CN201924376U - Reinforced cantilever retaining wall - Google Patents
Reinforced cantilever retaining wall Download PDFInfo
- Publication number
- CN201924376U CN201924376U CN2011200296337U CN201120029633U CN201924376U CN 201924376 U CN201924376 U CN 201924376U CN 2011200296337 U CN2011200296337 U CN 2011200296337U CN 201120029633 U CN201120029633 U CN 201120029633U CN 201924376 U CN201924376 U CN 201924376U
- Authority
- CN
- China
- Prior art keywords
- retaining wall
- panel
- board
- tie bar
- heel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
Abstract
A reinforced cantilever retaining wall comprises a toe board, a panel and a heel board, wherein the toe board and the heel board are disposed side by side in the horizontal direction, and the lower end of the panel perpendicularly disposed is connected between the toe board and the heel board. The reinforced cantilever retaining wall further comprises a plurality of horizontally arranged and spaced tie bar layers above the heel board, one end of each tie bar is connected with the panel. The tie bar layers for enhancing slip resistance and upsetting resistance stability of the retaining wall are horizontally arranged above the heel board, one end of each tie bar is connected with the panel, no buttress is needed for the retaining wall, and thereby large-sized machines can be used for compacting soil during soil filling, construction speed is fast, quality is fine, work efficiency for the reinforced cantilever retaining wall compared with a buttress retaining wall can be increased by above 20%, construction period is shortened by 10%, and construction cost can be reduced greatly. Further, lengthening of the heel board is not needed by using the tie bar layers, and thereby masonry quantity for the reinforced cantilever retaining wall compared with a cantilever retaining wall can be reduced by 15%.
Description
Technical field
The utility model belongs to technical field of civil engineering, particularly relates to a kind of reinforcement cantilevered barricade.
Background technology
Cantilever and counterfort wall are two kinds of retaining structures commonly used in railway, highway, harbour and the construction work both at home and abroad at present, because these two kinds of retaining structures have simple in structure, easy construction, wall body cross section is less, sole mass is light, the easy advantage such as assurances of handsome in appearance and construction quality, thereby have obtained application widely in actual engineering.Fig. 1 is a kind of cantilevered wall-retaining structure stereogram of prior art.As shown in Figure 1, the cantilevered barricade of this prior art comprises toe board 1, panel 2 and heel slab 3; Wherein toe board 1 and heel slab 3 along continuous straight runs are arranged side by side; Panel 2 vertically is provided with, and its lower end is connected between toe board 1 and the heel slab 3.The stability of this retaining structure mainly is that the deadweight of dependence panel 2 and the fill stratum 6 that is laid on heel slab 3 tops guarantee.But, there is following point in this cantilevered barricade: when the height of panel 2 during greater than 6 meters, for stability against sliding and the stability against overturning that guarantees barricade, need to strengthen the length of heel slab 3, the quantity of masonry and the quantity of reinforcement of panel 2 are increased, so the construction costs height.In order to reduce the size of panel 2, common way is to set up a plurality of counterforts 4 that vertically are provided with between panel 2 and heel slab 3, and this barricade is counterfort wall, and its structure as shown in Figure 2.But there is following point in this counterfort wall: when setting up counterfort 4, the quantity of masonry of counterfort 4 also increases thereupon.In addition, as mentioned above, because counterfort 4 vertically is provided with, can only adopt small-sized machine that soil is carried out compacting when therefore above heel slab 3, laying fill stratum 6, so efficiency of construction is low, and construction quality is difficult to guarantee, and detects also very inconveniently, therefore can't be applied in the engineerings such as compacting and the demanding high-speed railway of examination criteria, Line for Passenger Transportation.
Summary of the invention
In order to address the above problem, the purpose of this utility model is to provide a kind of can reduce construction costs, the reinforcement cantilevered barricade that efficiency of construction height and construction quality are good.
In order to achieve the above object, the reinforcement cantilevered barricade that provides of the utility model comprises toe board, panel and heel slab; Wherein toe board and heel slab along continuous straight runs are arranged side by side; Panel vertically is provided with, and its lower end is connected between toe board and the heel slab; Described reinforcement cantilevered barricade also comprises the lacing wire of being separated by multilayer the top that is horizontally set on heel slab and an end linking to each other with panel.
Described lacing wire is geosynthetics or concrete structure.
Described geosynthetics is high-strength geo-grid
The reinforcement cantilevered barricade that the utility model provides is in the heel slab upper horizontal lacing wire that multilayer is used to improve barricade stability against sliding and stability against overturning to be set, and an end of lacing wire is linked to each other with panel, because this barricade need not to be provided with counterfort, can adopt big machinery that soil pressure is real when therefore banketing, so the speed of construction is fast, quality good, compare work efficiency with counterfort wall and can improve more than 20%, the duration shortens 10%, and the result can reduce construction costs significantly.In addition, owing to adopted the multilayer lacing wire, therefore need not the length of heel slab that extends, so compare quantity of masonry with the cantilevered barricade and can reduce 15%.
Description of drawings
Fig. 1 is a kind of cantilevered wall-retaining structure stereogram of prior art.
Fig. 2 is a kind of counterfort wall structural perspective of prior art.
The reinforcement cantilevered wall-retaining structure schematic diagram that Fig. 3 provides for the utility model.
1-toe board 2-panel
3-heel slab 4-counterfort
5-lacing wire 6-fill stratum
The specific embodiment
Below in conjunction with the drawings and specific embodiments the reinforcement cantilevered barricade that the utility model provides is elaborated.The parts identical with prior art adopt identical drawing reference numeral.
As shown in Figure 3, the reinforcement cantilevered barricade that provides of the utility model comprises toe board 1, panel 2 and heel slab 3; Wherein toe board 1 and heel slab 3 along continuous straight runs are arranged side by side; Panel 2 vertically is provided with, and its lower end is connected between toe board 1 and the heel slab 3; Described reinforcement cantilevered barricade also comprises the lacing wire 5 of being separated by multilayer the top that is horizontally set on heel slab 3 and an end linking to each other with panel 2.
Described lacing wire 5 is geosynthetics or concrete structure.
Described geosynthetics is high-strength geo-grid.
The work progress of reinforcement cantilevered barricade in a certain engineering that now the utility model is provided is described as follows: at first make toe board 1 according to traditional job practices, panel 2 and heel slab 3, begin then above heel slab 3, to banket, and adopt big machinery that soil pressure is real, when lacing wire 5 paving locations that are filled to basecoat, on the soil layer after the above-mentioned compacting, lay one deck lacing wire 5, and an end of lacing wire 5 is connected with built-in fitting in being embedded in panel 2 by not shown reinforcing rod, the high-strength geo-grid of 100kN/m is adopted in lacing wire 5, and position that built-in fitting is exposed and reinforcing rod adopt corrosion resistant coating and asphaltmastic to carry out preservative treatment afterwards.In above-mentioned lacing wire 5, continue again to banket then, compacting, re-lay one deck lacing wire 5 afterwards, so repeatedly, flush with panel 2 and compacting and form fill stratum 6 up to soil is filled to, finish the work progress of reinforcement cantilevered barricade thus.In addition, lacing wire 5 numbers of plies and width need to be determined by calculating according to the concrete condition of engineering.
Claims (3)
1. a reinforcement cantilevered barricade comprises toe board (1), panel (2) and heel slab (3); Wherein toe board (1) and heel slab (3) along continuous straight runs are arranged side by side; Panel (2) vertically is provided with, and its lower end is connected between toe board (1) and the heel slab (3); It is characterized in that: described reinforcement cantilevered barricade also comprises the lacing wire (5) of being separated by multilayer the top that is horizontally set on heel slab (3) and an end linking to each other with panel (2).
2. reinforcement cantilevered barricade according to claim 1 is characterized in that: described lacing wire (5) is geosynthetics or concrete structure.
3. reinforcement cantilevered barricade according to claim 2 is characterized in that: described geosynthetics is high-strength geo-grid.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011200296337U CN201924376U (en) | 2011-01-28 | 2011-01-28 | Reinforced cantilever retaining wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011200296337U CN201924376U (en) | 2011-01-28 | 2011-01-28 | Reinforced cantilever retaining wall |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201924376U true CN201924376U (en) | 2011-08-10 |
Family
ID=44428235
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011200296337U Expired - Lifetime CN201924376U (en) | 2011-01-28 | 2011-01-28 | Reinforced cantilever retaining wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201924376U (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104499502A (en) * | 2014-11-26 | 2015-04-08 | 禹顺生态建设有限公司 | Riverway arch retaining wall structure and construction method thereof |
CN106836144A (en) * | 2017-01-25 | 2017-06-13 | 中国电建集团西北勘测设计研究院有限公司 | A kind of method of the maintenanceability of buttress type duplex face dam and raising panel |
CN107514008A (en) * | 2017-09-27 | 2017-12-26 | 长江勘测规划设计研究有限责任公司 | Composite foundation reinforced cantilever retaining wall structure and construction method |
CN108729468A (en) * | 2018-06-11 | 2018-11-02 | 中国电建集团贵阳勘测设计研究院有限公司 | One kind increasing processing method for rock foundation road barricade |
CN109653241A (en) * | 2019-01-16 | 2019-04-19 | 长江勘测规划设计研究有限责任公司 | Composite foundation reinforcement counterfort wall structure and construction method |
CN114108690A (en) * | 2021-12-02 | 2022-03-01 | 国能朔黄铁路发展有限责任公司 | Buttress type retaining wall for newly-built rail material platform and construction device |
-
2011
- 2011-01-28 CN CN2011200296337U patent/CN201924376U/en not_active Expired - Lifetime
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104499502A (en) * | 2014-11-26 | 2015-04-08 | 禹顺生态建设有限公司 | Riverway arch retaining wall structure and construction method thereof |
CN104499502B (en) * | 2014-11-26 | 2016-06-29 | 禹顺生态建设有限公司 | A kind of river course arch barrier wall structure and construction method thereof |
CN106836144A (en) * | 2017-01-25 | 2017-06-13 | 中国电建集团西北勘测设计研究院有限公司 | A kind of method of the maintenanceability of buttress type duplex face dam and raising panel |
CN107514008A (en) * | 2017-09-27 | 2017-12-26 | 长江勘测规划设计研究有限责任公司 | Composite foundation reinforced cantilever retaining wall structure and construction method |
CN108729468A (en) * | 2018-06-11 | 2018-11-02 | 中国电建集团贵阳勘测设计研究院有限公司 | One kind increasing processing method for rock foundation road barricade |
CN109653241A (en) * | 2019-01-16 | 2019-04-19 | 长江勘测规划设计研究有限责任公司 | Composite foundation reinforcement counterfort wall structure and construction method |
CN114108690A (en) * | 2021-12-02 | 2022-03-01 | 国能朔黄铁路发展有限责任公司 | Buttress type retaining wall for newly-built rail material platform and construction device |
CN114108690B (en) * | 2021-12-02 | 2023-01-24 | 国能朔黄铁路发展有限责任公司 | A construction equipment that is used for newly-built rail material platform's counterfort formula barricade |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201924376U (en) | Reinforced cantilever retaining wall | |
CN204644799U (en) | A kind of four line ballastless track roadbed pile slab structure | |
CN201148621Y (en) | Miniature anti-slide pile composite structure | |
CN201896283U (en) | Joint bar top-connection type composite foundation structure | |
CN103244130A (en) | Quick excavation and expanding construction method of herringbone tunnel section | |
CN107905114A (en) | A kind of construction method of large span Successive interference cancellation | |
CN103032080A (en) | Support method of weak and broken surrounding rock tunnel | |
CN109577683A (en) | Wetland lookout terrace structure and construction method | |
CN106192898A (en) | The joint construction method of Face Slab of Concrete-faced Rockfill anti-settling deformation | |
CN203334154U (en) | Embankment structure for preventing bearing platform of pile foundation from stretching in roadbed under viaduct | |
CN204941565U (en) | A kind of novel tunnel inverted arch structure | |
CN106917358B (en) | A kind of cable-stayed bridge main-beam combination constructing method thereof and its counter weight construction system | |
CN202047415U (en) | Composite support structure among piles | |
CN104632228B (en) | Main track entering construction method for cross aisle and cross aisle | |
CN101748708B (en) | 4.5 or 4 meter high toe board structure of concrete-face rick-fill dam and construction method thereof | |
CN106320184B (en) | A kind of unit construction bridge beam construction method | |
CN209114733U (en) | A kind of assembled arthitecutral structure convenient for docking and being in the milk | |
CN102296960A (en) | Prestress back box culvert jacking construction method | |
CN102277875A (en) | Composite supporting structure between piles | |
CN204491320U (en) | Existing railway station roadbed light supporting structure on filled ground | |
CN201538934U (en) | Collapsible loess tunnel foundation basic structure of high-speed railway | |
CN203783590U (en) | Tunnel bottom soft ground dynamic load and static load separating tunnel structure | |
CN108708397A (en) | The paving frame method of underground pipe gallery standard knot | |
CN104452667B (en) | A kind of river course reinforced earth retaining wall structure and construction method thereof | |
CN206127736U (en) | Moderate -low speed magnetic levitation double -line compound framing formula support rail roof beam transition section structure of location pile foundation that fills |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20110810 |