CN206495188U - A kind of buttress type duplex rock - Google Patents

A kind of buttress type duplex rock Download PDF

Info

Publication number
CN206495188U
CN206495188U CN201720096529.7U CN201720096529U CN206495188U CN 206495188 U CN206495188 U CN 206495188U CN 201720096529 U CN201720096529 U CN 201720096529U CN 206495188 U CN206495188 U CN 206495188U
Authority
CN
China
Prior art keywords
downstream
rock
concrete
buttress
upstream
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720096529.7U
Other languages
Chinese (zh)
Inventor
陆希
姚栓喜
周恒�
徐宏璐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Northwest Engineering Corp Ltd
Original Assignee
PowerChina Northwest Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Northwest Engineering Corp Ltd filed Critical PowerChina Northwest Engineering Corp Ltd
Priority to CN201720096529.7U priority Critical patent/CN206495188U/en
Application granted granted Critical
Publication of CN206495188U publication Critical patent/CN206495188U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model is related to hydro science dam field of engineering technology, more particularly to a kind of buttress type duplex rock.It includes the concrete slab set gradually by upstream to downstream, bedding material, upper Transition Materials, upstream rockfill area, downstream rockfill area;In the concrete slab bottom, concrete buttress structure is set;The upstream side of the concrete buttress structure sets Gai Chong areas, and downstream sets lower Transition Materials;The downstream of the lower Transition Materials is the bottom of upstream rockfill area.The utility model is on the basis of conventional concrete panel, solidifying native buttress structure is additionally arranged, instead of profundal zone panel, reduces panel length, and part stockpile is instead of, so as to improve the maintenanceability of profundal zone panel, improve superelevation rock stress and deformations of concrete face slab and dam deformation.

Description

A kind of buttress type duplex rock
Technical field
The utility model is related to hydro science dam construction technique field, more particularly to a kind of buttress type duplex panel heap Masonry dam.
Background technology
Face dam dam type because with to Dam Site topographic and geologic condition strong adaptability, good economy performance, it is safe and reliable the characteristics of, It is rapidly developed in China, but the high face dam in part built in recent years occurs in that dam deformation is bigger than predicted value, panel The problems such as there is extruding destruction, crack, big embankment seepage amount.These problems are attributed to three aspects:One is that dam deformation is big;Two are The seepage control system such as panel destructible, destruction cause embankment seepage amount big, it is understood that there may be the potential safety hazard of seepage stability;Three be to tie up Repairing property is poor, and lower panels maintenance is difficult, runs into extreme operating condition problem and more protrudes.Thus at present to 250m grades or higher of panel The security presence on dam is queried.
As China's economic development and the public, government significantly improve to safety requirements, to large and medium water power station engineering Water retaining structure proposes the requirement that the extreme operating conditions such as macroseism are not fallen, design conditions can be used normally after repairing.The built 70m of China The high face dam of the above does not overhaul the condition of base impervious system all.The presence of these problems, constrains the country to building 250 The decision-making of ~ 300m ultra-high concrete panel rock-fill dams.
During usual high face dam or superelevation face dam design, mostly from dam zoning, fill standard, joint seal, construction Studied in terms of step, propose reduction dam deformation, improve panel stress and the related measure of control joint displacement.But these Measure all can not more effectively solve the technical problem present in superelevation rock at present.
Utility model content
In order to overcome in the prior art high face dam panel it is long, deform it is larger;Maintenanceability is poor, and lower panels maintenance is tired Difficult defect, the purpose of this utility model is to propose a kind of buttress type duplex rock, by face dam bottom Portion sets concrete buttress structure, improves the maintenanceability of profundal zone panel so as to reach, improves superelevation rock panel Stress deformation and the purpose of dam deformation.
To realize above-mentioned technical purpose, the utility model, which is adopted the following technical scheme that, to be achieved:
A kind of buttress type duplex rock, including concrete slab, the pad set gradually by upstream to downstream Layered material, upper Transition Materials, upstream rockfill area, downstream rockfill area;In the concrete slab bottom, concrete buttress structure is set;Institute The upstream side for stating concrete buttress structure sets Gai Chong areas, and downstream sets lower Transition Materials;The downstream of the lower Transition Materials is The bottom of upstream rockfill area.
It is preferred that, the concrete buttress structure includes a lower flat portion;Prolonged upwardly by the upper table of the lower flat portion The vertical portion stretched.
It is preferred that, the form of fracture of the vertical portion uses trapezoidal cross-section.
It is preferred that, gallery is overhauled in the monitoring that is internally provided with of the vertical portion.
It is preferred that, the vertical portion has a downstream outside wall surface;The upper table of the downstream outside wall surface and the lower flat portion Multiple ribs are provided between face.
It is preferred that, the vertical portion has a downstream outside wall surface;The connection of the downstream outside wall surface and the lower flat portion Place is provided with lead angle.
It is preferred that, the lower flat portion has a upstream-side end surface and a downstream-side end surface, and the vertical portion is close to described Upstream-side end surface is set.
It is preferred that, the upper Transition Materials are connected with the lower Transition Materials.
It is preferred that, the concrete buttress structure upstream slope ratio is 1:m;M is 1:0~0.3;Downstream slope ratio is 1:n;N is 1: 0.1~0.3。
It is preferred that, the height of the concrete buttress structure is less than 100m.
The beneficial effects of the utility model:
The utility model is additionally arranged positioned at riverbed position concrete slab upstream side on the basis of conventional concrete panel Concrete buttress structure, instead of profundal zone panel, reduce panel length;And part stockpile is instead of, so as to improve depth Maintenanceability, improvement superelevation rock stress and deformations of concrete face slab and the dam deformation of pool panel, are high face dam or super The construction of high face dam provides foundation, especially 300m grade high CFRD;Development for superelevation face dam provides support, Promote ultra-high concrete panel rock-fill dams technological progress, be that the research of superelevation dam is accumulated experience.
Brief description of the drawings
Fig. 1 is the structural representation of the utility model rock.
Fig. 2 is the dimensional structure diagram of concrete buttress structure of the present utility model.
In figure, 1- concrete buttress structures;2- Gai Chong areas;3- concrete slabs;4- connecting plates;5- toe boards;6- bedding materials; 7- Transition Materials;8- upstreams rockfill area;9- downstreams rockfill area;Transition Materials under 10-;11- lower flat portions;12- upper surfaces;13- is vertical Portion;14- downstreams outside wall surface;15- ribs;16- lead angles;17- upstream-side end surfaces;18- downstream-side end surfaces;19- monitoring maintenance corridor Road.
Embodiment
The utility model is described in further detail below in conjunction with the accompanying drawings:
Embodiment 1
In order to overcome in the prior art high face dam panel it is long, deform it is larger, maintenanceability is poor, lower panels maintenance is stranded Difficult defect, the utility model provides a kind of buttress type duplex rock as depicted in figs. 1 and 2, including by Concrete slab 3 that upstream to downstream is set gradually, bedding material 4, upper Transition Materials 5, upstream rockfill area 6, downstream rockfill area 7; The bottom of concrete slab 3 sets concrete buttress structure 1;The upstream side of the concrete buttress structure 1 sets Gai Chong areas 2, downstream sets lower Transition Materials 10;The downstream of the lower Transition Materials 10 is the bottom of upstream rockfill area 6.
The utility model sets concrete buttress structure 1 in the bottom of concrete slab 3, instead of profundal zone panel, improves The maintenanceability of profundal zone panel, improves superelevation rock stress and deformations of concrete face slab and dam deformation, be high face dam or The construction of superelevation face dam provides foundation, and be particularly suitable for use in 300m grades of high CFRDs.
Embodiment 2
On the basis of embodiment 1, as depicted in figs. 1 and 2, the concrete buttress structure 1 includes a lower flat portion 11;The vertical portion 13 upwardly extended by the upper surface 12 of the lower flat portion 11.
The form of fracture of the vertical portion 13 uses trapezoidal cross-section, using trapezoidal, the construction of convenient lower Transition Materials 10.
The vertical portion 13 is internally provided with monitoring maintenance gallery 19.
The vertical portion 13 has a downstream outside wall surface 14;The upper table of the downstream outside wall surface 14 and the lower flat portion 11 Multiple ribs 15 are provided between face 12, strengthen the bulk strength of the concrete buttress structure 1.
The junction of the downstream outside wall surface 14 and the lower flat portion 11 is provided with lead angle 16, reduces stress concentration.
The lower flat portion 11 has a upstream-side end surface 17 and a downstream-side end surface 18, and the vertical portion 13 is close to described Upstream-side end surface 17 is set;Enough enough spaces are stayed for filler between the vertical portion 13 and the downstream-side end surface 18, are increased The stability of the concrete buttress structure 1.
Embodiment 3
On the basis of embodiment 1, as described in Figure 1, upper Transition Materials 5 are connected with lower Transition Materials 10, upstream and downstream it Between form a complete and continuous Transition Materials, to make compressibility and water penetration be from upstream to downstream stably transition, it is ensured that pad Layered material will not be washed into the macrovoid of upstream rockfill area 6 and downstream rockfill area 7.
Embodiment 4
On the basis of embodiment 1, as described in Figure 1, the up stream slope ratio of concrete buttress structure 1 is 1:m;M is 1:0~ 0.3;Downstream slope ratio is 1:n;N is 1:0.1 ~ 0.3, dam material fills closely knit when can fully meet construction in this proportion Requirement.
The up stream slope ratio of concrete buttress structure 1 can be consistent with downstream slope ratio, also can be inconsistent, according to site operation ring Depending on border.
In order to meet engineering design requirements, the height on dam is more matched, the height of concrete buttress structure 1 is less than 100m.
Obviously, those skilled in the art can carry out various changes and modification without departing from this practicality to the utility model New spirit and scope.So, if these modifications and variations of the present utility model belong to the utility model claim and Within the scope of its equivalent technologies, then the utility model is also intended to comprising including these changes and modification.

Claims (10)

1. a kind of buttress type duplex rock, including the concrete slab set gradually by upstream to downstream(3), pad Layered material(4), upper Transition Materials(5), upstream rockfill area(6), downstream rockfill area(7);It is characterized in that:In the concrete slab (3)Bottom sets concrete buttress structure(1);The concrete buttress structure(1)Upstream side Gai Chong areas are set(2), downstream Side sets lower Transition Materials(10);The lower Transition Materials(10)Downstream be upstream rockfill area(6)Bottom.
2. buttress type duplex rock as claimed in claim 1, it is characterised in that:The concrete buttress structure (1)Including a lower flat portion(11);By the lower flat portion(11)Upper surface(12)The vertical portion upwardly extended(13).
3. buttress type duplex rock as claimed in claim 2, it is characterised in that:The vertical portion(13)It is disconnected Face form uses trapezoidal cross-section.
4. buttress type duplex rock as claimed in claim 2, it is characterised in that:The vertical portion(13)It is interior Portion is provided with monitoring maintenance gallery(19).
5. buttress type duplex rock as claimed in claim 2, it is characterised in that:The vertical portion(13)Have One downstream outside wall surface(14);The downstream outside wall surface(14)With the lower flat portion(11)Upper surface(12)Between provided with multiple Ribs(15).
6. buttress type duplex rock as claimed in claim 2, it is characterised in that:The vertical portion(13)Have One downstream outside wall surface(14);The downstream outside wall surface(14)With the lower flat portion(11)Junction be provided with lead angle(16).
7. buttress type duplex rock as claimed in claim 2, it is characterised in that:The lower flat portion(11)Tool There is a upstream-side end surface(17)With a downstream-side end surface(18), the vertical portion(13)Close to the upstream-side end surface(17)If Put.
8. buttress type duplex rock as claimed in claim 1, it is characterised in that:The upper Transition Materials(5)With The lower Transition Materials(10)It is connected.
9. buttress type duplex rock as claimed in claim 1, it is characterised in that:The concrete buttress structure (1)Up stream slope ratio is 1:m;M is 1:0~0.3;Downstream slope ratio is 1:n;N is 1:0.1~0.3.
10. buttress type duplex rock as claimed in claim 1, it is characterised in that:The concrete buttress knot Structure(1)Height be less than 100m.
CN201720096529.7U 2017-01-25 2017-01-25 A kind of buttress type duplex rock Active CN206495188U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720096529.7U CN206495188U (en) 2017-01-25 2017-01-25 A kind of buttress type duplex rock

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720096529.7U CN206495188U (en) 2017-01-25 2017-01-25 A kind of buttress type duplex rock

Publications (1)

Publication Number Publication Date
CN206495188U true CN206495188U (en) 2017-09-15

Family

ID=59803765

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720096529.7U Active CN206495188U (en) 2017-01-25 2017-01-25 A kind of buttress type duplex rock

Country Status (1)

Country Link
CN (1) CN206495188U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108677980A (en) * 2018-07-12 2018-10-19 中国电建集团贵阳勘测设计研究院有限公司 A kind of upstream cofferdam that taking into account communication function increases method and structure
CN110158547A (en) * 2019-06-14 2019-08-23 贵州省水利水电勘测设计研究院 A kind of cement sand and gravel buttress dam

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108677980A (en) * 2018-07-12 2018-10-19 中国电建集团贵阳勘测设计研究院有限公司 A kind of upstream cofferdam that taking into account communication function increases method and structure
CN108677980B (en) * 2018-07-12 2023-10-31 中国电建集团贵阳勘测设计研究院有限公司 Upstream cofferdam heightening method and structure taking traffic function into consideration
CN110158547A (en) * 2019-06-14 2019-08-23 贵州省水利水电勘测设计研究院 A kind of cement sand and gravel buttress dam

Similar Documents

Publication Publication Date Title
CN107700435B (en) The cementing rock-fill dams of rock-fill concrete core-wall and its construction method
CN104120686B (en) A kind of high-elastic die-cushion A seating compound dam
CN104652371B (en) The glue of crossing set up based on old dam coagulates rock-fill dams and construction method thereof
CN203008160U (en) Wall body for top filling of filling wall under beam slab
CN206495188U (en) A kind of buttress type duplex rock
CN202416263U (en) Concrete faced rockfill dam compounded with gravity dam
CN204703179U (en) A kind of composite geo-membrane sloping core cofferdam
CN106245595B (en) A kind of maintainable face dam of antiseepage wall bottom seepage control system
CN203034492U (en) Reinforced concrete pipe ditch deformation seam
CN206495190U (en) A kind of arch duplex rock
CN106759134A (en) A kind of method of the maintenanceability of arch duplex face dam and raising panel
CN218969919U (en) Asphalt concrete face rockfill dam arrangement structure
CN203925530U (en) A kind of first active relief is pressed the adjustable gob side entry retaining body of wall of supporting
CN106149641B (en) A kind of rock for making panel have maintenanceability and method
CN203741782U (en) Multi-section face plate structure of high concrete faced rockfill dam
CN212000904U (en) Mixed seepage-proofing dam
CN106836144A (en) A kind of method of the maintenanceability of buttress type duplex face dam and raising panel
CN206495189U (en) A kind of wall duplex rock
CN206015618U (en) A kind of rock for making panel possess maintenanceability
CN206015619U (en) A kind of rock for reducing panel stress strain level
CN205617413U (en) Miniature clump of piles foundation pile with articulated joint
CN209722944U (en) A kind of karst sinkhole plugging structure
CN210002382U (en) Foundation treatment structure for vertical development of large karst caves on bottom plate of tunnel
CN208055997U (en) Asphaltic concrete core wall and dam foundation concrete watertight wall joint structure
CN209082426U (en) A kind of leakage preventing structure that bottom storehouse reverse osmosis is combined with seepage prevention of core wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant