CN104632228B - Main track entering construction method for cross aisle and cross aisle - Google Patents
Main track entering construction method for cross aisle and cross aisle Download PDFInfo
- Publication number
- CN104632228B CN104632228B CN201410811386.4A CN201410811386A CN104632228B CN 104632228 B CN104632228 B CN 104632228B CN 201410811386 A CN201410811386 A CN 201410811386A CN 104632228 B CN104632228 B CN 104632228B
- Authority
- CN
- China
- Prior art keywords
- way
- transverse passage
- portal
- preliminary bracing
- steel frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 38
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 69
- 239000010959 steel Substances 0.000 claims abstract description 69
- 239000004567 concrete Substances 0.000 claims abstract description 14
- 210000005239 tubule Anatomy 0.000 claims description 10
- 210000003127 knee Anatomy 0.000 claims description 6
- 239000011435 rock Substances 0.000 claims description 5
- 239000011378 shotcrete Substances 0.000 claims description 5
- 238000007569 slipcasting Methods 0.000 claims description 5
- 230000015271 coagulation Effects 0.000 claims description 2
- 238000005345 coagulation Methods 0.000 claims description 2
- 238000000034 method Methods 0.000 abstract description 6
- 230000003014 reinforcing effect Effects 0.000 abstract 2
- 238000009412 basement excavation Methods 0.000 description 4
- 238000010586 diagram Methods 0.000 description 3
- 239000002689 soil Substances 0.000 description 3
- 230000015572 biosynthetic process Effects 0.000 description 2
- 238000002347 injection Methods 0.000 description 2
- 239000007924 injection Substances 0.000 description 2
- 238000005065 mining Methods 0.000 description 2
- 230000002787 reinforcement Effects 0.000 description 2
- 238000005507 spraying Methods 0.000 description 2
- 229910000746 Structural steel Inorganic materials 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 230000035800 maturation Effects 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 210000003205 muscle Anatomy 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/14—Lining predominantly with metal
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D20/00—Setting anchoring-bolts
- E21D20/02—Setting anchoring-bolts with provisions for grouting
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/001—Improving soil or rock, e.g. by freezing; Injections
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Structural Engineering (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Soil Sciences (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
The invention discloses a main track entering construction method for a cross aisle and the cross aisle, and relates to the field of the subway tunnel construction. The method comprises the following steps: step one, surveying and lining are carried out, and a main track tunnel portal position is arranged on the side wall of the cross aisle; step two, a grid steel frame is arranged on the main track tunnel portal position, and advanced small pipes are punched in an internal arch part of the grid steel frame; step three, anchor pipes and double-layer reinforcing meshes are arranged on the side wall outside a main track tunnel portal; step four, the advanced small pipes and the anchor pipes are subjected to grouting, and the grouted the advanced small pipes and the anchor pipes are welded with double-layer reinforcing mesh sheets as a whole; step five, concrete is sprayed to form a supporting wall. Compared with the prior art, the main track entering construction method for cross aisle fully and reasonably utilizes an existing mature construction method, so that the construction is convenient and fast.
Description
Technical field
The present invention relates to constructing metro tunnel field, it is logical that more particularly to a kind of transverse passage-way enters main track construction method, lateral road
Supporting member and transverse passage-way.
Background technology
Metro using mining method bored tunnel is by shaft excavation transverse passage-way, then opens in the transverse passage-way for performed preliminary bracing
Main track tunnel is dug, therefore repeatedly excavation is faced in transverse passage-way, stress transmission is complicated, affects construction safety.
The content of the invention
An object of the present invention is to provide a kind of transverse passage-way to enter main track construction method, and the transverse passage-way is applied into main track
Work method can adequately and reasonably utilize existing ripe construction means, fast and easy construction.
Technical scheme is:A kind of transverse passage-way enters main track construction method, is made up of following sequential steps:
1. surveying setting-out, puts place main track portal position on transverse passage-way side wall;
2. grid steel frame is installed in main track portal position, in grid steel frame internal arch part advanced tubule is set;
3. anchor tube and double layer bar are arranged on the side wall outside main track portal;
4. by advanced tubule and anchor tube slip casting, and it is welded as a whole with double steel bar mesh sheet;
5. gunite concrete, forms knee wall.
Preferably, the anchor tube is squeezed on the outside of transverse passage-way and main track tunnel in country rock.
The second object of the present invention is to provide a kind of transverse passage-way to lead to into the lateral road of formation after the construction of main track construction method
Supporting member.
Technical scheme is:
A kind of above-mentioned transverse passage-way enters the logical supporting member of the lateral road formed after the construction of main track construction method, and the lateral road is logical to be supported
Component by upper transverse passage-way portal preliminary bracing structure, lower transverse passage-way portal preliminary bracing structure, afterwards upper portal profile steel frame, it is front on
Portal profile steel frame, rear transverse passage-way preliminary bracing structure, front transverse passage-way preliminary bracing structure, rear support wall, front support wall, it is rear under
Portal profile steel frame and front lower portal profile steel frame composition, the rear support wall and the rear transverse passage-way preliminary bracing structure phase
Even, the front support wall is connected with the front transverse passage-way preliminary bracing structure, the upper transverse passage-way portal preliminary bracing structure with
Lower transverse passage-way portal preliminary bracing structure is respectively provided with transverse passage-way preliminary bracing structure in the rear and front transverse passage-way preliminary bracing
Superstructure and lower section, it is described after upper portal profile steel frame be arranged on the upper transverse passage-way portal preliminary bracing structure and it is described after
In the middle of transverse passage-way preliminary bracing structure, the front upper portal profile steel frame is arranged on the upper transverse passage-way portal preliminary bracing structure
In the middle of the front transverse passage-way preliminary bracing structure, the rear lower portal profile steel frame is arranged on the lower transverse passage-way portal initial stage
In the middle of supporting construction and the rear transverse passage-way preliminary bracing structure, the front lower portal profile steel frame is arranged on the lower transverse passage-way
In the middle of portal preliminary bracing structure and the front transverse passage-way preliminary bracing structure.
Preferably, the logical supporting member of the lateral road also include rear upper grid steel frame set arch, front upper grid steel frame set arch, after
Under The Grille steelframe set arch and front lower grid steel frame set arch.
Preferably, after described upper grid steel frame set arch be arranged on the upper transverse passage-way portal preliminary bracing structure with it is described
Between rear support wall, the front upper grid steel frame set arch is arranged on the upper transverse passage-way portal preliminary bracing structure with described front
Between buttress, the rear Under The Grille steelframe set arch is arranged on the lower transverse passage-way portal preliminary bracing structure and the rear support wall
Between, the front lower grid steel frame set arch be arranged on the lower transverse passage-way portal preliminary bracing structure and the front support wall it
Between.
The third object of the present invention is to provide a kind of transverse passage-way to lead to into the lateral road of formation after the construction of main track construction method.
Technical scheme is:
A kind of above-mentioned transverse passage-way enters the lateral road formed after the construction of main track construction method and leads to, including transverse passage-way portal, tunnel
Transverse passage-way main track, transverse passage-way preliminary bracing structure, Tunnel structure and tunnel double-lining, the lateral road is logical also to include slip casting
Anchor tube, grid steel frame set arch, double layer bar, portal profile steel frame, grouting pipe, main track advanced tubule and injection coagulation
Soil, the grouting pipe is arranged at the transverse passage-way portal, and the grid steel frame set arch is being arranged on the tunnel transverse passage-way just
At line portal.
Preferably, the main track advanced tubule is arranged on the grid steel frame set arch internal arch part.
Preferably, the grouting pipe is arranged on the grid steel frame set arch top, the portal profile steel frame and institute
State grid steel frame set arch adjacent.
Preferably, the double layer bar and grouting anchor pile are arranged on the side wall outside the tunnel transverse passage-way main track portal
On.
Compared with prior art, the beneficial effects of the present invention is:
The present invention effectively guarantees that main track ingate excavates safety, by anchor tube steel by set arch and per-fore pouring liquid with small pipe
Muscle net gunite concrete knee wall, can preferably replace interim steelframe to support, and can effectively be suppressed by abutment wall anchor tube and slip casting
Clearance convergence in transverse passage-way.
The present invention adequately and reasonably can be constructed by after anchor tube Spraying of reinforcement mat with concrete knee wall using existing maturation
Means, fast and easy construction.
It is of the invention then to can ensure that and transverse passage-way preliminary bracing structure comprehensive engagement stress using Spraying of reinforcement mat with concrete,
Stress is very reasonable.
Of the invention effectively to suppress surrouding rock deformation, squeezing into the anchor tube on the outside of transverse passage-way and main track tunnel in country rock can play soil
Nail is acted on, and improves self, effectively suppresses surrouding rock deformation..
Description of the drawings
Fig. 1 is the logical supporting member schematic diagram of lateral road formed after construction method construction of the present invention;
Fig. 2 is the logical planar structure schematic diagram of lateral road that the present invention does not inject concrete;
Fig. 3 is Fig. 2 section B-B structural representations;
Fig. 4 is Fig. 2A-A cross section structure schematic diagrams;
Fig. 5 is the logical planar structure of lateral road of present invention injection concrete;
Fig. 6 is Fig. 5 section B-B structural representations;
Fig. 7 is Fig. 5 Section A-A structural representations.
Specific embodiment
Below in conjunction with accompanying drawing, the invention will be further described.
Embodiment 1
A kind of metro built by mining method transverse passage-way enters main track construction method, is made up of following sequential steps:
1. surveying setting-out, the main track portal position measuring on transverse passage-way side wall goes out main track portal excavation contour line.
2. grid steel frame is installed in main track portal position, in grid steel frame internal arch part advanced tubule is set.
3. anchor tube and double layer bar are arranged on the side wall outside main track portal.
4. by advanced tubule and anchor tube slip casting, and it is welded as a whole with double steel bar mesh sheet.
5. gunite concrete, forms knee wall.
Embodiment 2
Fig. 1 is the logical supporting member of lateral road formed after above-mentioned construction method construction, and the logical supporting member of the lateral road is by upper horizontal logical
Road portal preliminary bracing structure 101, afterwards lower transverse passage-way portal preliminary bracing structure 102, upper portal profile steel frame 103, front upper hole
Door profile steel frame 104, rear transverse passage-way preliminary bracing structure 17, front transverse passage-way preliminary bracing structure 18, rear support wall 19, front support
Wall 110, afterwards lower portal profile steel frame 105 and front lower portal profile steel frame 16 are constituted.
Rear support wall 19 is connected with rear transverse passage-way preliminary bracing structure 17, front support wall 110 and front transverse passage-way preliminary bracing
Structure 18 is connected, and upper transverse passage-way portal preliminary bracing structure 101 and lower transverse passage-way portal preliminary bracing structure 102 are separately positioned on
Afterwards above and below transverse passage-way preliminary bracing structure 17 and front transverse passage-way preliminary bracing structure 18, portal profile steel frame 3 is gone up afterwards and is set
Put in the middle of upper transverse passage-way portal preliminary bracing structure 101 and rear transverse passage-way preliminary bracing structure 17, front upper portal profile steel frame
104 are arranged on 104 in the middle of transverse passage-way portal preliminary bracing structure 101 and front transverse passage-way preliminary bracing structure 18, and portal is descended afterwards
Profile steel frame 105 is arranged in the middle of lower transverse passage-way portal preliminary bracing structure 102 and rear transverse passage-way preliminary bracing structure 17, front lower
Portal profile steel frame 16 is arranged in the middle of lower transverse passage-way portal preliminary bracing structure 102 and front transverse passage-way preliminary bracing structure 18.
Rear support wall 19 is concrete rear support wall, and front support wall is concrete front support wall.
Temporary support component also includes rear upper grid steel frame set arch 111, front upper grid steel frame set arch 112, rear Under The Grille steel
Frame set arch 113 and front lower grid steel frame set arch 114.Grid steel frame set arch 111 is gone up afterwards is arranged on transverse passage-way portal preliminary bracing
Between structure 101 and rear support wall 19, front upper grid steel frame set arch 112 is arranged on transverse passage-way portal preliminary bracing structure 101
Between front support wall 110, rear Under The Grille steelframe set arch 113 is arranged on lower transverse passage-way portal preliminary bracing structure 102 with rear
Between buttress 19, front lower grid steel frame set arch 114 be arranged on lower transverse passage-way portal preliminary bracing structure 2 and front support wall 110 it
Between.
It is respectively arranged with anchor tube 115 in transverse passage-way preliminary bracing structure 17 and front transverse passage-way preliminary bracing structure 18 afterwards.
Embodiment 3
Fig. 2-4 is the logical component of lateral road that concrete is not injected in the method for embodiment 1, including transverse passage-way portal, tunnel are horizontal logical
Road main track, grouting anchor pile 1, grid steel frame set arch 3, transverse passage-way preliminary bracing structure 4, double layer bar 2, portal profile steel frame 6,
Grouting pipe 7, Tunnel structure 8, tunnel double-lining 9 and main track advanced tubule 10.
Grouting pipe 7 is arranged at transverse passage-way portal, and grid steel frame set arch 3 is arranged at tunnel transverse passage-way main track portal,
Main track advanced tubule 10 is arranged on grid steel frame set 3 internal arch parts of arch, and grouting pipe 7 is in the top of grid steel frame set arch 3, portal type
Steel steelframe 6 is adjacent with grid steel frame set arch 3.Double layer bar 2 and grouting anchor pile 1 are arranged on outside tunnel transverse passage-way main track portal
On side wall.
Transverse passage-way preliminary bracing structure 4 includes hole scope transverse passage-way preliminary bracing structure 5, holes a transverse passage-way initial stage
Protection structure 41, transverse passage-way preliminary bracing structural steel shape steelframe 42 is arranged on the periphery of transverse passage-way preliminary bracing structure 4, at the beginning of transverse passage-way
Phase supporting construction 4 is additionally provided with transverse passage-way preliminary bracing plug wall 43.Main track portal excavation contour line 11 is used to excavate.
Embodiment 4
Fig. 5-7 is that the method for embodiment 1 injects the logical component of the lateral road after concrete, and in the logical component of the lateral road embodiment is included
The logical supporting member of lateral road in 2, compared with Example 3, gunite concrete 12 forms mixed in double layer bar 2 in embodiment 4
Solidifying soil knee wall.
Claims (5)
1. a kind of transverse passage-way enters main track construction method, is made up of following sequential steps:
1. surveying setting-out, puts place main track portal position on transverse passage-way side wall;
2. grid steel frame is installed in main track portal position, in grid steel frame internal arch part advanced tubule is set;
3. anchor tube and double layer bar are arranged on the side wall outside main track portal;
4. by advanced tubule and anchor tube slip casting, and it is welded as a whole with double steel bar mesh sheet;
5. gunite concrete, forms knee wall;
The transverse passage-way entered the logical supporting member of the lateral road formed after the construction of main track construction method by the upper transverse passage-way portal initial stage
At the beginning of protection structure, lower transverse passage-way portal preliminary bracing structure, rear upper portal profile steel frame, front upper portal profile steel frame, rear transverse passage-way
Phase supporting construction, front transverse passage-way preliminary bracing structure, rear support wall, afterwards front support wall, lower portal profile steel frame and front lower portal
Profile steel frame is constituted, and the rear support wall is connected with the rear transverse passage-way preliminary bracing structure, the front support wall with it is described before
Transverse passage-way preliminary bracing structure is connected, the upper transverse passage-way portal preliminary bracing structure and lower transverse passage-way portal preliminary bracing structure
It is respectively provided with transverse passage-way preliminary bracing structure in the rear and front transverse passage-way preliminary bracing superstructure and lower section, the rear upper hole
Door profile steel frame is arranged in the middle of the upper transverse passage-way portal preliminary bracing structure and the rear transverse passage-way preliminary bracing structure, institute
Upper portal profile steel frame is arranged on the upper transverse passage-way portal preliminary bracing structure and the front transverse passage-way preliminary bracing knot before stating
In the middle of structure, at the beginning of the rear lower portal profile steel frame is arranged on the lower transverse passage-way portal preliminary bracing structure and the rear transverse passage-way
In the middle of phase supporting construction, the front lower portal profile steel frame be arranged on the lower transverse passage-way portal preliminary bracing structure and it is described before
In the middle of transverse passage-way preliminary bracing structure.
2. transverse passage-way according to claim 1 enters main track construction method, it is characterised in that:The anchor tube squeezes into transverse passage-way
In country rock on the outside of main track tunnel.
3. transverse passage-way according to claim 1 enters main track construction method, it is characterised in that:The rear support wall is coagulation
Tu Houzhichengqiang.
4. transverse passage-way according to claim 1 enters main track construction method, it is characterised in that:The lateral road leads to supporting member
Also include rear upper grid steel frame set arch, front upper grid steel frame set arch, rear Under The Grille steelframe set arch and front lower grid steel frame set arch.
5. transverse passage-way according to claim 4 enters main track construction method, it is characterised in that:Upper grid steel frame after described
Set arch is arranged between the upper transverse passage-way portal preliminary bracing structure and the rear support wall, the front upper grid steel frame set arch
It is arranged between the upper transverse passage-way portal preliminary bracing structure and the front support wall, the rear Under The Grille steelframe set arch is arranged
Between the lower transverse passage-way portal preliminary bracing structure and the rear support wall, the front lower grid steel frame set arch is arranged on institute
State between lower transverse passage-way portal preliminary bracing structure and the front support wall.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410811386.4A CN104632228B (en) | 2014-12-19 | 2014-12-19 | Main track entering construction method for cross aisle and cross aisle |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410811386.4A CN104632228B (en) | 2014-12-19 | 2014-12-19 | Main track entering construction method for cross aisle and cross aisle |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104632228A CN104632228A (en) | 2015-05-20 |
CN104632228B true CN104632228B (en) | 2017-04-12 |
Family
ID=53211407
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410811386.4A Expired - Fee Related CN104632228B (en) | 2014-12-19 | 2014-12-19 | Main track entering construction method for cross aisle and cross aisle |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104632228B (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106014442B (en) * | 2016-07-07 | 2018-03-02 | 云南省交通规划设计研究院 | A kind of vcehicular tunnel escape and rescue transverse passage-way method to set up |
CN108412522A (en) * | 2018-04-09 | 2018-08-17 | 长江勘测规划设计研究有限责任公司 | Underground engineering wall portal ruggedized construction and its construction method |
CN111379577B (en) * | 2020-01-08 | 2021-11-19 | 中铁隧道局集团有限公司 | Detachable U-shaped primary support method combined with shed cover construction |
CN112483094B (en) * | 2020-12-09 | 2023-03-31 | 中国铁路设计集团有限公司 | Construction method for reinforcing U-shaped structure of old tunnel |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102155233A (en) * | 2011-04-21 | 2011-08-17 | 上海市城市建设设计研究院 | Tunnel excavation construction method |
CN202768001U (en) * | 2012-08-08 | 2013-03-06 | 中铁二十局集团有限公司 | Arc bridge type integral supporting structure for inclined well bell mouth construction |
CN103174132A (en) * | 2013-02-07 | 2013-06-26 | 北京建工集团有限责任公司 | Construction method of minor diameter pile inside city underground construction underground excavation pilot tunnel |
CN104047621A (en) * | 2013-03-14 | 2014-09-17 | 上海市城市建设设计研究总院 | Construction method of cross aisle with high cross section under excavation conditions of basement with small clear distance at top |
-
2014
- 2014-12-19 CN CN201410811386.4A patent/CN104632228B/en not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102155233A (en) * | 2011-04-21 | 2011-08-17 | 上海市城市建设设计研究院 | Tunnel excavation construction method |
CN202768001U (en) * | 2012-08-08 | 2013-03-06 | 中铁二十局集团有限公司 | Arc bridge type integral supporting structure for inclined well bell mouth construction |
CN103174132A (en) * | 2013-02-07 | 2013-06-26 | 北京建工集团有限责任公司 | Construction method of minor diameter pile inside city underground construction underground excavation pilot tunnel |
CN104047621A (en) * | 2013-03-14 | 2014-09-17 | 上海市城市建设设计研究总院 | Construction method of cross aisle with high cross section under excavation conditions of basement with small clear distance at top |
Non-Patent Citations (5)
Title |
---|
地铁浅埋暗挖法车站进洞施工技术;苏斌;《山西建筑》;20050630(第12期);全文 * |
地铁竖井横通道破马头门施工技术研究;王福恩等;《安徽建筑》;20090620(第3期);全文 * |
城市地铁暗挖隧道特殊地段施工技术;朱成杰;《隧道建设》;20061230;第26卷(第6期);正文第3.1-3.3节,图1 * |
新哨隧道平导横通道进正洞挑顶技术方案;封波;《四川建材》;20120618(第3期);全文 * |
西山特长隧道斜井进入正洞交叉口施工技术;王鑫;《现代隧道技术》;20110815(第4期);正文第2-3节 * |
Also Published As
Publication number | Publication date |
---|---|
CN104632228A (en) | 2015-05-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108019222B (en) | A kind of tunnel lining structure and construction method using haydite filling | |
CN103758134B (en) | A kind of construction method combining Double-row Piles Support system | |
CN101864963B (en) | Large-section loess tunnel construction method | |
CN104653197B (en) | Method for constructing extra-large variable cross section tunnel | |
CN104047623B (en) | A kind of big across cavern excavation construction method | |
CN203547773U (en) | Channel combined support structure suitable for slowly inclined stratified rock mass | |
CN103375170A (en) | Underground excavation construction deformation control method for three-hole small clear distance tunnel underpass trunk railway | |
CN108798702B (en) | Supporting method for large-section soft rock large-deformation tunnel | |
CN104632228B (en) | Main track entering construction method for cross aisle and cross aisle | |
CN105696602A (en) | Composite pile-anchor supporting method and structure for deepening excavation | |
CN105201516B (en) | A kind of main structure of subway station and its tetrad arch PBA excavating construction methods | |
CN101539021B (en) | Road tunnel excavation method | |
CN206956742U (en) | High precipitous rock roadbed side slope repair system | |
CN103032080A (en) | Support method of weak and broken surrounding rock tunnel | |
CN203905018U (en) | Supporting and protecting system with combined double-row piles in combination with oblique anchors | |
CN104294769B (en) | A kind of piling and the construction method increasing the built bridge abutment structure of platform cap composite reinforcement | |
CN105064397A (en) | Open excavation construction method for expanding excavation of station on metro interzone shield tunnel foundation | |
CN110318772A (en) | Canal in Loess Area is greatly across the asymmetric bore tunnel supporting construction of small interval and construction method | |
CN103696784A (en) | Large-diameter long pipe curtain construction method for shallowly-buried large-span under-tunnel-passing architectural structure | |
CN102817621B (en) | Comprehensive construction method applicable to controlling arch basement sedimentation for tunnel in unfavorable geological conditions | |
CN106049195A (en) | Method for strengthening subgrade basement of existing high speed railway line | |
CN104632227A (en) | Subway station excavation technology of single-layer beam arch structure | |
CN109322313B (en) | Foundation pit enclosure structure system and its construction method | |
CN204097889U (en) | A kind of piling and the built bridge abutment structure of increase platform cap composite reinforcement | |
CN109538236A (en) | A kind of tunnel structure and tunnel construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170412 Termination date: 20171219 |
|
CF01 | Termination of patent right due to non-payment of annual fee |