CN105568871A - Method for building temporary abutment of emergency bridge by using containers - Google Patents

Method for building temporary abutment of emergency bridge by using containers Download PDF

Info

Publication number
CN105568871A
CN105568871A CN201510953207.5A CN201510953207A CN105568871A CN 105568871 A CN105568871 A CN 105568871A CN 201510953207 A CN201510953207 A CN 201510953207A CN 105568871 A CN105568871 A CN 105568871A
Authority
CN
China
Prior art keywords
container
abutment
containers
concrete
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510953207.5A
Other languages
Chinese (zh)
Other versions
CN105568871B (en
Inventor
张云红
李聚轩
孙奇
郑义
程万里
雷克平
乔伟
田广才
汪建伟
张静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Army Military Transportation University
Original Assignee
Military Transportation University of PLA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Military Transportation University of PLA filed Critical Military Transportation University of PLA
Priority to CN201510953207.5A priority Critical patent/CN105568871B/en
Publication of CN105568871A publication Critical patent/CN105568871A/en
Application granted granted Critical
Publication of CN105568871B publication Critical patent/CN105568871B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)
  • Revetment (AREA)

Abstract

According to the technical scheme, a method for building a temporary abutment of an emergency bridge by using containers comprises steps as follows: Step 1, selection of the containers: selecting the containers of a certain model according to the actual requirement; Step 2, treatment of the containers and fields; Step 3, post-treatment of the containers after placement: after the containers are placed, gaps in embankment connection positions are filled with graded gravel or concrete. The method has the benefits as follows: 1, the container abutment is good in integrity, the self-weight is increased and the shock resistance is improved after the abutment is filled with the gravel or the concrete, under the action of wall boards and top and bottom beams, the integrity of the containers is high, and the abutment is higher in erosion resistance than traditional abutments filled with stones or sandbags; 2, the method is quicker than a method for building a gravel abutment directly on site; 3, the containers are generally used, the operation for building the abutment with the containers is simple, compared with permanent abutment building, materials are convenient to obtain, erection is simple, traffic recovery is quicker.

Description

A kind of method based on utilizing container to carry out the interim abutment construction of emergency bridge
Technical field
The present invention relates to Highway and Railway Engineering technical field, particularly relating to a kind of method based on utilizing container to carry out the interim abutment construction of emergency bridge.
Background technology
Bridge is very easily damaged in natural calamity or wartime, causes great negative effect, affect huge to rescue and relief work and communications and transportation in wartime, in Wenchuan earthquake, Lushan earthquake and all previous war, all demonstrate this point.The method that current Abutment Reinforcement is repaired mainly contains: for slight damage, adopts crack grouting and reinforcing and waterproofing work, and side wall and the damage of abutment body leading edge adopt cast-in-situ steel reinforced concrete reinforcement; During leakiness of banketing, can adopt to change and fill out or the method such as slip casting; Destroy serious for abutment body, then need to rebuild as early as possible, can according to bridge engineering index formation abutment, but the construction period is long, can not meet the needs of emergent communications and transportation; Two is the Uniformed Bridge rush repair equipment erection temporary bridges adopting official reserves, but Uniformed Bridge rush repair equipment deposit less, transportation range is far away; Three is use the local expedient material that can raise to set up interim abutment, as the wooden abutment of volunteers' erection in Korean War, in the earthquake relief work of Wenchuan, parachutist uses the interim abutment of steel wood mixed material erection, its shortcoming is that bearing capacity is unstable, and below bridge, headroom is low can not meet current by requiring.
Summary of the invention
The object of the invention is the technological deficiency for existing in prior art, and a kind of method based on utilizing container to carry out the interim abutment construction of emergency bridge is provided.
For realizing object of the present invention, the technical solution adopted in the present invention is: a kind of method based on utilizing container to carry out the interim abutment construction of emergency bridge, described method comprises the steps:
Step 1, choosing of container: according to the actual requirements, chooses the container of certain model;
Step 2, the process in container and place: former for container lay down location abutment is cleared up, ground leveling, compacting, make both sides abutment end face absolute altitude consistent, to ensure that superstructure is steady; Fill appropriate sandy soil in container, increase anti-side and move power and anti-impact brushing force, cross sandstone with filling or concrete container does abutment, when container apical side height is higher than predetermined finite element, by container base earthwork excavation, the height of adjustment abutment; When single container height is inadequate, container can be piled up, corner fittings fastener connects, and as abutment, can pile up at most two-layer, determine every layer of container number according to riverbed geological condition.
Step 3, post processing laid by container: after container enters position, by space graded broken stone or concrete embankment with embankment junction.
Compared with prior art, the invention has the beneficial effects as follows: 1. container abutment, good integrity, after inserting sandstone or concrete, deadweight increases, and anti-impact force improves, and due to wallboard and top end beam action, the globality of container is strong, and fill compared to traditional sandstone or sandbag, erosion resistibility is stronger; 2. the sandstone of container abutment is filled, and can carry out in place near bridge, increases working area, compared to directly filling sandstone abutment at the scene, faster; 3. container use is general, builds abutment simple to operate with container, compared to constructing permanent abutment, drawing materials conveniently, setting up simply, resuming traffic more quick.
Accompanying drawing explanation
Figure 1 shows that enforcement view of the present invention;
In figure: 1. original road surface, 2. asphalt concrete layer, 3. superstructure, 4. embankment, 5. cone, 6. container, 7. face, riverbed.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the present invention is described in further detail.Should be appreciated that specific embodiment described herein only in order to explain the present invention, be not intended to limit the present invention.
Should be noted that, " connection " described in the application and the word for expressing " connection ", as " being connected ", " being connected " etc., it both can refer to a certain parts with another parts and directly be connected, and also can refer to a certain parts and was connected with another parts by miscellaneous part.
As shown in Figure 1, the embodiment of the present invention comprises the steps:
1. the choosing of container model
For the ease of transporting and laying, 20 chi standard container selected by container abutment, and this type container structure size is about 6m × 2.4m × 2.4m.Maximum employing two superimposed, determines every layer of container number according to riverbed geological condition.
Number can be determined according to following table.
2. the process in container and place
Cross sandstone with filling or concrete container does abutment, when single container height is inadequate, container can be piled up, corner fittings fastener connects, as abutment.When container apical side height is higher than predetermined finite element, by container base earthwork excavation, adjust the height of abutment; When single container height is inadequate, container can be piled up, corner fittings fastener connects, and as abutment, can pile up at most two-layer, highly reach 5.2m, increases under-clearance.Container frame structure supporting capacity is comparatively large, and its surrounding corner fittings can play the effect of constraint transverse shifting; When superstructure gross mass and a logical year vehicular gross combined weight are greater than 20000kg, penetration concrete in container is needed to improve supporting capacity.Use cutting equipment (mechanical cutting device and thermal cutting equipment can be used) before pouring into, container top boxboard is excised.When pouring in order to prevent lateral pressure excessive, each influx height controls within 1m, after having built 1-2h, continues perfusion; When container is piled up two-layer, squeeze into HW200 × 200 shaped steel (or the equal shaped steel of sectional area) in container corner, opposing lateral force, to improve resistance to overturning.When container abutment is used for the rush repair stage, former for container lay down location abutment need be cleared up, ground leveling, compacting, make both sides abutment end face absolute altitude consistent, to ensure that superstructure is steady; Fill appropriate sandy soil in container, increase anti-side and move power and anti-impact brushing force.If abutment needs to use to the stage of rebuilding, need fill concrete in container, during fill concrete, concrete grammar can operation as follows:
1. container roof plate is cut the hole of two 1m × 1m, be convenient to build and vibrated concrete, chamber door is locked, and gap suitably seals;
2. container is placed on desired location, if bottom container then requires levelling of the land, through preliminary consolidation, prevents lateral tilt;
3. inside container corner, squeeze into 4 HW200 × 200 shaped steel (or uniform section long-pending other shaped steel), ensure that shaped steel outer rim is not less than 50mm apart from side plate distance, its height is identical with finite element;
4. laminated pouring C20 concrete, every layer thickness is about 1m.Every layer of cast is spaced apart 1 hour, depending on the circumstances or the needs of the situation, can build early strength concrete;
5. by adjacent container at corner fittings place Plate Welding.
Sandstone filled by container or concrete can according to conditions such as site machinery Lifting Capacity and emergency repair time, and employing is first laid and recharged, or lifts the mode into position again after filling outside place.
3. post processing laid by container
After container enters position, by space graded broken stone or concrete embankment with embankment junction.The cone being highly not less than 100cm piled up by container abutment leading edge sandstone or concrete, to prevent water stream washing away basis under container, if be non-crossing bridge, can not carry out this process.
After Abutment process, just can carry out the repairing of bridge superstructure.
The above is only the preferred embodiment of the present invention; it should be pointed out that for those skilled in the art, under the premise without departing from the principles of the invention; can also make some improvements and modifications, these improvements and modifications also should be considered as protection scope of the present invention.

Claims (3)

1., based on the method utilizing container to carry out the interim abutment construction of emergency bridge, it is characterized in that, described method comprises the steps:
Step 1, choosing of container: according to the actual requirements, chooses the container of certain model;
Step 2, the process in container and place: former for container lay down location abutment is cleared up, ground leveling, compacting, make both sides abutment end face absolute altitude consistent, to ensure that superstructure is steady; Fill appropriate sandy soil in container, increase anti-side and move power and anti-impact brushing force, cross sandstone with filling or concrete container does abutment, when container apical side height is higher than predetermined finite element, by container base earthwork excavation, the height of adjustment abutment; When single container height is inadequate, container can be piled up, corner fittings fastener connects, and as abutment, can pile up at most two-layer, determine every layer of container number according to riverbed geological condition.
Step 3, post processing laid by container: after container enters position, by space graded broken stone or concrete embankment with embankment junction.
2. a kind of method based on utilizing container to carry out the interim abutment construction of emergency bridge according to claim 1, is characterized in that,
If abutment needs to use to the stage of rebuilding, need fill concrete in container, the method for fill concrete comprises the steps:
Step 101, cuts the hole of two 1m × 1m by container roof plate, be convenient to build and vibrated concrete, chamber door is locked, and gap suitably seals;
Step 102, is placed on desired location by container, if bottom container then requires levelling of the land, through preliminary consolidation, prevents lateral tilt;
Step 103, squeezes into shaped steel inside container corner, ensures that shaped steel outer rim is not less than 50mm apart from side plate distance, and its height is identical with finite element;
Step 104, laminated pouring C20 concrete, every layer thickness is about 1m, and every layer of cast is spaced apart 1 hour, depending on the circumstances or the needs of the situation, can build early strength concrete;
Step 105, by adjacent container at corner fittings place Plate Welding.
3. a kind of method based on utilizing container to carry out the interim abutment construction of emergency bridge according to claim 2, it is characterized in that, the cone being highly not less than 100cm piled up by container abutment leading edge sandstone or concrete, to prevent water stream washing away basis under container.
CN201510953207.5A 2015-12-15 2015-12-15 A kind of method based on using the interim abutment construction of container progress emergency bridge Active CN105568871B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510953207.5A CN105568871B (en) 2015-12-15 2015-12-15 A kind of method based on using the interim abutment construction of container progress emergency bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510953207.5A CN105568871B (en) 2015-12-15 2015-12-15 A kind of method based on using the interim abutment construction of container progress emergency bridge

Publications (2)

Publication Number Publication Date
CN105568871A true CN105568871A (en) 2016-05-11
CN105568871B CN105568871B (en) 2018-01-12

Family

ID=55879461

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510953207.5A Active CN105568871B (en) 2015-12-15 2015-12-15 A kind of method based on using the interim abutment construction of container progress emergency bridge

Country Status (1)

Country Link
CN (1) CN105568871B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107905130A (en) * 2017-10-26 2018-04-13 合肥学院 A kind of anti-Rolling Stone percussion mechanism of bridge pier based on waste and old Container Reconstruction
CN110656576A (en) * 2019-09-26 2020-01-07 中国二十冶集团有限公司 Pier structure and construction method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203755141U (en) * 2014-03-25 2014-08-06 宋金博 Novel high-strength waterproof concrete bridge abutment building block
CN104195961A (en) * 2014-09-02 2014-12-10 司徒毅 Highway bridge technical condition examination and evaluation method
CN204097889U (en) * 2014-09-16 2015-01-14 安徽省交通建设有限责任公司 A kind of piling and the built bridge abutment structure of increase platform cap composite reinforcement
JP2015055085A (en) * 2013-09-11 2015-03-23 公益財団法人鉄道総合技術研究所 Earthquake strengthening method for bridge for preventing bridge fall

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015055085A (en) * 2013-09-11 2015-03-23 公益財団法人鉄道総合技術研究所 Earthquake strengthening method for bridge for preventing bridge fall
CN203755141U (en) * 2014-03-25 2014-08-06 宋金博 Novel high-strength waterproof concrete bridge abutment building block
CN104195961A (en) * 2014-09-02 2014-12-10 司徒毅 Highway bridge technical condition examination and evaluation method
CN204097889U (en) * 2014-09-16 2015-01-14 安徽省交通建设有限责任公司 A kind of piling and the built bridge abutment structure of increase platform cap composite reinforcement

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
陈正诚等: "《灾后临时桥梁施工技术之研发》", 30 September 2010 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107905130A (en) * 2017-10-26 2018-04-13 合肥学院 A kind of anti-Rolling Stone percussion mechanism of bridge pier based on waste and old Container Reconstruction
CN110656576A (en) * 2019-09-26 2020-01-07 中国二十冶集团有限公司 Pier structure and construction method thereof

Also Published As

Publication number Publication date
CN105568871B (en) 2018-01-12

Similar Documents

Publication Publication Date Title
CN108060683B (en) A kind of middle weathering geology top-down construction method
CN102691300B (en) Construction method of foundation pit earthwork
CN106703050A (en) Expansive soil road cutting side slope reinforced soil back-pressure seepage-preventive supporting structure and construction method thereof
CN103696784B (en) Large-diameter long pipe curtain construction method for shallowly-buried large-span under-tunnel-passing architectural structure
CN105155558A (en) Combined retaining structure and construction method thereof
CN105568805B (en) A method of it is repaired based on circuit embankment along the river is carried out using container
CN102352590A (en) Method for splicing highfill roadbed by adopting pile-sheet retaining wall
WO2017084573A1 (en) Upheaval-resisting support structure
KR20140075767A (en) Retaining wall construction using site compaction and excavation
CN111305027B (en) Rapid repairing construction method and repairing structure for subsidence of karst area pavement
CN109750571A (en) A kind of road landslide emergency and permanent supporting and retaining system integral structure and construction method
CN108374663B (en) Twice-molding construction method for sandy gravel geological tunnel
CN109914470A (en) A kind of road shoulder barricade and its construction method
CN105421488B (en) The construction method of sole plate support replacement in the combined fender construction system of underground
CN108385612B (en) Construction method of concrete protective panel with good stability
CN112049011B (en) Reverse construction method for large-span prestressed cast-in-place bridge
CN105568871A (en) Method for building temporary abutment of emergency bridge by using containers
CN113502828A (en) Processing method for early warning of deep foundation pit
CN212200464U (en) Large prefabricated lattice beam structure for slope reinforcement
CN102493485A (en) Method for building slope protection retaining wall during filling
CN110241863B (en) Soft soil foundation pit excavation process pipe gallery deformation control device and control method thereof
CN205223874U (en) Emergent bridge with novel interim abutment
CN105544400B (en) A kind of method based on using the interim bridge pier construction of container progress emergency bridge
CN105113350A (en) Pier abutment roadbed structure and construction method
CN109083442A (en) The construction method of dynamic load bearing structure when existing building is docked with newly-built basis

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 300161 No.1, dongjuzi, Chenglin Road, Hedong District, Tianjin

Patentee after: ARMY MILITARY TRANSPORTATION University

Address before: No.1, dongjuzi, Hedong District, Tianjin, 300361

Patentee before: Military Transportation University of PLA