover mechanism (235) of motivation;The engine turnover mechanism (235) includes the overturning substrate connecting with mobile mechanism (2351), the first overturning component (2352) and second for overturning engine for being symmetricly set on overturning substrate bottom surface two sides is turned over Turn component (2353), the first overturning component and the second overturning component are mobily connected in the bottom surface for overturning substrate.
3. the engine production line according to claim 2 for installing water and gas conduit and controlling route, which is characterized in that First overturning component (2352) is identical with the second overturning structure of component (2353), includes being mobily connected in overturning base The movable plate (2352a) in board bottom portion, is arranged in the support plate (2352b) of movable plate bottom surface, setting at that low end of the support plate inwardly one The overturning seat (2352c) of side, and the connecting rod (2352d) for being used to connect engine being arranged on overturning seat, the overturning Seat is rotatably connected with support plate, is additionally provided with the first actuator for driving overturning seat to rotate in the side of support plate outwardly (2352e);The movable plate moves under the second actuator (2352f) driving for being set to overturning substrate bottom surface.
4. the engine production line according to claim 3 for installing water and gas conduit and controlling route, which is characterized in that The mobile mechanism (234) includes the straight line mould group (2341) being arranged in top frame, and the movement in straight line mould group is arranged in The third actuator for driving turnover mechanism to move along the vertical direction on mobile foundation is arranged in pedestal (2342) And the fourth drive member (2344) for driving straight line mould group (2343),;The overturning substrate (2351) passes through multiple guiding Bar (2345) is connected with mobile foundation.
5. the engine production line according to claim 4 for installing water and gas conduit and controlling route, which is characterized in that First actuator (2352e), fourth drive member (2344) are motor, and the second actuator (2352f) is cylinder, and third is driven Moving part (2343) is electric cylinders.
6. the engine production line according to claim 2 for installing water and gas conduit and controlling route, which is characterized in that The Plane Rotation jig (8) includes jig base (81), and be rotatably connected the turntable (82) on pedestal, and setting is rotating The multiple clamps for being used to clamp engine on a spinstand are arranged in the multiple supporting elements (83) for being used to support engine on platform (84), and setting on a spinstand for manpower hold handle (85), multiple confessions are additionally provided in the jig base The handle (86) of lifting.
7. the engine production line according to claim 6 for installing water and gas conduit and controlling route, which is characterized in that Water route installment work station (3), air road installment work station (4), line work station (5) are provided at least one standard work Make platform (31), the standard workbench includes board (311), and the bracket (312) on board is arranged in, the touching on bracket is arranged in It controls display screen (313);Use is provided on the base (231) of the engine turnover device (23) and the board of standard workbench In the transport mechanism (314) for transporting Plane Rotation jig.
8. the engine production line according to claim 7 for installing water and gas conduit and controlling route, which is characterized in that The transport mechanism (314) is double-speed chain, and the middle position of double-speed chain is provided with for positioning determining for Plane Rotation jig Hyte part (315);The positioning component includes the positioning seat (3151) being arranged on the rack, and is rotatably connected on positioning seat The roller group (3153) for being used to contact jig base of locating piece end is arranged in locating piece (3152).
9. the engine production line according to claim 2 for installing water and gas conduit and controlling route, which is characterized in that The feeding work station (1) includes the loading working table (11) connecting with the first overturning work station (2), and is used for feeding work Make the feeding manipulator (12) of platform handling material;The blanking work station (7) includes the blanking work connecting with testing workstation Platform (71), the discharging manipulator (72) for discharging.
10. the engine production line according to claim 9 for installing water and gas conduit and controlling route, feature exist In, the AGV vehicle movement system (9) includes the track (91) that ground is arranged in, multiple AGV vehicles (92) in orbit are set, The feeding locating rack (93) for being used to position AGV vehicle of feeding work station side is set, the use around blanking work station is set In the first blanking locating rack (94) and the second blanking locating rack (95) of positioning AGV vehicle, in terms of depression angle, first blanking Locating rack is located at the downside of blanking mechanical hand, and the second blanking locating rack is located at the left side of blanking work platform.
CN201910689395.3A 2019-07-29 2019-07-29 Engine production line for installing water-gas pipeline and control circuit Active CN110216476B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910689395.3A CN110216476B (en) 2019-07-29 2019-07-29 Engine production line for installing water-gas pipeline and control circuit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910689395.3A CN110216476B (en) 2019-07-29 2019-07-29 Engine production line for installing water-gas pipeline and control circuit

Publications (2)

Publication Number Publication Date
CN110216476A true CN110216476A (en) 2019-09-10
CN110216476B CN110216476B (en) 2024-03-19

Family

ID=67812664

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910689395.3A Active CN110216476B (en) 2019-07-29 2019-07-29 Engine production line for installing water-gas pipeline and control circuit

Country Status (1)

Country Link
CN (1) CN110216476B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102513822A (en) * 2011-12-03 2012-06-27 锐展(铜陵)科技有限公司 Manual assembling auxiliary mechanism for engine
CN202461954U (en) * 2011-12-31 2012-10-03 大连智云自动化装备股份有限公司 Device for conveying machine body on engine assembly line
CN202668049U (en) * 2012-07-18 2013-01-16 大连智云自动化装备股份有限公司 Cylinder head assembly automatic assembly line
CN103406757A (en) * 2013-07-31 2013-11-27 重庆长安汽车股份有限公司 Supporting-rotating-type engine assembly tray
CN105645091A (en) * 2016-01-26 2016-06-08 广东辰奕科技有限公司 Turnover device and assembly line
CN205526520U (en) * 2016-01-26 2016-08-31 广东辰奕智能科技股份有限公司 Turning device and assembly line
CN210549448U (en) * 2019-07-29 2020-05-19 惠州绿保科技有限公司 Engine production line for installing water-gas pipeline and control circuit

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102513822A (en) * 2011-12-03 2012-06-27 锐展(铜陵)科技有限公司 Manual assembling auxiliary mechanism for engine
CN202461954U (en) * 2011-12-31 2012-10-03 大连智云自动化装备股份有限公司 Device for conveying machine body on engine assembly line
CN202668049U (en) * 2012-07-18 2013-01-16 大连智云自动化装备股份有限公司 Cylinder head assembly automatic assembly line
CN103406757A (en) * 2013-07-31 2013-11-27 重庆长安汽车股份有限公司 Supporting-rotating-type engine assembly tray
CN105645091A (en) * 2016-01-26 2016-06-08 广东辰奕科技有限公司 Turnover device and assembly line
CN205526520U (en) * 2016-01-26 2016-08-31 广东辰奕智能科技股份有限公司 Turning device and assembly line
CN210549448U (en) * 2019-07-29 2020-05-19 惠州绿保科技有限公司 Engine production line for installing water-gas pipeline and control circuit

Also Published As

Publication number Publication date
CN110216476B (en) 2024-03-19

Similar Documents

Publication Publication Date Title
CN202461404U (en) Automatic riveting machine for lithium ion battery cover plate
CN102183739B (en) Device for moving electric energy meter between meter case and multi-epitope tooling board
CN106571492A (en) Storage battery cutting brushing and cast-welding integrated automatic production device and production technological process
CN106002011A (en) Intelligent flexible welding system
CN113199185A (en) Automatic girth welding device and method for large pipeline
CN108340066A (en) A kind of medical stainless steel cup cup lid automatic welding leaks hunting equipment integrating
CN206500811U (en) A kind of multi-vehicle-type switching vehicle body is merged fixture
CN104785944A (en) Cylinder end plate installing and welding workstation
CN103949811B (en) A kind of method carrying vehicle body between welding and assembling production lines and the device that is welded
CN113523561B (en) Trinity laser welding equipment of blade battery
CN204449907U (en) Riveted radium carving equipment tested automatically by a kind of band line formula charger
CN206811470U (en) A kind of rotating disc type GPS assembling mechanisms
CN208450805U (en) A kind of arc-welding slewing equipment
CN206225487U (en) Battery cuts brush and cast welding integral type automated production equipment
CN1300692A (en) Apparatus for machining vehicle body with fixing and centrilizing on working position
CN110216476A (en) A kind of engine production line for installing water and gas conduit and controlling route
CN110293399A (en) A kind of engine pile and hydrogen tube assembly assembling line
CN210549448U (en) Engine production line for installing water-gas pipeline and control circuit
CN204735857U (en) Barrel end plate assembly welding workstation
CN103934604A (en) Automatic welding device and method for vehicle console installing support
CN207888073U (en) A kind of full-automatic turbine marking machine
CN210615722U (en) Engine galvanic pile and hydrogen pipe assembly production line
CN207171296U (en) A kind of double flexible welding positioner for welding workstation
CN207283010U (en) A kind of inflating switch cabinet production line skid clamping tooling and clamping device
CN207209371U (en) A kind of battery clamp feeding transfer device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant