CN208293532U - A kind of mud-rock flow is blocked structure - Google Patents

A kind of mud-rock flow is blocked structure Download PDF

Info

Publication number
CN208293532U
CN208293532U CN201820913400.5U CN201820913400U CN208293532U CN 208293532 U CN208293532 U CN 208293532U CN 201820913400 U CN201820913400 U CN 201820913400U CN 208293532 U CN208293532 U CN 208293532U
Authority
CN
China
Prior art keywords
drag
mud
anchor pole
line
gravity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820913400.5U
Other languages
Chinese (zh)
Inventor
李思滢
范雲鹤
陈永珍
翁杨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201820913400.5U priority Critical patent/CN208293532U/en
Application granted granted Critical
Publication of CN208293532U publication Critical patent/CN208293532U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

The utility model provides a kind of mud-rock flow and blocks structure, the structure includes anchor pole, drag-line, groove, gravity abutment, even rope, in debris flow gully, the anchoring section of anchor pole protrudes into basement rock rockbolt installation, and one end of drag-line connects anchor pole, the other end of drag-line connects gravity abutment, the connection of drag-line and anchor pole can dismantle, and groove is excavated in debris flow gully, places several gravity abutments in groove, gravity abutment is placed in the trench side by side, by even rope connection between gravity abutment.The utility model provides drag by anchor pole, project amount is saved, to save engineering cost and construction time.It blocks bulky grain stone in structure barrier mud-rock flow, the scouring capability of mud-rock flow is weakened, to prevent and treat mud-stone flow disaster.In addition, the structure of blocking of the utility model can be freely disassembled and can be recycled for multiple times.

Description

A kind of mud-rock flow is blocked structure
Technical field
It blocks structure the invention belongs to hydraulic engineering field more particularly to a kind of mud-rock flow.
Background technique
Mud-rock flow is a kind of extremely strong geological disaster of harmfulness, and Mountain In China area is big, and alpine terrain is steep, concentrates rainfall Easily cause mud-rock flow, the basin of typical mud-rock flow generally comprises to form area, Circulation Area, accumulation area, and debris flow control works are general Setting is forming area or Circulation Area.Most common Controlling Debris Flow measure is using structure of blocking, such as cable wire grid dam, lattice Grid dam, sieve dam, comb teeth dam, water penetration arch dam etc., the structure common problem of blocking of these dam formulas are that ground excavates work Journey amount is big, and dam body project amount is also larger, and construction condition is poor, and construction-time is long.In addition also flexible steel wire, steel construction block The control measures such as barricade, both technical measures are huge using steel material, and cost is high.Ecological management engineering passes through kind Plant is planted, it is given full play to and is detained precipitation, conserves water and soil, the functions such as regulated flow, to reach prevention and prevent mud-rock flow hair Life reduces its scale, mitigates the purpose of its extent of injury.The characteristics of ecological management engineering, is that investment is small, can improve nature ring Border, but the plant planted in cheuch does not have safeguard measure, is easy the erosion by rainfall and water flow, growth and development state compared with Difference, the time played effectiveness is long, cannot effectively prevent the generation of mud-stone flow disaster, and the auxiliary for generally only doing debris flow is arranged It applies.
Summary of the invention
The present invention provides a kind of mud-rock flow and blocks structure, is blocked structure by anchor cable constraint, and mud-rock flow flows through structure of blocking Bulky grain stone is intercepted afterwards, and the decline of mud-rock flow carrying capacity, mud-rock flow damage capability reduces, so that mud-rock flow is effectively prevented, Solve and need to excavate ground when building, construction condition is poor, and construction-time is long, project amount and it is at high cost the problems such as, this hair It is bright to be suitable for water-rock debris flow, diluted debris flow, and the basement rock depth of debris flow gully Circulation Area is less than 10 meters.
The structure the technical scheme is that a kind of mud-rock flow is blocked, including anchor pole, drag-line, groove, gravity abutment, even rope, In debris flow gully, the anchoring section of anchor pole protrudes into basement rock rockbolt installation, and one end of drag-line connects anchor pole, and the other end of drag-line connects Connecing gravity abutment, the connection of the connection of drag-line and anchor pole, drag-line and gravity abutment can dismantle, groove is excavated in debris flow gully, Several gravity abutments are placed in groove, gravity abutment is placed in the trench side by side, by even rope connection between gravity abutment.
The drag-line and Lian Suo is all made of steel wire winding.
Drag-line between the anchor pole and gravity abutment is arranged 2 or 2 or more.
The gravity abutment is precast member for reinforcing bar concrete.
A plurality of even rope is connected between the gravity abutment, the spacing of adjacent even rope is no more than 20cm.
One or more can be set in mud-rock flow structure of blocking in debris flow gully.
A kind of mud-rock flow is blocked the method for blocking of structure, this method comprises:
(1) Engineering geology and hydrogeology conditions for investigating and analysing debris flow gully, determine formation area, the Circulation Area of mud-rock flow With accumulation area;
(2) drainage area for counting debris flow gully, the crest discharge of debris flow gully is determined according to meteorological data, according to mudstone Ditch sectional dimension is flowed, mud-rock flow depth capacity is determined, the height of gravity abutment is determined according to mud-rock flow depth capacity;
(3) mud-rock flow blocks structure setting in the Circulation Area of mud-rock flow, and in debris flow gully internal drilling, drilling is in quincunx cloth It sets, anchor pole is installed in drilling, groove is excavated in the debris flow gully in anchor pole downstream, places gravity abutment in the trench, with even rope Adjacent gravity abutment is connected, connects anchor pole and gravity abutment with drag-line;
(4) mud-rock flow flows through mud-rock flow and blocks structure, and anchor pole provides withdrawal resistance, and withdrawal resistance passes to drag-line, and drag-line pulls Gravity abutment provides drag for gravity abutment, and the stone that partial size is greater than steel wire mesh is blocked and accumulated, the stone of water and remaining partial size Block flows away.
After a mud-rock flow, can there are two types of selection:
It blocks the stone of structure periphery first is that removing and being deposited in mud-rock flow, repairs impaired anchor pole, drag-line, even rope, gravity Pier, structure of mud-rock flow blocking continue to play a role;
Second is that dismantling the connection of drag-line and anchor pole, company's rope between gravity abutment is dismantled, repairs impaired drag-line, even rope, again Power pier selects new region to install anchor pole, excavates groove, places gravity abutment, connects anchor pole and drag-line, connects and connects between gravity abutment Rope, structure of mud-rock flow blocking continue to play a role.
The present invention has the advantage that
(1) structure of blocking of the invention is built without excavating ground, is provided drag by anchor pole, is saved project amount, thus Save engineering cost and construction time.
(2) gravity abutment of the invention is prefabricated components, is completed in factory, and remote location, execution conditions are suitable for The debris flow gully of difference, construction environment difference.
(3) bulky grain stone in structure barrier mud-rock flow of blocking of the invention, weakens the scouring capability of mud-rock flow, from And prevent and treat mud-stone flow disaster.
(4) structure of blocking of the invention can be dismantled, and after a mud-rock flow, can remove heap there are two types of selection Long-pending stone or disassembly is blocked structure and the place installation that more renews, and structure of entirely blocking can reuse, economize on resources.
Detailed description of the invention
Fig. 1 is overall schematic of the invention;
Fig. 2 is gravity abutment arrangement schematic diagram of the present invention along mud-rock flow flow direction;
Fig. 3 is top view of the invention;
In figure, debris flow gully 1, groove 2, anchor pole 3, gravity abutment 4, even rope 5, drag-line 6, mud-rock flow flow direction 7.
Specific embodiment
Present invention will be further explained below with reference to specific examples.It should be understood that these embodiments are merely to illustrate this hair It is bright rather than limit the scope of the invention.In addition, it should also be understood that, after reading the content taught by the present invention, art technology Personnel can make various changes or modifications the present invention, and such equivalent forms equally fall within the application the appended claims and limited Fixed range.
Embodiment 1
Mud-rock flow as shown in Figs. 1-3 is blocked structure, including anchor pole 3, drag-line 6, groove 2, gravity abutment 4, even rope 5, anchor pole 3 It is mounted in debris flow gully 1,3 bore diameter of anchor pole protrudes into basement rock in 80mm-120mm, the anchoring section of anchor pole 3, anchors segment length Degree is not less than 400mm, and one end of drag-line 6 connects anchor pole 3, and the other end of drag-line 6 connects gravity abutment 4, the company of drag-line 6 and anchor pole 3 Connect, drag-line 6 and the connection of gravity abutment 4 can be dismantled, and groove 2 is excavated in debris flow gully 1, it is heavy that several are placed in groove 2 Power pier 4, gravity abutment 4 are placed on side by side in groove 2, are connected between gravity abutment 4 by even rope 5, the diameter of drag-line 6 and Lian Suo 5 is not small In 50mm.
The drag-line 6 and Lian Suo 5 is all made of steel wire winding.
Drag-line 6 between the anchor pole 3 and gravity abutment 4 is arranged 2 or 2 or more.
The gravity abutment 4 is precast member for reinforcing bar concrete.
A plurality of even rope 5 is connected between the gravity abutment 4, the spacing of adjacent even rope 5 is no more than 20cm.
One or more can be set in debris flow gully 1 in mud-rock flow structure of blocking.
A kind of mud-rock flow is blocked the method for blocking of structure, this method comprises:
(1) Engineering geology and hydrogeology conditions for investigating and analysing debris flow gully 1 determine formation area, the circulation of mud-rock flow Area and accumulation area;
(2) drainage area for counting debris flow gully 1, the crest discharge of debris flow gully 1 is determined according to meteorological data, according to mud 1 sectional dimension of rock glacier ditch, determines mud-rock flow depth capacity, and the height of gravity abutment 4 is determined according to mud-rock flow depth capacity;
(3) mud-rock flow blocks structure setting in the Circulation Area of mud-rock flow, and in 1 internal drilling of debris flow gully, drilling is in quincunx Arrangement installs anchor pole 3 in drilling, and groove 2 is excavated in the debris flow gully 1 in 3 downstream of anchor pole, places gravity abutment in groove 2 4, adjacent gravity abutment 4 is connected with even rope 5, connects anchor pole 3 and gravity abutment 4 with drag-line 6;
(4) mud-rock flow flows through mud-rock flow and blocks structure, and anchor pole 3 provides withdrawal resistance, and withdrawal resistance passes to drag-line 6, and drag-line 6 is drawn Dynamic gravity abutment 4 provides drag for gravity abutment 4, and the stone that partial size is greater than steel wire mesh is blocked and accumulated, water and remaining partial size Stone flow away.
After a mud-rock flow, can there are two types of selection:
It blocks the stone of structure periphery first is that removing and being deposited in mud-rock flow, repairs impaired anchor pole 3, drag-line 6, even rope 5, again Power pier 4, structure of mud-rock flow blocking continue to play a role;
Second is that dismantle the connection of drag-line 6 and anchor pole 3, dismantle company's rope 5 between gravity abutment 4, take out gravity abutment 4, repair by The drag-line 6 of damage, even rope 5, gravity abutment 4, select new region to install anchor pole 3, excavate groove 2, place gravity abutment 4, connect anchor pole 3 With drag-line 6, connects and connect rope 5 between gravity abutment 4, structure of mud-rock flow blocking continues to play a role.

Claims (1)

  1. The structure 1. a kind of mud-rock flow is blocked, which is characterized in that including anchor pole, drag-line, groove, gravity abutment, even rope, rockbolt installation exist In debris flow gully, the anchoring section of anchor pole is protruded into basement rock, and one end of drag-line connects anchor pole, and the other end of drag-line connects gravity abutment, The connection of the connection of drag-line and anchor pole, drag-line and gravity abutment can dismantle, and groove is excavated in debris flow gully, is placed in groove Several gravity abutments, gravity abutment are placed in the trench side by side, by even rope connection between gravity abutment, the drag-line and Lian Suo all by Steel wire winding is made, and the drag-line between the anchor pole and gravity abutment is arranged 2 or 2 or more, and the gravity abutment is reinforcing bar Concrete prefabricated element, a plurality of even rope is connected between the gravity abutment, and the spacing of adjacent even rope is no more than 20cm.
CN201820913400.5U 2018-06-13 2018-06-13 A kind of mud-rock flow is blocked structure Expired - Fee Related CN208293532U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820913400.5U CN208293532U (en) 2018-06-13 2018-06-13 A kind of mud-rock flow is blocked structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820913400.5U CN208293532U (en) 2018-06-13 2018-06-13 A kind of mud-rock flow is blocked structure

Publications (1)

Publication Number Publication Date
CN208293532U true CN208293532U (en) 2018-12-28

Family

ID=64700462

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820913400.5U Expired - Fee Related CN208293532U (en) 2018-06-13 2018-06-13 A kind of mud-rock flow is blocked structure

Country Status (1)

Country Link
CN (1) CN208293532U (en)

Similar Documents

Publication Publication Date Title
CN110080254B (en) drainage slide-resistant pile-water guide culvert structure for slope reinforcement and construction method
CN111691438A (en) Anti-skidding-drainage comprehensive treatment method for landslide of large-scale accumulation body
KR100965467B1 (en) Eco-pillar debris barrier
CN110952574A (en) Method for treating landslide deformation body
CN211228626U (en) Automatic pressure relief device for anti-floating of basement bottom plate
CN108560503A (en) A kind of mud-rock flow is blocked structure and method of blocking
CN110344374A (en) Mud-rock flow flexible blocking backstop and mud-rock flow flexibility blocking dam
KR20090039448A (en) Nature-friendly diversion drain at top of slope
CN110777821B (en) Method for treating water burst disaster of fissures of weathered rock slope
CN210482339U (en) Embankment side slope protection system
CN208293532U (en) A kind of mud-rock flow is blocked structure
CN208280086U (en) Detachable mud-rock flow is blocked system
CN108517837A (en) Anchor cable formula mud-rock flow, which is blocked, system and blocks method
CN208280087U (en) Anchor cable formula mud-rock flow is blocked system
CN206916686U (en) A kind of subgrade protection system in debris flow gully
CN205617396U (en) Close on existing railway line construction protection structure
KR101170789B1 (en) Complex debris barrier of eco-friendly
CN108517836A (en) Detachable mud-rock flow is blocked system and its method of blocking
CN211735243U (en) Mud-rock flow prevention and control system for tunnel valley type abandoned dreg site
CN212225231U (en) Protective structure for bias tunnel portal
CN208589025U (en) A kind of riverbed lower section advanced pre-reinforcement device of closed conduit antiscour
KR100776621B1 (en) Pile structure for preventing a disaster by debris flow
CN218437106U (en) Assembled ecological plate rib formula stock retaining wall structure convenient to dismantle
KR100965522B1 (en) Reinforcement material for slope ditch and slope ditch structure using the same
CN211773292U (en) Retaining wall for hydraulic engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181228

CF01 Termination of patent right due to non-payment of annual fee