CN208293532U - A kind of mud-rock flow is blocked structure - Google Patents
A kind of mud-rock flow is blocked structure Download PDFInfo
- Publication number
- CN208293532U CN208293532U CN201820913400.5U CN201820913400U CN208293532U CN 208293532 U CN208293532 U CN 208293532U CN 201820913400 U CN201820913400 U CN 201820913400U CN 208293532 U CN208293532 U CN 208293532U
- Authority
- CN
- China
- Prior art keywords
- drag
- mud
- anchor pole
- line
- gravity
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Sewage (AREA)
Abstract
The utility model provides a kind of mud-rock flow and blocks structure, the structure includes anchor pole, drag-line, groove, gravity abutment, even rope, in debris flow gully, the anchoring section of anchor pole protrudes into basement rock rockbolt installation, and one end of drag-line connects anchor pole, the other end of drag-line connects gravity abutment, the connection of drag-line and anchor pole can dismantle, and groove is excavated in debris flow gully, places several gravity abutments in groove, gravity abutment is placed in the trench side by side, by even rope connection between gravity abutment.The utility model provides drag by anchor pole, project amount is saved, to save engineering cost and construction time.It blocks bulky grain stone in structure barrier mud-rock flow, the scouring capability of mud-rock flow is weakened, to prevent and treat mud-stone flow disaster.In addition, the structure of blocking of the utility model can be freely disassembled and can be recycled for multiple times.
Description
Technical field
It blocks structure the invention belongs to hydraulic engineering field more particularly to a kind of mud-rock flow.
Background technique
Mud-rock flow is a kind of extremely strong geological disaster of harmfulness, and Mountain In China area is big, and alpine terrain is steep, concentrates rainfall
Easily cause mud-rock flow, the basin of typical mud-rock flow generally comprises to form area, Circulation Area, accumulation area, and debris flow control works are general
Setting is forming area or Circulation Area.Most common Controlling Debris Flow measure is using structure of blocking, such as cable wire grid dam, lattice
Grid dam, sieve dam, comb teeth dam, water penetration arch dam etc., the structure common problem of blocking of these dam formulas are that ground excavates work
Journey amount is big, and dam body project amount is also larger, and construction condition is poor, and construction-time is long.In addition also flexible steel wire, steel construction block
The control measures such as barricade, both technical measures are huge using steel material, and cost is high.Ecological management engineering passes through kind
Plant is planted, it is given full play to and is detained precipitation, conserves water and soil, the functions such as regulated flow, to reach prevention and prevent mud-rock flow hair
Life reduces its scale, mitigates the purpose of its extent of injury.The characteristics of ecological management engineering, is that investment is small, can improve nature ring
Border, but the plant planted in cheuch does not have safeguard measure, is easy the erosion by rainfall and water flow, growth and development state compared with
Difference, the time played effectiveness is long, cannot effectively prevent the generation of mud-stone flow disaster, and the auxiliary for generally only doing debris flow is arranged
It applies.
Summary of the invention
The present invention provides a kind of mud-rock flow and blocks structure, is blocked structure by anchor cable constraint, and mud-rock flow flows through structure of blocking
Bulky grain stone is intercepted afterwards, and the decline of mud-rock flow carrying capacity, mud-rock flow damage capability reduces, so that mud-rock flow is effectively prevented,
Solve and need to excavate ground when building, construction condition is poor, and construction-time is long, project amount and it is at high cost the problems such as, this hair
It is bright to be suitable for water-rock debris flow, diluted debris flow, and the basement rock depth of debris flow gully Circulation Area is less than 10 meters.
The structure the technical scheme is that a kind of mud-rock flow is blocked, including anchor pole, drag-line, groove, gravity abutment, even rope,
In debris flow gully, the anchoring section of anchor pole protrudes into basement rock rockbolt installation, and one end of drag-line connects anchor pole, and the other end of drag-line connects
Connecing gravity abutment, the connection of the connection of drag-line and anchor pole, drag-line and gravity abutment can dismantle, groove is excavated in debris flow gully,
Several gravity abutments are placed in groove, gravity abutment is placed in the trench side by side, by even rope connection between gravity abutment.
The drag-line and Lian Suo is all made of steel wire winding.
Drag-line between the anchor pole and gravity abutment is arranged 2 or 2 or more.
The gravity abutment is precast member for reinforcing bar concrete.
A plurality of even rope is connected between the gravity abutment, the spacing of adjacent even rope is no more than 20cm.
One or more can be set in mud-rock flow structure of blocking in debris flow gully.
A kind of mud-rock flow is blocked the method for blocking of structure, this method comprises:
(1) Engineering geology and hydrogeology conditions for investigating and analysing debris flow gully, determine formation area, the Circulation Area of mud-rock flow
With accumulation area;
(2) drainage area for counting debris flow gully, the crest discharge of debris flow gully is determined according to meteorological data, according to mudstone
Ditch sectional dimension is flowed, mud-rock flow depth capacity is determined, the height of gravity abutment is determined according to mud-rock flow depth capacity;
(3) mud-rock flow blocks structure setting in the Circulation Area of mud-rock flow, and in debris flow gully internal drilling, drilling is in quincunx cloth
It sets, anchor pole is installed in drilling, groove is excavated in the debris flow gully in anchor pole downstream, places gravity abutment in the trench, with even rope
Adjacent gravity abutment is connected, connects anchor pole and gravity abutment with drag-line;
(4) mud-rock flow flows through mud-rock flow and blocks structure, and anchor pole provides withdrawal resistance, and withdrawal resistance passes to drag-line, and drag-line pulls
Gravity abutment provides drag for gravity abutment, and the stone that partial size is greater than steel wire mesh is blocked and accumulated, the stone of water and remaining partial size
Block flows away.
After a mud-rock flow, can there are two types of selection:
It blocks the stone of structure periphery first is that removing and being deposited in mud-rock flow, repairs impaired anchor pole, drag-line, even rope, gravity
Pier, structure of mud-rock flow blocking continue to play a role;
Second is that dismantling the connection of drag-line and anchor pole, company's rope between gravity abutment is dismantled, repairs impaired drag-line, even rope, again
Power pier selects new region to install anchor pole, excavates groove, places gravity abutment, connects anchor pole and drag-line, connects and connects between gravity abutment
Rope, structure of mud-rock flow blocking continue to play a role.
The present invention has the advantage that
(1) structure of blocking of the invention is built without excavating ground, is provided drag by anchor pole, is saved project amount, thus
Save engineering cost and construction time.
(2) gravity abutment of the invention is prefabricated components, is completed in factory, and remote location, execution conditions are suitable for
The debris flow gully of difference, construction environment difference.
(3) bulky grain stone in structure barrier mud-rock flow of blocking of the invention, weakens the scouring capability of mud-rock flow, from
And prevent and treat mud-stone flow disaster.
(4) structure of blocking of the invention can be dismantled, and after a mud-rock flow, can remove heap there are two types of selection
Long-pending stone or disassembly is blocked structure and the place installation that more renews, and structure of entirely blocking can reuse, economize on resources.
Detailed description of the invention
Fig. 1 is overall schematic of the invention;
Fig. 2 is gravity abutment arrangement schematic diagram of the present invention along mud-rock flow flow direction;
Fig. 3 is top view of the invention;
In figure, debris flow gully 1, groove 2, anchor pole 3, gravity abutment 4, even rope 5, drag-line 6, mud-rock flow flow direction 7.
Specific embodiment
Present invention will be further explained below with reference to specific examples.It should be understood that these embodiments are merely to illustrate this hair
It is bright rather than limit the scope of the invention.In addition, it should also be understood that, after reading the content taught by the present invention, art technology
Personnel can make various changes or modifications the present invention, and such equivalent forms equally fall within the application the appended claims and limited
Fixed range.
Embodiment 1
Mud-rock flow as shown in Figs. 1-3 is blocked structure, including anchor pole 3, drag-line 6, groove 2, gravity abutment 4, even rope 5, anchor pole 3
It is mounted in debris flow gully 1,3 bore diameter of anchor pole protrudes into basement rock in 80mm-120mm, the anchoring section of anchor pole 3, anchors segment length
Degree is not less than 400mm, and one end of drag-line 6 connects anchor pole 3, and the other end of drag-line 6 connects gravity abutment 4, the company of drag-line 6 and anchor pole 3
Connect, drag-line 6 and the connection of gravity abutment 4 can be dismantled, and groove 2 is excavated in debris flow gully 1, it is heavy that several are placed in groove 2
Power pier 4, gravity abutment 4 are placed on side by side in groove 2, are connected between gravity abutment 4 by even rope 5, the diameter of drag-line 6 and Lian Suo 5 is not small
In 50mm.
The drag-line 6 and Lian Suo 5 is all made of steel wire winding.
Drag-line 6 between the anchor pole 3 and gravity abutment 4 is arranged 2 or 2 or more.
The gravity abutment 4 is precast member for reinforcing bar concrete.
A plurality of even rope 5 is connected between the gravity abutment 4, the spacing of adjacent even rope 5 is no more than 20cm.
One or more can be set in debris flow gully 1 in mud-rock flow structure of blocking.
A kind of mud-rock flow is blocked the method for blocking of structure, this method comprises:
(1) Engineering geology and hydrogeology conditions for investigating and analysing debris flow gully 1 determine formation area, the circulation of mud-rock flow
Area and accumulation area;
(2) drainage area for counting debris flow gully 1, the crest discharge of debris flow gully 1 is determined according to meteorological data, according to mud
1 sectional dimension of rock glacier ditch, determines mud-rock flow depth capacity, and the height of gravity abutment 4 is determined according to mud-rock flow depth capacity;
(3) mud-rock flow blocks structure setting in the Circulation Area of mud-rock flow, and in 1 internal drilling of debris flow gully, drilling is in quincunx
Arrangement installs anchor pole 3 in drilling, and groove 2 is excavated in the debris flow gully 1 in 3 downstream of anchor pole, places gravity abutment in groove 2
4, adjacent gravity abutment 4 is connected with even rope 5, connects anchor pole 3 and gravity abutment 4 with drag-line 6;
(4) mud-rock flow flows through mud-rock flow and blocks structure, and anchor pole 3 provides withdrawal resistance, and withdrawal resistance passes to drag-line 6, and drag-line 6 is drawn
Dynamic gravity abutment 4 provides drag for gravity abutment 4, and the stone that partial size is greater than steel wire mesh is blocked and accumulated, water and remaining partial size
Stone flow away.
After a mud-rock flow, can there are two types of selection:
It blocks the stone of structure periphery first is that removing and being deposited in mud-rock flow, repairs impaired anchor pole 3, drag-line 6, even rope 5, again
Power pier 4, structure of mud-rock flow blocking continue to play a role;
Second is that dismantle the connection of drag-line 6 and anchor pole 3, dismantle company's rope 5 between gravity abutment 4, take out gravity abutment 4, repair by
The drag-line 6 of damage, even rope 5, gravity abutment 4, select new region to install anchor pole 3, excavate groove 2, place gravity abutment 4, connect anchor pole 3
With drag-line 6, connects and connect rope 5 between gravity abutment 4, structure of mud-rock flow blocking continues to play a role.
Claims (1)
- The structure 1. a kind of mud-rock flow is blocked, which is characterized in that including anchor pole, drag-line, groove, gravity abutment, even rope, rockbolt installation exist In debris flow gully, the anchoring section of anchor pole is protruded into basement rock, and one end of drag-line connects anchor pole, and the other end of drag-line connects gravity abutment, The connection of the connection of drag-line and anchor pole, drag-line and gravity abutment can dismantle, and groove is excavated in debris flow gully, is placed in groove Several gravity abutments, gravity abutment are placed in the trench side by side, by even rope connection between gravity abutment, the drag-line and Lian Suo all by Steel wire winding is made, and the drag-line between the anchor pole and gravity abutment is arranged 2 or 2 or more, and the gravity abutment is reinforcing bar Concrete prefabricated element, a plurality of even rope is connected between the gravity abutment, and the spacing of adjacent even rope is no more than 20cm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820913400.5U CN208293532U (en) | 2018-06-13 | 2018-06-13 | A kind of mud-rock flow is blocked structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820913400.5U CN208293532U (en) | 2018-06-13 | 2018-06-13 | A kind of mud-rock flow is blocked structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208293532U true CN208293532U (en) | 2018-12-28 |
Family
ID=64700462
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820913400.5U Expired - Fee Related CN208293532U (en) | 2018-06-13 | 2018-06-13 | A kind of mud-rock flow is blocked structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208293532U (en) |
-
2018
- 2018-06-13 CN CN201820913400.5U patent/CN208293532U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110080254B (en) | drainage slide-resistant pile-water guide culvert structure for slope reinforcement and construction method | |
CN111691438A (en) | Anti-skidding-drainage comprehensive treatment method for landslide of large-scale accumulation body | |
KR100965467B1 (en) | Eco-pillar debris barrier | |
CN110952574A (en) | Method for treating landslide deformation body | |
CN211228626U (en) | Automatic pressure relief device for anti-floating of basement bottom plate | |
CN108560503A (en) | A kind of mud-rock flow is blocked structure and method of blocking | |
CN110344374A (en) | Mud-rock flow flexible blocking backstop and mud-rock flow flexibility blocking dam | |
KR20090039448A (en) | Nature-friendly diversion drain at top of slope | |
CN110777821B (en) | Method for treating water burst disaster of fissures of weathered rock slope | |
CN210482339U (en) | Embankment side slope protection system | |
CN208293532U (en) | A kind of mud-rock flow is blocked structure | |
CN208280086U (en) | Detachable mud-rock flow is blocked system | |
CN108517837A (en) | Anchor cable formula mud-rock flow, which is blocked, system and blocks method | |
CN208280087U (en) | Anchor cable formula mud-rock flow is blocked system | |
CN206916686U (en) | A kind of subgrade protection system in debris flow gully | |
CN205617396U (en) | Close on existing railway line construction protection structure | |
KR101170789B1 (en) | Complex debris barrier of eco-friendly | |
CN108517836A (en) | Detachable mud-rock flow is blocked system and its method of blocking | |
CN211735243U (en) | Mud-rock flow prevention and control system for tunnel valley type abandoned dreg site | |
CN212225231U (en) | Protective structure for bias tunnel portal | |
CN208589025U (en) | A kind of riverbed lower section advanced pre-reinforcement device of closed conduit antiscour | |
KR100776621B1 (en) | Pile structure for preventing a disaster by debris flow | |
CN218437106U (en) | Assembled ecological plate rib formula stock retaining wall structure convenient to dismantle | |
KR100965522B1 (en) | Reinforcement material for slope ditch and slope ditch structure using the same | |
CN211773292U (en) | Retaining wall for hydraulic engineering |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181228 |
|
CF01 | Termination of patent right due to non-payment of annual fee |