CN204370376U - One draws anchor formula mud-rock flow to block row's structure - Google Patents

One draws anchor formula mud-rock flow to block row's structure Download PDF

Info

Publication number
CN204370376U
CN204370376U CN201420839593.6U CN201420839593U CN204370376U CN 204370376 U CN204370376 U CN 204370376U CN 201420839593 U CN201420839593 U CN 201420839593U CN 204370376 U CN204370376 U CN 204370376U
Authority
CN
China
Prior art keywords
grid
counterfort
drag
line
rock flow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420839593.6U
Other languages
Chinese (zh)
Inventor
王永胜
朱彦鹏
董旭光
王秀丽
吴意谦
马天忠
来春景
李元勋
柳珂
代涛
袁方龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lanzhou University of Technology
Original Assignee
Lanzhou University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lanzhou University of Technology filed Critical Lanzhou University of Technology
Priority to CN201420839593.6U priority Critical patent/CN204370376U/en
Application granted granted Critical
Publication of CN204370376U publication Critical patent/CN204370376U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

One draws anchor formula mud-rock flow to block row's structure, and its objective is and solve current control structure heaviness, water permeability is weak, the problem of poor stability; This structure is made up of grid, counterfort (1), base plate (2) and drag-line (3); Grid is connected and composed by grid beam (4), grid post (5) and foundation pile (6); Grid beam (4) is connected with grid post (5) square crossing, and grid post (5) build-in is in foundation pile (6), and foundation pile (6) is embedded in stable firm hard formation (10); Grid post (5) is connected with counterfort (1), and counterfort (1) is built below in integrally with base plate (2), base plate (2) is close to ditch bed (11); Drag-line (3) is through the preformed hole (7) offered in counterfort (1), and drag-line (3) leading portion ground tackle (9) is anchored on grid, builds to form enlarged body (8) and be anchored at stablize hard stratum (10) at the back segment of drag-line (3).

Description

One draws anchor formula mud-rock flow to block row's structure
Technical field
The utility model belongs to debris flow technical field, is specifically related to one and draws anchor formula mud-rock flow to block row's structure, be mainly applicable to the improvement of middle-size and small-size diluted debris flow disaster.
Background technology
China's mountain area area is large, debris flow gully and potential debris flow gully widely distributed.Annual heavy rain season, mud-stone flow disaster frequently occurs.Particularly western China, the people life property loss that causes of mud-stone flow disaster is quite serious in recent years.In order to alleviate the frequent mud-stone flow disaster occurred, people take prophylactico-therapeutic measures miscellaneous.Single from initial engineering type, it is main for leading facility, check dam, entity dam and Bao Kan mainly with the row of building, engineering norm for civil defense is general lower, the studying and combating level of mud-rock flow significantly improves finally, start debris flow planning and the design of system of formulating, means of prevention becomes increasingly abundant, and defines many model about synthesis control having surely, block, arrange, stop silt combination gradually.
Current gravity blocking dam and concrete grating dam are the normal two kinds of form of structure adopted in debris flow control works.Gravity blocking dam carrys out by the weight of self impact that mud-rock flow is kept out in front, and suffered impact force is very large, therefore sectional dimension is very large, need consume its normal sediment trapping function of larger manpower, material resources and financial resources guarantee; And water permeable ability is poor, later stage draining and anticorrosive outstanding problem, desilting difficulty is larger.Concrete grating dam blocks, arranges and have both, becoming the whole of entity gravity dam in the past blocks as part is blocked, the larger solid matter of major part in mud-rock flow is deposited in storehouse, and most of current are overflowed, let out the density of mud-rock flow, flow and scale under can reducing, reduce the degree that downstream suffers state of debris flow disasters.In order to resist the impact of mud-rock flow fluid and ratchel, often with the lateral rigidity of heavy in section structural element for cost enhanced grid dam during design, be the stability that cost ensures crib dam with buried (half that about pile body is long) and space structures arrangement form.Therefore, under the prerequisite considering economy, stability becomes the deadly defect that concrete grating dam utilizes.
The difference such as mud-stone flow disaster scale and character in basin, the prophylactico-therapeutic measures taked and the preventive works of building respectively are had any different, in order to reach the object alleviating mud-stone flow disaster to greatest extent, dissimilar preventive works need various types of control structure conbined usage.Therefore, debris flow structure should towards the future development of lightness and multifunction.
Summary of the invention
The purpose of this utility model solves current control structure heaviness, and water permeability is weak, the problem of poor stability.
The utility model is that one draws anchor formula mud-rock flow to block row's structure, is made up of grid, counterfort 1, base plate 2 and drag-line 3; Grid is connected and composed by grid beam 4, grid post 5 and foundation pile 6; Grid beam 4 is connected with grid post 5 square crossing, and grid post 5 build-in is in foundation pile 6, and foundation pile 6 is embedded in stable firm hard formation 10; Grid post 5 is connected with counterfort 1, and counterfort 1 is built below in integrally with base plate 2, base plate 2 is close to ditch bed 11; Drag-line 3 is through the preformed hole 7 offered in counterfort 1, and drag-line 3 leading portion ground tackle 9 is anchored on grid, builds to form enlarged body 8 and be anchored at stablize hard stratum 10 at the back segment of drag-line 3.
The invention has the beneficial effects as follows: this utility model structure is slim and graceful, and the row's of blocking ability is good and stability is strong.Grid and counterfort, base plate, drag-line combines and greatly improves the stability of structure; Grill space is adjustable, achieves the target that mud-rock flow blocks row's combination; If grid adopts shaped steel, structure assembly and disassembly ability is strong; The enlarged body that drag-line connects can ensure the resistance to overturning of mud-rock flow cell structure, can avoid again the waste using heavy in section, buried structure is brought; Counterfort makes the uniform force of cell structure, and has the effect that protection drag-line washes out and shunts.Along with the increasing of Accumulation In Debris-flow of this structure intercepts, base plate ballast increases, and enlarged body buried depth is darker, and the anchored force that drag-line can provide increases, and structure will make stability sharply decline because of increasing of deposit.This structure can reach dependable performance, use safety, easy construction, cheap general effect.
Accompanying drawing explanation
Fig. 1 is that in the utility model, enlarged body is the schematic diagram of anchor pier, and Fig. 2 is elevation of the present utility model, and Fig. 3 is A-A sectional drawing in Fig. 1, and Fig. 4 is that in the utility model, enlarged body is the schematic diagram of grade beam; Reference numeral and name are called: counterfort 1, base plate 2, drag-line 3, grid beam 4, grid post 5, foundation pile 6, preformed hole 7, enlarged body 8, ground tackle 9, firm hard formation 10, ditch bed 11 and bolt 12.
Detailed description of the invention
Below in conjunction with accompanying drawing and instantiation, feature of the present utility model is explained in detail.Below in conjunction with accompanying drawing and instantiation, feature of the present utility model is explained in detail.Example, only for explaining the utility model, is not for limiting scope of the present utility model.After reading the utility model, all within spirit of the present utility model and principle, within any amendment done, equivalent replacement and improvement all should be contained in protection domain of the present utility model.
As shown in Figure 1,2,3, 4, the utility model is that one draws anchor formula mud-rock flow to block row's structure, is made up of grid, counterfort 1, base plate 2 and drag-line 3; Grid is connected and composed by grid beam 4, grid post 5 and foundation pile 6; Grid beam 4 is connected with grid post 5 square crossing, and grid post 5 build-in is in foundation pile 6, and foundation pile 6 is embedded in stable firm hard formation 10; Grid post 5 is connected with counterfort 1, and counterfort 1 is built below in integrally with base plate 2, base plate 2 is close to ditch bed 11; Drag-line 3 is through the preformed hole 7 offered in counterfort 1, and drag-line 3 leading portion ground tackle 9 is anchored on grid, builds to form enlarged body 8 and be anchored at stablize hard stratum 10 at the back segment of drag-line 3.
Shown anchor formula mud-rock flow structure of blocking of drawing can arrange one or more levels protection according to mud-rock flow raceway groove scale.In the end one-level draw anchor formula mud-rock flow block structure implement time, can at the laid inside gauze wire cloth of grid.
As shown in Figure 1,3, counterfort 1 is built by steel concrete and is formed, in counterfort 1, form preformed hole 7 by pvc pipe or steel pipe, and the axial line OO ' of preformed hole 7 and the angle α of ditch bed plane P are 30 ° ~ 60 °; Counterfort 1 is triangle or trapezoidal, and thickness is 200 ~ 400mm.
As shown in Figure 1, base plate 2 is built by steel concrete and is formed, and thickness is 150 ~ 300mm.
As shown in Figure 3, described drag-line 3 is at least arranged together.
As shown in Figure 1, grid beam 4 and grid post 5 can be reinforced concrete structure, also can be waste and old shaped steel.If during shaped steel, by bolt 12, shaped steel is connected.Grid beam 4 spacing can be determined according to the diameter will tackling particle.
As shown in Fig. 1,3,4, enlarged body 8 can be anchor pier or grade beam, is formed by concreting.
The utility model carries out as follows when implementing:
(1) position is arranged accordingly according to engineering design, smooth location;
(2) on stable firm hard formation 10, dig foundation pile 6 and bury hole underground, the reinforcing cage of colligation foundation pile 5, reinforcing cage is put in hole, concreting;
(3) on stable firm hard formation 10, dig enlarged body 8 and bury hole underground, the reinforcing cage of colligation enlarged body 8, and drag-line 3 is connected with reinforcing cage to be together put in buries underground in hole, concreting;
(4) colligation grid beam 4 and grid post 5 reinforcing bar, and formwork supporting plate;
(5) reinforced mesh of colligation base plate 2 and counterfort 1, and the corresponding plate of formwork; Pvc pipe is embedded in or steel pipe carrys out preformed hole 7 at counterfort 1;
(6) concreting in the template of (4) and (5) step;
(7) when concrete strength reaches more than 85%, the drag-line 3 be connected was passed the crossover location of preformed hole 7 in counterfort 1 and grid beam 4 and grid post 5 with enlarged body 8, stretch-draw drag-line 3 makes it reach design stretch-draw value, is anchored on grid with ground tackle 9.

Claims (6)

1. draw anchor formula mud-rock flow to block row's structure, it is characterized in that: structure is made up of grid, counterfort (1), base plate (2) and drag-line (3); Grid is connected and composed by grid beam (4), grid post (5) and foundation pile (6); Grid beam (4) is connected with grid post (5) square crossing, and grid post (5) build-in is in foundation pile (6), and foundation pile (6) is embedded in stable firm hard formation (10); Grid post (5) is connected with counterfort (1), and counterfort (1) is built below in integrally with base plate (2), base plate (2) is close to ditch bed (11); Drag-line (3) is through the preformed hole (7) offered in counterfort (1), and drag-line (3) leading portion ground tackle (9) is anchored on grid, builds to form enlarged body (8) and be anchored at stablize hard stratum (10) at the back segment of drag-line (3).
2. block row's structure according to the anchor formula mud-rock flow that draws described in claim 1, it is characterized in that: draw anchor formula mud-rock flow block structure can according to mud-rock flow raceway groove scale arrange at least one-level protection.
3. block row's structure according to the anchor formula mud-rock flow that draws described in claim 1, it is characterized in that: counterfort (1) is built by steel concrete and formed, in counterfort (1), form preformed hole (7) by pvc pipe or steel pipe, the axial line of preformed hole (7) (OO ') is 30 ° ~ 60 ° with the angle (α) of ditch bed plane (P); Counterfort (1) is triangle or trapezoidal, and thickness is 200 ~ 400mm.
4. block row's structure according to the anchor formula mud-rock flow that draws described in claim 1, it is characterized in that: base plate (2) is built by steel concrete and formed, thickness is 150 ~ 300mm.
5. block row's structure according to the anchor formula mud-rock flow that draws described in claim 1, it is characterized in that: described drag-line (3) arranges at least one.
6. block row's structure according to the anchor formula mud-rock flow that draws described in claim 1, it is characterized in that: grid beam (4) and grid post (5) can be reinforced concrete structure, also can be waste and old shaped steel; If shaped steel, by bolt (12), shaped steel is connected.
CN201420839593.6U 2014-12-26 2014-12-26 One draws anchor formula mud-rock flow to block row's structure Expired - Fee Related CN204370376U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420839593.6U CN204370376U (en) 2014-12-26 2014-12-26 One draws anchor formula mud-rock flow to block row's structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420839593.6U CN204370376U (en) 2014-12-26 2014-12-26 One draws anchor formula mud-rock flow to block row's structure

Publications (1)

Publication Number Publication Date
CN204370376U true CN204370376U (en) 2015-06-03

Family

ID=53326608

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420839593.6U Expired - Fee Related CN204370376U (en) 2014-12-26 2014-12-26 One draws anchor formula mud-rock flow to block row's structure

Country Status (1)

Country Link
CN (1) CN204370376U (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836144A (en) * 2017-01-25 2017-06-13 中国电建集团西北勘测设计研究院有限公司 A kind of method of the maintenanceability of buttress type duplex face dam and raising panel
CN107700434A (en) * 2017-08-15 2018-02-16 甘肃建筑职业技术学院 A kind of dome grating formula armored concrete mud-rock flow blocking dam and its construction process
CN107964929A (en) * 2017-12-07 2018-04-27 刘曼华 A kind of refuse collector being used in water body
CN107975011A (en) * 2017-12-07 2018-05-01 刘曼华 A kind of slope protection device for the cleaning of water body rubbish
CN108560503A (en) * 2018-06-13 2018-09-21 范雲鹤 A kind of mud-rock flow is blocked structure and method of blocking
CN108914886A (en) * 2018-07-23 2018-11-30 四川理工学院 A kind of row of mud-rock flow classified energy-dissipation leads equipment
CN109729967A (en) * 2019-03-19 2019-05-10 东北师范大学 A kind of ecology weir
CN111335272A (en) * 2020-03-16 2020-06-26 兰州理工大学 Ground anchor beam string beam type debris flow grid dam and construction method thereof
CN111926770A (en) * 2020-08-12 2020-11-13 兰州理工大学 Damping energy-consumption debris flow grid dam and construction method thereof
CN113309075A (en) * 2021-06-16 2021-08-27 同济大学 Debris flow pile group protection structure and system based on energy conversion enhancement mechanism
CN115404821A (en) * 2022-09-16 2022-11-29 中国水利水电建设工程咨询贵阳有限公司 Sand blocking dam structure of counterfort type front desilting basin

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836144A (en) * 2017-01-25 2017-06-13 中国电建集团西北勘测设计研究院有限公司 A kind of method of the maintenanceability of buttress type duplex face dam and raising panel
CN107700434A (en) * 2017-08-15 2018-02-16 甘肃建筑职业技术学院 A kind of dome grating formula armored concrete mud-rock flow blocking dam and its construction process
CN107700434B (en) * 2017-08-15 2023-03-17 兰州交通大学 Arch-shaped grid type reinforced concrete debris flow blocking dam and construction method thereof
CN107964929A (en) * 2017-12-07 2018-04-27 刘曼华 A kind of refuse collector being used in water body
CN107975011A (en) * 2017-12-07 2018-05-01 刘曼华 A kind of slope protection device for the cleaning of water body rubbish
CN108560503A (en) * 2018-06-13 2018-09-21 范雲鹤 A kind of mud-rock flow is blocked structure and method of blocking
CN108914886B (en) * 2018-07-23 2020-09-08 四川理工学院 Mud-rock flow grading energy dissipation guide device
CN108914886A (en) * 2018-07-23 2018-11-30 四川理工学院 A kind of row of mud-rock flow classified energy-dissipation leads equipment
CN109729967A (en) * 2019-03-19 2019-05-10 东北师范大学 A kind of ecology weir
CN109729967B (en) * 2019-03-19 2022-03-01 东北师范大学 Ecological weir
CN111335272A (en) * 2020-03-16 2020-06-26 兰州理工大学 Ground anchor beam string beam type debris flow grid dam and construction method thereof
CN111926770A (en) * 2020-08-12 2020-11-13 兰州理工大学 Damping energy-consumption debris flow grid dam and construction method thereof
CN111926770B (en) * 2020-08-12 2021-12-21 兰州理工大学 Damping energy-consumption debris flow grid dam and construction method thereof
CN113309075A (en) * 2021-06-16 2021-08-27 同济大学 Debris flow pile group protection structure and system based on energy conversion enhancement mechanism
CN113309075B (en) * 2021-06-16 2022-04-05 同济大学 Debris flow pile group protection structure and system based on energy conversion enhancement mechanism
CN115404821A (en) * 2022-09-16 2022-11-29 中国水利水电建设工程咨询贵阳有限公司 Sand blocking dam structure of counterfort type front desilting basin

Similar Documents

Publication Publication Date Title
CN204370376U (en) One draws anchor formula mud-rock flow to block row's structure
CN108978585B (en) Flood control dykes and dams of scour protection
JP2010024745A (en) Reinforcing structure of dike
CN105179011B (en) A kind of tunnel closure facility and its method for blocking
CN110443741B (en) Multi-stage treatment method for extra-large debris flow disasters based on risk control
CN110438999A (en) A kind of deep basal pit slope excavation construction method of rich groundwater
CN111691438A (en) Anti-skidding-drainage comprehensive treatment method for landslide of large-scale accumulation body
CN103615042A (en) Network type seepage discharging device in transverse direction, longitudinal direction and vertical direction
CN111622240B (en) Trapezoidal toe-added drainage slide-resistant pile and construction method thereof
CN204151796U (en) A kind of reinforcement eco-concrete bank protection
CN108149692B (en) Supporting construction suitable for non-closed foundation ditch
CN105862659B (en) High-frequency debris flow shore protection and diversion method
CN110344374A (en) Mud-rock flow flexible blocking backstop and mud-rock flow flexibility blocking dam
CN102373675B (en) Fabricated culvert member and construction method thereof
CN107700434B (en) Arch-shaped grid type reinforced concrete debris flow blocking dam and construction method thereof
CN107761668A (en) A kind of strand Bin Ku makes ground type bank protection structure and its construction process
CN107724405B (en) Dewatering of foundation construction method in a kind of underground pipe construction
CN108560503A (en) A kind of mud-rock flow is blocked structure and method of blocking
CN205617396U (en) Close on existing railway line construction protection structure
CN204919578U (en) Vacuum tubular well precipitation system under special geological conditions
CN108343074A (en) A kind of anchor rod type lattice guest blocks structure and construction method
CN110593205B (en) High-order debris flow multistage self-adaptive barrier pile group disaster reduction structure and implementation method
CN210459232U (en) Soil nailing wall supporting structure for pure sand area
Pinchard et al. Spillway capacity upgrade at Malarce dam: Design of an additional Piano Key Weir spillway
CN208055980U (en) A kind of permeable erosion control wall construction of hydraulic engineering

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150603

Termination date: 20151226

EXPY Termination of patent right or utility model