CN103643656B - High rock-fill dam membrane anti-seepage body on deep coverage layer and construction method of high rock-fill dam membrane anti-seepage body - Google Patents

High rock-fill dam membrane anti-seepage body on deep coverage layer and construction method of high rock-fill dam membrane anti-seepage body Download PDF

Info

Publication number
CN103643656B
CN103643656B CN201310592978.7A CN201310592978A CN103643656B CN 103643656 B CN103643656 B CN 103643656B CN 201310592978 A CN201310592978 A CN 201310592978A CN 103643656 B CN103643656 B CN 103643656B
Authority
CN
China
Prior art keywords
layer
dam
seepage
geomembrane
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310592978.7A
Other languages
Chinese (zh)
Other versions
CN103643656A (en
Inventor
吴海民
束一鸣
张宪雷
满晓磊
刘欣欣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hohai University HHU
Original Assignee
Hohai University HHU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hohai University HHU filed Critical Hohai University HHU
Priority to CN201310592978.7A priority Critical patent/CN103643656B/en
Publication of CN103643656A publication Critical patent/CN103643656A/en
Application granted granted Critical
Publication of CN103643656B publication Critical patent/CN103643656B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The invention discloses a high rock-fill dam membrane anti-seepage body on a deep coverage layer and a construction method of the high rock-fill dam membrane anti-seepage body. The membrane anti-seepage body is composed of a concrete protection layer, a geomembrane anti-seepage layer, a flexibility cushion layer and a transition layer. The concrete protection layer is a cast-in-place fiber concrete layer for a reserved cross joint and a vertical joint and located on a surface layer to protect a geomembrane. The geomembrane anti-seepage layer is a two-cloth and one-membrane composite geomembrane and is located in the middle to play a role of preventing seepage. The flexibility cushion layer is a polyurethane pervious concrete layer and located at the bottom of the anti-seepage body to support the geomembrane and to transmit and disperse water loads. The rough granule transition layer is arranged between the flexibility cushion layer and a rock-fill dam body. The construction method comprises the technical steps of filling and building the transition layer, pouring the flexibility cushion layer, paving the composite geomembrane, pouring the concrete protection layer and the like. The membrane anti-seepage body can keep stable on a high rock-fill dam slope, the ability of adapting to deformation of a coverage layer dam foundation and the dam body is high, the structural form is simple, construction is fast, and the anti-seepage problem of the high rock-fill dam on the deep coverage layer can be effectively solved.

Description

High loose rock dam facial mask impervious body and construction method thereof on a kind of deeply covered layer
Technical field
The present invention relates to Hydraulic and Hydro-Power Engineering technical field, relate to a kind of loose rock dam impervious body and construction method thereof, particularly relate to high loose rock dam facial mask impervious body and construction method thereof on a kind of deeply covered layer.
Background technology
Southwestern China area hydraulic power potentials enriches, but along with the deep enforcement of strategy to develop western regions and the quick propelling of water conservancy and hydropower exploitation, the good excellent dam site of geological conditions is fewer and feweri, and the dam site area relating to riverbed deep covering layer is more and more.Loose rock dam can make full use of local natural materials owing to having, and dam site condition is adaptable, dam foundation covering layer open excavation amount is little, the advantage such as convenient of constructing and become the optimum dam type that can be built on the deep covering layer dam foundation.For building high loose rock dam on deep covering layer, because dam foundation distortion is comparatively large, impervious body structure the most key in dam body is very easily destroyed, thus threatens the safety of whole dam.So reasonably loose rock dam impervious body material and structural shape become the key realizing deeply covered layer being built high loose rock dam.
Tradition loose rock dam are divided into core wall rockfill dam and rock by impervious body pattern.Seepage prevention of core wall body mainly contains earth core and asphaltic concrete core wall.For earth core impervious body, owing to substantially can use without clay near the dam site of River Valley Region, Southwest Mountainous Areas, and the cost transporting outward clay is too high; Fetch earth in a large number simultaneously and also can occupy cultivated land and destroy ecological environment; And southwest is longer for general rainy season, large on the impact of earth core filling construction, thus cause long in time limit, construction costs increases; In addition, easily there is arching because relative enrockment dam shell modulus is less in earth core, causes core-wall that hydraulic fracture easily occurs after retaining and destroy.For pitch seepage prevention of core wall body, hydraulic fracture can be produced equally because of arching and destroy problem, and bituminous concrete all cannot be constructed in rainy season and winter low temperature period, also can larger prolongation construction period and increase construction costs.Relative to core wall rockfill dam, it is simple that rock has structural shape, and upstream and downstream dam slope is steeper, and dam body section is little, and the side of filling amount is little, and the construction period is short in the advantage such as cost is low.But rock is generally build on basement rock or more shallow covering layer, and on deep covering layer the dam foundation and dam body settlement and relative settlement larger, the steel concrete panel of rigidity easily occurs coming to nothing and problems of crack owing to adapting to moderate finite deformation, in addition, face dam is owing to adapting to dam deformation, and its anti-seismic performance is also poor.
Flexible geo-membrane impervious body loose rock dam antiseepage problem on reply deeply covered layer of rising in recent years has unique advantage.Relative to traditional loose rock dam impervious body pattern, enrockment dam facing geomembrane anti-seepage body have barrier performance good, adapt to the advantages such as the dam foundation and dam deformation ability are strong, the convenient and cost of constructing is low.
Before making the present invention, the case of existing application of civil engineering loose rock dam antiseepage on deeply covered layer, such as, benevolence ancestor sea loose rock dam have employed geomembrane anti-seepage, this dam dam foundation covering layer reaches 148m the most deeply, but dam body is the highest only has 56m, belongs to middle weir, upstream and downstream dam slope is also more slow, and slope ratio is respectively 1:1.8 and 1:2.0.The geomembrane anti-seepage body that this dam uses forms primarily of the precast concrete buckle topping that non-fine concrete bed course, composite geo-membrane and 12cm that bottom 6cm is thick are thick.There is following two problems in the geomembrane anti-seepage body adopted in this dam: one be non-fine concrete bed course is fragile material on deeply covered layer during high loose rock dam, modulus is higher, and anti-bending strength is poor, if the dam foundation and dam body produce larger differential settlement, dam facing will produce comparatively Large deflection, the non-fine concrete bed course of fragility cannot adapt to dam facing deflection deformation and produce even changing of the relative positions destruction of ftractureing, and then jeopardize the safety of geomembrane under effect of water pressure; Two be this impervious body topping adopt be precast concrete buckle, can use in the comparatively slow situation of dam slope, but as dam slope comparatively steep (slope ratio >=1:1.5), interface shearing strength between topping and composite geo-membrane cannot meet stability against sliding requirement, especially produce comparatively after Large deflection at dam facing, more easily will there is unstable failure in concrete buckle, and then threaten the safety of geomembrane; And if the design of loose rock dam dam slope is more slow, for high dam, dam body section will increase, dam embankment side's amount increases, thus causes the economy advantage of loose rock dam to give full play to.So this traditional dam facing geomembrane anti-seepage body cannot be applied on the steeper high loose rock dam of dam slope on the deeply covered layer dam foundation.
Summary of the invention
The object of the invention is to overcome the deficiency that above-mentioned existing loose rock dam impervious body effectively can not solve high enrockment antiseepage problem on deeply covered layer, high loose rock dam facial mask impervious body and construction method thereof on a kind of deeply covered layer are proposed, this impervious body can adapt to moderate finite deformation that the steeper high enrockment dam body of dam slope on deeply covered layer produces and differential deformation, and structural shape is simple, constructs convenient.
Another object of the present invention is to the construction method providing described facial mask impervious body to apply in Practical Project.
The present invention realizes by the following technical solutions:
High loose rock dam facial mask impervious body on a kind of deeply covered layer, its technical characteristics is: facial mask impervious body is made up of concrete cover, geomembrane anti-seepage layer, flexible cushion and transition zone.Concrete cover is the cast-in-place fibrous concrete layer of reserved transverse joint and perps, is positioned at top layer to protect geomembrane; Geomembrane anti-seepage layer is two cloth one film composite geo-membranes, is positioned at centre and plays antiseepage effect; Flexible cushion is polyurethane pervious concrete layer, is positioned at impervious body bottom support geomembrane and transmits disperse water load; Coarse Aggregate transition zone is set between flexible cushion and enrockment dam body.
Described cast-in-place fibrous concrete layer adopts polypropylene fibre and cement concrete mix and blend after-pouring to form, by the fiber and steel bar reinforced flexural strength and the toughness that improve portland cement concrete.
Described polypropylene fiber concrete layer, its coarse aggregate preferable particle size is 5 ~ 20mm, and preferred thickness is 25 ~ 35cm, and topping reserves perps and transverse joint, clogs pitch batten and close in seam, and preset slot parting preferred distance is 10 ~ 15m, and stitching wide is 1 ~ 2cm.
Described polyurethane pervious concrete flexible cushion, adopts BASF polyurethane adhesive forms than mixing after-pouring according to certain mass gelatine with rubble, and colloid is wrapped in rubble surface uniformly, utilizes the adhesion stress of colloid self by the cellular resilient unitary of bonding for loose rubble one-tenth.Flexible cushion good water permeability, resistance to compression flexural strength is high, and modulus of elasticity is low, has higher toughness, can adapt to the distortion of the dam foundation and dam body, and the Discontinuous Deformations such as the cracking changing of the relative positions can not occur under larger flexure situation occurs dam facing.
Described polyurethane pervious concrete bed course, its preferred thickness is 6 ~ 10cm, and polyurethane adhesive and crushed stone aggregate quality proportioning are 1.4:100 ~ 1.6:100, and aggregate is the rubble of 6 ~ 20mm continuous grading.
Described composite geo-membrane, adopts the sandwiched type structure of two cloth one films, and centre is the PVC light film that 0.5 ~ 1.5mm is thick, and both sides are 500 ~ 1200g/m 2acupuncture long filament geotextile, trilaminate material in factory by hot compound or film process combining integrally impervious barrier.
Described transition zone is arranged between dam body enrockment and flexible cushion, and preferred thickness is 2 ~ 3m, and particle diameter will match with the flexible cushion aggregate size size on the dam body enrockment of bottom and top, meet permeable and anti-filter requirement.
The invention still further relates to the construction method of high loose rock dam facial mask impervious body on described deeply covered layer, comprise the following steps:
(1) enrockment dam body and transition zone is filled;
(2) enrockment dam body and transition zone fill to crest elevation, revise domatic the peeling of transition zone and roll process, make transition zone surface reach design line of slope position;
(3), after completing transition zone slope surface treatment, polyurethane pervious concrete flexible cushion is built from toe to dam crest along domatic, maintenance 2 ~ 3 days;
(4), after bed course maintenance terminates, from dam crest to toe along the domatic laying composite geo-membrane of bed course, and seam welds and welding quality inspection is carried out;
(5) after composite geo-membrane is laid; polypropylene fiber concrete topping is built from toe to dam crest on composite earth geomembrane surface; and reserve perps and transverse joint by design attitude; after concrete cover maintenance to design strength, in reserved perps and transverse joint, clog pitch batten close.
Advantage of the present invention and effect are that bed course have employed toughness good polyurethane pervious concrete layer, topping have employed anti-bending strength and toughness better and the polypropylene fiber concrete layer of reserved perps and transverse joint, the two composite anti-penetrating body formed together with the geomembrane of flexibility has stronger distortion adaptive capacity, when the dam facing deflection deformation that the deeply covered layer dam foundation and dam body cause because of larger sedimentation, crack and the changing of the relative positions can not be there is in bed course, and topping is by reserved perps, Heng Feng and the toughness of self can absorb distortion and obvious crack not occur, so, topping and bed course all can occur compared with playing the effect protecting geomembrane during Large deflection at dam facing.
Polyurethane pervious concrete bed course of the present invention is cast in transition zone surface in cast-in-place mode, can bond together before final set with the rubble on transition zone top layer, thus maintains the stability of bed course self;
Polyurethane cushion surface of the present invention is cellular rough, and the interface between the long filament acupuncture geotextile of the composite geo-membrane layer on upper strata has higher friction factor, enables composite geotechnical impervious membrane maintain self stability;
Fibrous concrete topping of the present invention is cast-in-place at composite geo-membrane top layer long filament acupuncture geotextile on the surface, before concrete setting, cement paste can penetrate in the middle of the fluffy long filament geotextile of composite film surface, good bonding plane will be formed with composite membrane after solidifying, can not owing to there is sliding deformation and unstable failure between topping and composite geo-membrane in dam deformation process;
Structural shape of the present invention is simpler, construct convenient, especially polyurethane pervious concrete bed course only needs static(al) to roll, and curing time only have within 1 ~ 2 day, just can reach more than 80% of final strength, relatively traditional cement non-fine concrete bed course, does not need to vibrate, construction sequence is simpler, curing time, foreshortened to 1 ~ 2 day from 28 days, greatly can shorten the construction period of whole engineering, thus reduced construction costs.
Material of the present invention is all the material of extensive use in Hydraulic and Hydro-Power Engineering, and construction sequence is comparatively simple, adopt technique to be existing mature technology, and the duration can shorten greatly, and cost is low, is a kind of loose rock dam impervious body of very economical practicality.
Below in conjunction with accompanying drawing, the specific embodiment of the present invention is described in detail.Protection scope of the present invention is not limited with detailed description of the invention, but is limited by claim.
Accompanying drawing explanation
Fig. 1 facial mask impervious body of the present invention structural representation;
Fig. 2 facial mask impervious body of the present invention topping perps and transverse joint arrange schematic diagram;
A position partial enlarged drawing in Fig. 3 Fig. 1.
In figure: 1, concrete cover, 2, geomembrane anti-seepage layer, 3, flexible cushion, 4, transition zone, 5, transverse joint, 6, perps, 7, pitch batten, 8, PVC light film, 9, acupuncture long filament geotextile.
Detailed description of the invention
As shown in FIG. 1 to 3, on a kind of deeply covered layer, high loose rock dam facial mask impervious body, is made up of concrete cover 1, geomembrane anti-seepage layer 2, flexible cushion 3 and transition zone 4.Topping 1 is the cast-in-place fibrous concrete layer of reserved transverse joint 5 and perps 6, and thickness is 25 ~ 35cm, and perps and transverse joint divide kerf spacing to be 10 ~ 15m, and stitching wide is 1 ~ 2cm, filling pitch batten 7 in seam; Geomembrane anti-seepage layer 2 is employing two cloth one membrane type composite geo-membrane, and centre is the PVC light film 8 that 0.5 ~ 1.5mm is thick, and both sides are 500 ~ 1200g/m 2acupuncture long filament geotextile 9; The flexible cushion 3 of bottom is for adopting BASF polyurethane adhesive and rubble mixing after-pouring, thickness is 6 ~ 10cm; Between flexible cushion 3 and enrockment dam body, arrange Coarse Aggregate transition zone 4, thickness is 2 ~ 3m.
The construction method of high loose rock dam facial mask impervious body on described deeply covered layer, comprises the following steps:
(1) fill enrockment dam body and transition zone 4, in reduced graph, enrockment dam body does not mark, transition zone 4 and dam body enrockment put down and have been constructed, employing stage filling, full-section Construction, the dam filling construction of use and rolling compaction machine identical with conventional panels loose rock dam;
(2) enrockment dam body and transition zone 4 fill to crest elevation, revise domatic the peeling of transition zone 4 and roll process, make transition zone 4 surface reach design line of slope position;
(3), after completing transition zone 4 slope surface treatment, line of slope is designed from toe to dam crest along domatic polyurethane pervious concrete of building to flexible cushion 3, after using hoist engine to coordinate drum roller to carry out static(al) roller-compaction, maintenance 1 ~ 2 day;
(4), after flexible cushion 3 maintenance terminates, form geomembrane anti-seepage layer 2 from dam crest to toe along the domatic laying composite geo-membrane of bed course, and carry out seam welds and welding quality inspection;
(5) after geomembrane anti-seepage layer 2 is laid; polypropylene fiber concrete topping 1 is built from toe to dam crest on geomembrane anti-seepage layer 2 surface; and reserve transverse joint 5 and perps 6 by design attitude; after concrete cover 1 maintenance to design strength, in reserved transverse joint 5 and perps 6, clog pitch batten 7 close.

Claims (4)

1. high loose rock dam facial mask impervious body on a deeply covered layer, it is characterized in that: facial mask impervious body is made up of concrete cover, geomembrane anti-seepage layer, flexible cushion and transition zone, concrete cover is the cast-in-place fibrous concrete layer of reserved transverse joint and perps, is positioned at top layer to protect geomembrane; Geomembrane anti-seepage layer is two cloth one film composite geo-membranes, is positioned at centre and plays antiseepage effect; Flexible cushion is polyurethane pervious concrete layer, is positioned at impervious body bottom support geomembrane and transmits disperse water load; Coarse Aggregate transition zone is set between flexible cushion and enrockment dam body;
Described cast-in-place fibrous concrete layer adopts polypropylene fibre and cement concrete mix and blend after-pouring to form, and polypropylene fiber concrete topping preferred thickness is 25 ~ 35cm, and coarse aggregate preferable particle size is 5 ~ 20mm;
Described flexible cushion adopts polyurethane pervious concrete to build and forms, and its preferred thickness is 6 ~ 10cm, adopts BASF polyurethane adhesive forms with rubble mixing after-pouring, and its polyurethane adhesive and crushed stone aggregate quality proportioning are 1.4:100 ~ 1.6:100, and aggregate size is the rubble of 6 ~ 20mm continuous grading.
2. high loose rock dam facial mask impervious body on deeply covered layer according to claim 1, is characterized in that: described topping perps and transverse joint preferably divide kerf spacing to be 10 ~ 15m, and stitching wide is 1 ~ 2cm.
3. high loose rock dam facial mask impervious body on deeply covered layer according to claim 1, is characterized in that: described geomembrane anti-seepage layer is employing two cloth one membrane type composite geo-membrane, and centre is the PVC light film that 0.5 ~ 1.5mm is thick, and both sides are 500 ~ 1200g/m 2acupuncture long filament geotextile.
4. the construction method of high loose rock dam facial mask impervious body on deeply covered layer according to claim 1, comprises the following steps:
(1) enrockment dam body and transition zone is filled;
(2) enrockment dam body and transition zone fill to crest elevation, revise domatic the peeling of transition zone and roll process, make transition zone surface reach design line of slope position;
(3), after completing transition zone slope surface treatment, polyurethane pervious concrete flexible cushion is built from toe to dam crest along domatic, maintenance 2 ~ 3 days;
(4), after flexible cushion maintenance terminates, form geomembrane anti-seepage layer from dam crest to toe along the domatic laying composite geo-membrane of bed course, and carry out seam welds and welding quality inspection;
(5) after geomembrane anti-seepage layer is laid; polypropylene fiber concrete topping is built from toe to dam crest on geomembrane anti-seepage layer surface; and reserve perps and transverse joint by design attitude; after concrete cover maintenance to design strength, in reserved perps and transverse joint, clog pitch batten close.
CN201310592978.7A 2013-11-22 2013-11-22 High rock-fill dam membrane anti-seepage body on deep coverage layer and construction method of high rock-fill dam membrane anti-seepage body Expired - Fee Related CN103643656B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310592978.7A CN103643656B (en) 2013-11-22 2013-11-22 High rock-fill dam membrane anti-seepage body on deep coverage layer and construction method of high rock-fill dam membrane anti-seepage body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310592978.7A CN103643656B (en) 2013-11-22 2013-11-22 High rock-fill dam membrane anti-seepage body on deep coverage layer and construction method of high rock-fill dam membrane anti-seepage body

Publications (2)

Publication Number Publication Date
CN103643656A CN103643656A (en) 2014-03-19
CN103643656B true CN103643656B (en) 2015-06-10

Family

ID=50248934

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310592978.7A Expired - Fee Related CN103643656B (en) 2013-11-22 2013-11-22 High rock-fill dam membrane anti-seepage body on deep coverage layer and construction method of high rock-fill dam membrane anti-seepage body

Country Status (1)

Country Link
CN (1) CN103643656B (en)

Families Citing this family (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104047269B (en) * 2014-07-07 2016-03-23 中国电建集团成都勘测设计研究院有限公司 For the checkdam structure in hydroelectric project coombe or river course
CN104131536B (en) * 2014-07-11 2016-05-18 中国电建集团贵阳勘测设计研究院有限公司 Rock-fill dam concrete panel horizontal structure seam setting method and structure
CN104389294B (en) * 2014-11-26 2016-06-22 禹顺生态建设有限公司 A kind of deep covering layer top panel rock-fill dams and construction method thereof
CN104674763A (en) * 2015-01-06 2015-06-03 中国电建集团华东勘测设计研究院有限公司 Method for repairing wide and large cracks of hydraulic engineering bituminous concrete impervious face slab
CN105155470A (en) * 2015-06-23 2015-12-16 武汉大学 Self-healing anti-seepage structure for concrete faced rockfill dam
CN106368173B (en) * 2016-10-25 2018-07-06 河海大学 A kind of method for calculating arch dam fracture width and determining impervious material thickness
CN106759114A (en) * 2016-12-17 2017-05-31 中国电建集团贵阳勘测设计研究院有限公司 Structure for preventing cushion material from being damaged by water reverse pressure and construction process thereof
CN107503322A (en) * 2017-07-19 2017-12-22 江西省水利科学研究院 A kind of preparation method for the earth and rockfill dam downstream patch slope concrete slab for filtering native draining
CN107345406B (en) * 2017-08-14 2019-12-13 洛阳双瑞特种装备有限公司 waterproof sealing method for deformation joint of pipe gallery
CN108049370B (en) * 2017-10-26 2023-12-08 中国水利水电科学研究院 Seepage-proofing drainage system of gel sand gravel dam
CN108314384B (en) * 2018-03-28 2020-11-17 海南微氪新材料科技有限公司 Water permeable corrosion resistant concrete
CN108218354B (en) * 2018-03-28 2020-11-06 宜昌安顺达商品砼有限公司 Water-permeable corrosion-resistant concrete and processing method thereof
CN110004886A (en) * 2019-05-15 2019-07-12 中国电建集团中南勘测设计研究院有限公司 Asphaltic concrete core wall basement construction method and its structure
CN110042800A (en) * 2019-05-24 2019-07-23 中水北方勘测设计研究有限责任公司 Concrete face rockfill dam leakage preventing structure
CN110396992B (en) * 2019-07-23 2024-03-19 中国电建集团贵阳勘测设计研究院有限公司 Concrete face rockfill dam face anti-cracking construction process
CN110409242A (en) * 2019-08-22 2019-11-05 中交路桥北方工程有限公司 A kind of antifreeze water barrier and roadbed
CN110424338A (en) * 2019-08-27 2019-11-08 中水北方勘测设计研究有限责任公司 The section partitioned organization of concrete face rockfill dam
CN111305157A (en) * 2019-12-25 2020-06-19 中国电建集团中南勘测设计研究院有限公司 Mixed dam type structure
CN111549725A (en) * 2020-05-29 2020-08-18 大连理工大学 Waterproof horizontal water leakage structure for roller compacted concrete dam intermittent layer in severe cold area
CN111576349A (en) * 2020-06-24 2020-08-25 中水北方勘测设计研究有限责任公司 Simplified construction partitioned rock-fill dam
CN113123300B (en) * 2021-04-27 2022-12-06 章丘市黄河水利水电工程有限公司 Construction method of concrete pond dam
CN113981760A (en) * 2021-11-05 2022-01-28 河北建筑工程学院 Anti-seismic roadbed and construction method thereof
CN114293512B (en) * 2021-11-25 2024-03-12 银川中铁水务集团有限公司 Composite geomembrane impermeable layer structure on dam slope and construction method
CN114427214B (en) * 2022-03-07 2023-12-29 中冶长天国际工程有限责任公司 Dam foundation reservoir bottom seepage-proofing paving structure and construction method thereof
CN114687323B (en) * 2022-05-18 2023-03-28 甘肃第六建设集团股份有限公司 Seepage-proof construction method for semi-reservoir seepage-proof high-fill silty loam homogeneous dam

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62185911A (en) * 1986-02-10 1987-08-14 Shimizu Constr Co Ltd Fill-dam using geotextile
CN101831889B (en) * 2010-05-05 2011-10-05 河海大学 Anti-seismic combination slab for earth and rockfill dam and construction method thereof
RU2474645C1 (en) * 2011-11-09 2013-02-10 Василий Петрович Ягин Rock and earth dam
CN202781976U (en) * 2012-08-15 2013-03-13 仪征市恒盈土工材料有限公司 Novel composite geomembrane
CN102852121B (en) * 2012-09-24 2015-01-07 长江勘测规划设计研究有限责任公司 Artificial composite foundation for building clay core rock-fill dam on deep overburden and construction method for artificial composite foundation
CN203129095U (en) * 2013-03-15 2013-08-14 大连理工大学 Composite impervious face slab structure for rock-fill dam

Also Published As

Publication number Publication date
CN103643656A (en) 2014-03-19

Similar Documents

Publication Publication Date Title
CN103643656B (en) High rock-fill dam membrane anti-seepage body on deep coverage layer and construction method of high rock-fill dam membrane anti-seepage body
CN109629585B (en) Novel cofferdam structure under weak covering layer and construction method
CN102660936A (en) Method for realizing seepage prevention of bridge wall by means of polyvinyl chloride film
CN201087334Y (en) Reservoir bottom and dam body integrated anti-seepage structure
CN109024458A (en) A kind of coal mine subsidence land landscape revetment and the construction method of water-bed antiseepage
CN106759223A (en) Controllable rigid pile+displacement hull+reinforcement cushion combined composite foundation
CN108193648A (en) Plasticity panel homogeneous dam
CN106087880B (en) A kind of dam that 300 meter level is high and its construction technology
CN205134303U (en) Compound reinforced structure of soft base of ecological bamboo raft among road engineering of field
CN107761668B (en) Coastal shore reservoir land-building type revetment structure and construction method thereof
CN106149640B (en) A method of it improving rock and permeates safety
CN205934862U (en) Local high -modulus enrockment concrete -faced rockfill dam structure
CN210262923U (en) Slope protection structure
CN208594460U (en) A kind of permeable pavement pavement structure applied to sponge urban construction
CN110424338A (en) The section partitioned organization of concrete face rockfill dam
CN207452609U (en) A kind of hassock layer Foam lightweight soil road structure in deep soft foundation section
JP2020070608A (en) Composite sheet and bag made of the composite sheet
CN210031693U (en) Trinity original ecology prevention of seepage system
CN212103518U (en) Railway embankment structure for plateau wet area
CN210636386U (en) Reservoir seepage prevention structure for dam face of rock-fill dam and backfill reservoir bottom of soil and stone materials
CN212248171U (en) Offshore artificial island structure suitable for silt foundation
CN107881986B (en) Solidified-formed plane interlocking three-dimensional buckling engineering building block and production method thereof
CN206916688U (en) A kind of new rammed earth retaining wall
CN207567719U (en) The dykes and dams that a kind of gangue dead meal fills
CN206015617U (en) A kind of double-drainage body rock

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150610

Termination date: 20171122