CN204097889U - A kind of piling and the built bridge abutment structure of increase platform cap composite reinforcement - Google Patents
A kind of piling and the built bridge abutment structure of increase platform cap composite reinforcement Download PDFInfo
- Publication number
- CN204097889U CN204097889U CN201420531630.7U CN201420531630U CN204097889U CN 204097889 U CN204097889 U CN 204097889U CN 201420531630 U CN201420531630 U CN 201420531630U CN 204097889 U CN204097889 U CN 204097889U
- Authority
- CN
- China
- Prior art keywords
- former
- pile foundation
- newly
- platform cap
- increased
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 230000002787 reinforcement Effects 0.000 title claims abstract description 23
- 239000002131 composite material Substances 0.000 title claims abstract description 16
- 210000000481 breast Anatomy 0.000 claims abstract description 29
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 28
- 239000011440 grout Substances 0.000 claims abstract description 19
- 206010048865 Hypoacusis Diseases 0.000 claims abstract description 18
- 238000013461 design Methods 0.000 claims description 12
- 238000005728 strengthening Methods 0.000 abstract description 3
- 238000005516 engineering process Methods 0.000 abstract description 2
- 238000010276 construction Methods 0.000 description 25
- 238000000034 method Methods 0.000 description 23
- 239000002689 soil Substances 0.000 description 11
- 239000004567 concrete Substances 0.000 description 10
- 239000007943 implant Substances 0.000 description 9
- 229910000831 Steel Inorganic materials 0.000 description 8
- 239000010959 steel Substances 0.000 description 8
- 230000008569 process Effects 0.000 description 7
- 230000007547 defect Effects 0.000 description 5
- 238000009415 formwork Methods 0.000 description 5
- 230000032683 aging Effects 0.000 description 4
- 238000009412 basement excavation Methods 0.000 description 4
- 238000005056 compaction Methods 0.000 description 4
- 230000000295 complement effect Effects 0.000 description 4
- 238000002513 implantation Methods 0.000 description 4
- 235000008733 Citrus aurantifolia Nutrition 0.000 description 2
- 206010068052 Mosaicism Diseases 0.000 description 2
- 235000011941 Tilia x europaea Nutrition 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 239000004571 lime Substances 0.000 description 2
- 210000003765 sex chromosome Anatomy 0.000 description 2
- 238000012360 testing method Methods 0.000 description 2
- 230000009466 transformation Effects 0.000 description 2
- 229910001294 Reinforcing steel Inorganic materials 0.000 description 1
- 238000007596 consolidation process Methods 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000018109 developmental process Effects 0.000 description 1
- 230000006870 function Effects 0.000 description 1
- 238000007429 general method Methods 0.000 description 1
- 230000001788 irregular Effects 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- 230000008521 reorganization Effects 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
- 238000004088 simulation Methods 0.000 description 1
- 230000006641 stabilisation Effects 0.000 description 1
- 238000011105 stabilization Methods 0.000 description 1
Landscapes
- Bridges Or Land Bridges (AREA)
- Foundations (AREA)
Abstract
Description
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420531630.7U CN204097889U (en) | 2014-09-16 | 2014-09-16 | A kind of piling and the built bridge abutment structure of increase platform cap composite reinforcement |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420531630.7U CN204097889U (en) | 2014-09-16 | 2014-09-16 | A kind of piling and the built bridge abutment structure of increase platform cap composite reinforcement |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204097889U true CN204097889U (en) | 2015-01-14 |
Family
ID=52266332
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420531630.7U Expired - Lifetime CN204097889U (en) | 2014-09-16 | 2014-09-16 | A kind of piling and the built bridge abutment structure of increase platform cap composite reinforcement |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204097889U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105568871A (en) * | 2015-12-15 | 2016-05-11 | 中国人民解放军军事交通学院 | Method for building temporary abutment of emergency bridge by using containers |
CN106884377A (en) * | 2017-04-13 | 2017-06-23 | 重庆正达工程咨询有限公司 | A kind of abutment prestressed reinforcement frame mounting and reinforcement means |
CN109487785A (en) * | 2018-12-25 | 2019-03-19 | 贵州建工集团第四建筑工程有限责任公司 | Combined type ruggedized construction and its construction method based on building pile foundation |
CN110016869A (en) * | 2019-04-23 | 2019-07-16 | 孙璐 | The improved method that deck installation structure designs when a kind of bridge widening |
-
2014
- 2014-09-16 CN CN201420531630.7U patent/CN204097889U/en not_active Expired - Lifetime
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105568871A (en) * | 2015-12-15 | 2016-05-11 | 中国人民解放军军事交通学院 | Method for building temporary abutment of emergency bridge by using containers |
CN105568871B (en) * | 2015-12-15 | 2018-01-12 | 中国人民解放军军事交通学院 | A kind of method based on using the interim abutment construction of container progress emergency bridge |
CN106884377A (en) * | 2017-04-13 | 2017-06-23 | 重庆正达工程咨询有限公司 | A kind of abutment prestressed reinforcement frame mounting and reinforcement means |
CN109487785A (en) * | 2018-12-25 | 2019-03-19 | 贵州建工集团第四建筑工程有限责任公司 | Combined type ruggedized construction and its construction method based on building pile foundation |
CN109487785B (en) * | 2018-12-25 | 2024-05-31 | 贵州建工集团第四建筑工程有限责任公司 | Combined reinforcing structure based on building pile foundation and construction method thereof |
CN110016869A (en) * | 2019-04-23 | 2019-07-16 | 孙璐 | The improved method that deck installation structure designs when a kind of bridge widening |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104294769B (en) | A kind of piling and the construction method increasing the built bridge abutment structure of platform cap composite reinforcement | |
CN106499413B (en) | A kind of Shallow-buried section tunnel stratum consolidation construction method | |
CN106522242B (en) | For soft stratum close to underground structure foundation pit supporting system construction method | |
CN103696784B (en) | Large-diameter long pipe curtain construction method for shallowly-buried large-span under-tunnel-passing architectural structure | |
CN105736001B (en) | A kind of construction method using prefabricated parts subway station | |
CN101509261B (en) | Method for pile plate base for ultra-high voltage electric power line steel tower on soft foundation | |
CN206956742U (en) | High precipitous rock roadbed side slope repair system | |
CN105804119A (en) | Underground corridor structure with dual-purpose pile foundations and construction method of underground corridor structure | |
CN102758458B (en) | Underground continuous wall repairing method | |
CN107419731A (en) | A kind of board-like double-row pile foundation pit support structure of counterfort and its construction method | |
CN204097889U (en) | A kind of piling and the built bridge abutment structure of increase platform cap composite reinforcement | |
CN205024712U (en) | Combined tower crane foundation | |
CN105780719A (en) | Heightened construction method for active service stone building bank protecting wall | |
CN104947681A (en) | Super large super deep basement ground pit construction method | |
CN109898521A (en) | A kind of anchored pile supporting and construction method for foundation pit external corner | |
CN204825867U (en) | As composite pile structure of secretly digging garage stand | |
CN101215840A (en) | Airplane type foundation reinforcing and prestressing method | |
CN111622234B (en) | Unloading type thin-wall box-type retaining wall supported by obliquely and vertically combined steel pipe pile and construction process | |
CN102966109A (en) | Method for constructing zonal deep foundation pit bottom sealing of soft soil foundation | |
CN203891047U (en) | Equipment equipped with steel platform for foundation construction of land bridge | |
CN105484270A (en) | Reinforcement protection construction method of high steep old rubble retaining wall adjacent to deep foundation pit | |
CN206385549U (en) | For soft stratum close to underground structure foundation pit supporting system | |
CN212642730U (en) | Collapsible loess area tunnel passes people's air defense structure | |
CN103866788A (en) | Retaining wall reformation method for column type bridge abutment foreslope | |
CN205205697U (en) | Keep on abutment stake platform combined type reinforced structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C53 | Correction of patent of invention or patent application | ||
CB03 | Change of inventor or designer information |
Inventor after: Zhang Xiuling Inventor after: Wu Desheng Inventor after: Wan Li Inventor after: Congruhui Inventor after: Li Ji Inventor after: He Hui Inventor after: Zhang Lei Inventor after: Shen Yuewu Inventor after: Ling Hongyi Inventor before: Zhang Xiuling Inventor before: Wu Desheng Inventor before: Wan Li |
|
COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: ZHANG XIULING WU DESHENG WAN LI TO: ZHANG XIULING WU DESHENG WAN LI CONG RUHUI LI JI HE HUI ZHANG LEI SHEN YUEWU LING HONGYI |
|
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: 230041 Suixi Road, Anhui, China, No. 310, No. Patentee after: ANHUI GOURGEN TRAFFIC CONSTRUCTION CO.,LTD. Address before: 230041 No. 310, Suixi Road, Luyang District, Anhui, Hefei Patentee before: ANHUI GOURGEN TRAFFIC CONSTRUCTION Co.,Ltd. |
|
CX01 | Expiry of patent term |
Granted publication date: 20150114 |