CN108517836A - Detachable mud-rock flow is blocked system and its method of blocking - Google Patents

Detachable mud-rock flow is blocked system and its method of blocking Download PDF

Info

Publication number
CN108517836A
CN108517836A CN201810606624.6A CN201810606624A CN108517836A CN 108517836 A CN108517836 A CN 108517836A CN 201810606624 A CN201810606624 A CN 201810606624A CN 108517836 A CN108517836 A CN 108517836A
Authority
CN
China
Prior art keywords
acanthosphere
masonry
type body
mud
steel wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810606624.6A
Other languages
Chinese (zh)
Inventor
范雲鹤
陈永珍
翁杨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810606624.6A priority Critical patent/CN108517836A/en
Publication of CN108517836A publication Critical patent/CN108517836A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/10Dams; Dykes; Sluice ways or other structures for dykes, dams, or the like

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The present invention provides a kind of detachable formula mud-rock flow and blocks system and its method of blocking, for existing dam formula block structure there are the problem of, such as need to excavate ground when building, construction condition is poor, and construction-time is long, quantities and of high cost etc..The technical scheme is that the system includes anchor pole, drag-line, groove, steel wire, acanthosphere type body of masonry, rockbolt installation is in debris flow gully, drag-line connects anchor pole and acanthosphere type body of masonry, the connection of drag-line and anchor pole can dismantle, acanthosphere type body of masonry includes centerbody, stabilizer blade, stabilizer blade is connect by reinforcing bar with centerbody, acanthosphere type body of masonry includes several stabilizer blades, groove is excavated in debris flow gully, several acanthosphere type body of masonries are placed in groove, acanthosphere type body of masonry, which stacks, to be placed in the trench, and steel wire is wrapped in the outside of acanthosphere type body of masonry.

Description

Detachable mud-rock flow is blocked system and its method of blocking
Technical field
It blocks system and its method of blocking the invention belongs to hydraulic engineering field more particularly to a kind of mud-rock flow.
Background technology
Mud-rock flow is a kind of widely distributed geological disaster, has the characteristics that inertia is high, defeated shifting power is strong, impact force is big, At present Controlling Debris Flow engineering mainly intercept water engineering, retain engineering, row lead engineering, ecological engineering etc..Engineering is wherein retained to answer With most extensively, engineering is retained by retaining the solid matter in mud-rock flow to reduce state of debris flow disasters, builds check dam, blocking dam, Library arch dam, broach dam, crib dam, rigid lattice dam, cable wire grid dam etc. are stored, bulk solid mass is made to be not involved in mud-rock flow fortune It is dynamic, using depression, gully, barren beach, lakes and marhshes or embankment can also be built other than the range of guard plot, by mud-rock flow solids Matter introduces and collects storage, and current main problem existing for engineering of retaining is that quantities is big, the cost that ground excavation etc. is built The construction condition of height, debris flow region is poor, and construction-time is long, and the restrictive condition used is more.
It is to drain mud-rock flow using engineerings such as flood discharge channel, aqueducts, control the harm of mud-rock flow that row, which leads engineering,.Due to mudstone The erosiveness of stream is strong, solid matter is abundant, and the erosion resistibility and anti-siltation Capability Requirement to drainage groove are very high.
In addition to above-mentioned measure, ecological management engineering is given full play to it and is detained precipitation, conserves water and soil, adjust by planting plants The functions such as pitch diameter stream mitigate the purpose of its extent of injury to reach prevention and the generation of prevention mud-rock flow or reduce its scale.It is raw The characteristics of state harnessing project, which is investment plant that is small, can improving natural environment, but be planted in cheuch, does not have safeguard measure, holds It is vulnerable to rainfall and the erosion of flow, growth and development state is poor, and the time played effectiveness is long, cannot effectively prevent Debris-flow Hazard Harmful generation.
Invention content
The purpose of the present invention is be directed to existing dam formula block structure there are the problem of, needed when such as building excavate ground, Quantities is big, and construction condition is poor, and construction-time is long, of high cost etc., and a kind of detachable mud-rock flow of present invention offer is blocked System and its method of blocking constrain structure of blocking by anchor cable, and bulky grain stone is intercepted after mud-rock flow flows through the system of blocking, mud Rock glacier carrying capacity declines, and mud-rock flow damage capability reduces, to effectively prevent mud-rock flow.
The present invention is suitable for water-rock debris flow and diluted debris flow, and the basement rock depth of debris flow gully Circulation Area is less than 10 meters.
The technical scheme is that:A kind of detachable mud-rock flow is blocked system, including anchor pole, drag-line, groove, steel wire Net, acanthosphere type body of masonry, in debris flow gully, the anchoring section of anchor pole stretches into basement rock rockbolt installation, and one end of drag-line connects anchor The other end of bar, drag-line connects acanthosphere type body of masonry, the connection of drag-line and anchor pole, the connection of drag-line and acanthosphere type body of masonry With dismounting, acanthosphere type body of masonry includes centerbody, stabilizer blade, and center shape is regular prism, and stabilizer blade is connected by reinforcing bar and centerbody It connects, acanthosphere type body of masonry includes several stabilizer blades, and groove is excavated in debris flow gully, several acanthosphere type bricklayings are placed in groove Body, acanthosphere type body of masonry, which stacks, to be placed in the trench, and steel wire is wrapped in the outside of acanthosphere type body of masonry.
The drag-line is made of steel wire winding.
The steel wire is worked out by steel wire rope, and steel wire rope infall installs buckling piece.
The acanthosphere type body of masonry is precast member for reinforcing bar concrete.
The aperture of the mesh of the steel wire is less than 20cm.
One or more can be arranged in detachable mud-rock flow system of blocking in debris flow gully.
A kind of detachable mud-rock flow is blocked the method for blocking of system, and this method includes:
(1)The Engineering geology and hydrogeology conditions for investigating and analysing debris flow gully, determine formation area, Circulation Area and the heap of mud-rock flow Product area;
(2)The drainage area for counting debris flow gully determines the crest discharge of debris flow gully according to meteorological data, according to debris flow gully Sectional dimension determines mud-rock flow depth capacity, and the quantity and stacking of acanthosphere type body of masonry are determined according to mud-rock flow depth capacity Highly;
(3)The detachable mud-rock flow system of blocking is arranged in the Circulation Area of mud-rock flow, and in debris flow gully internal drilling, drilling is in plum blossom Shape is arranged, anchor pole is installed in drilling, groove is excavated in the debris flow gully in anchor pole downstream, is laid with steel wire in the trench, On steel wire stack acanthosphere type body of masonry, drag-line first is connect with acanthosphere type body of masonry, drag-line after steel wire is connected with anchor pole, Close steel wire;
(4)Mud-rock flow flows through detachable mud-rock flow and blocks system, and anchor pole provides withdrawal resistance, and withdrawal resistance passes to drag-line, drag-line Acanthosphere type body of masonry is pulled, drag is provided for acanthosphere type body of masonry, the stone that grain size is more than steel wire mesh is blocked and is accumulated, The stone of water and remaining grain size flows away.
After a mud-rock flow, can there are two types of selection:
It is deposited in the stone that detachable mud-rock flow is blocked around system first, removing, repairs impaired steel wire, anchor pole, drawing Rope, acanthosphere type body of masonry, the detachable mud-rock flow system of blocking continue to play a role;
Second is that dismantling the connection of drag-line and anchor pole, steel wire is dismantled, takes out acanthosphere type body of masonry, impaired steel wire is repaired, draws Rope, acanthosphere type body of masonry select new region to install anchor pole, excavate groove, place acanthosphere type body of masonry, are wrapped up and being pierced with steel wire Ball-type body of masonry, connects anchor pole and drag-line, the detachable mud-rock flow system of blocking continue to play a role.
The invention has the advantages that:
(1)The system of blocking of the present invention is built without excavating ground, is provided drag by anchor pole, quantities is saved, to save Engineering cost and construction time.
(2)The acanthosphere type body of masonry of the present invention is prefabricated components, completes in factory, suitable for remote location, applies Work condition is poor, construction environment difference debris flow gully.
(3)Bulky grain stone in the system blocks mud-rock flow of blocking of the present invention, weakens the scouring capability of mud-rock flow, from And prevent mud-stone flow disaster.
(4)The system of blocking of the present invention can be dismantled, and after a mud-rock flow, can remove heap there are two types of selection Long-pending stone or dismounting block system and more renew place installation, entirely the system of blocking can reuse, and economize on resources.
Description of the drawings
Fig. 1 is overall structure of the present invention;
Fig. 2 is the schematic diagram of the acanthosphere type body of masonry of the present invention;
In figure, debris flow gully 1, anchor pole 2, drag-line 3, acanthosphere type body of masonry 4, centerbody 41, stabilizer blade 42, mud-rock flow flow direction 5, Groove 6, steel wire 7.
Specific implementation mode
Present invention will be further explained below with reference to specific examples.It should be understood that these embodiments are merely to illustrate this hair It is bright rather than limit the scope of the invention.In addition, it should also be understood that, after reading the content taught by the present invention, art technology Personnel can make various changes or modifications the present invention, and such equivalent forms equally fall within the application the appended claims and limited Fixed range.
Embodiment 1
A kind of detachable formula mud-rock flow as shown in Figure 1 and Figure 2 is blocked system, including anchor pole 2, drag-line 3, groove 6, steel wire 7, acanthosphere type body of masonry 4, anchor pole 2 are mounted in debris flow gully 1, and 2 bore diameter of anchor pole is in 80mm-120mm, the anchoring of anchor pole 2 Section stretches into basement rock, and anchoring depth is not less than 400mm, and one end of drag-line 3 connects anchor pole 2, and the other end of drag-line 3 connects acanthosphere The diameter of type body of masonry 4, drag-line 3 is not less than 40mm, and the diameter of acanthosphere type body of masonry 4 is not less than 1m, the company of drag-line 3 and anchor pole 2 Connect, drag-line 3 and the connection of acanthosphere type body of masonry 4 can be dismantled, acanthosphere type body of masonry 4 include centerbody 41, stabilizer blade 42, center 41 shape of body is regular prism, and stabilizer blade 42 is connect by reinforcing bar with centerbody 41, and acanthosphere type body of masonry 4 includes several stabilizer blades 42, Groove 6 is excavated in debris flow gully 1, several acanthosphere type body of masonries 4 are placed in groove 6, and the stacking of acanthosphere type body of masonry 4 is placed on In groove 6, steel wire 7 is wrapped in the outside of acanthosphere type body of masonry 4.
The drag-line 3 is made of steel wire winding, with improved corrosion, high intensity.
The steel wire 7 is worked out by steel wire rope, and steel wire rope infall installs buckling piece.
The acanthosphere type body of masonry 4 is precast member for reinforcing bar concrete.
The aperture of the mesh of the steel wire 7 is less than 20cm.
One or more can be arranged in detachable mud-rock flow system of blocking in debris flow gully 1.
A kind of detachable mud-rock flow is blocked the method for blocking of system, and this method includes:
(1)The Engineering geology and hydrogeology conditions for investigating and analysing debris flow gully 1, determine the formation area of mud-rock flow, Circulation Area with Accumulation area;
(2)1 drainage area of debris flow gully is counted, the crest discharge of debris flow gully 1 is determined according to meteorological data, according to debris flow gully 1 sectional dimension determines mud-rock flow depth capacity, and the quantity and stacking of acanthosphere type body of masonry 4 are determined according to mud-rock flow depth capacity Height;
(3)The detachable mud-rock flow system of blocking is arranged in the Circulation Area of mud-rock flow, and in 1 internal drilling of debris flow gully, drilling is in plum Flower-shape is arranged, anchor pole 2 is installed in drilling, and groove 6 is excavated in the debris flow gully 1 in 2 downstream of anchor pole, and steel is laid in groove 6 Silk screen 7 stacks acanthosphere type body of masonry 4 on steel wire 7, and drag-line 3 is first connect with acanthosphere type body of masonry 4, and drag-line 3 passes through steel wire 7 and anchor pole 2 connect after, close steel wire 7;
(4)Mud-rock flow flows through detachable mud-rock flow and blocks system, and anchor pole 2 provides withdrawal resistance, and withdrawal resistance passes to drag-line 3, draws Rope 3 pulls acanthosphere type body of masonry 4, provides drag for acanthosphere type body of masonry 4, the stone that grain size is more than 7 mesh of steel wire is blocked And accumulate, the stone of water and remaining grain size flows away.
After a mud-rock flow, can there are two types of selection:
It is deposited in the stone that detachable mud-rock flow is blocked around system first, removing, impaired steel wire 7 is repaired, anchor pole 2, draws Rope 3, acanthosphere type body of masonry 4, the detachable mud-rock flow system of blocking continue to play a role;
Second is that dismantling the connection of drag-line 3 and anchor pole 2, steel wire 7 is dismantled, acanthosphere type body of masonry 4 is taken out, repairs impaired steel wire 7, drag-line 3, acanthosphere type body of masonry 4 select new region to install anchor pole 2, excavate groove 6, place acanthosphere type body of masonry 4, use steel Silk screen 7 wraps up acanthosphere type body of masonry 4, connects anchor pole 2 and drag-line 3, the detachable mud-rock flow system of blocking continue to play a role.

Claims (9)

  1. The system 1. a kind of detachable mud-rock flow is blocked, which is characterized in that including anchor pole 2, drag-line 3, groove 6, steel wire 7, thorn Ball-type body of masonry 4, anchor pole 2 are mounted in debris flow gully 1, and the anchoring section of anchor pole 2 stretches into basement rock, and one end of drag-line 3 connects anchor Bar 2, the other end connection acanthosphere type body of masonry 4 of drag-line 3, connection, drag-line 3 and the acanthosphere type body of masonry 4 of drag-line 3 and anchor pole 2 Connection can dismantle, and acanthosphere type body of masonry 4 includes centerbody 41, stabilizer blade 42, and 41 shape of centerbody is regular prism, and stabilizer blade 42 is logical It crosses reinforcing bar to connect with centerbody 41, acanthosphere type body of masonry 4 includes several stabilizer blades 42, and groove 6, ditch are excavated in debris flow gully 1 Several acanthosphere type body of masonries 4 are placed in slot 6, the stacking of acanthosphere type body of masonry 4 is placed in groove 6, and steel wire 7 is wrapped in acanthosphere The outside of type body of masonry 4.
  2. The system 2. detachable mud-rock flow according to claim 1 is blocked, which is characterized in that the drag-line 3 is by steel wire Winding is made.
  3. The system 3. detachable mud-rock flow according to claim 1 is blocked, which is characterized in that the steel wire 7 is by steel Cord is worked out, and steel wire rope infall installs buckling piece.
  4. The system 4. detachable mud-rock flow according to claim 3 is blocked, which is characterized in that the net of the steel wire 7 The aperture in hole is less than 20cm.
  5. The system 5. detachable mud-rock flow according to claim 1 is blocked, which is characterized in that the acanthosphere type body of masonry 4 be precast member for reinforcing bar concrete.
  6. The system 6. detachable mud-rock flow according to claim 1 is blocked, which is characterized in that the detachable mudstone One or more can be arranged in stream system of blocking in debris flow gully 1.
  7. A kind of method of blocking of system 7. detachable mud-rock flow using any one of the claim 1-6 systems is blocked, It is characterized in that, this method includes:
    (1)The Engineering geology and hydrogeology conditions for investigating and analysing debris flow gully, determine formation area, Circulation Area and the heap of mud-rock flow Product area;
    (2)The drainage area for counting debris flow gully determines the crest discharge of debris flow gully according to meteorological data, according to debris flow gully Sectional dimension determines mud-rock flow depth capacity, and the quantity and stacking of acanthosphere type body of masonry are determined according to mud-rock flow depth capacity Highly;
    (3)The detachable mud-rock flow system of blocking is arranged in the Circulation Area of mud-rock flow, and in debris flow gully internal drilling, drilling is in plum blossom Shape is arranged, anchor pole is installed in drilling, groove is excavated in the debris flow gully in anchor pole downstream, is laid with steel wire in the trench, On steel wire stack acanthosphere type body of masonry, drag-line first is connect with acanthosphere type body of masonry, drag-line after steel wire is connected with anchor pole, Close steel wire;
    (4)Mud-rock flow flows through detachable mud-rock flow and blocks system, and the stone that grain size is more than steel wire mesh is blocked and accumulated, The stone of water and remaining grain size flows away.
  8. The method of blocking of system 8. detachable mud-rock flow according to claim 7 is blocked, which is characterized in that when a mud After rock glacier, remove and be deposited in the stone that detachable mud-rock flow is blocked around system, repair impaired steel wire, anchor pole, Drag-line, acanthosphere type body of masonry, the detachable mud-rock flow system of blocking continue to play a role.
  9. The method of blocking of system 9. detachable mud-rock flow according to claim 7 is blocked, which is characterized in that when a mud After rock glacier, dismantle the connection of drag-line and anchor pole, dismantle steel wire, take out acanthosphere type body of masonry, repair impaired steel wire, Drag-line, acanthosphere type body of masonry select new region to install anchor pole, excavate groove, place acanthosphere type body of masonry, are wrapped up with steel wire Acanthosphere type body of masonry, connects anchor pole and drag-line, the detachable mud-rock flow system of blocking continue to play a role.
CN201810606624.6A 2018-06-13 2018-06-13 Detachable mud-rock flow is blocked system and its method of blocking Pending CN108517836A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810606624.6A CN108517836A (en) 2018-06-13 2018-06-13 Detachable mud-rock flow is blocked system and its method of blocking

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810606624.6A CN108517836A (en) 2018-06-13 2018-06-13 Detachable mud-rock flow is blocked system and its method of blocking

Publications (1)

Publication Number Publication Date
CN108517836A true CN108517836A (en) 2018-09-11

Family

ID=63427429

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810606624.6A Pending CN108517836A (en) 2018-06-13 2018-06-13 Detachable mud-rock flow is blocked system and its method of blocking

Country Status (1)

Country Link
CN (1) CN108517836A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114892593A (en) * 2022-06-01 2022-08-12 清华大学 Bionic energy dissipation and disaster reduction structural unit

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2844212Y (en) * 2005-09-26 2006-12-06 张宗胜 Mud-flow intercepting block
CN204163090U (en) * 2014-10-21 2015-02-18 中国科学院、水利部成都山地灾害与环境研究所 A kind of for the mud-rock flow deceleration device in debris flow drainage groove
CN105672188A (en) * 2016-01-12 2016-06-15 中国地质大学(武汉) Debris flow ecological protection device capable of dissipating energy and conducting filtration

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2844212Y (en) * 2005-09-26 2006-12-06 张宗胜 Mud-flow intercepting block
CN204163090U (en) * 2014-10-21 2015-02-18 中国科学院、水利部成都山地灾害与环境研究所 A kind of for the mud-rock flow deceleration device in debris flow drainage groove
CN105672188A (en) * 2016-01-12 2016-06-15 中国地质大学(武汉) Debris flow ecological protection device capable of dissipating energy and conducting filtration

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114892593A (en) * 2022-06-01 2022-08-12 清华大学 Bionic energy dissipation and disaster reduction structural unit
CN114892593B (en) * 2022-06-01 2023-10-27 清华大学 Bionic energy dissipation and disaster reduction structural unit

Similar Documents

Publication Publication Date Title
KR100818758B1 (en) Structure for establish mat of river slope
CN106759066B (en) A kind of method of mountain area side slope water conservancy diversion energy dissipating prevention and control geological disaster
Perez et al. Installation enhancements to common inlet protection practices using large-scale testing techniques
CN107100130A (en) Subgrade protection system and implementation in a kind of debris flow gully
CN110952574A (en) Method for treating landslide deformation body
CN114960536A (en) Early-stage presetting processing device and method for damming dam
CN208280086U (en) Detachable mud-rock flow is blocked system
EP1347101A1 (en) Method for soil erosion control works or shore protection works and structure for soil protection or shore protection
JP2003129437A (en) Structure for catching flow-down matter and energy absorption in river and mountain stream
CN214363265U (en) Flexible protection system for promoting silt and making land near nature
CN112942385B (en) Villages and small towns building torrent debris flow protection system and design method
CN108517836A (en) Detachable mud-rock flow is blocked system and its method of blocking
CN108560503A (en) A kind of mud-rock flow is blocked structure and method of blocking
JPH0782725A (en) Permeable erosion control weir levee
CN108517837A (en) Anchor cable formula mud-rock flow, which is blocked, system and blocks method
CN208280087U (en) Anchor cable formula mud-rock flow is blocked system
CN206916686U (en) A kind of subgrade protection system in debris flow gully
CN208293532U (en) A kind of mud-rock flow is blocked structure
CN205776286U (en) Retaining wall pumping equipment
CN211735243U (en) Mud-rock flow prevention and control system for tunnel valley type abandoned dreg site
JP2012031622A (en) Drain structure and construction method of the same
CN214328931U (en) Protection slope is administered to abandonment stone ore deposit
KR101170789B1 (en) Complex debris barrier of eco-friendly
CN212477800U (en) Anchoring gabion retaining wall
CN219118058U (en) Modular river course dykes and dams reinforced structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180911

RJ01 Rejection of invention patent application after publication