KR100818758B1 - Structure for establish mat of river slope - Google Patents

Structure for establish mat of river slope Download PDF

Info

Publication number
KR100818758B1
KR100818758B1 KR1020070128469A KR20070128469A KR100818758B1 KR 100818758 B1 KR100818758 B1 KR 100818758B1 KR 1020070128469 A KR1020070128469 A KR 1020070128469A KR 20070128469 A KR20070128469 A KR 20070128469A KR 100818758 B1 KR100818758 B1 KR 100818758B1
Authority
KR
South Korea
Prior art keywords
mat
vegetation
vegetation mat
river
pile
Prior art date
Application number
KR1020070128469A
Other languages
Korean (ko)
Inventor
박영노
Original Assignee
주식회사 오이디
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 오이디 filed Critical 주식회사 오이디
Priority to KR1020070128469A priority Critical patent/KR100818758B1/en
Application granted granted Critical
Publication of KR100818758B1 publication Critical patent/KR100818758B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/12Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G24/00Growth substrates; Culture media; Apparatus or methods therefor
    • A01G24/40Growth substrates; Culture media; Apparatus or methods therefor characterised by their structure
    • A01G24/44Growth substrates; Culture media; Apparatus or methods therefor characterised by their structure in block, mat or sheet form

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

An installation structure of a vegetation mat for a river ecosystem is provided to green a river bank and to prevent the breaking of a river bank caused by a flood by cultivating plants on the surface of a river bank, and to prevent the breaking of a river bank by coupling the surface of a river bank with the inside of a river bank structurally and generating resistance to earth pressure. An installation structure of a vegetation mat for a river ecosystem includes a river bank(10) constructed on a riverside and covered with soil to grow trees and plants, a vegetation mat(20) spread on a first slope(11) and a second slope(12) of the river bank to prevent the breaking of the first slope and the second slope and filled with vegetation soil to grow plants(2), a reinforcement mat(30) laid under the river bank to supply tensile force to prevent the river bank from being pushed by earth pressure and connected with the vegetation mat by the plants to have strong resistance to the earth pressure of the river bank, many piles(40) fixing the vegetation mat and the reinforcement mat to the river bank, and a fixture composed of a fixing plate(50) and a fixing cap(60) to prevent the separation of the vegetation mat and first, second support caps(70,80) to prevent the sliding of the reinforcement mat.

Description

하천 호안 생태계 식생매트 설치구조{STRUCTURE FOR ESTABLISH MAT OF RIVER SLOPE} STRUCTURE FOR ESTABLISH MAT OF RIVER SLOPE}

본 발명은 하천 호안 생태계 식생매트 설치구조에 관한 것으로서, 더욱 상세하게는 하천 변의 제방을 녹화함과 아울러 제방 표면의 식생매트와 제방 내부에 매설된 보강매트를 말뚝으로 서로 결속하여 제방의 붕괴를 방지하고, 제방에 부분 침하가 발생되어도 식생매트, 보강매트 및 말뚝이 설치 상태를 유지할 수 있도록 한 하천 호안 생태계 식생매트 설치구조에 관한 것이다.The present invention relates to the installation structure of the vegetation mat of the river shore bank ecosystem, and more specifically, to record the banks of the sides of the river, and to bind the vegetation mat on the surface of the bank and the reinforcing mat embedded in the bank with piles to prevent the collapse of the bank. In addition, the present invention relates to a structure for installing a riverside ecosystem of vegetation mats, which allows vegetation mats, reinforcement mats and piles to be installed even when partial settlement occurs in the dike.

호안(護岸, revetment)은 일반적으로 하안(河岸), 해안(海岸), 둑을 보호해서 유수에 의한 물가선의 침식을 방지하기 위하여 그 비탈면에 시설하는 공작물로, 대개의 경우, 하천 호안공사에는 수제(水制)공사가 따르게 마련이다.A revetment is a workpiece that is generally installed on the slope to protect riversides, coasts, and dams and prevent erosion of shoreline by running water. Construction work will follow.

호안을 시공장소에 따라 분류하면 제방호안ㅇ저수호안ㅇ홍수터 호안 등으로 크게 나눌 수 있다. 제방호안은 직접 제방을 보호하기 위하여 제방 비탈면에 시공하는 것으로 저수로가 제방에 접근하는 곳 또는 홍수 때 물의 충돌이 많은 곳에는 특히 견고하게 할 필요가 있다. 저수호안은 저수로(低水路)의 난류를 막기 위하여 또는 홍수터가 세굴(洗掘)되는 것을 방지하기 위하여 저수로 강안에 시공하는 것인데, 일반적으로 보통수위 이상일 때는 수중에 들어가므로 견고한 구조로 한다. 홍수터 호안은 저수로와 홍수터가 확실하지 않은 주로 급류하천에 시행되며, 공법은 저수호안과 동일하다. 양자 모두 홍수터를 방지하는 것은 마찬가지이나, 전자는 주로 저수로의 유지에 있고, 후자는 홍수터를 유지함으로써 제방을 보호하는 데 큰 목적이 있다.If the banks are categorized by city factories, they can be divided into shelter banks, reservoir banks, and floodplains. Draft protection is to be installed on the bank slopes to protect the dike directly, especially where waterways approach the dike or where there are many water collisions during flooding. Reservoir lakes are constructed in reservoirs to prevent turbulence in the reservoirs or to prevent flooding of the floodplain. Generally, they enter the water when the water level is above the normal level. Floodplain revetment is usually carried out in rivers and rivers where the floodplain is unclear. Both of them prevent floodplain, but the former is mainly for the maintenance of reservoirs, while the latter has a great purpose to protect the levees by maintaining the floodplain.

호안 각부의 명칭은 통일성은 없으나 표준구조는 비탈덮기공ㅇ밑보호공(기초 보호)ㅇ기초다짐공의 세 가지로 구성된다. 비탈덮기공은 비탈면을 보호하는 부분에 시공하는 것으로, 하상 및 시공장소에 따라서 바자공ㅇ돌붙임공ㅇ콘크리트 붙임공ㅇ철선망태공ㅇ버들가지공 등이 채택된다. 이 비탈경사는 1:1.5∼1:2.0을 보통으로 하나, 버들가지공과 같은 간이한 공법에서는 1:2.5 정도가 안전하다. 밑보호공은 비탈기슭(또는 비탈끝)에 시공하여 비탈덮기공의 기초가 되는 부분으로서 호안파손 원인의 대부분은 기초가 불안전할 때 많으므로 어떤 공작물을 설치하여 비탈덮기공의 붕괴를 방지할 필요가 있다. 시공상 주의할 점으로는, 밑보호공과 밑다짐공을 완전히 절연할 것, 수심이 큰 곳 및 유속이 빠른 곳에는 특별한 경우를 제외하고 밑다짐공을 같이 설치할 것, 목재를 사용할 경우는 제방 마루높이를 될 수 있는 대로 평균저수위 이하로 할 것 등이다. 공종(工種)으로는 각종의 바자공[柵工]ㅇ말뚝박기공ㅇ널말뚝공과 그밖에 사석공(捨石工)ㅇ돌방틀공 등이 있다. 기초 다짐공은 비탈덮기공의 기초와 달라서 각부(脚部)의 세굴 보호를 제일의 목적으로 하는 것으 로서, 각종 침상공(沈床工)ㅇ망태공ㅇ사석공ㅇ돌방틀공 등이 채용되나, 유속이 큰 곳에서는 특히 밑다짐공을 단단히 할 필요가 있다. 해안에서는 파력(波力)을 정면으로 받으므로 흉벽(胸壁)을 붙인 안벽 모양의 것이 많고, 사빈(砂濱)에 있어서는 사석ㅇ틀공ㅇ소파용(消波用) 테트라포드나 삼발블록과 같은 구조물을 사용한다. 예를 들면, 파랑의 세굴력에 충분히 저항할 수 있는 구조물을 축조해서 해안을 보호한다. 그밖에도 각국 각 지방마다 경험에 의한 여러 가지 공법이 있다.Although the name of each part of the shore is not uniform, the standard structure consists of three types: slope cover hole, base protection hole and foundation compaction hole. Slope covering is to be installed on the part that protects the slope, and bazaar, stone attaching, concrete attaching, wire netting and weaving will be adopted depending on the riverbed and city plant. The slope is usually 1: 1.5 to 1: 2.0, but in simple methods such as willows, 1: 2.5 is safe. The base protector is the foundation part of the slope covering by installing at the foot of the slope (or the slope), and most of the causes of the damage to the slope are when the foundation is unstable, so it is necessary to install a workpiece to prevent the collapse of the slope covering. There is. Cautions for construction: Insulate the bottom protector and the bottom hole completely, and install the bottom hole except in special places where the depth of water and the flow rate are high. The height should be below the average low level as much as possible. There are various kinds of bazaar, pile piling, pile piling, and sandstone. The basic compaction ball is different from the foundation of the slope cover ball, and the primary purpose is to protect the scour of each part, and various types of needlework, manatee, stonework, and stonework are adopted. In these large places, it is necessary, in particular, to tighten the hole. The coastal wave receives the wave force in front, so there are many quay-walled walls. use. For example, the coast is protected by constructing a structure that can resist blue scour power. In addition, there are various methods by experience in each region.

이렇게 일반적인 하천시설은 그 측면에 하천 제방이 시공되고, 하천과 하천 제방이 접하는 위치에 콘크리트 옹벽을 설치함으로써, 하천 제방의 유실을 방지하는 목적에 충실하고, 시공비의 절감을 도모하는 방향으로 호안공사가 시공되고 있는 실정이다.In this general river facility, river banks are constructed on the side, and concrete retaining walls are installed at locations where rivers and river banks are in contact with each other, thereby fulfilling the purpose of preventing the loss of river banks and improving construction costs. Is being installed.

그러나, 호안공사 시공시, 생태계를 전혀 고려하지 않는 시공이 보편화된바, 호안주변의 수중 생태계를 보호할 수 있는 시설이 전혀 없어서, 생태계의 균형을 깨뜨리게 되며, 이에 따라 하천의 자정능력을 상실하게 되는 문제점이 있다.However, the construction of the shoreline construction, which does not consider the ecosystem at all, has become commonplace, and there is no facility to protect the underwater ecosystem around the shoreline, which breaks the balance of the ecosystem, thus losing the river's self-cleaning ability. There is a problem.

그리고, 제방의 일부 구간에 침하가 발생된 경우 이 부분 침하가 다른 부분으로 전도되어 제방이 붕괴되는 문제점도 있다.In addition, when settlement occurs in a portion of the dike, there is a problem that the partial settlement is conducted to another portion and the dike is collapsed.

본 발명은 상기와 같은 문제점을 해결하기 위한 것으로, 하천 제방의 표면에 식물 등을 식재하여 제방을 녹화함과 아울러 홍수로 인한 제방의 붕괴를 방지하고 제방의 표면과 제방 내부를 서로 구조적으로 결속하여 서로를 지지기반으로 하여 토압에 대항하는 버팀력을 발생함으로써 제방의 붕괴를 방지할 수 있는 하천 호안 생태계 식생매트 설치구조를 제공하는데 그 목적이 있다.The present invention is to solve the above problems, by planting plants and the like on the surface of the river dike to record the dike and to prevent the collapse of the dike due to the flood and structurally bind the surface of the dike and the inside of the dike Its purpose is to provide a riverside ecosystem vegetation mat installation structure that can prevent the collapse of banks by generating support forces against earth pressure based on each other.

전술한 바와 같은 목적을 달성하기 위한 본 발명에 의한 하천 호안 생태계 식생매트 설치구조는, 제방 표면에 깔리는 식생매트, 상기 제방 내부에 매설되는 보강매트, 상기 식생매트와 보강매트에 박혀 고정되는 말뚝, 상기 보강매트를 상기 말뚝에 고정하는 지지캡, 상기 말뚝의 상부에 설치되어 상기 말뚝을 상기 식생매트에 지지하는 고정캡을 포함하여 구성된 것을 특징으로 한다.A river shore ecosystem vegetation mat installation structure according to the present invention for achieving the above object, the vegetation mat laid on the surface of the embankment, reinforcement mat embedded in the inside of the embankment, the pile is fixed to the vegetation mat and reinforcement mat, It characterized in that it comprises a support cap for fixing the reinforcing mat to the pile, the cap is installed on the top of the pile to support the pile to the vegetation mat.

본 발명에 의한 하천 호안 생태계 식생매트 설치구조에 의하면, 제방 표면에 식생매트를 설치하여 식물에 의해 제방을 녹화 및 토사 유실을 막고, 제방 내부에 보강매트를 매설 및 이 보강매트와 제방 표면의 식생매트를 말뚝에 의해 서로 결속하여 지지토록 함으로써 제방 표면 또는 제방 내부에 토압이 가해지는 경우 제방의 붕괴를 막거나 지연시킬 수 있으므로 대형사고를 막을 수 있고 제방의 복구에 따른 경제적 손실을 줄일 수 있다.According to the river shore ecological vegetation mat installation structure according to the present invention, the vegetation mat is installed on the surface of the dike to prevent the greening of the dike by the plants and to prevent the loss of soil, embed the reinforcement mat inside the dike and the vegetation of the reinforcement mat and the dike surface By binding the mats to each other by a pile to support them, when earth pressure is applied to the surface of the dike or the inside of the dike, the collapse of the dike can be prevented or delayed, thereby preventing a large accident and reducing the economic loss due to the restoration of the dike.

그리고, 제방에 일부 침하가 발생되는 경우 말뚝이 식생매트에 지지되어 지반 침하에 의해 침하되지 않고 아울러 보강매트가 말뚝에 설치된 상태를 유지할 수 있기 때문에 부분 침하가 다른 지역으로 전도되지 않으므로 제방의 유실을 미연에 방지할 수 있다.In addition, when some settlement occurs in the dike, the pile is supported by the vegetation mat, so that the settlement is not settled by the ground settlement and the reinforcing mat can be installed on the pile, so the partial settlement does not fall to other areas, thus preventing the loss of the dike. To prevent it.

도 1 내지 도 3에 도시된 것처럼, 본 발명에 의한 하천 호안 생태계 식생매트 설치구조는, 하천(1) 변에 구축되는 제방(10)과; 제방(10)의 상면에 깔리며 식물의 성장 공간을 제공하는 식생매트(20)와; 제방(10)에 매설되어 토압에 의한 제방(10)의 밀림을 막는 보강매트(30)와; 식생매트(20)와 보강매트(30)를 제방(10)에 고정하는 다수의 말뚝(40)과; 말뚝(40)을 식생매트(20)와 보강매트(30)에 각각 고정하는 고정수단을 포함하며, 이하 각 구성요소를 구체적으로 설명한다.As shown in Figures 1 to 3, the riverbank ecological vegetation mat installation structure according to the present invention, the bank (10) is built on the side of the river (1); A vegetation mat 20 which is laid on the upper surface of the levee 10 and provides a growth space of the plant; A reinforcing mat 30 embedded in the dike 10 to prevent the rolling of the dike 10 by earth pressure; A plurality of piles 40 for fixing the vegetation mat 20 and the reinforcing mat 30 to the embankment 10; Fixing means for fixing the pile 40 to the vegetation mat 20 and the reinforcing mat 30, respectively, will be described in detail below.

제방(10)은 하천(1) 변에서부터 차례로 연속되는 제1경사부(11), 수평부(12) 및 제2경사부(13)로 구축된다. 제방(10)은 토사 등이 쌓여 구축될 수 있으며 초목 등이 식재된다.The levee 10 is constructed from the first inclined portion 11, the horizontal portion 12, and the second inclined portion 13 which are sequentially formed from the river 1 side. The embankment 10 may be built by piled up with soil, such as vegetation is planted.

식생매트(20)는 제1경사부(11)와 제2경사부(12)에 걸쳐 깔려 제1경사부(11)와 제2경사부(12)의 붕괴를 막는 동시에 식물(2)이 성장할 수 있도록 내부에 미도시된 식생토(식물(2)의 뿌리가 통과할 수 있는 틈을 형성하는 골재 등이 바람직하다)가 충진된 그물망(식물(2)의 뿌리가 통과하여 제방(10)에 활착할 수 있으면서 식생토가 빠지지 않을 메쉬인 것이 바람직하다) 형태이다. 즉, 식물(2)은 뿌리가 식생매트(20)를 통과하여 제방(10)에 활착됨으로써 제방(10)을 녹화한다. 식생매트(20)는 내부에 채워진 식생토에 의해 자중이 무거울 것이며 이 자중에 의해 제 방(10)을 눌러 지지할 수 있다.The vegetation mat 20 is spread over the first inclined portion 11 and the second inclined portion 12 to prevent the collapse of the first inclined portion 11 and the second inclined portion 12 and at the same time the plant 2 grows. A net filled with vegetation soil (not shown in the aggregate forming a gap through which the roots of the plant 2 can pass) is shown inside (the root of the plant 2 passes through the dike 10). It is desirable to have a mesh that can stick to the soil and not leave the vegetation soil). That is, the plant 2 records the dike 10 by rooting through the vegetation mat 20 and slid into the dike 10. The vegetation mat 20 is heavy due to the vegetation soil filled therein, and can press and support the bank 10 by the own weight.

보강매트(30)는 그물망 형태로서 제방(10)이 토압에 의해 하천(1)측으로 밀리지 않도록 인장력을 작용하며, 특히 말뚝(40)을 통해 식생매트(20)와 유기적으로 연결되어 지지기반을 확보함으로써 제방(10)의 밀림에 대한 큰 버팀력을 발휘할 수 있을 것이다.The reinforcing mat 30 has a net-like form, and exerts a tensile force such that the levee 10 is not pushed toward the river 1 by earth pressure. In particular, the reinforcing mat 30 is organically connected to the vegetation mat 20 through the pile 40 to secure a supporting base. By doing so, it will be able to exert a great support for the jungle of the embankment 10.

보강매트(30)는 식생매트(20)의 저부에 매설되기 때문에 식물(2)의 뿌리가 활착될 수도 있으며, 이에 따라 식생매트(20)와 보강매트(30)가 식물(2)에 의해 연결됨에 따라 제방(10)의 토압에 대한 큰 버팀력을 발휘할 수 있다.Since the reinforcing mat 30 is buried at the bottom of the vegetation mat 20, the root of the plant 2 may be active, and thus the vegetation mat 20 and the reinforcing mat 30 are connected by the plant 2. As a result, it can exert a great support for the earth pressure of the embankment (10).

말뚝(40)은 하단부에 첨예부(41)가 형성된 봉 형상이며 식생매트(20)와 보강매트(30)를 제방(10)에 고정한다. 이러한 구조의 말뚝(40)은 식생매트(20)가 수평부(12)에서 이탈되지 않도록 식생매트(20)보다 돌출되며 보강매트(30)를 충분히 관통하는 길이로 이루어진다. 이 길이는 제방(10)의 여건에 따라 달라질 것이므로 구체적이니 수치로 한정되지는 않는다.Pile 40 is a rod-shaped rod formed with a sharp portion 41 at the lower end and fixes the vegetation mat 20 and the reinforcing mat 30 to the embankment (10). The pile 40 of this structure protrudes from the vegetation mat 20 so that the vegetation mat 20 is not separated from the horizontal portion 12 and has a length that sufficiently passes through the reinforcing mat 30. This length will vary depending on the conditions of the embankment 10, so it is not limited to numerical values.

제방(10)의 제1경사부(11)에서부터 수평부(12)에 이르기까지 다수개가 일정 간격을 두고 설치된다. From the first inclined portion 11 to the horizontal portion 12 of the bank 10, a plurality of them are installed at regular intervals.

상기 고정수단은 식생매트(20)가 말뚝(40)에서 이탈되지 않고 보강매트(30)가 말뚝(40)에서 흘러내리지 않도록 지지하는 것으로 구분될 수 있으며, 식생매트(20)의 이탈방지를 위한 고정판(50)과 고정캡(60), 보강매트(30)의 흘러내림 방지를 위한 제1,2지지캡(70,80)으로 구성된다.The fixing means may be divided into supporting the vegetation mat 20 is not separated from the pile 40, so that the reinforcing mat 30 does not flow from the pile 40, for preventing the vegetation mat 20 The fixing plate 50 and the fixing cap 60, the first and second support caps (70, 80) for preventing the falling of the reinforcing mat (30).

고정판(50)은 저면에 다수의 원추형 스파이크(51)가 구비된 환형으로 이루어져 말뚝(40)이 상하로 관통된다. 고정판(50)은 스파이크(51)가 식생매트(20)에 박혀 식생매트(20)와 말뚝(40)을 서로 결속한다. The fixing plate 50 is formed in an annular shape having a plurality of conical spikes 51 on the bottom thereof, and the pile 40 is penetrated vertically. The fixed plate 50 has the spike 51 is embedded in the vegetation mat 20 to bind the vegetation mat 20 and the pile 40 to each other.

고정캡(60)은 고정판(50)이 말뚝(40)에서 이탈되지 않도록 지지하는 것이며, 원통형으로 이루어져 말뚝(40)에 끼워진다. 고정캡(60)은 말뚝(40)에 대해 견고하게 고정될 수 있도록 하나 이상의 조임볼트(61)가 나사 체결된다. 조임볼트(61)는 고정캡(60)에 나사 체결된 상태이기 때문에 회전되기 이전에는 고정캡(60)에서 이탈되지 않으며 이 상태에서 나사 체결에 의해 말뚝(40)측으로 이동하여 고정캡(60)을 말뚝(40)에 고정한다. 조임볼트(61)를 전술한 반대 방향으로 회전시키면 말뚝(40)에서 멀어져 고정캡(60)을 말뚝(40)에서 분리할 수도 있다. 물론, 고정캡(60)을 말뚝(40)에 나사 체결하는 방식으로도 결합 수 있으나, 이를 위해서는 말뚝(40)과 고정캡(60) 모두에 나사 탭을 가공하여야 하고 고정캡(60) 자체를 회전시켜야 하는 단점이 있다.Fixing cap 60 is to support the fixing plate 50 so as not to be separated from the pile 40, it is made of a cylindrical fitting to the pile (40). Fixing cap 60 is one or more fastening bolts 61 are screwed to be firmly fixed to the pile (40). Since the fastening bolt 61 is screwed to the fixing cap 60, it is not detached from the fixing cap 60 before being rotated, and in this state, the tightening bolt 61 is moved toward the pile 40 by screwing to fix the cap 60. Fix it to the pile (40). When the tightening bolt 61 is rotated in the opposite direction as described above, the fixing cap 60 may be separated from the pile 40 by moving away from the pile 40. Of course, the fixing cap 60 may be coupled to the method by screwing the pile 40, but for this purpose, a screw tab should be processed on both the pile 40 and the fixing cap 60, and the fixing cap 60 itself is There is a disadvantage to rotate.

제1,2지지캡(70,80)은 원통형으로 이루어지며 둘레부에 하나 이상의 조임볼트(71,81)가 나사 체결되어 구성된다. 이와 같은 구성의 제1,2지지캡(70,80)은 보강매트(30)를 상하부에서 지지하여 보강매트(30)가 말뚝(40)에서 상하로 이동하지 않도록 한다.The first and second support caps 70 and 80 are formed in a cylindrical shape and one or more fastening bolts 71 and 81 are screwed to the circumference thereof. The first and second support caps 70 and 80 having such a configuration support the reinforcing mat 30 at the upper and lower portions so that the reinforcing mat 30 does not move up and down in the pile 40.

부가적으로 제2지지캡(80)은 하부를 향해 경사지게 연장 형성된 침하방지편(82)이 더 형성될 수 있다. 즉, 구조적으로 제2지지캡(80)은 말뚝(40)을 박을 때 간섭을 일으키지 않으므로 침하방지편(82)(도 4)이 돌출되어도 말뚝(40)을 쉽게 박을 수 있으며, 식생매트(20), 보강매트(30) 보다 아래쪽에 배치되어 지반이 침하할 때 버팀력을 발생하여 말뚝(40)이 지중으로 밀리는 것을 막을 수 있고 보강매트(30)가 전방으로 밀리는 것을 막을 수 있다.In addition, the second support cap 80 may further include a settlement preventing piece 82 formed to be inclined toward the lower portion. That is, structurally the second support cap 80 does not cause interference when driving the pile 40, even if the settling prevention piece 82 (FIG. 4) protrudes, can easily drive the pile 40, vegetation mat (20), it is disposed below the reinforcing mat 30 can generate a bracing force when the ground is settled to prevent the pile 40 from being pushed into the ground and to prevent the reinforcing mat 30 is pushed forward.

이와 같이 구성된 본 발명에 의한 하천 호안 생태계 식생매트 설치방법은 다음과 같다.The method of installing the river vegetation ecosystem vegetation mat according to the present invention configured as described above is as follows.

다수의 말뚝(40)에 제2지지캡(80)을 조립하고, 이 말뚝(40)을 제방(10)에 박아 설치한다.Assemble the second support cap 80 to the plurality of piles 40, and install the pile 40 is driven into the bank (10).

보강매트(30)를 말뚝(40)의 상부에서부터 끼워 제2지지캡(80) 위에 깔아 설치한 후, 보강매트(30) 위에 제1지지캡(70)을 설치하여 보강매트(30)를 말뚝(40)에 고정한다. After installing the reinforcing mat 30 from the top of the pile 40 to install on the second support cap 80, the first support cap 70 is installed on the reinforcing mat 30 to pile the reinforcing mat 30 Secure to 40.

이어서 보강매트(30) 위에 토사를 채워 다짐으로써 제방(10)의 수평부(12)를 구축하며, 수평부(12)의 평탄화가 완료되면 식생매트(20)를 깔아 설치한다. 여기서 말뚝(40)의 상단부가 식생매트(20)를 관통하도록 식생매트(20)를 벌리는 등의 방법에 의해 식생매트(20)를 설치할 수 있다.Subsequently, by filling the earth and sand on the reinforcing mat 30, the horizontal portion 12 of the bank 10 is constructed, and when the flattening of the horizontal portion 12 is completed, the vegetation mat 20 is laid. Here, the vegetation mat 20 may be installed by spreading the vegetation mat 20 such that the upper end of the pile 40 penetrates the vegetation mat 20.

식생매트(20)의 설치가 완료된 후 말뚝(40)의 상단부에 고정판(50)을 끼우고 공구 등으로 고정판(50)을 눌러 스파이크(51)가 식생매트(20)에 박히도록 하고, 이어서, 고정캡(50)을 말뚝(40)에 끼워 고정판(50)에 밀착시킨 후 조임볼트(51)를 조여 고정판(50)이 말뚝(40)에서 이탈되지 않도록 한다. 식생매트(20)에 씨앗을 파종하거나 식생매트(20)에 식물(2)을 미리 식재하여 제방(10)을 녹화한다. 식생매트(20)의 설치방법은 전술한 방법으로 한정되는 것은 아니다After the installation of the vegetation mat 20 is completed, insert the fixing plate 50 on the upper end of the pile 40 and press the fixing plate 50 with a tool or the like so that the spike 51 is lodged in the vegetation mat 20. The fixing cap 50 is inserted into the pile 40 to closely adhere to the fixing plate 50, and then the tightening bolt 51 is tightened to prevent the fixing plate 50 from being separated from the pile 40. Seeds are planted on the vegetation mat 20 or the plant 2 is planted in advance on the vegetation mat 20 to record the dike 10. The installation method of the vegetation mat 20 is not limited to the above-described method.

이와 같이 설치된 본 발명에 의한 하천 호안 생태계 식생매트 설치구조에 따르면, 식생매트(20), 보강매트(30), 말뚝(40)이 서로 결속되어 제방(10)에 토압이 가해지는 경우 식생매트(20)와 보강매트(30)가 서로를 지지기반으로 하여 토압에 대항하는 버팀력을 발생함으로써 보강매트(30)측이 전방으로 밀리는 경우 식생매트(20)의 지지를 통해 보강매트(30)의 밀림을 막거나 지연시킬 수 있고, 또한, 식생매트(20)층이 전방으로 밀리는 경우 보강매트(30)가 버팀력에 의해 제방(10)의 밀림을 막게 되므로 보강매트(30)와 말뚝(40)으로 연결된 식생매트(20)가 전방으로 밀리지 않게 된다.According to the installation structure of the river shore ecological vegetation mat according to the present invention installed in this way, when the vegetation mat 20, the reinforcement mat 30, the pile 40 is bound to each other and the earth pressure is applied to the embankment 10 ( 20) and the reinforcing mat 30 is a support base against each other by generating a support force against the earth pressure by the support base when the side of the reinforcing mat 30 is pushed forward through the support of the vegetation mat 20 of the reinforcing mat 30 The jungle can be prevented or delayed, and also, if the vegetation mat 20 layer is pushed forward, the reinforcement mat 30 prevents the jungle of the levee 10 due to the propulsion force, so the reinforcement mat 30 and the pile 40 ) Vegetation mat 20 is not pushed forward.

한편, 제방(10)에 일부 침하가 발생되는 경우 보강매트(30)가 제1,2지지캡(70,80)에 의해 말뚝(40)에 고정된 상태를 유지하기 때문에 부분 침하가 다른 부분으로 전가되지 않으며, 고정판(50)과 고정캡(60)에 의해 말뚝(40)이 식생매트(20)의 상부에 걸쳐진 구조이기 때문에 부분 침하가 발생되어도 말뚝(40)이 식생매트(20)의 하부로 빠지지 않고 설치 상태를 유지할 수 있다.On the other hand, when partial settlement occurs in the embankment 10, the partial settlement is set to another part because the reinforcing mat 30 is kept fixed to the pile 40 by the first and second support caps 70 and 80. It is not transferred, and because the structure of the pile 40 over the top of the vegetation mat 20 by the fixing plate 50 and the fixing cap 60, even if partial settlement occurs, the pile 40 is the lower portion of the vegetation mat 20 It can be installed without falling out.

도 1은 본 발명에 의한 하천 호안 생태계 식생매트 설치구조를 보인 측면도.1 is a side view showing the structure of the river vegetation ecosystem vegetation mat according to the present invention.

도 2는 본 발명에 의한 하천 호안 생태계 식생매트 설치구조의 확대도.Figure 2 is an enlarged view of the riverbank ecological vegetation mat installation structure according to the present invention.

도 3은 본 발명에 의한 하천 호안 생태계 식생매트 설치구조를 보인 분해 사시도.Figure 3 is an exploded perspective view showing the structure of the river vegetation ecosystem vegetation mat installation according to the present invention.

도 4는 본 발명에 의한 하천 호안 생태계 식생매트 설치구조에 적용된 제2지지캡의 변형예시도.Figure 4 is a modified example of the second support cap applied to the river vegetation ecosystem vegetation mat installation structure according to the present invention.

< 도면의 주요 부분에 대한 부호 설명><Description of Signs for Main Parts of Drawings>

10 : 제방, 20 : 식생매트10: dike, 20: vegetation mat

30 : 보강매트, 40 : 말뚝30: reinforcing mat, 40: pile

50 : 고정판, 60 : 고정캡50: fixed plate, 60: fixed cap

70,80 : 지지캡, 70,80: support cap,

Claims (2)

하천 변에서부터 차례로 연속되는 제1경사부, 수평부 및 제2경사부로 구축되는 제방(10)과;An embankment (10) constructed of a first inclined portion, a horizontal portion, and a second inclined portion successively from a river side; 내부에 식생토가 충진된 그물망 형태이고 상기 제방의 제1경사부에서부터 수평부에 걸쳐 깔리며 수생식물이 식재되는 식생매트(20)와;A vegetation mat 20 filled with vegetation soil inside and spread over a horizontal portion from the first inclined portion of the embankment, in which aquatic plants are planted; 상기 제방의 수평부 아래에 매설되는 그물망 형태의 보강매트(30)와;Reinforcing mats (30) in the form of a net embedded under the horizontal portion of the embankment; 하단부에 첨예부가 형성된 봉 형상이며 상부가 상기 식생매트보다 돌출되면서 상기 보강매트를 관통하도록 상기 제방에 박혀 상기 식생매트와 보강매트를 고정하는 다수의 말뚝(40)과;A plurality of piles 40 having a rod shape having a sharp part at a lower end thereof, and having an upper portion protruding from the vegetation mat and being embedded in the embankment so as to pass through the reinforcement mat to fix the vegetation mat and the reinforcement mat; 저면에 다수의 원추형 스파이크(51)가 구비된 환형으로 이루어져 상기 말뚝에 끼워지면서 상기 스파이크를 통해 상기 식생매트에 박히는 고정판(50)과;A fixing plate (50) formed of an annular shape having a plurality of conical spikes (51) at a bottom thereof and fitted into the pile while being embedded in the vegetation mat through the spikes; 원통형으로 이루어지며 둘레부에 하나 이상의 조임볼트(61)가 나사 체결되어 상기 말뚝의 상단부에서부터 끼워져 상기 고정판을 위에서 눌러 지지하는 매트 고정캡(60)과;A mat fixing cap 60 having a cylindrical shape and having one or more tightening bolts 61 screwed on a circumference thereof to be fitted from an upper end of the pile to support the fixing plate from above; 원통형으로 이루어지며 둘레부에 하나 이상의 조임볼트(71,81)가 각각 나사 체결되어 상기 보강매트의 상하부에 배치되도록 상기 말뚝에 결합되어 상기 보강매트를 지지하는 제1,2지지캡(70,80)으로 이루어진 것을 특징으로 하는 하천 호안 생태계 식생매트 설치구조.First and second support caps 70 and 80 which are formed in a cylindrical shape and are coupled to the pile to support one or more tightening bolts 71 and 81 on the circumference thereof and are disposed on upper and lower portions of the reinforcing mat. The river vegetation ecosystem vegetation mat installation structure, characterized in that consisting of. 제 1 항에 있어서, 제1,2지지캡 중 하부의 제2지지캡은 하부를 향해 경사지게 연장 형성된 침하방지편(82)이 더 포함된 것을 특징으로 하는 하천 호안 생태계 식생매트 설치구조.According to claim 1, wherein the second support cap of the lower one of the first and second support caps river estuary ecosystem vegetation mat installation structure, characterized in that it further comprises an anti-sedimentation piece 82 formed to be inclined toward the lower portion.
KR1020070128469A 2007-12-11 2007-12-11 Structure for establish mat of river slope KR100818758B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020070128469A KR100818758B1 (en) 2007-12-11 2007-12-11 Structure for establish mat of river slope

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020070128469A KR100818758B1 (en) 2007-12-11 2007-12-11 Structure for establish mat of river slope

Publications (1)

Publication Number Publication Date
KR100818758B1 true KR100818758B1 (en) 2008-04-03

Family

ID=39533555

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020070128469A KR100818758B1 (en) 2007-12-11 2007-12-11 Structure for establish mat of river slope

Country Status (1)

Country Link
KR (1) KR100818758B1 (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100986180B1 (en) 2010-04-23 2010-10-07 주식회사 서영엔지니어링 Device for fixing vegetation mat
CN104594288A (en) * 2014-12-08 2015-05-06 江苏龙腾工程设计有限公司 Novel Taihu Lake bank planting ecological restoration technology
CN106149623A (en) * 2016-08-12 2016-11-23 广州思特环境科技有限公司 The construction method of a kind of riparian buffer strips and the riparian buffer strips of formation thereof
CN109356093A (en) * 2018-11-05 2019-02-19 河海大学 A kind of upright shore protection three-dimensional modularized ecology modernization system of hard and its technique
CN110616666A (en) * 2019-08-27 2019-12-27 中国建筑一局(集团)有限公司 Combined ecological revetment and construction method thereof
CN112005795A (en) * 2019-05-28 2020-12-01 上海勘测设计研究院有限公司 Submerged plant planting bed
CN114045779A (en) * 2021-11-24 2022-02-15 北京师范大学 Ecological river channel restoration method based on riverbed structural reconstruction
CN114197396A (en) * 2022-01-05 2022-03-18 江苏省太湖水利规划设计研究院有限公司 Load-reducing ecological bank protection structure for reinforcing river and lake dikes and construction method
CN114541317A (en) * 2022-03-09 2022-05-27 杭州煌伟市政工程有限公司 River channel revetment reinforcing structure and construction method
CN114622523A (en) * 2022-04-23 2022-06-14 黄河园林集团有限公司 Side slope water and soil conservation system based on river course vertical slope
CN116065526A (en) * 2022-11-23 2023-05-05 四川大学 Vegetation recovery method for water-level-fluctuating zone of reservoir in high-altitude area

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20010088027A (en) * 2000-03-10 2001-09-26 강수용 Soil addition composition for greening slope land
KR20040072587A (en) * 2004-07-23 2004-08-18 박성언 Slope tree-planting and stabilization construction method using geo-grid and vegetation mat
KR100735459B1 (en) * 2006-09-05 2007-07-03 함흥식 Greening method of cutting surface the riverside and thereof structure

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20010088027A (en) * 2000-03-10 2001-09-26 강수용 Soil addition composition for greening slope land
KR20040072587A (en) * 2004-07-23 2004-08-18 박성언 Slope tree-planting and stabilization construction method using geo-grid and vegetation mat
KR100514576B1 (en) * 2004-07-23 2005-09-13 박성언 Slope stable construction method
KR100735459B1 (en) * 2006-09-05 2007-07-03 함흥식 Greening method of cutting surface the riverside and thereof structure

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100986180B1 (en) 2010-04-23 2010-10-07 주식회사 서영엔지니어링 Device for fixing vegetation mat
CN104594288A (en) * 2014-12-08 2015-05-06 江苏龙腾工程设计有限公司 Novel Taihu Lake bank planting ecological restoration technology
CN106149623A (en) * 2016-08-12 2016-11-23 广州思特环境科技有限公司 The construction method of a kind of riparian buffer strips and the riparian buffer strips of formation thereof
CN109356093A (en) * 2018-11-05 2019-02-19 河海大学 A kind of upright shore protection three-dimensional modularized ecology modernization system of hard and its technique
CN112005795A (en) * 2019-05-28 2020-12-01 上海勘测设计研究院有限公司 Submerged plant planting bed
CN110616666A (en) * 2019-08-27 2019-12-27 中国建筑一局(集团)有限公司 Combined ecological revetment and construction method thereof
CN114045779A (en) * 2021-11-24 2022-02-15 北京师范大学 Ecological river channel restoration method based on riverbed structural reconstruction
CN114197396A (en) * 2022-01-05 2022-03-18 江苏省太湖水利规划设计研究院有限公司 Load-reducing ecological bank protection structure for reinforcing river and lake dikes and construction method
CN114541317A (en) * 2022-03-09 2022-05-27 杭州煌伟市政工程有限公司 River channel revetment reinforcing structure and construction method
CN114541317B (en) * 2022-03-09 2023-11-28 杭州煌伟市政工程有限公司 River course revetment reinforcing structure and construction method
CN114622523A (en) * 2022-04-23 2022-06-14 黄河园林集团有限公司 Side slope water and soil conservation system based on river course vertical slope
CN116065526A (en) * 2022-11-23 2023-05-05 四川大学 Vegetation recovery method for water-level-fluctuating zone of reservoir in high-altitude area

Similar Documents

Publication Publication Date Title
KR100818758B1 (en) Structure for establish mat of river slope
RU2319806C2 (en) Method for bio-positive shore revetment
CN108411856B (en) Ecological restoration structure and method for river waste residue bank slope
KR20080000156A (en) Construction method of shore block
RU2319805C2 (en) Method for bio-positive spur dike erection
KR20080111706A (en) Plantable gabion for river bank and construction method thereof
CN210066626U (en) Coast Bidao system capable of resisting strong storm surge
Greenway et al. Engineered approaches for limiting erosion along sheltered shorelines: a review of existing methods
KR101001290B1 (en) Wood Pipe for growth plant life and Framework using thereof
CN111321700B (en) Overflowing energy dissipation type ecological bank protection method for anti-scouring and anti-landslide barrier plugs
KR200461490Y1 (en) Vegetation Mat
KR101367848B1 (en) System for accelerating salt removal by artificial water supply and method for accelerating salt using the same
CN109056784B (en) Construction method of stable gabion retaining wall
KR100381254B1 (en) Methode for construction of vegetative streambank of stream using trench
KR100306045B1 (en) Shore protection construction material for vegetation and construction method by using the same
KR100989662B1 (en) stone structure and this construction technique for bank protection
KR100696066B1 (en) Retaining wall for preventive corrosion
KR101684340B1 (en) Scour protection system for shore and its installation methods
KR100458721B1 (en) Vegetation bank protection structures well-matched in nature environment and constructing method thereof
CN212533934U (en) Be applied to ecological slope protection structure of mud flat
CN218842992U (en) Ecological slope protection structure for channel
KR102264637B1 (en) River bank Shore Erosion Prevention Structure Using Coated Biopolymer Porous on Concrete block, and Construction Method therefor
CN220827765U (en) Multistage combined ecological bank protection structure suitable for high steep side slope
KR100818759B1 (en) Slide protection of river slope
CN215912828U (en) Anti-flow-speed riverway side slope aquatic plant planting device

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
N231 Notification of change of applicant
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
N231 Notification of change of applicant
FPAY Annual fee payment

Payment date: 20130326

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20140326

Year of fee payment: 7

LAPS Lapse due to unpaid annual fee