CN206495190U CN201720096542.2U CN201720096542U CN206495190U CN 206495190 U CN206495190 U CN 206495190U CN 201720096542 U CN201720096542 U CN 201720096542U CN 206495190 U CN206495190 U CN 206495190U
Authority
CN
China
Prior art keywords
arch
dam
concrete
rock
upstream
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720096542.2U
Other languages
Chinese (zh)
Inventor
姚栓喜
陆希
周恒�
徐宏璐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Northwest Engineering Corp Ltd
Original Assignee
PowerChina Northwest Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Northwest Engineering Corp Ltd filed Critical PowerChina Northwest Engineering Corp Ltd
Priority to CN201720096542.2U priority Critical patent/CN206495190U/en
Application granted granted Critical
Publication of CN206495190U publication Critical patent/CN206495190U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model is related to hydro science dam field of engineering technology, more particularly to a kind of arch duplex rock.It includes the concrete slab set gradually by upstream to downstream, bedding material, upper Transition Materials, upstream rockfill area, downstream rockfill area;In the concrete slab bottom, concrete arch dam is set;The upstream side of the concrete arch dam is provided with Gai Chong areas;The downstream of the concrete arch dam is upstream rockfill area.By setting concrete arch dam in concrete slab bottom, so as to improve the maintenanceability of profundal zone panel, reduce dam body and concrete slab deformation.

Description

A kind of arch duplex rock
Technical field
The utility model is related to hydro science dam field of engineering technology, more particularly to a kind of arch duplex panel heap Masonry dam.
Background technology
Face dam dam type because with to Dam Site topographic and geologic condition strong adaptability, good economy performance, it is safe and reliable the characteristics of, It is rapidly developed in China, but the high face dam in part built in recent years occurs in that dam deformation is bigger than predicted value, panel The problems such as there is extruding destruction, crack, big embankment seepage amount.These problems are attributed to three aspects:One is that dam deformation is big;Two are The seepage control system such as panel destructible, destruction cause embankment seepage amount big, it is understood that there may be the potential safety hazard of seepage stability;Three be to tie up Repairing property is poor, and lower panels maintenance is difficult, runs into extreme operating condition problem and more protrudes.Thus at present to 250m grades or higher of panel The security presence on dam is queried.
As China's economic development and the public, government significantly improve to safety requirements, to large and medium water power station engineering Water retaining structure proposes the requirement that the extreme operating conditions such as macroseism are not fallen, design conditions can be used normally after repairing.The built 70m of China The high face dam of the above does not overhaul the condition of base impervious system all.The presence of these problems, constrains the country to building 250 The decision-making of ~ 300m ultra-high concrete panel rock-fill dams.
During usual high face dam or superelevation face dam design, mostly from dam zoning, fill standard, joint seal, construction Studied in terms of step, propose reduction dam deformation, improve panel stress and the related measure of control joint displacement.But these Measure all can not more effectively solve the technical problem present in superelevation rock at present.
Utility model content
In order to overcome in the prior art high face dam panel it is long, deform it is larger;Maintenanceability is poor, and lower panels maintenance is tired Difficult defect, the purpose of this utility model is to propose a kind of arch duplex rock, by face dam bottom Concrete arch dam is set, the maintenanceability of profundal zone panel is improved so as to reach, improves superelevation rock panel stress Deformation and the purpose of dam deformation.
To realize above-mentioned technical purpose, the utility model, which is adopted the following technical scheme that, to be achieved:
A kind of arch duplex rock, including concrete slab, the bed course set gradually by upstream to downstream Material, upper Transition Materials, upstream rockfill area, downstream rockfill area;In the concrete slab bottom, concrete arch dam is set;It is described mixed The upstream side of solidifying soil arch dam is provided with Gai Chong areas;The downstream of the concrete arch dam is upstream rockfill area.
It is preferred that, the concrete arch dam is in the horizontal plane in the arch for being convex to upstream.
It is preferred that, the concrete arch height of dam degree is less than 100m.
It is preferred that, the concrete arch dam is internally provided with monitoring maintenance gallery.
It is preferred that, the arch abutment of the concrete arch dam is located on the basis of two sides.
It is preferred that, the concrete arch dam downstream is additionally provided with lower Transition Materials;The lower Transition Materials are located at the coagulation Between native arch dam and the upstream rockfill area.
It is preferred that, the upper Transition Materials are connected with the lower Transition Materials.
The beneficial effects of the utility model:
The utility model is additionally arranged positioned at riverbed position concrete slab upstream side on the basis of conventional concrete panel Concrete arch dam, instead of profundal zone panel, reduce panel length, and instead of part stockpile, so as to improve depth Maintenanceability, improvement superelevation rock stress and deformations of concrete face slab and the dam deformation of pool panel, are high face dam or super The construction of high face dam provides foundation, especially 300m grade high CFRD;Development for superelevation face dam provides support, Promote ultra-high concrete panel rock-fill dams technological progress, be that the research of superelevation dam is accumulated experience.
Brief description of the drawings
Fig. 1 is the structural representation of the utility model rock.
Fig. 2 is the structural representation of the concrete arch dam of the utility model rock.
In figure, 1- concrete arch dams;2- concrete arch dams;3- concrete slabs;4- bedding materials;The upper Transition Materials of 5-; 6- upstreams rockfill area;7- downstreams rockfill area;8- two sides basis;Transition Materials under 9-;10- monitoring maintenance gallerys.
Embodiment
The utility model is described in further detail below in conjunction with the accompanying drawings:
Embodiment 1
In order to overcome in the prior art high face dam panel it is long, deform it is larger;Maintenanceability is poor, and lower panels maintenance is tired Difficult defect, the utility model provides a kind of arch duplex rock as illustrated in fig. 1 and 2, including by upstream The concrete slab 3 that is set gradually to downstream, bedding material 4, upper Transition Materials 5, upstream rockfill area 6, downstream rockfill area 7;Described The bottom of concrete slab 3 sets concrete arch dam 1;The upstream side of the concrete arch dam 1 is provided with Gai Chong areas 2;It is described mixed The downstream of solidifying soil arch dam 1 is upstream rockfill area 6.
The utility model sets concrete arch dam 1 in the bottom of concrete slab 3, instead of profundal zone panel, improves deep water The maintenanceability of area's panel, improves superelevation rock stress and deformations of concrete face slab and dam deformation, is high face dam or superelevation The construction of face dam provides foundation, and be particularly suitable for use in 300m grades of high CFRDs.
Embodiment 2
On the basis of embodiment 1, as depicted in figs. 1 and 2, the concrete arch dam 1 is in be convex in the horizontal plane The arch of trip.The arch abutment of the concrete arch dam 1 is located on two sides basis 8.The concrete arch dam 1 is in the plane in arch The water ballast(ing) that it is born, can effectively be delivered on two sides basis 8, solve its stable problem, while can also reduce by shape The stress of concrete arch dam 1.
The concrete arch dam 1 its be internally provided with monitoring maintenance gallery 10.
In order to meet engineering design requirements, the height on dam is more matched, the height of concrete arch dam 1 is less than 100m.
Embodiment 3
On the basis of embodiment 1, as depicted in figs. 1 and 2, the downstream of concrete arch dam 1 is additionally provided with lower transition Material 9;The lower Transition Materials 9 are located between the concrete arch dam 1 and the upstream rockfill area 6, by setting lower Transition Materials 9, to make the contact with upstream rockfill area 6 of concrete arch dam 1 more closely knit reliable.
The upper Transition Materials 5 are connected with lower Transition Materials 9, are formed between upstream and downstream with complete and continuous transition Material, has more preferable transitional function from upstream to downstream.
Obviously, those skilled in the art can carry out various changes and modification without departing from this practicality to the utility model New spirit and scope.So, if these modifications and variations of the present utility model belong to the utility model claim and Within the scope of its equivalent technologies, then the utility model is also intended to comprising including these changes and modification.

Claims (7)

1. a kind of arch duplex rock, including the concrete slab set gradually by upstream to downstream(3), bed course Material(4), upper Transition Materials(5), upstream rockfill area(6), downstream rockfill area(7);It is characterized in that:In the concrete slab(3) Bottom sets concrete arch dam(1);The concrete arch dam(1)Upstream side be provided with Gai Chong areas(2);The concrete arch Shape dam(1)Downstream be upstream rockfill area(6).
2. arch duplex rock as claimed in claim 1, it is characterised in that:The concrete arch dam(1) In the horizontal plane in the arch for being convex to upstream.
3. arch duplex rock as claimed in claim 1, it is characterised in that:The concrete arch dam(1) Highly it is less than 100m.
4. arch duplex rock as claimed in claim 1, it is characterised in that:The concrete arch dam(1) Be internally provided with monitoring maintenance gallery(10).
5. arch duplex rock as claimed in claim 1, it is characterised in that:The concrete arch dam(1) Arch abutment be located at two sides basis(8)On.
6. arch duplex rock as claimed in claim 1, it is characterised in that:The concrete arch dam(1) Downstream is additionally provided with lower Transition Materials(9);The lower Transition Materials(9)Positioned at the concrete arch dam(1)With the upstream enrockment Area(6)Between.
7. arch duplex rock as claimed in claim 6, it is characterised in that:The upper Transition Materials(5)And institute State lower Transition Materials(9)It is connected.
CN201720096542.2U 2017-01-25 2017-01-25 A kind of arch duplex rock Active CN206495190U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720096542.2U CN206495190U (en) 2017-01-25 2017-01-25 A kind of arch duplex rock

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720096542.2U CN206495190U (en) 2017-01-25 2017-01-25 A kind of arch duplex rock

Publications (1)

Publication Number Publication Date
CN206495190U true CN206495190U (en) 2017-09-15

Family

ID=59803713

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720096542.2U Active CN206495190U (en) 2017-01-25 2017-01-25 A kind of arch duplex rock

Country Status (1)

Country Link
CN (1) CN206495190U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759134A (en) * 2017-01-25 2017-05-31 中国电建集团西北勘测设计研究院有限公司 A kind of method of the maintenanceability of arch duplex face dam and raising panel

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759134A (en) * 2017-01-25 2017-05-31 中国电建集团西北勘测设计研究院有限公司 A kind of method of the maintenanceability of arch duplex face dam and raising panel

Similar Documents

Publication Publication Date Title
CN104120686B (en) A kind of high-elastic die-cushion A seating compound dam
CN202416263U (en) Concrete faced rockfill dam compounded with gravity dam
CN104652371B (en) The glue of crossing set up based on old dam coagulates rock-fill dams and construction method thereof
CN107354917A (en) A kind of gravity rock and its construction method
CN110939104A (en) Mixed seepage-proofing dam
CN106245595B (en) A kind of maintainable face dam of antiseepage wall bottom seepage control system
CN206495188U (en) A kind of buttress type duplex rock
CN206495190U (en) A kind of arch duplex rock
CN106759134A (en) A kind of method of the maintenanceability of arch duplex face dam and raising panel
CN201771514U (en) Concealed tunneling structure with pile foundation
CN205934862U (en) Local high -modulus enrockment concrete -faced rockfill dam structure
CN106192909B (en) A kind of rock and method reducing panel stress strain level
CN206015619U (en) A kind of rock for reducing panel stress strain level
CN217710582U (en) Rolling and pouring combined asphalt concrete straight core wall dam
CN203113335U (en) Counterfort type U-type groove retaining structure
CN212000904U (en) Mixed seepage-proofing dam
CN103132487A (en) Method of reducing horizontal displacement of concrete faced rockfill dam and concrete faced rockfill dam
CN203741782U (en) Multi-section face plate structure of high concrete faced rockfill dam
CN206495189U (en) A kind of wall duplex rock
CN113846663A (en) Concrete continuous tooth wall structure without structural joint and construction method
CN101603298A (en) A kind of dam joint structure and job practices thereof
CN212248107U (en) Structure of core dam heightening face plate rock-fill dam
CN112813931A (en) Heightening mixed dam structure combined with built earth-rock dam and construction method thereof
Fan et al. Water pressure and stress characteristics of lining structure in water rich karst tunnel
CN106836144A (en) A kind of method of the maintenanceability of buttress type duplex face dam and raising panel