KR100989662B1 - stone structure and this construction technique for bank protection - Google Patents

stone structure and this construction technique for bank protection Download PDF

Info

Publication number
KR100989662B1
KR100989662B1 KR1020080014258A KR20080014258A KR100989662B1 KR 100989662 B1 KR100989662 B1 KR 100989662B1 KR 1020080014258 A KR1020080014258 A KR 1020080014258A KR 20080014258 A KR20080014258 A KR 20080014258A KR 100989662 B1 KR100989662 B1 KR 100989662B1
Authority
KR
South Korea
Prior art keywords
stone
wires
eye
set anchor
protection
Prior art date
Application number
KR1020080014258A
Other languages
Korean (ko)
Other versions
KR20090088982A (en
Inventor
박용선
Original Assignee
대한이.이엔.씨(주)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 대한이.이엔.씨(주) filed Critical 대한이.이엔.씨(주)
Priority to KR1020080014258A priority Critical patent/KR100989662B1/en
Publication of KR20090088982A publication Critical patent/KR20090088982A/en
Application granted granted Critical
Publication of KR100989662B1 publication Critical patent/KR100989662B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/12Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
    • E02B3/122Flexible prefabricated covering elements, e.g. mats, strips
    • E02B3/123Flexible prefabricated covering elements, e.g. mats, strips mainly consisting of stone, concrete or similar stony material
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/11Hard structures, e.g. dams, dykes or breakwaters

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

본 발명은 하상, 고수, 호안 등 각 용도에 따라 자연석 또는 인조석으로 이루어진 석재를 세트 앵커 및 아이 너트로 고정하여, 호안 사면을 보호하도록 한 호안 보호용 석재 구조체 및 이의 시공방법을 제공하는데 그 목적이 있다. An object of the present invention is to provide a stone protection stone structure and a construction method for protecting the lake slope by fixing the stone made of natural stone or artificial stone according to each use, such as river bed, cilantro, lakes, etc. with a set anchor and eye nuts. .

상기한 목적을 달성하기 위한 본 발명에 따른 호안 보호용 석재 구조체는 자연석, 인조석, 또는 파쇄석으로 이루어지는 석재와; 상기 석재에 일정한 깊이 및 직경으로 삽입되는 세트 앵커와; 상기 세트 앵커에 나사 결합되는 아이 너트와; 상기 아이 너트에 다수 개가 고정 설치되는 와이어로 구성됨을 특징으로 한다.Stone protection stone structure according to the present invention for achieving the above object is a stone made of natural stone, artificial stone, or crushed stone; A set anchor inserted into the stone at a predetermined depth and diameter; An eye nut screwed to the set anchor; The eye nut is characterized in that composed of a plurality of wires are fixed.

또한, 상기한 목적을 달성하기 위한 본 발명에 따른 호안 보호용 석재 구조체 시공방법은 석재에 일정한 직경 및 깊이로 구멍을 천공하는 단계(Ⅰ); 상기 구멍에 세트 앵커를 박아 넣는 단계(Ⅱ); 상기 세트 앵커에 다수개의 와이어가 결합된 아이 너트를 체결하는 단계(Ⅲ); 상기 아이 너트가 체결된 석재를 호안사면에 접하도록 배치하는 단계(Ⅳ); 상기 단계(Ⅰ) 내지 단계(Ⅳ)를 수회 반복 실시하여 설치위치에 석재를 정리하는 단계(Ⅴ); 상기 각각의 석재의 아이 너트에 부착된 와이어를 4방향으로 펼친 후 각 와이어를 슬리브를 이용하여 상호 연결하는 단계(Ⅵ)로 이루어짐을 특징으로 한다.In addition, the stone protection construction method for constructing a shelter in accordance with the present invention for achieving the above object comprises the steps of drilling holes in the stone with a constant diameter and depth (I); Embedding a set anchor in the hole (II); Fastening an eye nut having a plurality of wires coupled to the set anchor (III); (IV) arranging the stone to which the eye nut is fastened to be in contact with the lake slope; Repeating the steps (I) to (IV) several times to arrange the stone at the installation position (V); The wires attached to the eye nuts of the respective stones are spread out in four directions, and the wires are connected to each other using a sleeve (VI).

호안 보호용 석재 구조체  Raft protection stone structure

Description

호안 보호용 석재 구조체 및 이의 시공방법{stone structure and this construction technique for bank protection}Stone structure and this construction technique for bank protection

본 발명은 호안 보호용 석재 구조체 및 이의 시공방법에 관한 것이다.The present invention relates to a stone protection stone structure and construction method thereof.

일반적으로 호안구조체는 홍수, 파도, 해일 침식 등으로 인해 무너지지 않게 해안·하천의 지반 표면을 적당한 재료로 덮어서 보호하는 구조물이다.In general, a shoreline structure is a structure that covers the ground surface of the coast and rivers with a suitable material so as not to collapse due to flooding, waves, and tsunami erosion.

여기서, 하천 호안은 비탈덮기공, 비탈고정공, 기초다짐공 등의 방법이 있다.Here, the river bank is a slope covering hole, slope fixing hole, foundation compaction method.

먼저, 상기 비탈덮기공은 물살에 따라서 잔디, 돌망태, 축댓돌, 콘크리트, 아스팔트 등으로 비탈면을 보호하는 공사이다.First, the slope covering is a construction that protects the slope with grass, gabions, shaft stones, concrete, asphalt, etc. according to the water current.

또한, 상기 비탈고정공은 말뚝, 토대목, 널말뚝 등으로 비탈면의 미끄럼을 방지하는 것이다.In addition, the slope fixed hole is to prevent the slip of the slope surface, such as piles, foundation timber, board piles.

그리고 상기 기초다짐공은 침상, 사석, 돌망태, 편비내, 콘크리트 이형 등으로 비탈면에 접한 강바닥을 다지는 공사이다.And the basic compaction is a work to stiffen the riverbed in contact with the slope surface, such as couch, sandstone, gabion, intestine, concrete release.

상기한 바와 같은 다양한 방법 중 비탈덮기공 공법은 자연석을 하나씩 아래에서 위로 채워가면서 빈 부위에 쇄석을 채워서 적층시키는 공법으로 전문용어로 돌붙임공이라 하고, 시공중 채우는 자연석 등이 빠지는 경우에는 그곳을 기점으로 하여, 적층된 자연석이 붕괴될 우려가 있다. Among the various methods as described above, the slope covering method is a method of filling natural stones one by one from the bottom up and filling them with crushed stone in the empty area, which is called a stone glue ball in terminology. As a starting point, there is a fear that the stacked natural stones will collapse.

특히, 이와 같은 적층식 비탈덮기공 공법은 안정하고 견고한 토목구조물을 시공할 수 없을 뿐만 아니라 시공중에 기 적층된 자연석이 붕괴되지 않도록 주의하면서 자연석을 적층시키지 않으면 안 되므로 시공상 치밀성이 요구되는 문제점이 있다. 더불어 환경이 강조되는 이 시기에 식물이 자랄 수 없을 뿐만 아니라 하천에서 살아가는 소생물의 생식기반이 사라질 수 있다.In particular, such a layered slope covering method is not only able to construct a stable and solid civil engineering structure, but also has to be laminated to natural stone while paying attention not to collapse the natural stone laminated during construction, which requires a dense construction. have. In addition, during this time of emphasis on the environment, not only can plants not grow, but the reproductive base of microbial species living in rivers can disappear.

이에, 본 발명은 상기한 바와 같은 제문제점을 해결하기 위해 안출된 것으로 기존의 돌붙임 공법보다는 구조적으로 우수하고 식물과 생물이 생존할 수 있는 공간을 제공하는 친환경 공법으로서, 하상, 고수 호안 등 각 용도에 따라 자연석 또는 인조석으로 이루어진 석재를 세트 앵커 및 아이 너트로 고정하여, 호안 사면을 보호하도록 한 호안 보호용 석재 구조체 및 이의 시공방법을 제공하는데 그 목적이 있다. Therefore, the present invention has been devised to solve the problems described above as an environmentally friendly method that is structurally superior to the existing stone method and provides a space for plants and organisms to survive, riverbed, coriander, etc. The purpose of the present invention is to provide a stone protection stone structure and a construction method thereof for fixing a stone made of natural stone or artificial stone with a set anchor and an eye nut to protect a slope of a lake.

상기한 목적을 달성하기 위한 본 발명에 따른 호안 보호용 석재 구조체는 자연석, 인조석, 또는 파쇄석으로 이루어지는 석재와; 상기 석재에 일정한 깊이 및 직경으로 삽입되는 세트 앵커와; 상기 세트 앵커에 나사 결합되는 아이 너트와; 상기 아이 너트에 다수 개가 고정 설치되는 와이어로 구성됨을 특징으로 한다.Stone protection stone structure according to the present invention for achieving the above object is a stone made of natural stone, artificial stone, or crushed stone; A set anchor inserted into the stone at a predetermined depth and diameter; An eye nut screwed to the set anchor; The eye nut is characterized in that composed of a plurality of wires are fixed.

또한, 상기한 목적을 달성하기 위한 본 발명에 따른 호안 보호용 석재 구조체 시공방법은 석재에 일정한 직경 및 깊이로 구멍을 천공하는 단계(Ⅰ); 상기 구멍에 세트 앵커를 박아 넣는 단계(Ⅱ); 상기 세트 앵커에 다수개의 와이어가 결합된 아이 너트를 체결하는 단계(Ⅲ); 상기 아이 너트가 체결된 석재를 호안사면에 접하도록 배치하는 단계(Ⅳ); 상기 단계(Ⅰ) 내지 단계(Ⅳ)를 수회 반복 실시하여 설치위치에 석재를 정리하는 단계(Ⅴ); 상기 각각의 석재의 아이 너트에 부착된 와이어를 4방향으로 펼친 후 각 와이어를 슬리브를 이용하여 상호 연결하는 단계(Ⅵ)로 이루어짐을 특징으로 한다.In addition, the stone protection construction method for constructing a shelter in accordance with the present invention for achieving the above object comprises the steps of drilling holes in the stone with a constant diameter and depth (I); Embedding a set anchor in the hole (II); Fastening an eye nut having a plurality of wires coupled to the set anchor (III); Disposing the stone to which the eye nut is fastened so as to be in contact with the rake slope (IV); Repeating the steps (I) to (IV) several times to arrange the stone at the installation position (V); The wires attached to the eye nuts of the respective stones are spread out in four directions, and the wires are connected to each other using a sleeve (VI).

이상에서 설명한 바와 같이, 본 발명에 따른 호안 보호용 석재 구조체 및 이의 시공방법은 다음과 같은 효과가 있다.As described above, the stone protection stone structure and construction method thereof according to the present invention has the following effects.

첫째, 본 발명은 구조체의 구성이 간단하여 시공이 간편한 장점이 있다.First, the present invention has the advantage that the construction of the structure is simple and easy construction.

둘째, 본 발명은 각각의 석재에 와이어가 결합된 아이 너트가 체결된 형태이므로 석재는 독립적으로 사면에 위치할 수 있음과 동시에 와이어에 의한 연결을 통해 전체적으로 하나의 석재 구조체로서 거동할 수 있는 장점이 있다.Second, the present invention is that the stone is coupled to the eye nut is coupled to each stone, so that the stone can be located on the slope independently and at the same time behaves as a single stone structure as a whole through the connection by the wire have.

셋째, 본 발명은 각각의 석재가 와이어에 의해 연결되어 있으므로 구조적인 안정성을 도모할 수 있는 장점이 있다.Third, the present invention has an advantage that can achieve structural stability because each stone is connected by a wire.

넷째, 본 발명은 시공 후 하나의 와이어가 끊어지더라도 전체적인 구조에 있어서는 별다른 영향이 없고 부분적인 보수 및 교체를 용이하게 할 수 있는 장점이 있다.Fourth, the present invention has the advantage that even if one wire is broken after construction, there is no effect on the overall structure and can facilitate partial repair and replacement.

다섯째, 본 발명은 기존의 공법에 비하여 돌, 흙, 식물로 구성된 친환경적인 공법으로 하천주변의 소생물의 생식기반을 제공하는데 크게 기여할 수 있다.Fifth, the present invention can greatly contribute to providing a reproductive base of the living organisms around the river in an environmentally friendly method consisting of stones, soil, plants compared to the existing method.

이하, 본 발명을 첨부한 예시도면을 참조하여 상세히 설명한다.Hereinafter, with reference to the accompanying drawings, the present invention will be described in detail.

도 1은 본 발명에 따른 호안 보호용 석재 구조체를 도시한 사시도이며, 도 2는 본 발명에 따른 호안 보호용 석재 구조체를 도시한 분리 사시도이다.1 is a perspective view showing a stone protection stone structure according to the present invention, Figure 2 is an exploded perspective view showing a stone protection stone structure according to the present invention.

이 도면에 도시된 바와 같이, 본 발명에 따른 호안 보호용 석재 구조체는 자연석, 인조석, 또는 파쇄석으로 이루어지는 석재(10)와; 상기 석재(10)에 일정한 깊이 및 직경으로 삽입되는 세트 앵커(20)와; 상기 세트 앵커(20)에 나사 결합되는 아이 너트(30)와; 상기 아이 너트(30)에 다수 개가 고정 설치되는 와이어(40)로 구성된다.As shown in this figure, the stone protection stone structure according to the present invention is a stone 10 made of natural stone, artificial stone, or crushed stone; A set anchor 20 inserted into the stone 10 at a predetermined depth and diameter; An eye nut (30) screwed to the set anchor (20); The eye nut 30 is composed of a plurality of wires 40 fixedly installed.

또한, 상기 와이어(40)간의 연결은 슬리브(50)를 매개로 연결된다.In addition, the connection between the wires 40 is connected via the sleeve (50).

즉, 본 발명에 따른 호안 보호용 석재 구조체는 석재(10) 1개당, 세트 앵커(20) 1개, 아이 너트(30) 1개 및 와이어(40) 4개 및 슬리브(50) 4개가 유기적으로 결합되어 이루어진 구조체이다.That is, the stone protection stone structure according to the present invention organically coupled to one stone 10, one set anchor 20, one eye nut 30 and four wires 40 and four sleeves 50 organically It is a structure made up of.

여기서, 상기 석재(10)는 자연석, 인조석 또는 암반 파쇄석 등을 사용한다.Here, the stone 10 uses natural stone, artificial stone or rock crushed stone.

또한, 상기 세트 앵커(20)는 외부로 잘 빠지지 않도록 앵커로서, 선단부가 석재(10)의 구멍(12) 내에서 벌어진 상태가 유지된다.In addition, the set anchor 20 is an anchor so as not to fall out to the outside, the state where the tip portion is opened in the hole 12 of the stone 10 is maintained.

그리고 상기 아이 너트(30)는 링형상의 두부와 하부의 내주면에 나사산이 형성된 구조로서, 하부가 세트 앵커(20)에 나사 결합된다. In addition, the eye nut 30 has a screw thread formed on an inner circumferential surface of a ring-shaped head and a lower portion thereof, and a lower portion thereof is screwed to the set anchor 20.

또한, 상기 와이어(40)는 일반적인 철선을 다수개의 가닥 꼬아 만든 것으로, 석재(10)들끼리를 연결하는데 사용한다.In addition, the wire 40 is made of a plurality of strands twisted common wire, it is used to connect the stones 10.

그리고 상기 슬리브(50)는 단위 석재 구조체(S)를 각각 연결하기 위해 사용되는 것으로 일측의 와이어(40)와 타측의 와이어(40)를 맞대놓고 속이 빈 원통형 상의 슬리브(50)를 끼워넣고 벤치로 압착시켜 와이어(40)를 연결한다.And the sleeve 50 is used to connect the unit stone structure (S), respectively, the wire 40 on one side and the other side of the wire 40, the hollow cylindrical sleeve 50 is inserted into the bench The wire 40 is connected by crimping.

상기한 바와 같은 구성으로 이루어진 본 발명에 따른 호안 보호용 석재 구조체의 시공에 대해 설명한다.It will be described for the construction of the raft protection stone structure according to the present invention having the configuration as described above.

도 3(a) 내지 3(e)은 본 발명에 따른 호안 보호용 석재 구조체를 시공하는 과정을 도시한 공정도이다.Figure 3 (a) to 3 (e) is a process chart showing a process of constructing a stone protection stone structure according to the present invention.

이들 도면에 도시된 바와 같이, 본 발명에 따른 호안 보호용 석재 구조체 시공방법은 석재(10)에 일정한 직경 및 깊이로 구멍(12)을 천공하는 단계(Ⅰ); 상기 구멍(12)에 세트 앵커(20)를 박아 넣는 단계(Ⅱ); 상기 세트 앵커(20)에 다수개의 와이어(40)가 결합된 아이 너트(30)를 체결하는 단계(Ⅲ); 상기 아이 너트(30)가 체결된 석재(10)를 호안사면에 접하도록 배치하는 단계(Ⅳ); 상기 단계(Ⅰ) 내지 단계(Ⅳ)를 수회 반복 실시하여 설치위치에 석재(10)를 정리하는 단계(Ⅴ); 상기 각각의 석재(10)의 아이 너트(30)에 부착된 와이어(40)를 4방향으로 펼친 후 각 와이어(40)를 슬리브(50)를 이용하여 상호 연결하는 단계(Ⅵ)로 이루어진다.As shown in these figures, the method for constructing a stone protection stone structure according to the present invention comprises the steps (I) for drilling a hole 12 in the stone 10 to a certain diameter and depth; Driving a set anchor (20) into the hole (12); Fastening an eye nut (30) having a plurality of wires (40) coupled to the set anchor (20); Disposing the stone (10) to which the eye nut (30) is fastened so as to be in contact with an inclined eye slope (IV); (V) arranging the stone 10 at the installation position by repeatedly performing the above steps (I) to (IV); After the wires 40 attached to the eye nuts 30 of the respective stones 10 are unfolded in four directions, the wires 40 are connected to each other by using the sleeve 50.

또한, 상기 와이어(40)를 상호 연결한 후 석재(10)와 석재(10) 사이에 토사를 20∼30㎝ 두께로 복토하는 단계(Ⅶ)를 추가한다.In addition, after the wires 40 are interconnected, a step (Ⅶ) of covering the earth and sand to a thickness of 20 to 30 cm between the stone 10 and the stone 10 is added.

그리고 상기 복토 후, 식물종자를 파종하거나 또는 식물을 식재하는 단계 (Ⅷ)를 추가한다. 이를 통해 최종적으로 돌과 흙과 식물이 어우러져 자연스러운 호안사면 경관이 연출될 수 있다.And after the cover, sowing plant seeds or planting the plant (iii) is added. Through this, stones, soil, and plants can finally be combined to create a natural landscape of slopes.

즉, 본 발명에 따른 호안 보호용 석재 구조체 시공방법은 석재(10) 저면에 세트 앵커(20)를 설치하기 위한 천공을 하고, 상기 구멍에 세트 앵커(20)를 설치한 후, 철재 와이어(40)가 결합된 아이 너트(30)를 세트 앵커(20)에 체결한 후, 상기 와이어(40)가 결합된 석재(10) 저면이 호안사면에 접하도록 석재(10)를 배치한 후, 상기와 같은 과정을 반복하여 설치 위치에 석재(10)를 정리한 후, 각각의 석재(10)에 설치된 아이 너트(30)의 와이어(40)를 4방향으로 펼친 후 슬리브(50)를 이용하여 인접 석재(10)에 있는 와이어(40)들과 연결한 후, 석재(10) 사이에 토사를 20∼30㎝가량의 두께로 복토하여 자연스러운 하천경관을 조성한 후, 복토된 부분에 인위적으로 식물종자를 파종하거나 식물을 식재하여 자연적인 식생 활착에 의해 수려한 하천경관을 창출한다. That is, in the stone protection construction method for constructing the protection method according to the present invention, after drilling to install the set anchor 20 on the bottom surface of the stone 10, and install the set anchor 20 in the hole, the steel wire 40 After fastening the eye nut 30 is coupled to the set anchor 20, the stone 10 is coupled to the bottom surface of the stone 10 coupled to the wire 40 is placed in contact with the recliner slope, as described above After repeating the process to arrange the stone 10 in the installation position, the wire 40 of the eye nut 30 installed in each stone 10 is unfolded in four directions, and then adjacent stone using the sleeve 50 ( 10) after connecting with the wires 40 in the soil, the soil between the stone 10 to a thickness of about 20 ~ 30cm to form a natural river landscape, and then artificially sowing plant seeds in the covered portion Planting plants creates beautiful river views by natural vegetation.

상기한 바와 같은 구성 및 시공으로 이루어지는 본 발명에 따른 호안 보호용 석재 구조체 및 이의 시공방법은 구성이 간단하여 시공이 간편하고, 각각의 석재(10)에 와이어(40)가 결합된 아이 너트(30)가 체결된 형태이므로 석재(10)는 독립적으로 사면에 위치할 수 있음과 동시에 와이어(40)에 의한 연결을 통해 전체적으로 하나의 석재 구조체(S)로서 거동이 가능하며, 각 석재가 와이어(40)에 의해 연결되어 있으므로 구조적인 안정성을 도모할 수 있으며, 특히 하나의 와이어(40)가 끊어지더라도 전체적인 구조에 있어서는 별다른 영향이 없고 부분적인 보수 및 교체가 용이한 작용효과가 있다.The relief protection stone structure and construction method thereof according to the present invention made of a configuration and construction as described above is simple in construction and easy construction, the eye nut 30 is coupled to the wire 40 to each stone 10 Since the shape of the fastened stone 10 can be independently located on the slope and at the same time through the connection by the wire 40 is possible to act as a single stone structure (S) as a whole, each stone wire 40 Since it is connected by the structural stability can be achieved, in particular, even if one wire 40 is broken, there is no effect on the overall structure and there is an effect that the partial repair and replacement is easy.

도 1은 본 발명에 따른 호안 보호용 석재 구조체를 도시한 사시도,1 is a perspective view showing a stone protection stone structure according to the present invention,

도 2는 본 발명에 따른 호안 보호용 석재 구조체를 도시한 분리 사시도,Figure 2 is an exploded perspective view showing a stone protection stone structure according to the present invention,

도 3(a) 내지 3(d)은 본 발명에 따른 호안 보호용 석재 구조체를 시공하는 과정을 도시한 공정도.Figure 3 (a) to 3 (d) is a process chart showing a process of constructing a stone protection stone structure according to the present invention.

-도면의 주요부분에 대한 부호의 설명-Explanation of symbols on the main parts of the drawing

10: 석재 12: 구멍10: stone 12: hole

20: 세트 앵커 30: 아이 너트20: set anchor 30: eye nut

40: 와이어 50: 슬리브40: wire 50: sleeve

S: 석재 구조체S: stone structure

Claims (5)

삭제delete 삭제delete 자연석, 인조석, 또는 파쇄석으로 이루어지는 석재(10)에 일정한 직경 및 깊이로 구멍(12)을 천공하는 단계(Ⅰ);Perforating the hole 12 to a predetermined diameter and depth in the stone 10 made of natural stone, artificial stone, or crushed stone (I); 상기 구멍(12)에 외부로 잘 빠지지 않도록 선단부가 벌어진 상태가 유지되는 세트 앵커(20)를 박아 넣는 단계(Ⅱ);Injecting a set anchor (20) into which the leading end portion is opened so as not to fall out into the hole (12) well; 상기 세트 앵커(20)에 철선을 다수개의 가닥으로 꼬아 만든 와이어(40)가 결합됨과 동시에 링형상의 두부와 하부의 내주면에 나사산이 형성된 아이 너트(30)를 체결하는 단계(Ⅲ);(III) fastening the wire nut (40) coupled to the set anchor (20) by twisting the wire into a plurality of strands and simultaneously threading an eye nut (30) formed on the inner peripheral surface of the ring-shaped head and the lower portion (III); 상기 아이 너트(30)가 체결된 석재(10)를 호안사면에 접하도록 배치하는 단계(Ⅳ);Disposing the stone (10) to which the eye nut (30) is fastened so as to be in contact with an inclined eye slope (IV); 상기 단계(Ⅰ) 내지 단계(Ⅳ)를 수회 반복 실시하여 설치위치에 석재(10)를 정리하는 단계(Ⅴ);(V) arranging the stone 10 at the installation position by repeatedly performing the above steps (I) to (IV); 상기 각각의 석재(10)의 아이 너트(30)에 부착된 와이어(40)를 4방향으로 펼친 후 각 와이어(40)를 속이 빈 원통형상의 슬리브(50)를 이용하여 상호 연결하는 단계(Ⅵ); After spreading the wires 40 attached to the eye nuts 30 of the respective stones 10 in four directions, interconnecting the wires 40 using hollow cylindrical sleeves 50 (VI). ; 상기 와이어(40)를 상호 연결한 후 석재(10)와 석재(10) 사이에 20∼30㎝ 두께로 토사를 복토하는 단계(Ⅶ); 상기 복토 후, 식물종자를 파종하거나 또는 식물을 식재하는 단계(Ⅷ)로 이루어짐을 특징으로 하는 호안 보호용 석재 구조체 시공방법. Covering the earth and sand to a thickness of 20 to 30 cm between the stone 10 and the stone 10 after interconnecting the wires 40; After the cover, sowing plant seeds or planting the plant (Ⅷ) comprising the step of (b) protective stone construction method for constructing. 삭제delete 삭제delete
KR1020080014258A 2008-02-18 2008-02-18 stone structure and this construction technique for bank protection KR100989662B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020080014258A KR100989662B1 (en) 2008-02-18 2008-02-18 stone structure and this construction technique for bank protection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020080014258A KR100989662B1 (en) 2008-02-18 2008-02-18 stone structure and this construction technique for bank protection

Publications (2)

Publication Number Publication Date
KR20090088982A KR20090088982A (en) 2009-08-21
KR100989662B1 true KR100989662B1 (en) 2010-10-26

Family

ID=41207359

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020080014258A KR100989662B1 (en) 2008-02-18 2008-02-18 stone structure and this construction technique for bank protection

Country Status (1)

Country Link
KR (1) KR100989662B1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101045150B1 (en) * 2010-09-13 2011-06-30 길도영 Retaining wall structure using stones and method thereof
KR102147407B1 (en) * 2019-12-30 2020-08-24 곽철우 Connecting device for underwater facilities

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0358521U (en) * 1989-10-12 1991-06-07
KR200346218Y1 (en) * 2003-12-23 2004-03-30 주식회사 덕원 The thing device which tightens a wire rope of falling rock prevention pence
KR20060023830A (en) * 2004-09-10 2006-03-15 레인보우스케이프주식회사 Structure of protecting bank using natural stone and method of loading

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0358521U (en) * 1989-10-12 1991-06-07
KR200346218Y1 (en) * 2003-12-23 2004-03-30 주식회사 덕원 The thing device which tightens a wire rope of falling rock prevention pence
KR20060023830A (en) * 2004-09-10 2006-03-15 레인보우스케이프주식회사 Structure of protecting bank using natural stone and method of loading

Also Published As

Publication number Publication date
KR20090088982A (en) 2009-08-21

Similar Documents

Publication Publication Date Title
KR100818758B1 (en) Structure for establish mat of river slope
US11459721B2 (en) Erosion control apparatus
US11492771B2 (en) Erosion control apparatus
US11306454B2 (en) Erosion control apparatus
CN102677682A (en) Ecological slope protection structure and construction method thereof
KR200401866Y1 (en) Gabion Block
US20230265625A9 (en) Erosion control apparatus
KR100989662B1 (en) stone structure and this construction technique for bank protection
CN108755592A (en) In situ for hard slope formula shore protection plants raw formula ecology reconstruction structure and method
CN105756015B (en) Method for restoring biodiversity dynamic landscape ecological composite system
CN208280089U (en) A kind of gardens ecological river bank revetment structure
US11306455B2 (en) Erosion control apparatus
CN211898175U (en) Ecological protection structure of river course bank slope
KR100884017B1 (en) Method of Constructing Bank Walls with Recovering Natural Environment
CN114737521A (en) Green environment-friendly ecological slope protection structure and construction method thereof
KR100631385B1 (en) construction method of nature embankment
CN113338312A (en) Ecological bank protection structure of coconut palm soil bag
KR100381254B1 (en) Methode for construction of vegetative streambank of stream using trench
KR100306045B1 (en) Shore protection construction material for vegetation and construction method by using the same
CN202610810U (en) Ecological slope protection structure
KR100862209B1 (en) Construction method of shallow water revetment using square coir
CN210827307U (en) Ecological bank protection of garden design
CN211498717U (en) A campshed supporting construction for reducing ecological revetment of soil erosion and water loss
RU2437277C1 (en) Device to fix root system of trees
KR200370059Y1 (en) Structure for revetment protection

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
AMND Amendment
E601 Decision to refuse application
AMND Amendment
J201 Request for trial against refusal decision
B701 Decision to grant
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130911

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20141013

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20151013

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20160922

Year of fee payment: 7

LAPS Lapse due to unpaid annual fee