A kind of cement sand and gravel buttress dam Download PDFInfo
- Publication number
- CN110158547A CN110158547A CN201910514303.8A CN201910514303A CN110158547A CN 110158547 A CN110158547 A CN 110158547A CN 201910514303 A CN201910514303 A CN 201910514303A CN 110158547 A CN110158547 A CN 110158547A
- Authority
- CN
- China
- Prior art keywords
- dam
- gravel
- buttress
- cement sand
- antiseepage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B7/00—Barrages or weirs; Layout, construction, methods of, or devices for, making same
- E02B7/02—Fixed barrages
- E02B7/04—Dams across valleys
- E02B7/08—Wall dams
- E02B7/14—Buttress dams
Abstract
The invention discloses a kind of cement sand and gravel buttress dams, including the dam foundation and the dam body being arranged on the dam foundation, the dam body include antiseepage watertight layer and be arranged after antiseepage watertight layer and with the vertically arranged one group of buttress of dam body axis, between buttress be filled with cement sand and gravel;The antiseepage watertight layer is by the dam foundation to dam crest gradually thinning trapezium structure;The antiseepage watertight layer is poured using armored concrete, and the gradient is between gravity dam and cemented gravel dam.The present invention shares upstream water pressure using multistage buttress, reduce the stress of dam body cement sand and gravel material, so as to reduce cement sand and gravel section, it not only can reach the purpose of optimization construction investment, and demand to sand gravel material reserves at dam site can be reduced, improve the adaptability of cemented gravel dam.
Description
Technical field
The present invention relates to a kind of cement sand and gravel buttress dams, belong to hydraulic and hydroelectric engineering technical field.
Background technique
Cemented gravel dam is a kind of novel dam developed in recent years, and sectional form is between cement sand and gravel between face
Between sheetpile masonry dam and concrete gravity dam.Cement sand and gravel dam construction technique is in grinding concrete dam technology and panel enrockment
A kind of novel dam construction technique to grow up on the basis of dam construction technique, using the sand gravel material for being added to a small amount of cementitious material
(including sand, ballast, gravel etc.) builds a dam, and is constructed using efficient cubic metre of earth and stone Transport Machinery and compacting machinary, makes sand gravel material
Become continuous rigid body from bulk solid.Cement sand and gravel dam construction technique is with safe and reliable, speed of application is fast, simple process, warp
Ji property is good, reduces the advantages that environmental disruption.
Cemented gravel dam is needed due to the characteristics of gathering materials on the spot using the riverbed sandy gravel near dam site, therefore for
Sandy gravel content less region in riverbed is not appropriate for using this kind of dam type (if optionally stock ground exploitation, loses economy
Advantage).Simultaneously as this kind of dam type figure heavy force dam body type is big, the riverbed sandy gravel needed is also more, therefore, very much
The less riverbed of natural grit granulation reserves, this kind of dam type popularization are restricted.
Summary of the invention
The purpose of the present invention is to provide a kind of cement sand and gravel buttress dam, which rationally utilizes buttress to bear lotus
It carries, the gradient of cement sand and gravel above and below the dam dam slope can be reduced, to reach optimization section, reduce cement sand and gravel material utilization amount
Purpose.
Technical solution of the present invention: a kind of cement sand and gravel buttress dam, including the dam foundation and the dam body being arranged on the dam foundation,
The dam body include antiseepage watertight layer and be arranged after antiseepage watertight layer and with the vertically arranged one group of branch of dam body axis
Pier is filled with cement sand and gravel between buttress.
Further, the antiseepage watertight layer is by the dam foundation to dam crest gradually thinning trapezium structure.
Further, the antiseepage watertight layer is poured using armored concrete, and the gradient is between gravity dam and gelling sand
Between gravel dam.
Further, the buttress is trapezoidal plate structure, and is poured using armored concrete.
By adopting the above-described technical solution, the present invention has the advantages that the present invention shares upper water using multistage buttress
Pressure, the stress for reducing dam body cement sand and gravel material not only can reach optimization work so as to reduce cement sand and gravel section
The purpose of journey investment, and the demand to sand gravel material reserves at dam site can be reduced, improve the adaptability of cemented gravel dam.
Detailed description of the invention
The main view that Fig. 1 is the structural diagram of the present invention;
Fig. 2 is the perspective view of structural schematic diagram of the invention
Description of symbols: the 1- dam foundation, 2- buttress, 3- antiseepage watertight layer, 4- cement sand and gravel.
Specific embodiment
To make the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawings and examples to this hair
It is bright to be described in further detail.
The embodiment of the present invention: the structural schematic diagram of cement sand and gravel buttress dam is as shown in Figures 1 and 2, including the dam foundation 1 with
And the dam body on the dam foundation 1 is set, the dam body include antiseepage watertight layer 3 and be arranged after antiseepage watertight layer 3 and with
The vertically arranged one group of buttress 2 of dam body axis, the buttress 2 is trapezoidal plate structure, and armored concrete is used to pour,
Cement sand and gravel 4 is filled between buttress 2.The antiseepage watertight layer 3 is by the dam foundation to dam crest gradually thinning trapezium structure;
The antiseepage watertight layer 3 is poured using armored concrete, and the gradient is between gravity dam and cemented gravel dam.
The present invention shares upstream water pressure using multistage buttress 2, reduces the stress of dam body cement sand and gravel 4, so as to
The section for reducing cement sand and gravel 4, not only can reach the purpose of optimization construction investment, but also can reduce to the gravel that is gelled at dam site
The demand of 4 reserves of stone, improves the adaptability of cemented gravel dam.
Claims (4)
1. a kind of cement sand and gravel buttress dam, including the dam foundation (1) and the dam body being arranged on the dam foundation (1), it is characterised in that: institute
The dam body stated include antiseepage watertight layer (3) and setting after the antiseepage watertight layer (3) and with dam body axis vertically arranged one
Group buttress (2) is filled with cement sand and gravel (4) between buttress (2).
2. cement sand and gravel buttress dam according to claim 1, it is characterised in that: the antiseepage watertight layer (3) is by dam
Base is to dam crest gradually thinning trapezium structure.
3. cement sand and gravel buttress dam according to claim 2, it is characterised in that: the antiseepage watertight layer (3) uses steel
Reinforced concrete pours, and the gradient is between gravity dam and cemented gravel dam.
4. cement sand and gravel buttress dam according to claim 1, it is characterised in that: the buttress (2) is trapezoidal plate knot
Structure, and poured using armored concrete.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910514303.8A CN110158547A (en) | 2019-06-14 | 2019-06-14 | A kind of cement sand and gravel buttress dam |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910514303.8A CN110158547A (en) | 2019-06-14 | 2019-06-14 | A kind of cement sand and gravel buttress dam |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110158547A true CN110158547A (en) | 2019-08-23 |
Family
ID=67628983
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910514303.8A Pending CN110158547A (en) | 2019-06-14 | 2019-06-14 | A kind of cement sand and gravel buttress dam |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110158547A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113774990A (en) * | 2021-08-25 | 2021-12-10 | 中国电建集团华东勘测设计研究院有限公司 | Bank side semi-buried thin-wall cylindrical water taking pump station structure |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002180441A (en) * | 2000-12-14 | 2002-06-26 | Kyosei Kiko Kk | Hybrid buttress type open dam |
CN103074899A (en) * | 2013-01-18 | 2013-05-01 | 周文松 | Subdepot pier-type foundation pit support structure and construction method |
CN103088791A (en) * | 2013-02-27 | 2013-05-08 | 中国科学院水利部成都山地灾害与环境研究所 | Energy dissipation type debris flow check dam combined draining and guiding and blocking |
CN206495188U (en) * | 2017-01-25 | 2017-09-15 | 中国电建集团西北勘测设计研究院有限公司 | A kind of buttress type duplex rock |
CN206591493U (en) * | 2017-01-24 | 2017-10-27 | 长江勘测规划设计研究有限责任公司上海分公司 | Curved panel buttress landscape dam |
CN208121706U (en) * | 2018-04-19 | 2018-11-20 | 环境保护部华南环境科学研究所 | A kind of basin unexpected environmental accident emergency bolt-type increases concrete dykes and dams |
CN208251026U (en) * | 2018-05-25 | 2018-12-18 | 中国电建集团成都勘测设计研究院有限公司 | For intercepting the comb teeth-shaped to remain in a standstill gear row's structure |
CN109537531A (en) * | 2019-01-24 | 2019-03-29 | 河海大学 | A kind of dam facing geomembrane anti-seepage rock-fill dams, construction method and defect positioning method |
CN210262945U (en) * | 2019-06-14 | 2020-04-07 | 贵州省水利水电勘测设计研究院 | Cemented sand gravel buttress dam structure |
-
2019
- 2019-06-14 CN CN201910514303.8A patent/CN110158547A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002180441A (en) * | 2000-12-14 | 2002-06-26 | Kyosei Kiko Kk | Hybrid buttress type open dam |
CN103074899A (en) * | 2013-01-18 | 2013-05-01 | 周文松 | Subdepot pier-type foundation pit support structure and construction method |
CN103088791A (en) * | 2013-02-27 | 2013-05-08 | 中国科学院水利部成都山地灾害与环境研究所 | Energy dissipation type debris flow check dam combined draining and guiding and blocking |
CN206591493U (en) * | 2017-01-24 | 2017-10-27 | 长江勘测规划设计研究有限责任公司上海分公司 | Curved panel buttress landscape dam |
CN206495188U (en) * | 2017-01-25 | 2017-09-15 | 中国电建集团西北勘测设计研究院有限公司 | A kind of buttress type duplex rock |
CN208121706U (en) * | 2018-04-19 | 2018-11-20 | 环境保护部华南环境科学研究所 | A kind of basin unexpected environmental accident emergency bolt-type increases concrete dykes and dams |
CN208251026U (en) * | 2018-05-25 | 2018-12-18 | 中国电建集团成都勘测设计研究院有限公司 | For intercepting the comb teeth-shaped to remain in a standstill gear row's structure |
CN109537531A (en) * | 2019-01-24 | 2019-03-29 | 河海大学 | A kind of dam facing geomembrane anti-seepage rock-fill dams, construction method and defect positioning method |
CN210262945U (en) * | 2019-06-14 | 2020-04-07 | 贵州省水利水电勘测设计研究院 | Cemented sand gravel buttress dam structure |
Non-Patent Citations (1)
Title |
---|
中国水力发电工程学会主编,: "《中国水力发电年鉴》", 中国电力出版社, pages: 469 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113774990A (en) * | 2021-08-25 | 2021-12-10 | 中国电建集团华东勘测设计研究院有限公司 | Bank side semi-buried thin-wall cylindrical water taking pump station structure |
CN113774990B (en) * | 2021-08-25 | 2022-09-30 | 中国电建集团华东勘测设计研究院有限公司 | Bank side semi-buried thin-wall cylindrical water taking pump station structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103643656B (en) | High rock-fill dam membrane anti-seepage body on deep coverage layer and construction method of high rock-fill dam membrane anti-seepage body | |
CN100439600C (en) | Treatment method of newly built high way railway engineering soft foundation | |
CN101672026A (en) | Face plate rock-fill dam structure of reasonably utilizing sand gravel material and construction method thereof | |
CN107805987A (en) | The hassock layer Foam lightweight soil road structure and construction method in deep soft foundation section | |
CN202989867U (en) | Junked tire protective surface combined steel-structure check dam | |
CN208472893U (en) | Plain stage of slope double-layer drainage ditch structure | |
CN111676987A (en) | Construction method for backfilling construction of construction fertilizer tank by vibrating, slurry-flushing and ramming method | |
CN205576857U (en) | Be suitable for hydraulic and hydroelectric engineering's super high enrockment dam structure | |
CN106087880B (en) | A kind of dam that 300 meter level is high and its construction technology | |
CN110499743A (en) | A kind of overlay film cemented gravel dam and its method of construction | |
CN110158547A (en) | A kind of cement sand and gravel buttress dam | |
CN202090324U (en) | Novel overflow cofferdam | |
CN107486940A (en) | A kind of water channel is passed by one's way the production method of prefabricated component | |
CN107034848A (en) | A kind of water storage concrete dam construction stitches the construction method of flexible leak stoppage | |
CN207452609U (en) | A kind of hassock layer Foam lightweight soil road structure in deep soft foundation section | |
CN206829167U (en) | A kind of cast-in-place box beam bracket raft foundation with discharge orifice | |
CN210262945U (en) | Cemented sand gravel buttress dam structure | |
CN212000674U (en) | Novel reverse construction method assembly type non-pressure culvert | |
CN108643132B (en) | Rolled concrete structure with composite slurry injected into stone slag material and construction method thereof | |
CN107299620A (en) | Sluice main structure construction scheme | |
CN106592648B (en) | A kind of ground crack resistence processing method | |
CN208857762U (en) | Semi-circular caisson and pile foundation combined type breakwater | |
CN102168421B (en) | Novel bottom expanding device and method for bored concrete pile with sharp teeth | |
CN205348098U (en) | A retaining wall structure for river course | |
CN205348103U (en) | Gabion and river course revetment structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |