CN108560503A - A kind of mud-rock flow is blocked structure and method of blocking - Google Patents

A kind of mud-rock flow is blocked structure and method of blocking Download PDF

Info

Publication number
CN108560503A
CN108560503A CN201810606963.4A CN201810606963A CN108560503A CN 108560503 A CN108560503 A CN 108560503A CN 201810606963 A CN201810606963 A CN 201810606963A CN 108560503 A CN108560503 A CN 108560503A
Authority
CN
China
Prior art keywords
mud
drag
rock flow
anchor pole
line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810606963.4A
Other languages
Chinese (zh)
Inventor
范雲鹤
李思滢
陈永珍
翁杨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810606963.4A priority Critical patent/CN108560503A/en
Publication of CN108560503A publication Critical patent/CN108560503A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B7/00Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • E02B7/02Fixed barrages
    • E02B7/04Dams across valleys
    • E02B7/08Wall dams
    • E02B7/10Gravity dams, i.e. those in which the weight of the structure prevents overturning

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Sewage (AREA)

Abstract

The present invention provides a kind of mud-rock flow and blocks structure and method of blocking, including anchor pole, drag-line, groove, gravity abutment, even rope, in debris flow gully, the anchoring section of anchor pole stretches into basement rock rockbolt installation, and one end of drag-line connects anchor pole, the other end of drag-line connects gravity abutment, the connection of drag-line and anchor pole can dismantle, and groove is excavated in debris flow gully, several gravity abutments are placed in groove, gravity abutment is placed in the trench side by side, by even rope connection between gravity abutment.The present invention provides drag by anchor pole, quantities is saved, to save engineering cost and construction time.It blocks bulky grain stone in structure barrier mud-rock flow, the scouring capability of mud-rock flow is weakened, to prevent mud-stone flow disaster.In addition, the structure of blocking of the present invention can be freely disassembled and can be recycled for multiple times.

Description

A kind of mud-rock flow is blocked structure and method of blocking
Technical field
It blocks structure and method of blocking the invention belongs to hydraulic engineering field more particularly to a kind of mud-rock flow.
Background technology
Mud-rock flow is a kind of geological disaster that harmfulness is extremely strong, and Mountain In China area is big, and alpine terrain is steep, concentrates rainfall Easily cause mud-rock flow, the basin of typical mud-rock flow generally comprises to form area, Circulation Area, accumulation area, and debris flow control works are general Setting is forming area or Circulation Area.Current most common Controlling Debris Flow measure is using structure of blocking, such as cable wire grid dam, lattice The structure common problem of blocking of grid dam, sieve dam, broach dam, water penetration arch dam etc., these dam formulas is that ground excavates work Journey amount is big, and dam body quantities is also larger, and construction condition is poor, and construction-time is long.In addition also flexible steel wire, steel construction block The control measures such as barricade, both technical measures are huge using steel material, and cost is high.Ecological management engineering passes through kind Plant is planted, it is given full play to and is detained precipitation, conserves water and soil, the functions such as regulated flow, to reach prevention and prevent mud-rock flow hair Life reduces its scale, mitigates the purpose of its extent of injury.The characteristics of ecological management engineering, is that investment is small, can improve nature ring Border, but the plant planted in cheuch does not have safeguard measure is easy to be corroded by rainfall and flow, growth and development state compared with Difference, the time played effectiveness is long, cannot effectively prevent the generation of mud-stone flow disaster, and the auxiliary for generally only doing debris flow is arranged It applies.
Invention content
The present invention provides a kind of mud-rock flow and blocks structure and method of blocking, and is blocked structure by anchor cable constraint, mud-rock flow stream Bulky grain stone is intercepted after structure of blocking, and mud-rock flow carrying capacity declines, and mud-rock flow damage capability reduces, to effectively anti- Control mud-rock flow, solve and need to excavate ground when building, construction condition is poor, and construction-time is long, quantities with it is of high cost etc. Problem, the present invention is suitable for water-rock debris flow, diluted debris flow, and the basement rock depth of debris flow gully Circulation Area is less than 10 meters.
The technical scheme is that:A kind of mud-rock flow is blocked structure, including anchor pole, drag-line, groove, gravity abutment, even rope, In debris flow gully, the anchoring section of anchor pole stretches into basement rock rockbolt installation, and one end of drag-line connects anchor pole, and the other end of drag-line connects Connecing gravity abutment, the connection of the connection of drag-line and anchor pole, drag-line and gravity abutment can dismantle, and groove is excavated in debris flow gully, Several gravity abutments are placed in groove, gravity abutment is placed in the trench side by side, by even rope connection between gravity abutment.
The drag-line and Lian Suo is all made of steel wire winding.
Drag-line between the anchor pole and gravity abutment is arranged 2 or 2 or more.
The gravity abutment is precast member for reinforcing bar concrete.
A plurality of even rope is connected between the gravity abutment, the spacing of adjacent even rope is no more than 20cm.
One or more can be arranged in mud-rock flow structure of blocking in debris flow gully.
A kind of mud-rock flow is blocked the method for blocking of structure, and this method includes:
(1)The Engineering geology and hydrogeology conditions for investigating and analysing debris flow gully, determine formation area, Circulation Area and the heap of mud-rock flow Product area;
(2)The drainage area for counting debris flow gully determines the crest discharge of debris flow gully according to meteorological data, according to debris flow gully Sectional dimension determines mud-rock flow depth capacity, and the height of gravity abutment is determined according to mud-rock flow depth capacity;
(3)Mud-rock flow blocks structure setting in the Circulation Area of mud-rock flow, and in debris flow gully internal drilling, drilling is in quincuncial arrangement, Anchor pole is installed in drilling, groove is excavated in the debris flow gully in anchor pole downstream, places gravity abutment in the trench, with even rope connection Adjacent gravity abutment connects anchor pole and gravity abutment with drag-line;
(4)Mud-rock flow flows through mud-rock flow and blocks structure, and anchor pole provides withdrawal resistance, and withdrawal resistance passes to drag-line, and drag-line pulls gravity Pier provides drag for gravity abutment, and the stone that grain size is more than steel wire mesh is blocked and accumulated, the stone stream of water and remaining grain size It walks.
After a mud-rock flow, can there are two types of selection:
It blocks the stone of structure periphery first, removing and being deposited in mud-rock flow, repairs impaired anchor pole, drag-line, even rope, gravity abutment, mud Structure of rock glacier blocking continues to play a role;
Second is that dismantling the connection of drag-line and anchor pole, company's rope between gravity abutment is dismantled, repairs impaired drag-line, even rope, gravity abutment, It selects new region that anchor pole is installed, excavates groove, place gravity abutment, connect anchor pole and drag-line, connect rope, mud between connection gravity abutment Structure of rock glacier blocking continues to play a role.
The invention has the advantages that:
(1)The structure of blocking of the present invention is built without excavating ground, is provided drag by anchor pole, quantities is saved, to save Engineering cost and construction time.
(2)The gravity abutment of the present invention is prefabricated components, is completed in factory, and remote location, execution conditions are suitable for The debris flow gully of difference, construction environment difference.
(3)Bulky grain stone in the structure barrier mud-rock flow of blocking of the present invention, weakens the scouring capability of mud-rock flow, from And prevent mud-stone flow disaster.
(4)The structure of blocking of the present invention can be dismantled, and after a mud-rock flow, can remove heap there are two types of selection Long-pending stone or dismounting is blocked structure and the place installation that more renews, and structure of entirely blocking can reuse, economize on resources.
Description of the drawings
Fig. 1 is the overall schematic of the present invention;
Fig. 2 is gravity abutment arrangement schematic diagram of the present invention along mud-rock flow flow direction;
Fig. 3 is the vertical view of the present invention;
In figure, debris flow gully 1, groove 2, anchor pole 3, gravity abutment 4, even rope 5, drag-line 6, mud-rock flow flow direction 7.
Specific implementation mode
Present invention will be further explained below with reference to specific examples.It should be understood that these embodiments are merely to illustrate this hair It is bright rather than limit the scope of the invention.In addition, it should also be understood that, after reading the content taught by the present invention, art technology Personnel can make various changes or modifications the present invention, and such equivalent forms equally fall within the application the appended claims and limited Fixed range.
Embodiment 1
Mud-rock flow as shown in Figs. 1-3 is blocked structure, including anchor pole 3, drag-line 6, groove 2, gravity abutment 4, even rope 5, anchor pole 3 are installed In debris flow gully 1,3 bore diameter of anchor pole is stretched into 80mm-120mm, the anchoring section of anchor pole 3 in basement rock, and anchoring depth is not Less than 400mm, one end of drag-line 6 connects anchor pole 3, and the other end of drag-line 6 connects gravity abutment 4, connection, drawing of the drag-line 6 with anchor pole 3 Rope 6 and the connection of gravity abutment 4 can dismantle, and groove 2 is excavated in debris flow gully 1, several gravity abutments 4 are placed in groove 2, Gravity abutment 4 is placed on side by side in groove 2, is connected by even rope 5 between gravity abutment 4, and the diameter of drag-line 6 and Lian Suo 5 are not less than 50mm.
The drag-line 6 and Lian Suo 5 is all made of steel wire winding, with high corrosion resistance, high intensity.
Drag-line 6 between the anchor pole 3 and gravity abutment 4 is arranged 2 or 2 or more.
The gravity abutment 4 is precast member for reinforcing bar concrete.
A plurality of even rope 5 is connected between the gravity abutment 4, the spacing of adjacent even rope 5 is no more than 20cm.
One or more can be arranged in mud-rock flow structure of blocking in debris flow gully 1.
A kind of mud-rock flow is blocked the method for blocking of structure, and this method includes:
(1)The Engineering geology and hydrogeology conditions for investigating and analysing debris flow gully 1, determine the formation area of mud-rock flow, Circulation Area with Accumulation area;
(2)The drainage area for counting debris flow gully 1 determines the crest discharge of debris flow gully 1 according to meteorological data, according to mud-rock flow 1 sectional dimension of ditch, determines mud-rock flow depth capacity, and the height of gravity abutment 4 is determined according to mud-rock flow depth capacity;
(3)Mud-rock flow blocks structure setting in the Circulation Area of mud-rock flow, and in 1 internal drilling of debris flow gully, drilling is in quincuncial arrangement, Anchor pole 3 is installed in drilling, groove 2 is excavated in the debris flow gully 1 in 3 downstream of anchor pole, gravity abutment 4 is placed in groove 2, with even Rope 5 connects adjacent gravity abutment 4, and anchor pole 3 and gravity abutment 4 are connected with drag-line 6;
(4)Mud-rock flow flows through mud-rock flow and blocks structure, and anchor pole 3 provides withdrawal resistance, and withdrawal resistance passes to drag-line 6, and drag-line 6 pulls weight Power pier 4 provides drag for gravity abutment 4, and the stone that grain size is more than steel wire mesh is blocked and accumulated, the stone of water and remaining grain size Block flows away.
After a mud-rock flow, can there are two types of selection:
It blocks the stone of structure periphery first, removing and being deposited in mud-rock flow, repairs impaired anchor pole 3, drag-line 6, even rope 5, gravity abutment 4, structure of mud-rock flow blocking continues to play a role;
Second is that dismantling the connection of drag-line 6 and anchor pole 3, company's rope 5 between gravity abutment 4 is dismantled, gravity abutment 4 is taken out, repairs impaired Drag-line 6, even rope 5, gravity abutment 4, select new region to install anchor pole 3, excavate groove 2, place gravity abutment 4, connect anchor pole 3 and draw Rope 6, connect gravity abutment 4 between connect rope 5, structure of mud-rock flow blocking continues to play a role.

Claims (9)

  1. The structure 1. a kind of mud-rock flow is blocked, which is characterized in that including anchor pole 3, drag-line 6, groove 2, gravity abutment 4, even rope 5, anchor pole 3 In debris flow gully 1, the anchoring section of anchor pole 3 stretches into basement rock, and one end of drag-line 6 connects anchor pole 3, the other end of drag-line 6 Gravity abutment 4 is connected, drag-line 6 and connection, drag-line 6 and the connection of gravity abutment 4 of anchor pole 3 can be dismantled, be opened in debris flow gully 1 Digging groove 2, groove 2 is interior to place several gravity abutments 4, and gravity abutment 4 is placed on side by side in groove 2, by even rope 5 between gravity abutment 4 Connection.
  2. The structure 2. mud-rock flow according to claim 1 is blocked, which is characterized in that the drag-line 6 and Lian Suo 5 is all by steel wire Winding is made.
  3. The structure 3. mud-rock flow according to claim 1 is blocked, which is characterized in that between the anchor pole 3 and gravity abutment 4 Drag-line 6 is arranged 2 or 2 or more.
  4. The structure 4. mud-rock flow according to claim 1 is blocked, which is characterized in that the gravity abutment 4 is armored concrete Prefabricated components.
  5. The structure 5. mud-rock flow according to claim 1 is blocked, which is characterized in that connected between the gravity abutment 4 a plurality of The spacing of even rope 5, adjacent even rope 5 is no more than 20cm.
  6. The structure 6. mud-rock flow according to claim 1 is blocked, which is characterized in that the mud-rock flow blocks structure in mudstone One or more can be set in stream ditch 1.
  7. 7. a kind of method of blocking for structure of blocking using claim 1-6 any one of them mud-rock flows, which is characterized in that the party Method includes:
    (1)The Engineering geology and hydrogeology conditions for investigating and analysing debris flow gully, determine formation area, Circulation Area and the heap of mud-rock flow Product area;
    (2)The drainage area for counting debris flow gully determines the crest discharge of debris flow gully according to meteorological data, according to debris flow gully Sectional dimension determines mud-rock flow depth capacity, and the height of gravity abutment is determined according to mud-rock flow depth capacity;
    (3)Mud-rock flow blocks structure setting in the Circulation Area of mud-rock flow, and in debris flow gully internal drilling, drilling is in quincuncial arrangement, Anchor pole is installed in drilling, groove is excavated in the debris flow gully in anchor pole downstream, places gravity abutment in the trench, with even rope connection Adjacent gravity abutment connects anchor pole and gravity abutment with drag-line;
    (4)Mud-rock flow flows through mud-rock flow and blocks structure, and the stone that grain size is more than steel wire mesh is blocked and accumulated, water and remaining The stone of grain size flows away.
  8. The method of blocking of structure 8. mud-rock flow according to claim 7 is blocked, which is characterized in that when a mud-rock flow terminates Afterwards, it removes and is deposited in mud-rock flow and blocks the stone of structure periphery, repair impaired anchor pole, drag-line, even rope, gravity abutment, mud-rock flow Structure of blocking continues to play a role.
  9. The method of blocking of structure 9. mud-rock flow according to claim 7 is blocked, which is characterized in that when a mud-rock flow terminates Afterwards, company's rope between gravity abutment is dismantled in the connection for dismantling drag-line and anchor pole, repairs impaired drag-line, even rope, gravity abutment, selection Anchor pole is installed in new region, excavates groove, places gravity abutment, is connected anchor pole and drag-line, is connected rope, mud-rock flow between connection gravity abutment Structure of blocking continues to play a role.
CN201810606963.4A 2018-06-13 2018-06-13 A kind of mud-rock flow is blocked structure and method of blocking Pending CN108560503A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810606963.4A CN108560503A (en) 2018-06-13 2018-06-13 A kind of mud-rock flow is blocked structure and method of blocking

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810606963.4A CN108560503A (en) 2018-06-13 2018-06-13 A kind of mud-rock flow is blocked structure and method of blocking

Publications (1)

Publication Number Publication Date
CN108560503A true CN108560503A (en) 2018-09-21

Family

ID=63553637

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810606963.4A Pending CN108560503A (en) 2018-06-13 2018-06-13 A kind of mud-rock flow is blocked structure and method of blocking

Country Status (1)

Country Link
CN (1) CN108560503A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109577504A (en) * 2018-11-14 2019-04-05 同济大学 A kind of half anti-mud-rock-flow-impact device of active of pneumatic back springing type
CN110593205A (en) * 2019-08-23 2019-12-20 中国地质环境监测院 High-order debris flow multistage self-adaptive barrier pile group disaster reduction structure and implementation method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2388945A1 (en) * 1977-04-29 1978-11-24 Porraz Mauricio Multi-leg modules protect coast from marine erosion - and have two groups of legs projecting from opposite ends of elongated member
JP2002339338A (en) * 2001-05-15 2002-11-27 Landcreate Kenkyusho:Kk Capturing construction for catching flow-down matters
CN202416338U (en) * 2011-05-06 2012-09-05 北方工业大学 Foundation for novel grating dam
CN102912769A (en) * 2012-10-29 2013-02-06 天津大学 Dragline buttress steel dam
CN202989867U (en) * 2012-10-31 2013-06-12 修海峰 Junked tire protective surface combined steel-structure check dam
CN204370376U (en) * 2014-12-26 2015-06-03 兰州理工大学 One draws anchor formula mud-rock flow to block row's structure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2388945A1 (en) * 1977-04-29 1978-11-24 Porraz Mauricio Multi-leg modules protect coast from marine erosion - and have two groups of legs projecting from opposite ends of elongated member
JP2002339338A (en) * 2001-05-15 2002-11-27 Landcreate Kenkyusho:Kk Capturing construction for catching flow-down matters
CN202416338U (en) * 2011-05-06 2012-09-05 北方工业大学 Foundation for novel grating dam
CN102912769A (en) * 2012-10-29 2013-02-06 天津大学 Dragline buttress steel dam
CN202989867U (en) * 2012-10-31 2013-06-12 修海峰 Junked tire protective surface combined steel-structure check dam
CN204370376U (en) * 2014-12-26 2015-06-03 兰州理工大学 One draws anchor formula mud-rock flow to block row's structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109577504A (en) * 2018-11-14 2019-04-05 同济大学 A kind of half anti-mud-rock-flow-impact device of active of pneumatic back springing type
CN110593205A (en) * 2019-08-23 2019-12-20 中国地质环境监测院 High-order debris flow multistage self-adaptive barrier pile group disaster reduction structure and implementation method

Similar Documents

Publication Publication Date Title
CN110080254B (en) drainage slide-resistant pile-water guide culvert structure for slope reinforcement and construction method
CN211228626U (en) Automatic pressure relief device for anti-floating of basement bottom plate
CN110952574A (en) Method for treating landslide deformation body
CN108560503A (en) A kind of mud-rock flow is blocked structure and method of blocking
CN108457289A (en) A kind of open caisson construction method of complex condition
CN110344374A (en) Mud-rock flow flexible blocking backstop and mud-rock flow flexibility blocking dam
KR20090039448A (en) Nature-friendly diversion drain at top of slope
CN110777821B (en) Method for treating water burst disaster of fissures of weathered rock slope
CN208293532U (en) A kind of mud-rock flow is blocked structure
CN108517837A (en) Anchor cable formula mud-rock flow, which is blocked, system and blocks method
CN208280086U (en) Detachable mud-rock flow is blocked system
CN206916686U (en) A kind of subgrade protection system in debris flow gully
CN215057564U (en) Visual and maintainable type anti-clogging drainage system for highway tunnel
KR101170789B1 (en) Complex debris barrier of eco-friendly
CN208280087U (en) Anchor cable formula mud-rock flow is blocked system
CN205617396U (en) Close on existing railway line construction protection structure
CN108517836A (en) Detachable mud-rock flow is blocked system and its method of blocking
CN211735243U (en) Mud-rock flow prevention and control system for tunnel valley type abandoned dreg site
KR100776621B1 (en) Pile structure for preventing a disaster by debris flow
CN208589025U (en) A kind of riverbed lower section advanced pre-reinforcement device of closed conduit antiscour
CN218437106U (en) Assembled ecological plate rib formula stock retaining wall structure convenient to dismantle
CN211773743U (en) A drainage reinforced structure for landslide is administered
CN211773292U (en) Retaining wall for hydraulic engineering
KR100965522B1 (en) Reinforcement material for slope ditch and slope ditch structure using the same
CN217419494U (en) Domatic type mud-rock flow structure of blocking

Legal Events