CN204644799U - A kind of four line ballastless track roadbed pile slab structure - Google Patents

A kind of four line ballastless track roadbed pile slab structure Download PDF

Info

Publication number
CN204644799U
CN204644799U CN201520302434.7U CN201520302434U CN204644799U CN 204644799 U CN204644799 U CN 204644799U CN 201520302434 U CN201520302434 U CN 201520302434U CN 204644799 U CN204644799 U CN 204644799U
Authority
CN
China
Prior art keywords
ballastless track
pile
slab
subgrade
armored concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520302434.7U
Other languages
Chinese (zh)
Inventor
张华莹
王应铭
姚宏乐
秦旗
刘钰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway First Survey and Design Institute Group Ltd
Original Assignee
China Railway First Survey and Design Institute Group Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway First Survey and Design Institute Group Ltd filed Critical China Railway First Survey and Design Institute Group Ltd
Priority to CN201520302434.7U priority Critical patent/CN204644799U/en
Application granted granted Critical
Publication of CN204644799U publication Critical patent/CN204644799U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Railway Tracks (AREA)

Abstract

The utility model relates to a kind of four line ballastless track roadbed pile slab structure.In high speed railway station, station track is numerous, and it is high that roadbed controls the depth of fill by landform and grade separation, and formation condition is poor, and non-fragment orbit requires high to post-construction settlement of subgrade.The utility model comprises embankment noumenon, longitudinally arranges many placing of reinforcements concrete pile, often arranges four, runs through embankment noumenon and be arranged at below above-ground route downwards; Reinforced concrete pile end face arranges armored concrete slab, and top has performed bottom layer of subgrade, surface layer of subgrade bed and ballastless track structure from bottom to top successively; The position of ballastless track structure corresponds to reinforced concrete pile; Armored concrete slab bottom surface is provided with concrete leveling layer.The utility model have effective control settlement, convenient construction, the optimization duration, with bridge engineering than advantages such as investment reduction, can be applicable to that embankment in high ferro station is too high, non-fragment orbit is laid in multiply road, transversary thing is intensive, changeover portion arranges frequently, be not suitable for arranging in the roadbed design of bridge engineering.

Description

A kind of four line ballastless track roadbed pile slab structure
Technical field
the utility model relates to a kind of high-speed railway subgrade foundation structure, is specifically related to a kind of four line ballastless track roadbed pile slab structure.
Background technology
In high-speed railway large-scale station, station track is more, non-fragment orbit is laid to hair line in main track and adjacent both sides, it is high that roadbed controls the depth of fill by landform and grade separation, formation condition is poor, and transversary thing is intensive in station, changeover portion is frequently arranged, and roadbed adopts complex ground treatment settlement after construction to be difficult to control, bridge is established station difficulty comparatively large, invest high.
Summary of the invention
The purpose of this utility model is to provide a kind of four line ballastless track roadbed pile slab structure, effectively can control post-construction settlement of subgrade, the reduction of erection time, investment reduction.
The technical scheme that the utility model adopts is:
A kind of four line ballastless track roadbed pile slab structure, comprise the embankment noumenon that above-ground route is arranged, it is characterized in that:
Longitudinally many placing of reinforcements concrete pile is set, often arranges four, run through embankment noumenon and be arranged at below above-ground route downwards;
Reinforced concrete pile end face arranges armored concrete slab, has performed bottom layer of subgrade, surface layer of subgrade bed and ballastless track structure successively from bottom to top above armored concrete slab;
The position of ballastless track structure corresponds to reinforced concrete pile.
Armored concrete slab bottom surface is provided with concrete leveling layer.
Longitudinal reinforcement in reinforced concrete pile stretches into armored concrete slab.
The longitudinal separation of each placing of reinforcement concrete pile is 4.5m.
Armored concrete slab longitudinal separation is provided with horizontal shrinkage joint, and the longitudinal separation at each shrinkage joint is not more than 150m.
Armored concrete slab end and bridges and culverts or transversary thing joint, the platform back of the body or headwall establish bracket, and armored concrete slab end is placed on bracket, and and arrange the wide shrinkage joint of 3cm, filled and process rubber tile in seam between abutment tail or abutment wall.
Bottom layer of subgrade end face corresponds to ballastless track structure and is divided into four parts, and the two parts at two ends, left and right have a down dip to the inside, and middle two parts are along connecing two ends and to center updip;
Surface layer of subgrade bed bottom shape is adapted to bottom layer of subgrade top surface shape.
It is domatic that bottom layer of subgrade both lateral sides end is set to outwards to have a down dip.
The utility model has the following advantages:
1, four line ballastless track roadbed pile slab structure are to bear upper load by reinforced concrete pile bearing bar concrete slab, a kind of novel foundation of road bed form of structure, effectively can control the settlement after construction of roadbed, can be widely used in the roadbed design such as railway, highway that transverse width is large, settlement Control is strict.
2, four line ballastless track roadbed pile slab structure bottoms are that bored pile penetrates features as poor geologic condition stratum, top is the armored concrete slab bearing load imbedded in roadbed filling, in length and breadth to defining a kind of brand-new continuous structure, significantly can reduce the impact that temperature Change produces armored concrete slab, effective control structure distortion and in length and breadth to differential settlement; Avoid shrinkage joint to produce stress to concentrate and the impact of knuckle on non-fragment orbit, ensure the ride comfort of the reliable and stable and rail system of subgrade construction.
3, four line ballastless track roadbed pile slab structure effectively can solve damp sink of foundation distortion and the series of problems such as compressive strain, the compressive strain of high made ground section filler.
4, four line ballastless track roadbed pile slab structure and bridge, transversary thing joint, without the need to arranging changeover portion, longitudinal rigidity is consistent.
5, four line ballastless track roadbed pile slab structure are compared with long-short-pile composite foundation, and without the need to piling prepressing, can save the duration being no less than 6 months, short-term direct economic benefit is obvious.
6, four line ballastless track roadbed pile slab structure are compared with bridge, significantly can reduce construction investment.
Accompanying drawing explanation
Fig. 1 is the utility model structure transverse face figure.
In figure, 1-reinforced concrete pile, 2-armored concrete slab, 3-embankment noumenon, 4-concrete leveling layer, 5-bottom layer of subgrade, 6-surface layer of subgrade bed, 7-ballastless track structure.
Detailed description of the invention
Below in conjunction with detailed description of the invention, the utility model is described in detail.
The one four line ballastless track roadbed pile slab structure that the utility model relates to, comprises the embankment noumenon 3 that above-ground route is arranged, successively fills.Longitudinally arranging many placing of reinforcements concrete pile 1, is reinforced concrete bored pile, often arranges four, runs through embankment noumenon 3 and be arranged at below above-ground route downwards.Reinforced concrete pile 1 end face arranges armored concrete slab 2, forms roadbed pile slab structure, bears upper load.Bottom layer of subgrade 5, surface layer of subgrade bed 6 and ballastless track structure 7 has been performed from bottom to top successively above armored concrete slab 2.The position of ballastless track structure 7 corresponds to reinforced concrete pile 1.Armored concrete slab 2 bottom surface is provided with concrete leveling layer 4.Roadbed body 3 adopts C group and above filler; Bottom layer of subgrade 5 adopts conditioned soil or B group and above filler; Surface layer of subgrade bed 6 adopts graded broken stone water mixing mud.
Longitudinal reinforcement in reinforced concrete pile 1 stretches into armored concrete slab 2, and the longitudinal separation of each placing of reinforcement concrete pile 1 is 4.5m.Armored concrete slab 2 longitudinal separation is provided with horizontal shrinkage joint, and the longitudinal separation at each shrinkage joint is not more than 150m.Armored concrete slab 2 end and bridges and culverts or transversary thing joint, the platform back of the body or headwall establish bracket, and armored concrete slab 2 end is placed on bracket, and and arrange the wide shrinkage joint of 3cm, filled and process rubber tile in seam between abutment tail or abutment wall.
Bottom layer of subgrade 5 end face corresponds to ballastless track structure 7 and is longitudinally divided into four parts, and the two parts at two ends, left and right have a down dip to the inside (gradient is 4%), and middle two parts are along connecing two ends and to center updip (gradient is 4%); Surface layer of subgrade bed 6 bottom shape is adapted to bottom layer of subgrade 5 top surface shape.Bottom layer of subgrade 5 both lateral sides end is set to domatic (gradient is 1:1.5) that outwards have a down dip.
Content of the present utility model is not limited to cited by embodiment, and the conversion of those of ordinary skill in the art by reading the utility model manual to any equivalence that technical solutions of the utility model are taked, is claim of the present utility model and contains.

Claims (8)

1. four line ballastless track roadbed pile slab structure, comprise the embankment noumenon (3) that above-ground route is arranged, it is characterized in that:
Longitudinally many placing of reinforcements concrete pile (1) is set, often arranges four, run through embankment noumenon (3) and be arranged at below above-ground route downwards;
Reinforced concrete pile (1) end face arranges armored concrete slab (2), and armored concrete slab (2) top has performed bottom layer of subgrade (5), surface layer of subgrade bed (6) and ballastless track structure (7) from bottom to top successively;
The position of ballastless track structure (7) corresponds to reinforced concrete pile (1).
2. a kind of four line ballastless track roadbed pile slab structure according to claim 1, is characterized in that:
Armored concrete slab (2) bottom surface is provided with concrete leveling layer (4).
3. a kind of four line ballastless track roadbed pile slab structure according to claim 2, is characterized in that:
Longitudinal reinforcement in reinforced concrete pile (1) stretches into armored concrete slab (2).
4. a kind of four line ballastless track roadbed pile slab structure according to claim 3, is characterized in that:
The longitudinal separation of each placing of reinforcement concrete pile (1) is 4.5m.
5. a kind of four line ballastless track roadbed pile slab structure according to claim 4, is characterized in that:
Armored concrete slab (2) longitudinal separation is provided with horizontal shrinkage joint, and the longitudinal separation at each shrinkage joint is not more than 150m.
6. a kind of four line ballastless track roadbed pile slab structure according to claim 5, is characterized in that:
Armored concrete slab (2) end and bridges and culverts or transversary thing joint, the platform back of the body or headwall establish bracket, and armored concrete slab (2) end is placed on bracket, and and arrange the wide shrinkage joint of 3cm, filled and process rubber tile in seam between abutment tail or abutment wall.
7. a kind of four line ballastless track roadbed pile slab structure according to claim 6, is characterized in that:
Bottom layer of subgrade (5) end face corresponds to ballastless track structure (7) and is divided into four parts, and the two parts at two ends, left and right have a down dip to the inside, and middle two parts are along connecing two ends and to center updip;
Surface layer of subgrade bed (6) bottom shape is adapted to bottom layer of subgrade (5) top surface shape.
8. a kind of four line ballastless track roadbed pile slab structure according to claim 7, is characterized in that:
It is domatic that bottom layer of subgrade (5) both lateral sides end is set to outwards to have a down dip.
CN201520302434.7U 2015-05-12 2015-05-12 A kind of four line ballastless track roadbed pile slab structure Active CN204644799U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520302434.7U CN204644799U (en) 2015-05-12 2015-05-12 A kind of four line ballastless track roadbed pile slab structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520302434.7U CN204644799U (en) 2015-05-12 2015-05-12 A kind of four line ballastless track roadbed pile slab structure

Publications (1)

Publication Number Publication Date
CN204644799U true CN204644799U (en) 2015-09-16

Family

ID=54097557

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520302434.7U Active CN204644799U (en) 2015-05-12 2015-05-12 A kind of four line ballastless track roadbed pile slab structure

Country Status (1)

Country Link
CN (1) CN204644799U (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105544311A (en) * 2016-01-17 2016-05-04 中铁二院工程集团有限责任公司 Water-rich foundation frost-heaving-resistant ballastless track embankment structure
CN105672075A (en) * 2016-01-17 2016-06-15 中铁二院工程集团有限责任公司 Water-rich through cut and low-embankment ballastless track roadbed structure in seasonal frozen soil region
CN105821764A (en) * 2016-05-12 2016-08-03 中南大学 Ballastless track rigidity adjusting device
CN106283956A (en) * 2016-09-15 2017-01-04 中铁第四勘察设计院集团有限公司 Medium-and low-speed maglev two-wire excavation location pile foundation combined type support rail beam transition section structure
CN106283957A (en) * 2016-09-15 2017-01-04 中铁第四勘察设计院集团有限公司 Medium-and low-speed maglev two-wire excavation location pile foundation joist framing type support rail beam transition section structure
CN106283972A (en) * 2016-09-15 2017-01-04 中铁第四勘察设计院集团有限公司 Medium-and low-speed maglev traffic engineering single line embankment location pile foundation combined type support rail girder construction
CN106283969A (en) * 2016-09-15 2017-01-04 中铁第四勘察设计院集团有限公司 Medium-and low-speed maglev traffic engineering two-wire excavation location detached pier pillar support rail girder construction
CN106283966A (en) * 2016-09-15 2017-01-04 中铁第四勘察设计院集团有限公司 Medium-and low-speed maglev single line embankment location detached pier pillar support rail beam transition section structure
CN106283973A (en) * 2016-09-15 2017-01-04 中铁第四勘察设计院集团有限公司 Medium-and low-speed maglev traffic engineering two-wire excavation location detached pier pillar support rail beam transition section structure
CN106283968A (en) * 2016-09-15 2017-01-04 中铁第四勘察设计院集团有限公司 Medium-and low-speed maglev two-wire embankment location pile foundation is combined framing type support rail girder construction
WO2017125028A1 (en) * 2016-01-21 2017-07-27 中铁第四勘察设计院集团有限公司 Rail support beam low track and viaduct transition section structure for medium-low-speed magnetic suspension traffic project
CN106988165A (en) * 2017-04-10 2017-07-28 中铁二院工程集团有限责任公司 A kind of track linear control method for multi-thread high-speed railway bridge
CN107142839A (en) * 2017-07-05 2017-09-08 安徽省交通规划设计研究总院股份有限公司 A kind of attachment means of pile slab structure floorings and roadbed
CN107841908A (en) * 2017-11-30 2018-03-27 中铁第四勘察设计院集团有限公司 For eliminating the road structure of the high embankment lateral variation sedimentation in high-speed railway abrupt slope

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105544311A (en) * 2016-01-17 2016-05-04 中铁二院工程集团有限责任公司 Water-rich foundation frost-heaving-resistant ballastless track embankment structure
CN105672075A (en) * 2016-01-17 2016-06-15 中铁二院工程集团有限责任公司 Water-rich through cut and low-embankment ballastless track roadbed structure in seasonal frozen soil region
WO2017125028A1 (en) * 2016-01-21 2017-07-27 中铁第四勘察设计院集团有限公司 Rail support beam low track and viaduct transition section structure for medium-low-speed magnetic suspension traffic project
CN105821764A (en) * 2016-05-12 2016-08-03 中南大学 Ballastless track rigidity adjusting device
CN106283973A (en) * 2016-09-15 2017-01-04 中铁第四勘察设计院集团有限公司 Medium-and low-speed maglev traffic engineering two-wire excavation location detached pier pillar support rail beam transition section structure
CN106283972B (en) * 2016-09-15 2017-10-31 中铁第四勘察设计院集团有限公司 Medium-and low-speed maglev traffic engineering single line embankment location pile foundation combined type support rail girder construction
CN106283969A (en) * 2016-09-15 2017-01-04 中铁第四勘察设计院集团有限公司 Medium-and low-speed maglev traffic engineering two-wire excavation location detached pier pillar support rail girder construction
CN106283966A (en) * 2016-09-15 2017-01-04 中铁第四勘察设计院集团有限公司 Medium-and low-speed maglev single line embankment location detached pier pillar support rail beam transition section structure
CN106283957A (en) * 2016-09-15 2017-01-04 中铁第四勘察设计院集团有限公司 Medium-and low-speed maglev two-wire excavation location pile foundation joist framing type support rail beam transition section structure
CN106283968A (en) * 2016-09-15 2017-01-04 中铁第四勘察设计院集团有限公司 Medium-and low-speed maglev two-wire embankment location pile foundation is combined framing type support rail girder construction
CN106283956A (en) * 2016-09-15 2017-01-04 中铁第四勘察设计院集团有限公司 Medium-and low-speed maglev two-wire excavation location pile foundation combined type support rail beam transition section structure
CN106283966B (en) * 2016-09-15 2018-01-02 中铁第四勘察设计院集团有限公司 Medium-and low-speed maglev single line embankment location independence pier stud type support rail beam transition section structure
CN106283972A (en) * 2016-09-15 2017-01-04 中铁第四勘察设计院集团有限公司 Medium-and low-speed maglev traffic engineering single line embankment location pile foundation combined type support rail girder construction
CN106283968B (en) * 2016-09-15 2017-10-31 中铁第四勘察设计院集团有限公司 Medium-and low-speed maglev two-wire embankment location pile foundation is combined framing type support rail girder construction
CN106988165A (en) * 2017-04-10 2017-07-28 中铁二院工程集团有限责任公司 A kind of track linear control method for multi-thread high-speed railway bridge
CN106988165B (en) * 2017-04-10 2018-10-19 中铁二院工程集团有限责任公司 A kind of track linear control method for multi-thread high-speed railway bridge
CN107142839A (en) * 2017-07-05 2017-09-08 安徽省交通规划设计研究总院股份有限公司 A kind of attachment means of pile slab structure floorings and roadbed
CN107841908A (en) * 2017-11-30 2018-03-27 中铁第四勘察设计院集团有限公司 For eliminating the road structure of the high embankment lateral variation sedimentation in high-speed railway abrupt slope

Similar Documents

Publication Publication Date Title
CN204644799U (en) A kind of four line ballastless track roadbed pile slab structure
CN103276639B (en) Roadbed structure for deep soft soil region
CN203960700U (en) The closed road structure of stake holder U-lag
CN103397656A (en) Embedded type joist pile plank structure
CN206219897U (en) Medium-and low-speed maglev two-wire excavation location pile foundation combined type support rail beam transition section structure
CN106283950B (en) Medium-and low-speed maglev traffic engineering two-wire embankment location pile foundation joist type support rail beam transition section structure
CN106283966B (en) Medium-and low-speed maglev single line embankment location independence pier stud type support rail beam transition section structure
CN201459525U (en) Foundation structure at tunnel-to-bridge junction of high-speed railway in loess regions
CN201538934U (en) Collapsible loess tunnel foundation basic structure of high-speed railway
CN104695315B (en) Frame structure of deep foundation pit under existing railway and layered jacking method for construction of frame structure
CN106400615B (en) Medium-and low-speed maglev single line excavation location independence pier stud type support rail beam transition section structure
CN106283957B (en) Medium-and low-speed maglev two-wire excavation location pile foundation joist framing type support rail beam transition section structure
CN206127736U (en) Moderate -low speed magnetic levitation double -line compound framing formula support rail roof beam transition section structure of location pile foundation that fills
CN205603974U (en) Low circuit single line location support rail girder segment limit structure within a definite time that puts of well low -speed maglev traffic engineering
CN209444342U (en) Portal for establishing shield support pressure in advance extends steel loop structure
CN106283973B (en) Medium-and low-speed maglev traffic engineering two-wire excavation location independence pier stud type support rail beam transition section structure
CN206127758U (en) Moderate -low speed magnetic levitation traffic engineering double -line excavation location detached pier column type support rail roof beam transition section structure
CN206127759U (en) Moderate -low speed magnetic levitation double -line location detached pier column type support rail roof beam transition section structure that fills
CN105256667A (en) Framework flat prefabricated track plate
CN206127741U (en) Moderate -low speed magnetic levitation single line excavation location detached pier column type support rail roof beam transition section structure
CN206127757U (en) Moderate -low speed magnetic levitation single line location detached pier column type support rail roof beam transition section structure that fills
CN106436496B (en) Medium-and low-speed maglev single line embankment location pile foundation combined type support rail beam transition section structure
CN206157488U (en) Moderate -low speed magnetic levitation traffic engineering double -line location supporting beam of pile foundation formula support rail roof beam transition section structure that fills
CN106283946B (en) The compound framing type support rail beam transition section structure of medium-and low-speed maglev two-wire excavation location pile foundation
CN106283959B (en) Medium-and low-speed maglev single line excavation location pile foundation joist type support rail beam transition section structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant