CN106836144A - A kind of method of the maintenanceability of buttress type duplex face dam and raising panel - Google Patents
A kind of method of the maintenanceability of buttress type duplex face dam and raising panel Download PDFInfo
- Publication number
- CN106836144A CN106836144A CN201710056011.5A CN201710056011A CN106836144A CN 106836144 A CN106836144 A CN 106836144A CN 201710056011 A CN201710056011 A CN 201710056011A CN 106836144 A CN106836144 A CN 106836144A
- Authority
- CN
- China
- Prior art keywords
- concrete
- downstream
- buttress
- upstream
- dam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 8
- 239000000463 material Substances 0.000 claims abstract description 35
- 230000007704 transition Effects 0.000 claims abstract description 28
- 238000011144 upstream manufacturing Methods 0.000 claims abstract description 28
- 238000010276 construction Methods 0.000 claims description 10
- 238000012423 maintenance Methods 0.000 claims description 7
- 238000012544 monitoring process Methods 0.000 claims description 4
- 230000002787 reinforcement Effects 0.000 claims 1
- UZVHFVZFNXBMQJ-UHFFFAOYSA-N butalbital Chemical compound CC(C)CC1(CC=C)C(=O)NC(=O)NC1=O UZVHFVZFNXBMQJ-UHFFFAOYSA-N 0.000 abstract description 7
- 238000005516 engineering process Methods 0.000 abstract description 4
- 239000011435 rock Substances 0.000 abstract description 4
- ZZUFCTLCJUWOSV-UHFFFAOYSA-N furosemide Chemical compound C1=C(Cl)C(S(=O)(=O)N)=CC(C(O)=O)=C1NCC1=CC=CO1 ZZUFCTLCJUWOSV-UHFFFAOYSA-N 0.000 abstract description 2
- 239000002689 soil Substances 0.000 abstract 1
- 238000012986 modification Methods 0.000 description 4
- 230000004048 modification Effects 0.000 description 4
- 230000006378 damage Effects 0.000 description 3
- 230000007547 defect Effects 0.000 description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 3
- 238000013461 design Methods 0.000 description 2
- 238000011161 development Methods 0.000 description 2
- 238000011160 research Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 239000000945 filler Substances 0.000 description 1
- 230000035515 penetration Effects 0.000 description 1
- 230000002035 prolonged effect Effects 0.000 description 1
- 238000013316 zoning Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B7/00—Barrages or weirs; Layout, construction, methods of, or devices for, making same
- E02B7/02—Fixed barrages
- E02B7/04—Dams across valleys
- E02B7/06—Earth-fill dams; Rock-fill dams
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B7/00—Barrages or weirs; Layout, construction, methods of, or devices for, making same
- E02B7/02—Fixed barrages
- E02B7/04—Dams across valleys
- E02B7/08—Wall dams
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Revetment (AREA)
Abstract
The present invention relates to hydro science dam field of engineering technology, the method for the maintenanceability of more particularly to a kind of buttress type duplex face dam and raising panel.It includes the concrete slab, bedding material, upper Transition Materials, upstream rockfill area, the downstream rockfill area that are set gradually by upstream to downstream;In the concrete slab bottom, concrete buttress structure is set;The upstream side of the concrete buttress structure sets Gai Chong areas, and downstream sets lower Transition Materials;The downstream of the lower Transition Materials is the bottom of upstream rockfill area.The present invention is on the basis of conventional concrete panel, solidifying soil buttress structure is additionally arranged, instead of profundal zone panel, reduces panel length, and part stockpile is instead of, so as to improve the maintenanceability of profundal zone panel, improve superelevation rock stress and deformations of concrete face slab and dam deformation.
Description
Technical field
The present invention relates to hydro science dam field of engineering technology, more particularly to a kind of buttress type duplex face dam and
The method for improving the maintenanceability of panel.
Background technology
Face dam dam type because with to Dam Site topographic and geologic condition strong adaptability, good economy performance, it is safe and reliable the characteristics of,
It is rapidly developed in China, but part face dam high built in recent years occurs in that dam deformation is bigger than predicted value, panel
The problems such as there is extruding destruction, crack, big embankment seepage amount.These problems are attributed to three aspects:One is big dam deformation;Two are
The seepage control system such as panel destructible, destruction cause embankment seepage amount big, it is understood that there may be the potential safety hazard of seepage stability;Three is to tie up
Repairing property is poor, and lower panels maintenance is difficult, runs into extreme operating condition problem and more protrudes.Thus at present to 250m grades or panel higher
The security presence on dam is queried.
As China's economic development and the public, government significantly improve to safety requirements, to large and medium water power station engineering
Water retaining structure proposes the requirement that the extreme operating conditions such as macroseism are not fallen, design conditions can be used normally after repairing.The built 70m of China
Above face dam high does not overhaul the condition of base impervious system all.The presence of these problems, constrains the country to building 250
The decision-making of ~ 300m ultra-high concrete panel rock-fill dams.
When usual face dam high or superelevation face dam are designed, mostly from dam zoning, fill standard, joint seal, construction
The aspect research such as step, proposes to reduce dam deformation, improves the related measure of panel stress and control joint displacement.But these
Measure all cannot more effectively solve the technical problem existing for superelevation rock at present.
The content of the invention
In order to overcome face dam panel high in the prior art long, deform larger;Maintenanceability is poor, and lower panels maintenance is tired
Difficult defect, a kind of side of the maintenanceability it is an object of the invention to propose buttress type duplex face dam and raising panel
Method, concrete buttress structure is set by face dam bottom, the maintenanceability of profundal zone panel is improved so as to reach, improves super
High CFRD stress and deformations of concrete face slab and the purpose of dam deformation.
To realize above-mentioned technical purpose, the present invention is adopted the following technical scheme that and is achieved:
A kind of buttress type duplex face dam, including concrete slab, bedding material, the upper mistake set gradually by upstream to downstream
Cross material, upstream rockfill area, downstream rockfill area;In the concrete slab bottom, concrete buttress structure is set;The concrete
The upstream side of buttress structure sets Gai Chong areas, and downstream sets lower Transition Materials;The downstream of the lower Transition Materials is upstream enrockment
The bottom in area.
Preferably, the concrete buttress structure includes a lower flat portion;Prolonged upwardly by the upper table of the lower flat portion
The vertical portion stretched.
Preferably, the form of fracture of the vertical portion uses trapezoidal cross-section.
Preferably, gallery is overhauled in the monitoring that is internally provided with of the vertical portion.
Preferably, the vertical portion has a downstream outside wall surface;The upper table of the downstream outside wall surface and the lower flat portion
Multiple ribs are provided between face.
Preferably, the vertical portion has a downstream outside wall surface;The connection of the downstream outside wall surface and the lower flat portion
Place is provided with lead angle.
Preferably, the lower flat portion has a upstream-side end surface and a downstream-side end surface, and the vertical portion is near described
Upstream-side end surface is set.
Preferably, the upper Transition Materials are connected with the lower Transition Materials.
Preferably, the concrete buttress structure upstream slope ratio is 1:M, m are 1: 0~0.3;Downstream slope ratio is 1:N, n are
1:0.1~0.3。
Another object of the present invention, there is provided a kind of method of the maintenanceability of raising panel, in the upstream of concrete slab
The bottom of side sets concrete buttress structure;In the upstream side construction Gai Chong areas of concrete buttress structure;Helped in the concrete
The downstream of wall construction sets lower Transition Materials;The Gai Chong areas, the concrete buttress structure and lower Transition Materials are filled should be with high
Cheng Pingqi is filled.
Beneficial effects of the present invention:
The present invention is additionally arranged the concrete positioned at riverbed position concrete slab upstream side on the basis of conventional concrete panel
Buttress structure, instead of profundal zone panel, reduces panel length;And part stockpile is instead of, so as to improve profundal zone face
The maintenanceability of plate, improvement superelevation rock stress and deformations of concrete face slab and dam deformation, are face dam high or superelevation panel
The construction on dam provides foundation, especially 300m grade high CFRD;For the development of superelevation face dam provides support, promote super
High concrete panel rock-fill dams technological progress, is that the research of superelevation dam is accumulated experience.
Brief description of the drawings
Fig. 1 is the structural representation of face dam of the present invention.
Fig. 2 is the dimensional structure diagram of concrete buttress structure of the invention.
In figure:1- concrete buttress structures;2- Gai Chong areas;3- concrete slabs;4- connecting plates;5- toe boards;6- bedding materials;
7- Transition Materials;8- upstreams rockfill area;9- downstreams rockfill area;Transition Materials under 10-;11- lower flat portions;12- upper surfaces;13- is vertical
Portion;14- downstreams outside wall surface;15- ribs;16- lead angles;17- upstream-side end surfaces;18- downstream-side end surfaces;19- monitoring maintenance corridor
Road.
Specific embodiment
The invention will be further described below in conjunction with the accompanying drawings:
Embodiment 1
In order to overcome face dam panel high in the prior art long, deform larger;Maintenanceability is poor, lower panels maintenance difficulty
Defect, the invention provides a kind of buttress type duplex face dam as depicted in figs. 1 and 2(Face dam is also referred to as panel enrockment
Dam), including concrete slab 3, bedding material 4, upper Transition Materials 5, the upstream rockfill area 6, downstream set gradually by upstream to downstream
Rockfill area 7;In the bottom of the concrete slab 3, concrete buttress structure 1 is set;The upstream side of the concrete buttress structure 1
Gai Chong areas 2 are set, and downstream sets lower Transition Materials 10;The downstream of the lower Transition Materials 10 is the bottom of upstream rockfill area 6.
The present invention sets concrete buttress structure 1 in the bottom of concrete slab 3, instead of profundal zone panel, improves profundal zone
The maintenanceability of panel, improvement superelevation rock stress and deformations of concrete face slab and dam deformation, are face dam high or superelevation face
The construction on plate dam provides foundation, is particularly suited for 300m grades of high CFRD.
Embodiment 2
On the basis of embodiment 1, as depicted in figs. 1 and 2, the concrete buttress structure 1 includes a lower flat portion 11;By institute
State the vertical portion 13 that the upper surface 12 of lower flat portion 11 upwardly extends.
The form of fracture of the vertical portion 13 uses trapezoidal cross-section, using trapezoidal, facilitates the construction of the lower Transition Materials 10.
The vertical portion 13 is internally provided with monitoring maintenance gallery 19.
The vertical portion 13 has a downstream outside wall surface 14;The upper table of the downstream outside wall surface 14 and the lower flat portion 11
Multiple ribs 15 are provided between face 12, strengthen the bulk strength of the concrete buttress structure 1.
The downstream outside wall surface 14 is provided with lead angle 16 with the junction of the lower flat portion 11, reduces stress concentration.
The lower flat portion 11 has a upstream-side end surface 17 and a downstream-side end surface 18, and the vertical portion 13 is near described
Upstream-side end surface 17 is set;For filler stays enough enough spaces between the vertical portion 13 and the downstream-side end surface 18, increase
The stability of the concrete buttress structure 1.
Embodiment 3
On the basis of embodiment 1, as described in Figure 1, upper Transition Materials 5 are connected with lower Transition Materials 10, the shape between upstream and downstream
Into a complete and continuous Transition Materials, to make compressibility and water penetration be from upstream to downstream stably transition, it is ensured that bedding material
Will not be washed into the macrovoid of upstream rockfill area 6 and downstream rockfill area 7.
Embodiment 4
On the basis of embodiment 1, as described in Figure 1, the up stream slope ratio of the concrete buttress structure 1 is 1:M, m are 1:0~0.3;
Downstream slope ratio is 1:N, n are 1:0.1 ~ 0.3, dam material fills closely knit wanting when can fully meet construction in this proportion
Ask.
The up stream slope ratio of the concrete buttress structure 1 can be consistent with downstream slope ratio, also can be inconsistent, according to site operation ring
Depending on border.
In order to meet engineering design requirements, the height on dam is more matched, the height of concrete buttress structure 1 is less than 100m.
Embodiment 5
In order to overcome face dam panel high in the prior art long, deform larger;Maintenanceability is poor, lower panels maintenance difficulty
Defect, the present invention also provides a kind of method of the maintenanceability for improving panel, is set in the bottom of the upstream side of concrete slab 3
Concrete buttress structure 1;In the upstream side construction Gai Chong areas 2 of concrete buttress structure 1;In the concrete buttress structure 1
Downstream sets lower Transition Materials 10;The Gai Chong areas 2, the concrete buttress structure 1 and lower Transition Materials 10 are filled should same elevation
Put down and filled, destruction has been produced to prevent arch dam both sides load unbalance.
Obviously, those skilled in the art can carry out various changes and modification without deviating from essence of the invention to the present invention
God and scope.So, if these modifications of the invention and modification belong to the scope of the claims in the present invention and its equivalent technologies
Within, then the present invention is also intended to comprising these changes and modification.
Claims (10)
1. a kind of buttress type duplex face dam, including the concrete slab set gradually by upstream to downstream(3), bedding material
(4), upper Transition Materials(5), upstream rockfill area(6), downstream rockfill area(7);It is characterized in that:In the concrete slab(3)Bottom
Portion sets concrete buttress structure(1);The concrete buttress structure(1)Upstream side Gai Chong areas are set(2), downstream is set
Lower Transition Materials(10);The lower Transition Materials(10)Downstream be upstream rockfill area(6)Bottom.
2. buttress type duplex face dam as claimed in claim 1, it is characterised in that:The concrete buttress structure(1)
Including a lower flat portion(11);By the lower flat portion(11)Upper surface(12)The vertical portion for upwardly extending(13).
3. buttress type duplex face dam as claimed in claim 2, it is characterised in that:The vertical portion(13)Section shape
Formula uses trapezoidal cross-section.
4. buttress type duplex face dam as claimed in claim 2, it is characterised in that:The vertical portion(13)Inside set
It is equipped with monitoring maintenance gallery.
5. buttress type duplex face dam as claimed in claim 2, it is characterised in that:The vertical portion(13)With once
Trip outside wall surface(14);The downstream outside wall surface(14)With the lower flat portion(11)Upper surface(12)Between be provided with multiple reinforcements
Rib(15).
6. buttress type duplex face dam as claimed in claim 2, it is characterised in that:The vertical portion(13)With once
Trip outside wall surface(14);The downstream outside wall surface(14)With the lower flat portion(11)Junction be provided with lead angle(16).
7. buttress type duplex face dam as claimed in claim 2, it is characterised in that:The lower flat portion(11)With one
Upstream-side end surface(17)With a downstream-side end surface(18), the vertical portion(13)Near the upstream-side end surface(17)Set.
8. buttress type duplex face dam as claimed in claim 1, it is characterised in that:The upper Transition Materials(5)With it is described
Lower Transition Materials(10)It is connected.
9. buttress type duplex face dam as claimed in claim 1, it is characterised in that:The concrete buttress structure(1)
Up stream slope ratio is 1:M, m are 1: 0~0.3;Downstream slope ratio is 1:N, n are 1:0.1~0.3.
10. it is a kind of improve panel maintenanceability method, it is characterised in that:In concrete slab(3)Upstream side bottom
Concrete buttress structure is set(1);In concrete buttress structure(1)Upstream side construction Gai Chong areas(2);Helped in the concrete
Wall construction(1)Downstream lower Transition Materials are set(10);The Gai Chong areas(2), the concrete buttress structure(1)And lower transition
Material(10)Fill to have been put down with elevation and fill.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710056011.5A CN106836144A (en) | 2017-01-25 | 2017-01-25 | A kind of method of the maintenanceability of buttress type duplex face dam and raising panel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710056011.5A CN106836144A (en) | 2017-01-25 | 2017-01-25 | A kind of method of the maintenanceability of buttress type duplex face dam and raising panel |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106836144A true CN106836144A (en) | 2017-06-13 |
Family
ID=59121150
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710056011.5A Pending CN106836144A (en) | 2017-01-25 | 2017-01-25 | A kind of method of the maintenanceability of buttress type duplex face dam and raising panel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106836144A (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201924376U (en) * | 2011-01-28 | 2011-08-10 | 中国土木工程集团有限公司 | Reinforced cantilever retaining wall |
CN104120686A (en) * | 2014-07-28 | 2014-10-29 | 中国电建集团西北勘测设计研究院有限公司 | High elastic die cushion type composite dam |
CN204370376U (en) * | 2014-12-26 | 2015-06-03 | 兰州理工大学 | One draws anchor formula mud-rock flow to block row's structure |
CN205152982U (en) * | 2015-11-23 | 2016-04-13 | 中冶赛迪工程技术股份有限公司 | Barricade and structure of filling suitable for height is filled |
CN106149641A (en) * | 2016-08-25 | 2016-11-23 | 中国电建集团西北勘测设计研究院有限公司 | A kind of rock making panel possess maintainability and method |
CN106245583A (en) * | 2016-08-04 | 2016-12-21 | 黑龙江省水利科学研究院 | A kind of upright cross narrow deep thin-walled barrage |
CN106284215A (en) * | 2016-08-17 | 2017-01-04 | 中国电建集团西北勘测设计研究院有限公司 | A kind of mixed dam |
-
2017
- 2017-01-25 CN CN201710056011.5A patent/CN106836144A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201924376U (en) * | 2011-01-28 | 2011-08-10 | 中国土木工程集团有限公司 | Reinforced cantilever retaining wall |
CN104120686A (en) * | 2014-07-28 | 2014-10-29 | 中国电建集团西北勘测设计研究院有限公司 | High elastic die cushion type composite dam |
CN204370376U (en) * | 2014-12-26 | 2015-06-03 | 兰州理工大学 | One draws anchor formula mud-rock flow to block row's structure |
CN205152982U (en) * | 2015-11-23 | 2016-04-13 | 中冶赛迪工程技术股份有限公司 | Barricade and structure of filling suitable for height is filled |
CN106245583A (en) * | 2016-08-04 | 2016-12-21 | 黑龙江省水利科学研究院 | A kind of upright cross narrow deep thin-walled barrage |
CN106284215A (en) * | 2016-08-17 | 2017-01-04 | 中国电建集团西北勘测设计研究院有限公司 | A kind of mixed dam |
CN106149641A (en) * | 2016-08-25 | 2016-11-23 | 中国电建集团西北勘测设计研究院有限公司 | A kind of rock making panel possess maintainability and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107354917B (en) | A kind of gravity rock and its construction method | |
CN104120686A (en) | High elastic die cushion type composite dam | |
CN109667262B (en) | Karst water falling hole plugging structure and construction method thereof | |
CN110565449A (en) | Anti-uplift and anti-separation type pile plate structure of high-speed railway | |
CN108035376A (en) | A kind of resistance to deformation suitable for goaf place Wind turbines can rectify a deviation basis and its construction method | |
CN110939104A (en) | Mixed seepage-proofing dam | |
CN206495188U (en) | A kind of buttress type duplex rock | |
CN106759134A (en) | A kind of method of the maintenanceability of arch duplex face dam and raising panel | |
CN205934862U (en) | Local high -modulus enrockment concrete -faced rockfill dam structure | |
CN206495190U (en) | A kind of arch duplex rock | |
CN218969919U (en) | Asphalt concrete face rockfill dam arrangement structure | |
CN206015619U (en) | A kind of rock for reducing panel stress strain level | |
CN106836144A (en) | A kind of method of the maintenanceability of buttress type duplex face dam and raising panel | |
CN114753313B (en) | Small-size reservoir dam body seepage prevention structure | |
CN106192909A (en) | A kind of rock reducing panel stress strain level and method | |
CN203113335U (en) | Counterfort type U-type groove retaining structure | |
CN207277342U (en) | Pin-connected panel precast concrete form for architectural engineering foundation platform | |
CN212000904U (en) | Mixed seepage-proofing dam | |
CN106149641B (en) | A kind of rock for making panel have maintenanceability and method | |
CN209722944U (en) | A kind of karst sinkhole plugging structure | |
CN111395082B (en) | Light roadbed structure above operation tunnel, design and construction method | |
CN206495189U (en) | A kind of wall duplex rock | |
CN205329735U (en) | Foundation ditch excavation closes on existing shallow foundation protection architecture | |
CN211036890U (en) | Narrow toe board structure of ultrahigh panel dam for narrow river valley deep and thick silt covering layer | |
CN203741782U (en) | Multi-section face plate structure of high concrete faced rockfill dam |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170613 |