CN106283950B - Medium-and low-speed maglev traffic engineering two-wire embankment location pile foundation joist type support rail beam transition section structure - Google Patents

Medium-and low-speed maglev traffic engineering two-wire embankment location pile foundation joist type support rail beam transition section structure Download PDF

Info

Publication number
CN106283950B
CN106283950B CN201610826057.6A CN201610826057A CN106283950B CN 106283950 B CN106283950 B CN 106283950B CN 201610826057 A CN201610826057 A CN 201610826057A CN 106283950 B CN106283950 B CN 106283950B
Authority
CN
China
Prior art keywords
support rail
rail beam
bottom plate
pile foundation
armored concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610826057.6A
Other languages
Chinese (zh)
Other versions
CN106283950A (en
Inventor
郭建湖
李小和
赵新益
姜鹰
姚洪锡
李巍
王勇刚
杨辉建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Siyuan Survey and Design Group Co Ltd
Original Assignee
China Railway Siyuan Survey and Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Siyuan Survey and Design Group Co Ltd filed Critical China Railway Siyuan Survey and Design Group Co Ltd
Priority to CN201610826057.6A priority Critical patent/CN106283950B/en
Publication of CN106283950A publication Critical patent/CN106283950A/en
Application granted granted Critical
Publication of CN106283950B publication Critical patent/CN106283950B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2/00General structure of permanent way
    • E01B2/006Deep foundation of tracks
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B1/00Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B1/00Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway
    • E01B1/008Drainage of track
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B25/00Tracks for special kinds of railways
    • E01B25/30Tracks for magnetic suspension or levitation vehicles
    • E01B25/305Rails or supporting constructions
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • E02D27/14Pile framings, i.e. piles assembled to form the substructure
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/34Foundations for sinking or earthquake territories
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2204/00Characteristics of the track and its foundations
    • E01B2204/07Drainage
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2204/00Characteristics of the track and its foundations
    • E01B2204/08Deep or vertical foundation
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2204/00Characteristics of the track and its foundations
    • E01B2204/09Ballastless systems

Abstract

Line technology field is put the invention belongs to middle low speed magnetic suspension traffic engineering is low, and disclose medium-and low-speed maglev traffic engineering two-wire embankment location pile foundation joist type support rail beam transition section structure, including roadbed filling under pile foundation bearing structure, reinforced concrete supporting beam, armored concrete support rail beam bottom plate, two placing of reinforcement concrete beam-type structures, support rail beam and support rail beam both sides backfill filler, bridge abutment, trapezoidal filling body and headwall, the pile foundation bearing structure are provided with more;Accept the reinforced concrete beam type structure in the top of armored concrete support rail beam bottom plate;Support rail beam both sides backfill filler is accepted by roadbed filling under the support rail beam.Long-time stability of the present invention are more preferable, both the high request to the deformation of support rail girder construction and settlement after construction had been met, meet the requirement of the controllability of bedding long-time stability, durability and construction quality again, effectively realize magnetic suspension elevated structure and the low smoothly transition for putting line transition section F rails.

Description

Medium-and low-speed maglev traffic engineering two-wire embankment location pile foundation joist type support rail beam changeover portion Structure
Technical field
Line technology field is put the invention belongs to middle low speed magnetic suspension traffic engineering is low, more particularly, to middle low speed magnetic Floating traffic engineering two-wire embankment location support rail beam transition section structure pattern.
Background technology
Middle low speed magnetic suspension track traffic belongs to a kind of novel traffic mode, and achievement in research both domestic and external is less, the whole world The circuit for opening operation is even more minority.The middle low speed magnetic suspension railway business that only in March, 2005, Japan's construction was opened at present is transported The middle low speed magnetic suspension railway business operating line that line-the East Hillside Line and in June, 2014, South Korea opened.And the middle low speed of China Magnetic suspension traffic only has National University of Defense technology's test wire, Green City Mountain test wire, Tangshan experiment line at present, but do not put into effect Formal circuit, and based on elevated structure, it is rarely seen about elevated structure and the low research put in terms of line transition segment structure with Using.
In wheel rail high speed railway, substantial amounts of bridge changeover portion roadbed be present, high-speed railway changeover portion roadbed uses mostly Trapezium structure, cement stabilized graded macabam is employed in trapezoidal scope and is filled, and employ the compacting higher than non-changeover portion roadbed It is required that.During built high-speed railway operation, bridge transition segment limit, non-fragment orbit protuberance, gap, grout often occurs Etc. disease.The reason for this disease, it is due to that changeover portion roadbed is still earth structure by rock and soil constitution mostly, changeover portion It after roadbed is laid a railway track, still can occur necessarily to settle, poor (the specification permission settlement after construction of certain settlement after construction be present with bridge abutment Difference is not more than 5mm), because high-speed railway uses seamless track steel rail, allow in specification within the scope of settlement after construction difference, have no effect on Normal operation, but the diseases such as non-fragment orbit protuberance, gap, grout can be caused, it is necessary to timely repair and maintenance.
The F rails of medium-and low-speed maglev traffic lines are to be spliced by a short rail successively using fishplate bar scene, and are left between rail Seam, meet the ride comfort of the F rails of magnetic-levitation train even running requirement, to lean on works under rail to ensure substantially.It is low to put circuit location, Basis is the earth structure by rock and soil constitution under support rail beam, is influenceed by factors such as landform, geological conditions, and quality is not relatively easily-controllable System, differential settlement is also easy to produce under load and the effect of various factor of natural environment, can be occurred unavoidably and elevated structure bridge bridge The inconsistent settlement after construction of platform, generation settlement after construction is poor, and low circuit of putting differential settlement occurs with bridge abutment position, necessarily affects The ride comfort of F rails, in some instances it may even be possible to the problems such as causing F rails generation faulting of slab ends, deform, when serious, the normal fortune of maglev vehicle will be influenceed Battalion.
The content of the invention
For the disadvantages described above or Improvement requirement of prior art, the invention provides medium-and low-speed maglev traffic engineering two-wire to fill out Square location pile foundation joist type support rail beam transition section structure, elevated structure and the low rigidity put between circuit were both met and had settled Cross, ensure magnetic suspension traffic engineering elevated structure and the low ride comfort requirement for putting line transition section F rails, meet magnetic floating traffic work again The low intensity for putting line transition section sub-rail foundation of journey, long-time stability requirement, and construction quality controllability is strong.
To achieve the above object, it is proposed, according to the invention, provide medium-and low-speed maglev traffic engineering two-wire embankment location pile foundation support Beam type support rail beam transition section structure, it is characterised in that held including pile foundation bearing structure, reinforced concrete supporting beam, armored concrete Roadbed filling under beam-and-rail bottom plate, two placing of reinforcement concrete beam-type structures, support rail beam, support rail beam both sides backfill filler, bridge abutment, Trapezoidal filling body and headwall, wherein,
The pile foundation bearing structure is provided with more, and the every pile foundation bearing structure is vertically arranged, and every institute Accept the reinforced concrete supporting beam in the top for stating pile foundation bearing structure;
The reinforced concrete supporting beam accepts the armored concrete support rail beam bottom plate;
Accept the reinforced concrete beam type structure in the top of the armored concrete support rail beam bottom plate;
The top of the pile foundation bearing structure is embedded in the reinforced concrete supporting beam and its rigid connection, the armored concrete support Beam and the armored concrete support rail beam bottom plate rigid connection or overlap joint, the armored concrete support rail beam bottom plate and the reinforced concrete Native girder structure formed by integrally casting is molded so as to collectively form armored concrete support rail beam;
The reinforced concrete supporting beam both sides are provided with for limiting the armored concrete support rail beam bottom plate lateral displacement Convex block machine;
Wired weathering section be set between reinforced concrete beam type structure described in two rows, and weathering section has between the line Cross fall and head fall, for by current introduce two adjacent sections armored concrete support rail beam bottom plate internode expansion joint and then Current are discharged;
Roadbed filling is arranged between shallow layer reinforcement area and the armored concrete support rail beam bottom plate under the support rail beam, with It is flat for providing construction for the armored concrete support rail beam bottom plate, reinforced concrete supporting beam and support rail beam both sides backfill filler Platform, and provide lateral support for the pile foundation bearing structure;Wherein, the shallow layer reinforcement area is arranged on the superficial of soft stratum Layer, and roadbed filling and the vertical consistency of the reinforced concrete beam type structure under the shallow layer reinforcement area, the support rail beam;
The support rail beam both sides backfill filler is accepted by roadbed filling under the support rail beam, and the support rail beam both sides Backfill filler props up the both sides of the armored concrete support rail beam bottom plate, to play protection to the armored concrete support rail beam bottom plate The transverse shifting of the armored concrete support rail beam bottom plate is acted on and constrained, and maintenance passage is provided;
Roadbed filling and support rail beam both sides backfill filler collectively form filler filling body under the support rail beam, described to fill out Material filling body both sides are provided with the first weathering;
The lower end of the every pile foundation bearing structure sequentially passes through roadbed filling under the support rail beam, the shallow layer reinforcement area Stretched into after the soft stratum in supporting course, so that when soft stratum produces sedimentation, the pile foundation bearing structure can bear to bear Frictional resistance, so as to provide stable bearing capacity to armored concrete support rail beam bottom plate and reinforced concrete beam type structure, to reduce Because the sedimentation of filler filling body is to adverse effect caused by the vertical of armored concrete support rail beam, vertical and horizontal rigidity;
One end of the armored concrete support rail beam bottom plate is overlapped on the bridge abutment, and both are connected by pin Release longitudinal restraint is connect, and limits lateral displacement;
The both sides of one end that the armored concrete support rail beam bottom plate is overlapped on the bridge abutment set the end respectively Wall, and the headwall per side is abutted with the support rail beam both sides backfill filler of respective side respectively, and the support rail is protected for gear Beam both sides backfill filler;
The trapezoidal filling body is arranged between shallow layer reinforcement area and the armored concrete support rail beam bottom plate, its with it is described Roadbed filling abuts close to one end of the bridge abutment under support rail beam, for accepting the armored concrete support rail beam bottom Plate, support rail beam both sides backfill filler and headwall;
The trapezoidal filling body both sides are provided with second weathering consistent with the first weathering gradient.
Preferably, the pile foundation bearing structure is cast-in-situ bored pile, reinforced concrete supporting beam and armored concrete support rail beam Bottom plate rigid connection or overlap joint, with pile foundation bearing structure rigid connection.Pin is used in the position at armored concrete support rail beam internode expansion joint Overlap joint, remaining position uses rigid connection.
Preferably, the height and the height phase of the armored concrete support rail beam bottom plate of the support rail beam both sides backfill filler Deng.
Preferably, all these described pile foundation bearing structures are arranged in ranks.
Preferably, the cross fall of weathering section is 3%~5% between the line, and head fall is not less than 2 ‰.
Preferably, the trapezoidal filling body mixes cement production systD using graded broken stone.
Preferably, the armored concrete support rail beam bottom plate is overlapped on one end of the bridge abutment and the bridge abutment Between be provided with wear-resisting sliding layer.
Preferably, the pin includes pre-buried connection reinforcing bar, pitch hemp cut and stainless steel sleeve pipe, the pre-buried connection reinforcing bar The pitch hemp cut is set in the stainless steel sleeve pipe and between the two.
In general, by the contemplated above technical scheme of the present invention compared with prior art, it can obtain down and show Beneficial effect:
(1) armored concrete support rail beam bottom plate of the invention, reinforced concrete beam type structure are showed using armored concrete Field one-piece casting, the two forms integral reinforced concrete structure to directly take on the magnetic-levitation train of track load and track transmission Load, then deadweight and upper load are passed to and its rigidly connected pile foundation bearing structure, structural reliability height.
(2) pile foundation bearing structure of the invention is goed deep into supporting course, when embankment produces certain sedimentation, pile foundation bearing structure according to Can so negative friction be born and stronger bearing capacity is provided, it is uneven heavy caused by filling compaction quality is whard to control to avoid Influence to support rail beam vertical and horizontal rigidity is dropped, and structure vertical cross stiffness is more excellent.
(3) circuit soft soil zone is put low, needs the superficial layer progress to soft stratum necessary according to embankment stability Reinforcing, its reinforcement depth controls by embankment stability, and tradition during compared to by settling and stablize Two indices control is solely For base reinforcing mode, shallow layer reinforcement area reinforcement depth is small, and roadbed reclamation and roadbed can be effectively controlled with reference to pile foundation bearing structure Settlement after construction.Non- soft soil zone can more avoid the stiffening basic ground of caused wide area after embankment slope, and Pile foundation bearing structure construction quality is more easy to control, can effectively control construction quality, investment reduction, shorten the duration, has obvious Technology and economic advantages.
(4) while by two placing of reinforcement concrete beam-type structures of two-wire by armored concrete support rail beam floor combination one Rise, the lateral stiffness of reinforced concrete beam type structure can be effectively increased, left and right two is saved reinforced concrete beam type structure and be placed in On rigidity identical armored concrete support rail beam bottom plate, the lateral stability of reinforced concrete beam type structure can be effectively increased, The relative settlement between reinforced concrete beam type structure is controlled, reduces the differential settlement between gauge, is also beneficial to the maintenance during operation With maintenance, measure is simple, easily construction, cost province, effect is good.
(5) reinforced concrete supporting beam that pile foundation bearing structure and armored concrete support rail beam bottom plate are set, can subtract significantly The stress concentration phenomenon of armored concrete support rail beam bottom plate at small pile foundation bearing structure;Further, since reinforced concrete supporting beam Lateral connection acts on, and also increases the lateral stiffness of structure and the ability of resistance differential settlement deformation, can reduce transverse pile foundation Quantity, reduce investment.
(6) armored concrete support rail beam bottom plate is overlapped on bridge abutment close to one end of elevated bridge, passes through pin Connection, avoid and settle faulting of slab ends caused by measures of foundation treatment difference between the two, it is ensured that magnetic float F rails it is low put circuit with Bridge abutment connected position will not produce faulting of slab ends, effectively realize that magnetic suspension traffic engineering elevated structure puts line transition section F with low The smoothly transition of rail.
Brief description of the drawings
Fig. 1 is the schematic longitudinal section of the present invention;
Fig. 2 is along the diagrammatic cross-section of I-I line in Fig. 1;
Fig. 3 is along the diagrammatic cross-section of II-II line in Fig. 1;
Fig. 4 is along the diagrammatic cross-section of III-III line in Fig. 1;
Fig. 5 is that armored concrete support rail beam bottom plate is overlapped on the floor map on bridge abutment in the present invention;
Fig. 6 is pile foundation reinforced concrete supporting beam of the present invention and armored concrete support rail beam bottom plate rigid connection connection diagram.
Fig. 7 is pile foundation reinforced concrete supporting beam of the present invention and armored concrete support rail beam bottom plate overlap joint connection diagram.
Fig. 8 is the cross-sectional view of pin in the present invention.
Embodiment
In order to make the purpose , technical scheme and advantage of the present invention be clearer, it is right below in conjunction with drawings and Examples The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and It is not used in the restriction present invention.As long as in addition, technical characteristic involved in each embodiment of invention described below Conflict can is not formed each other to be mutually combined.
1~Fig. 8 of reference picture, medium-and low-speed maglev traffic engineering two-wire embankment location pile foundation joist type support rail beam changeover portion knot Structure, including pile foundation bearing structure 3, reinforced concrete supporting beam 90, armored concrete support rail beam bottom plate 2, two placing of reinforcement beams of concretes Roadbed filling 5, support rail beam both sides backfill filler 4, bridge abutment 12, trapezoidal filling body 14 and headwall under formula structure 1, support rail beam 13, wherein,
The pile foundation bearing structure 3 is provided with more, and the every pile foundation bearing structure 3 is vertically arranged, and every Accept the reinforced concrete supporting beam 90 in the top of the pile foundation bearing structure 3;
The reinforced concrete supporting beam 90 accepts the armored concrete support rail beam bottom plate 2;
Accept the reinforced concrete beam type structure 1 in the top of the armored concrete support rail beam bottom plate 2;
The top of the pile foundation bearing structure 3 is embedded in the reinforced concrete supporting beam 90 and its rigid connection, the reinforced concrete Native joist 90 and the rigid connection of armored concrete support rail beam bottom plate 2 or overlap joint, the armored concrete support rail beam bottom plate 2 with it is described The formed by integrally casting of reinforced concrete beam type structure 1 is molded so as to collectively form armored concrete support rail beam 9;
It is provided with the reinforced concrete supporting beam 90 for limiting the lateral displacement of armored concrete support rail beam bottom plate 2 Convex block machine 91;
Wired weathering section be set between reinforced concrete beam type structure 1 described in two rows, and weathering section has between the line There are cross fall and head fall, for current are introduced into the internode expansion joint of two adjacent sections armored concrete support rail beam bottom plate 2 And then current are discharged;The cross fall of weathering section is 3%~5%, more preferably 4% between the line, weathering section between line Head fall be not less than 2 ‰, in order to draining.
Under the support rail beam roadbed filling 5 be arranged on shallow layer reinforcement area 6 and the armored concrete support rail beam bottom plate 2 it Between, carried for backfilling filler 4 for the armored concrete support rail beam bottom plate 2, reinforced concrete supporting beam 90 and support rail beam both sides Lateral support is provided for construction platform, and for the pile foundation bearing structure 3;Wherein, the shallow layer reinforcement area 6 is arranged on flabbily The superficial layer of layer 7, and roadbed filling 5 and the reinforced concrete beam type structure under the shallow layer reinforcement area 6, the support rail beam 1 vertical consistency;
The support rail beam both sides backfill filler 4 is accepted by roadbed filling 5 under the support rail beam, and the support rail beam two Side backfill filler 4 props up the both sides of the armored concrete support rail beam bottom plate 2, with to the armored concrete support rail beam bottom plate 2 The transverse shifting of the armored concrete support rail beam bottom plate 2 is shielded and constrained, and maintenance passage is provided;
Roadbed filling 5 and support rail beam both sides backfill filler 4 collectively form filler filling body 10, institute under the support rail beam State the both sides of filler filling body 10 and be provided with the first weathering 11;
The lower end of the every pile foundation bearing structure 3 sequentially passes through roadbed filling 5, the shallow layer reinforcement under the support rail beam Stretched into after area 6 and the soft stratum 7 in supporting course 8, so that when soft stratum 7 produces sedimentation, the pile foundation bearing structure 3 can Negative friction is born, so as to provide stable carrying to armored concrete support rail beam bottom plate 2 and reinforced concrete beam type structure 1 Power, with reduce because filler filling body 10 sedimentation to caused by the vertical of armored concrete support rail beam 9, vertical and horizontal rigidity not Profit influences;
One end of the armored concrete support rail beam bottom plate 2 is overlapped on the bridge abutment 12, and both pass through pin 15 Connection Release longitudinal restraints are followed closely, and limit lateral displacement;
The both sides of one end that the armored concrete support rail beam bottom plate 2 is overlapped on the bridge abutment 12 set described respectively Headwall 13, and the headwall 13 per side is abutted with the support rail beam both sides backfill filler 4 of respective side respectively, and institute is protected for gear State support rail beam both sides backfill filler 4;
The trapezoidal filling body 14 is arranged between shallow layer reinforcement area 6 and the armored concrete support rail beam bottom plate 2, its with Roadbed filling 5 abuts close to one end of the bridge abutment 12 under the support rail beam, is held for accepting the armored concrete Beam-and-rail bottom plate 2, support rail beam both sides backfill filler 4 and headwall 13;
The both sides of trapezoidal filling body 14 are provided with second weathering 17 consistent with the gradient of the first weathering 11.
Further, the pile foundation bearing structure 3 is cast-in-situ bored pile, reinforced concrete supporting beam 90 and armored concrete support rail The rigid connection of beam bottom plate 2 or overlap joint, with the rigid connection of pile foundation bearing structure 3.Used in the position at armored concrete support rail beam internode expansion joint Pin 15 overlaps, and remaining position uses rigid connection.
The height of the support rail beam both sides backfill filler 4 is equal with the height of the armored concrete support rail beam bottom plate 2, institute These the described pile foundation bearing structures 3 having are arranged in ranks.
Further, the trapezoidal filling body 14 is made of cement stabilized graded macabam, the armored concrete support rail beam bottom plate 2 It is overlapped between one end of the bridge abutment 12 and the bridge abutment 12 and is provided with wear-resisting sliding layer 16, the pin 15 wraps Pre-buried connection reinforcing bar 15.1, pitch hemp cut 15.2 and stainless steel sleeve pipe 15.3 are included, the pre-buried connection reinforcing bar 15.1 is positioned at described The pitch hemp cut 15.2 is set in stainless steel sleeve pipe 15.3 and between the two.
The low circuit of putting of low speed magnetic suspension traffic engineering is tight to post-construction settlement of subgrade requirement during the structural shape can be solved effectively Lattice, take traditional foundation stabilization measure caused by engineering is huge, investment is big, long in time limit, and basement process and embankment Construction quality is whard to control, bedding long-time stability and the problem of poor durability, so as to improve low circuit support rail girder construction of putting Reliability, reduce the engineering risk of traditional structure pattern.
The agent structure of armored concrete support rail beam 9 of the present invention uses reinforced concrete soil scene one-piece casting, reinforced concrete The native girder structure of support rail beam 9, then will deadweight and top directly taking on the magnetic-levitation train load of track load and track transmission Load passes to high with its rigidly connected pile foundation bearing structure 3, structural reliability.Pile foundation bearing structure 3 uses reinforced concrete Earth boring auger hole pouring pile is made, and transverse direction and longitudinal direction is made up of multiple rows of reinforced concrete bored pile, and vertical cross stiffness is big;And pile foundation Go deep into reliable supporting course 8, when generation is come to nothing between the certain sedimentation of embankment generation and armored concrete support rail beam 9, pile foundation carrying is tied Structure 3 can still bear negative friction and provide stronger bearing capacity, have stronger longitudinal, vertical and lateral stability.Two lines Reinforced concrete beam type structure is connected by sharing armored concrete support rail beam bottom plate 2, further increases the laterally firm of structure Degree and stability.
The reinforced concrete supporting beam 90 that pile foundation bearing structure and armored concrete support rail beam bottom plate 2 are set, can subtract significantly The stress concentration phenomenon of armored concrete support rail beam bottom plate 2 at small pile foundation bearing structure;Further, since reinforced concrete supporting beam 90 Lateral connection effect, also increase structure lateral stiffness and resistance differential settlement deformation ability, horizontal stake can be reduced The quantity of base, reduce investment.
One end of armored concrete support rail beam bottom plate 2 of armored concrete support rail beam 9 is overlapped on bridge abutment 12, and the two is logical Cross pin 15 to connect, the releasable temperature stress in the longitudinal direction of pin 15, realize support rail beam stretching in longitudinal direction, laterally limit support rail beam Displacement, improve the lateral stability of structure.One end of support rail beam overlaps with bridge abutment 12, makes low to put circuit support rail beam and bridge The sedimentation of the lap position of abutment 12 is consistent, avoids bridge abutment 12 and low generation faulting of slab ends sedimentation between putting circuit support rail girder construction;It is low Put the other end of circuit armored concrete support rail beam bottom plate 2 be embedded in it is stable it is low put in line construction, it is settled puts circuit with low Structure is consistent, due to it is low put line construction through basement process and fill compacting after sedimentation value be in controlled range, therefore, support rail Sedimentation between beam both ends be located at bridge abutment 12 and it is low put line construction between, close to linear change, it is achieved thereby that overhead Bridge structure and the low sedimentation transition put between line construction, it also avoid faulting of slab ends, the smooth-going of transition segment limit F rails have been effectively ensured Property.
Wear-resisting sliding layer 16 is arranged between armored concrete support rail beam bottom plate 2 and bridge abutment 12, passes through resistance to mill sliding The effect of layer 16, can release the rotation that support rail beam is likely to occur under the load actions such as relative settlement, temperature to a certain extent Constraint, and the dynamic stress that bridge abutment 12 is transferred to magnetic-levitation train plays cushioning effect, it also avoid support rail beam and bridge abutment Abrasion and stress concentration between 12 cause the partial pressing of structure to destroy.
Headwall 13 is set by low line side of putting, returned for keeping off shield circuit support rail beam both sides of putting low with the joint of bridge abutment 12 Filler.The low basic reference High-speed Railway Bridges road transition section structure form of geotechnique under circuit support rail beam of putting is set, and changeover portion is trapezoidal Filling body 14 is filled using graded broken stone water mixing mud, and the top layer on the trapezoidal top of filling body 14 is also filled out using graded broken stone water mixing mud Build, while meet corresponding compacting requirement and basement process requirement of settlement control, set between graded broken stone and bridge abutment 12 Non-fine concrete loaded filter is put, while sets drainpipe to draw water outside roadbed.
When changeover portion is located at soft soil zone, add necessary to the progress of ground superficial layer, should be needed according to embankment stability Gu form shallow layer reinforcement area 6.The reinforcement depth in shallow layer reinforcement area 6 is controlled by embankment stability, and it whether is reinforced and reinforcement depth It should be determined according to embankment raising, foundation condition by stability calculation.Compared to by settling and stablizing biography during Two indices control Unite for single ground reinforcing mode, the reinforcement depth of shallow layer reinforcement area 6 is small, and embankment can be effectively controlled with reference to pile foundation bearing structure 3 Stable and post-construction settlement of subgrade.By contrast, the structural strengthening quantity is small, and investment is small, and is sunk more conducively after construction quality and work The control of drop, and save cost and shorten the duration.
The making step of the present invention is as follows:
(1) construction overhead bridge structure abutment, bridge abutment body concrete is poured, abutment of constructing, backfills abutment foundation foundation ditch; The positioning of pin and embedded work should be performed before abutment concreting;
(2) it is low after smooth platform to put circuit location construction site, carried out according to design requirement at necessary shallow layer foundation reinforcing Reason, after the completion of basement process, by changeover portion design requirement fill it is low after platform put geotechnique basis under circuit support rail beam, support rail beam after platform The lower basic filling construction synchronous with abutment cone of geotechnique.According to each position wire feeding and compaction requirement, changeover portion when filling Scope with non-changeover portion area is synchronous layered fills, next layer fills after detection meets the requirements and fills last layer again, until reinforcing bar mixes At solidifying native support rail beam bottom plate bottom surface absolute altitude;
(3) in armored concrete support rail beam bottom plate bottom surface, absolute altitude is in embankment subgrade cross section, the construction of vertical section direction is bored Hole pouring pile, i.e. pile foundation bearing structure 3, drilled pile construction should use and small construction technology disturbed to railway embankment, if necessary Steel pile casting is set in embankment altitude range or draws hole;After cast-in-situ bored pile reaches desired strength, cut by code requirement Except pile crown, assembling reinforcement concrete support rail beam bottom plate and the connection reinforcing bar with stake;
(4) according to design attitude to reinforced concrete supporting beam 90, the formwork erection of convex block machine 91, one-time-concreting shaping, before pouring Carry out all kinds of built-in fittings such as pin 15 and positioning and installation with the connection reinforcing bar of pile foundation, concrete are removed after reaching design strength Template;
(5) high-strength wearable sliding layer is laid on abutment in armored concrete support rail beam and abutment overlap joint, according to design Section length reaches design to armored concrete support rail beam bottom plate 2 and the merogenesis formwork erection of reinforced concrete beam type structure 1, each part concrete Form removal is distinguished after intensity, intilted weathering is made and by design requirement in backfill face between reinforced concrete beam type structure Top layer waterproof is carried out, one-time-concreting shaping, all kinds of built-in fittings such as pin, sleeper pedestal connection reinforcing bar, water conservancy diversion rail are carried out before pouring The positioning and installation of bearing built-in fitting etc.;
(6) construction is low puts the joint both sides headwall 13 of circuit bridge abutment 12, and headwall 13 is applied using concrete one-piece casting Work, wait the concrete of headwall 13 to reach form removal after design strength, then put circuit graded broken stone top by design requirement construction is low Backfill layer, confining bed, the associated satellite structures in face, by design and construction cone top surface confining bed of bridge abutment 12 etc., side of constructing Slope protection, drainage system etc..
(7) carry out it is low put circuit and the laying of the elevated structure section of track and the installation and construction of associated satellite engineering, construction finishes Afterwards.
As it will be easily appreciated by one skilled in the art that the foregoing is merely illustrative of the preferred embodiments of the present invention, not to The limitation present invention, all any modification, equivalent and improvement made within the spirit and principles of the invention etc., all should be included Within protection scope of the present invention.

Claims (9)

1. medium-and low-speed maglev traffic engineering two-wire embankment location pile foundation joist type support rail beam transition section structure, it is characterised in that bag Include pile foundation bearing structure, reinforced concrete supporting beam, armored concrete support rail beam bottom plate, two placing of reinforcement concrete beam-type structures, hold Roadbed filling, support rail beam both sides backfill filler, bridge abutment, trapezoidal filling body and headwall under beam-and-rail, wherein,
The pile foundation bearing structure is provided with more, and the every pile foundation bearing structure is vertically arranged, and the every stake Accept the reinforced concrete supporting beam in the top of base bearing structure;
The reinforced concrete supporting beam accepts the armored concrete support rail beam bottom plate;
Accept the reinforced concrete beam type structure in the top of the armored concrete support rail beam bottom plate;
The top of the pile foundation bearing structure is embedded in the reinforced concrete supporting beam and its rigid connection, the reinforced concrete supporting beam with The armored concrete support rail beam bottom plate rigid connection or overlap joint, the armored concrete support rail beam bottom plate and the reinforced beam Formula structural integrity pouring molding is so as to collectively forming armored concrete support rail beam;
The reinforced concrete supporting beam both sides are provided with for limiting the convex of the armored concrete support rail beam bottom plate lateral displacement Type block machine;
Wired weathering section be set between reinforced concrete beam type structure described in two rows, and weathering section has laterally between the line The gradient and head fall, for current are introduced into two adjacent sections armored concrete support rail beam bottom plate internode expansion joint and then by water Stream discharge;
Roadbed filling is arranged between shallow layer reinforcement area and the armored concrete support rail beam bottom plate under the support rail beam, for Filler is backfilled for the armored concrete support rail beam bottom plate, reinforced concrete supporting beam and support rail beam both sides, and construction platform is provided, and Lateral support is provided for the pile foundation bearing structure;Wherein, the shallow layer reinforcement area is arranged on the superficial floor of soft stratum, and Roadbed filling and the vertical consistency of the reinforced concrete beam type structure under the shallow layer reinforcement area, the support rail beam;
The support rail beam both sides backfill filler is accepted by roadbed filling under the support rail beam, and the support rail beam both sides backfill Filler props up the both sides of the armored concrete support rail beam bottom plate, to be shielded to the armored concrete support rail beam bottom plate And the transverse shifting of the constraint armored concrete support rail beam bottom plate, and maintenance passage is provided;
Roadbed filling and support rail beam both sides backfill filler collectively form filler filling body under the support rail beam, and the filler is filled out Building body both sides are provided with the first weathering;
The lower end of the every pile foundation bearing structure sequentially passes through roadbed filling under the support rail beam, the shallow layer reinforcement area and institute Stretched into after stating soft stratum in supporting course, so that when soft stratum produces sedimentation, the pile foundation bearing structure can bear negative frictional resistance Power, so as to provide stable bearing capacity to armored concrete support rail beam bottom plate and reinforced concrete beam type structure, to reduce because filling out Expect the sedimentation of filling body to adverse effect caused by the vertical of armored concrete support rail beam, vertical and horizontal rigidity;
One end of the armored concrete support rail beam bottom plate is overlapped on the bridge abutment, and both are released by pin connection Longitudinal restraint is put, and limits lateral displacement;
The both sides of one end that the armored concrete support rail beam bottom plate is overlapped on the bridge abutment set the headwall respectively, and And the headwall per side is abutted with the support rail beam both sides backfill filler of respective side respectively, and the support rail beam both sides are protected for gear Backfill filler;
The trapezoidal filling body is arranged between shallow layer reinforcement area and the armored concrete support rail beam bottom plate, itself and the support rail Roadbed filling abuts close to one end of the bridge abutment under beam, for accepting the armored concrete support rail beam bottom plate, holding Beam-and-rail both sides backfill filler and headwall;
The trapezoidal filling body both sides are provided with second weathering consistent with the first weathering gradient.
2. pile foundation joist type support rail beam changeover portion in medium-and low-speed maglev traffic engineering two-wire embankment location according to claim 1 Structure, it is characterised in that the pile foundation bearing structure is cast-in-situ bored pile, reinforced concrete supporting beam and armored concrete support rail beam Bottom plate rigid connection or overlap joint, with pile foundation bearing structure rigid connection.
3. pile foundation joist type support rail beam changeover portion in medium-and low-speed maglev traffic engineering two-wire embankment location according to claim 1 Structure, it is characterised in that position reinforced concrete supporting beam and armored concrete at armored concrete support rail beam internode expansion joint Support rail beam bottom plate is overlapped using pin, and remaining position uses rigid connection.
4. pile foundation joist type support rail beam changeover portion in medium-and low-speed maglev traffic engineering two-wire embankment location according to claim 1 Structure, it is characterised in that the height and the height of the armored concrete support rail beam bottom plate of the support rail beam both sides backfill filler It is equal.
5. pile foundation joist type support rail beam changeover portion in medium-and low-speed maglev traffic engineering two-wire embankment location according to claim 1 Structure, it is characterised in that all these described pile foundation bearing structures are arranged in ranks.
6. pile foundation joist type support rail beam changeover portion in medium-and low-speed maglev traffic engineering two-wire embankment location according to claim 1 Structure, it is characterised in that the cross fall of weathering section is 3%~5% between the line, and head fall is not less than 2 ‰.
7. pile foundation joist type support rail beam changeover portion in medium-and low-speed maglev traffic engineering two-wire embankment location according to claim 1 Structure, it is characterised in that the trapezoidal filling body mixes cement production systD using graded broken stone.
8. pile foundation joist type support rail beam changeover portion in medium-and low-speed maglev traffic engineering two-wire embankment location according to claim 1 Structure, it is characterised in that the armored concrete support rail beam bottom plate is overlapped on one end of the bridge abutment and the bridge bridge Wear-resisting sliding layer is provided between platform.
9. pile foundation joist type support rail beam changeover portion in medium-and low-speed maglev traffic engineering two-wire embankment location according to claim 1 Structure, it is characterised in that the pin includes pre-buried connection reinforcing bar, pitch hemp cut and stainless steel sleeve pipe, the pre-buried connection steel Muscle is located in the stainless steel sleeve pipe and sets the pitch hemp cut between the two.
CN201610826057.6A 2016-09-15 2016-09-15 Medium-and low-speed maglev traffic engineering two-wire embankment location pile foundation joist type support rail beam transition section structure Active CN106283950B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610826057.6A CN106283950B (en) 2016-09-15 2016-09-15 Medium-and low-speed maglev traffic engineering two-wire embankment location pile foundation joist type support rail beam transition section structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610826057.6A CN106283950B (en) 2016-09-15 2016-09-15 Medium-and low-speed maglev traffic engineering two-wire embankment location pile foundation joist type support rail beam transition section structure

Publications (2)

Publication Number Publication Date
CN106283950A CN106283950A (en) 2017-01-04
CN106283950B true CN106283950B (en) 2017-12-05

Family

ID=57712904

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610826057.6A Active CN106283950B (en) 2016-09-15 2016-09-15 Medium-and low-speed maglev traffic engineering two-wire embankment location pile foundation joist type support rail beam transition section structure

Country Status (1)

Country Link
CN (1) CN106283950B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108252165A (en) * 2018-03-30 2018-07-06 中铁二局第四工程有限公司 A kind of middle low speed magnetic suspension is low to put circuit road structure and its construction method
CN115839045B (en) * 2022-12-15 2023-10-20 中铁西北科学研究院有限公司 Roadbed differential settlement deformation region remediation process and frozen soil remediation roadbed structure

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005273296A (en) * 2004-03-25 2005-10-06 Geotop Corp Foundation structure
CN202227214U (en) * 2011-08-30 2012-05-23 中铁二院工程集团有限责任公司 Deep soft soil foundation embankment structure of high-speed railway
CN105507227A (en) * 2015-12-04 2016-04-20 中铁第四勘察设计院集团有限公司 Novel construction method of large-diameter composite structure pile consolidated foundation
CN105672067B (en) * 2016-01-21 2017-04-26 中铁第四勘察设计院集团有限公司 Bearing-rail beam low track and viaduct transition section structure of medium-low-speed magnetic suspension traffic engineering
CN105714626B (en) * 2016-01-21 2017-05-10 中铁第四勘察设计院集团有限公司 Joggle joint type bearing rail beam structure for middle and low-speed magnetic suspension traffic engineering low line
CN105887587B (en) * 2016-04-29 2017-06-13 中铁第四勘察设计院集团有限公司 A kind of low circuit switch area of putting of medium-and low-speed maglev is with non-switch area transition section structure
CN206157488U (en) * 2016-09-15 2017-05-10 中铁第四勘察设计院集团有限公司 Moderate -low speed magnetic levitation traffic engineering double -line location supporting beam of pile foundation formula support rail roof beam transition section structure that fills

Also Published As

Publication number Publication date
CN106283950A (en) 2017-01-04

Similar Documents

Publication Publication Date Title
CN206219897U (en) Medium-and low-speed maglev two-wire excavation location pile foundation combined type support rail beam transition section structure
CN106283966B (en) Medium-and low-speed maglev single line embankment location independence pier stud type support rail beam transition section structure
CN106283950B (en) Medium-and low-speed maglev traffic engineering two-wire embankment location pile foundation joist type support rail beam transition section structure
CN106283948B (en) Medium-and low-speed maglev traffic engineering two-wire embankment location pile foundation joist type support rail girder construction
CN206157485U (en) Moderate -low speed magnetic levitation single line excavation location pile foundation combined type support rail roof beam transition section structure
CN106283953B (en) Medium-and low-speed maglev two-wire embankment location pile foundation combined type support rail beam transition section structure
CN106436496B (en) Medium-and low-speed maglev single line embankment location pile foundation combined type support rail beam transition section structure
CN106283967B (en) Medium-and low-speed maglev two-wire embankment location pile foundation joist framing type support rail beam transition section structure
CN106283956B (en) Medium-and low-speed maglev two-wire excavation location pile foundation combined type support rail beam transition section structure
CN206157488U (en) Moderate -low speed magnetic levitation traffic engineering double -line location supporting beam of pile foundation formula support rail roof beam transition section structure that fills
CN206127759U (en) Moderate -low speed magnetic levitation double -line location detached pier column type support rail roof beam transition section structure that fills
CN206219912U (en) Medium-and low-speed maglev two-wire embankment location pile foundation joist framing type support rail beam transition section structure
CN106283973B (en) Medium-and low-speed maglev traffic engineering two-wire excavation location independence pier stud type support rail beam transition section structure
CN206127740U (en) Moderate -low speed magnetic levitation single line location supporting beam of pile foundation formula support rail roof beam transition section structure that fills
CN206127736U (en) Moderate -low speed magnetic levitation double -line compound framing formula support rail roof beam transition section structure of location pile foundation that fills
CN206127757U (en) Moderate -low speed magnetic levitation single line location detached pier column type support rail roof beam transition section structure that fills
CN106400615B (en) Medium-and low-speed maglev single line excavation location independence pier stud type support rail beam transition section structure
CN206157482U (en) Moderate -low speed magnetic levitation double -line location pile foundation combined type support rail roof beam transition section structure that fills
CN106283946B (en) The compound framing type support rail beam transition section structure of medium-and low-speed maglev two-wire excavation location pile foundation
CN206157487U (en) Moderate -low speed magnetic levitation single line location pile foundation combined type support rail roof beam transition section structure that fills
CN206127758U (en) Moderate -low speed magnetic levitation traffic engineering double -line excavation location detached pier column type support rail roof beam transition section structure
CN206157478U (en) Moderate -low speed magnetic levitation double -line excavation location supporting beam of pile foundation formula support rail roof beam transition section structure
CN206157481U (en) Compound framing type support rail roof beam transition section structure of moderate -low speed magnetic levitation double -line excavation location pile foundation
CN206127744U (en) Moderate -low speed magnetic levitation single line excavation location supporting beam of pile foundation formula support rail roof beam transition section structure
CN206127741U (en) Moderate -low speed magnetic levitation single line excavation location detached pier column type support rail roof beam transition section structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant